CN103822088A - Dry air filling system for transformer lifting base and dry air filling method - Google Patents

Dry air filling system for transformer lifting base and dry air filling method Download PDF

Info

Publication number
CN103822088A
CN103822088A CN201410080255.3A CN201410080255A CN103822088A CN 103822088 A CN103822088 A CN 103822088A CN 201410080255 A CN201410080255 A CN 201410080255A CN 103822088 A CN103822088 A CN 103822088A
Authority
CN
China
Prior art keywords
dry air
tank
power transformer
silica gel
transformer enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410080255.3A
Other languages
Chinese (zh)
Inventor
康宏彪
王在勇
王秀花
白峰君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dachi Electric Co Ltd
Original Assignee
Shandong Dachi Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dachi Electric Co Ltd filed Critical Shandong Dachi Electric Co Ltd
Priority to CN201410080255.3A priority Critical patent/CN103822088A/en
Publication of CN103822088A publication Critical patent/CN103822088A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention relates to a transformer, particularly to a dry air filling system for a transformer lifting base, which includes a dry air tank, a silica gel tank and a transformer oil tank, wherein the dry air tank, the silica gel tank and the transformer oil tank are connected in sequence; the upper outlet of the dry air tank and the lower inlet of the silica gel tank, as well as the upper outlet of the silica gel tank and the lower inlet of the transformer oil tank are connected through a pipeline respectively, and an outlet pipeline is connected with the upper outlet of the transformer oil tank. The using steps of the dry air filling system for the transformer lifting base are as follows: firstly, vacuumizing the transformer lifting base with a vacuum machine; secondly, connecting the outlet pipe onto a pipe bank valve; thirdly, opening an outlet valve and the pipe bank valve simultaneously and slowly; lastly, shutting the pipe bank valve and dismounting the outlet pipeline when the inner pressure of the lifting base reaches 0.02 to 0.03 MPa. According to the invention, the structure is simple, the operation is convenient, product quality of transformers is obviously improved, besides, the transportation cost is saved; furthermore, the safety factor is increased and pollutant emission is reduced.

