CN103821525B - 高水位地质条件下电缆隧道快速施工方法 - Google Patents

高水位地质条件下电缆隧道快速施工方法 Download PDF

Info

Publication number
CN103821525B
CN103821525B CN201410084791.0A CN201410084791A CN103821525B CN 103821525 B CN103821525 B CN 103821525B CN 201410084791 A CN201410084791 A CN 201410084791A CN 103821525 B CN103821525 B CN 103821525B
Authority
CN
China
Prior art keywords
stone
cable tunnel
water level
tunnel
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410084791.0A
Other languages
English (en)
Other versions
CN103821525A (zh
Inventor
李建廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201410084791.0A priority Critical patent/CN103821525B/zh
Publication of CN103821525A publication Critical patent/CN103821525A/zh
Application granted granted Critical
Publication of CN103821525B publication Critical patent/CN103821525B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明属于电