Description

Power transformer enclosure fills dry air system and fills the method for dry air
(1) technical field
The present invention relates to field transformer, particularly a kind of power transformer enclosure fills dry air system and utilizes this system to fill the method for dry air.
(2) background technique
Present stage, the transportation of power transformer enclosure band oil, behind erecting bed, user will carry out verification to the mutual inductor of power transformer enclosure inside, and the seat that raises just can complete verification after will draining the oil, and field requirement has the oil tank that stores transformer oil, can cause environmental pollution otherwise drain the oil, and transformer oil in power transformer enclosure belongs to article of consumption, virtually increases product cost.A general 220kV transformer has 8 seats that raise, and consumes nearly 2 tons of transformer oil.
(3) summary of the invention
The present invention, in order to make up the defect of prior art, provides a kind of safe, fuel-efficient power transformer enclosure to fill dry air system and has utilized this system to fill the method for dry air.
The present invention is achieved through the following technical solutions:
A kind of power transformer enclosure fills dry air system, it is characterized in that: comprise the dry air tank, silica gel tank and the transformer oil tank that connect successively, wherein the upper outlet of dry air tank is connected by pipeline respectively with the lower inlet of transformer oil tank with the lower inlet of silica gel tank, the upper outlet of silica gel tank, and the upper outlet of described transformer oil tank is connected with export pipeline.
The method of utilizing power transformer enclosure described in claim 1 to fill dry air system to fill dry air, is characterized in that, comprises the following steps:
1) first with vacuum machine, power transformer enclosure is vacuumized, after degree of vacuum reaches below negative pressure 133pa, close the union valve on power transformer enclosure;
2) export pipeline on transformer oil tank is connected on the union valve on power transformer enclosure;
3) slowly open the outlet valve of dry air tank, slowly open the union valve of power transformer enclosure simultaneously;
4) pressure gauge of observation power transformer enclosure, in the time that power transformer enclosure internal pressure reaches 0.02~0.03MPa, ambient atmosphere is pressed with malleation relatively, avoids air to enter power transformer enclosure, now closes union valve, pulls down export pipeline.
The invention has the beneficial effects as follows:
This invention is simple in structure, easy to operate, can obviously improve power transformer product quality.The mutual inductor rising seat of 220kV and above high-power transformer, adopts and fills dry air transportation, significantly saves product cost in alleviating hauled weight.Contrast oil-filled rising seat, scene does not need special oil storage tank, saves transformer oil cost; Contrast inflated with nitrogen rising seat, safety when field unloading presses gas, needn't worry the asphyxiation hazard of nitrogen to people.
(4) accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Fig. 1 is working principle schematic diagram of the present invention.
In figure, 1 dry air tank, 2 silica gel tanks, 3 transformer oil tanks, 4 pipelines, 5 export pipelines, 6 power transformer enclosures, 7 union valves, 8 outlet valves.
(5) embodiment
Accompanying drawing is specific embodiments of the invention.As shown in Figure 1, this kind of power transformer enclosure fills dry air system, comprise the dry air tank 1, silica gel tank 2 and the transformer oil tank 3 that connect successively, wherein the upper outlet of dry air tank 1 is connected by pipeline 4 respectively with lower inlet, the upper outlet of silica gel tank 2 and the lower inlet of transformer oil tank 3 of silica gel tank 2, and the upper outlet of transformer oil tank 3 is connected with export pipeline 5.
Utilize above-mentioned power transformer enclosure to fill the step that dry air system fills dry air to power transformer enclosure as follows:
1) be first connected on the union valve 7 of power transformer enclosure 6 power transformer enclosure 6 is vacuumized with vacuum machine, after degree of vacuum reaches below negative pressure 133pa, close the union valve 7 on power transformer enclosure 6;
2) export pipeline on transformer oil tank 35 is connected on the union valve 7 on power transformer enclosure 6;
3) slowly open the outlet valve 8 of dry air tank 1, slowly open the union valve 7 of power transformer enclosure 6 simultaneously; Taking slowly to open, be because there is the air pressure of 0.06~0.1MPa dry air tank 1 inside, and power transformer enclosure 6 inside is the negative pressure of vacuum of 133Pa.Once open fast, huge air-flow may cause damage to mutual inductor and the secondary connection thereof of power transformer enclosure 6 inside.
4) pressure gauge of observation power transformer enclosure 6, in the time that power transformer enclosure 6 internal pressures reach 0.02~0.03MPa, ambient atmosphere is pressed with malleation relatively, avoid air to enter power transformer enclosure 6, now close union valve 7, the work of rushing dry air of pulling down 5, one power transformer enclosures 6 of export pipeline completes.
5) continue next power transformer enclosure 6 to fill dry air according to same method, a general 220kV transformer has 8 power transformer enclosures 6.
The substitute the bad for the good power transformer enclosure 6 of dry air, can deliver, and during to onsite user's verification internal mutual sensor, opens union valve 7 release pressures.Power transformer enclosure 6 after having inspected is installed in transformer body, with transformer oiling.
Except technical characteristics described in specification, all the other technical characteristicss are those skilled in the art's known technology.

Claims (2)

1. a power transformer enclosure fills dry air system, it is characterized in that: comprise the dry air tank (1), silica gel tank (2) and the transformer oil tank (3) that connect successively, wherein the upper outlet of the upper outlet of dry air tank (1) and the lower inlet of silica gel tank (2), silica gel tank (2) and the lower inlet of transformer oil tank (3) are connected by pipeline (4) respectively, and the upper outlet of described transformer oil tank (3) is connected with export pipeline (5).
2. the method for utilizing power transformer enclosure described in claim 1 to fill dry air system to fill dry air, is characterized in that, comprises the following steps:
1) first with vacuum machine, power transformer enclosure is vacuumized, after degree of vacuum reaches below negative pressure 133pa, close the union valve on power transformer enclosure;
2) export pipeline on transformer oil tank is connected on the union valve on power transformer enclosure;
3) slowly open the outlet valve of dry air tank, slowly open the union valve of power transformer enclosure simultaneously;
4) pressure gauge of observation power transformer enclosure, in the time that power transformer enclosure internal pressure reaches 0.02~0.03MPa, ambient atmosphere is pressed with malleation relatively, avoids air to enter power transformer enclosure, now closes union valve, pulls down export pipeline.
CN201410080255.3A 2014-03-06 2014-03-06 Dry air filling system for transformer lifting base and dry air filling method Pending CN103822088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410080255.3A CN103822088A (en) 2014-03-06 2014-03-06 Dry air filling system for transformer lifting base and dry air filling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410080255.3A CN103822088A (en) 2014-03-06 2014-03-06 Dry air filling system for transformer lifting base and dry air filling method

Publications (1)

Publication Number Publication Date
CN103822088A true CN103822088A (en) 2014-05-28

Family

ID=50757290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410080255.3A Pending CN103822088A (en) 2014-03-06 2014-03-06 Dry air filling system for transformer lifting base and dry air filling method

Country Status (1)

Country Link
CN (1) CN103822088A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106098317A (en) * 2016-07-12 2016-11-09 无锡市华东电力设备有限公司 Charging dry air into transformer at negative pressure method and device thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6426097A (en) * 1987-07-17 1989-01-27 Kyodo Sanso Method for charging xenon gas into high pressure vessel
CN201402712Y (en) * 2009-04-27 2010-02-10 焦作万方铝业股份有限公司 Transformer breather
CN201672244U (en) * 2010-06-01 2010-12-15 沈阳大型电力变压器维修有限公司 Evacuation nitrogen filling or gas filling device specialized for finned radiator and cooler
CN202327636U (en) * 2011-11-10 2012-07-11 保定天威集团有限公司 Air charging system of transformer product
CN202884465U (en) * 2012-11-06 2013-04-17 保定天威集团有限公司 Transformer mutual inductor ascending flanged base storage and transportation structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6426097A (en) * 1987-07-17 1989-01-27 Kyodo Sanso Method for charging xenon gas into high pressure vessel
CN201402712Y (en) * 2009-04-27 2010-02-10 焦作万方铝业股份有限公司 Transformer breather
CN201672244U (en) * 2010-06-01 2010-12-15 沈阳大型电力变压器维修有限公司 Evacuation nitrogen filling or gas filling device specialized for finned radiator and cooler
CN202327636U (en) * 2011-11-10 2012-07-11 保定天威集团有限公司 Air charging system of transformer product
CN202884465U (en) * 2012-11-06 2013-04-17 保定天威集团有限公司 Transformer mutual inductor ascending flanged base storage and transportation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106098317A (en) * 2016-07-12 2016-11-09 无锡市华东电力设备有限公司 Charging dry air into transformer at negative pressure method and device thereof

Similar Documents

Publication Publication Date Title
CN101931175B (en) Method for replacing accessory of large transformer without discharging oil by vacuum oil extraction
CN204387679U (en) Four-wire system refueling system
WO2020133778A1 (en) Fatigue testing system for liquefied petroleum gas cylinder and testing method for fatigue testing system
CN207750726U (en) Gas drive pumps the hydrogenation system in skid hydrogenation plant
CN103822088A (en) Dry air filling system for transformer lifting base and dry air filling method
CN203443755U (en) Seal leakage test device for oil-immersed transformer
CN105004494A (en) Oil tank car oil gas recovery system sealing performance detection platform and detection method
CN103646754A (en) Method and device for vacuum oil filling of transformer
CN103033390B (en) Device for testing negative pressure shock resistance and pulse pressure resistance of water heater
CN206290968U (en) Refueling system is compressed without caisson mark mother station
CN203745155U (en) Fuel tank comprehensive leakage detection platform
CN201787326U (en) Automatic transformer charging device
CN202434296U (en) Onsite vacuum oil-changing system of transformer
CN206038245U (en) Battery package gas tightness test regulator
CN201444433U (en) Oil storage tank of oil immersed transformer
CN204666318U (en) A kind of vehicle gas leak detection device
CN203617078U (en) Vacuum oiling device of transformer
CN202884465U (en) Transformer mutual inductor ascending flanged base storage and transportation structure
CN204459758U (en) Without station gas storage system piston type compressed natural gas standard station
CN204187267U (en) A kind of hydraulic pressure aerating type bundled tube shipping container
CN203895812U (en) Integrated apparatus of oil drain nitrogen filling, vacuum-pumping nitrogen filling and vacuum-pumping of main transformer
CN205211543U (en) Novel oil pressure leak test structure
CN113125086A (en) Breather valve test bed for improving test efficiency and test method
CN202382910U (en) Device for testing air tightness of ship tanks
CN208222056U (en) A kind of fill of liquid oxygen device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140528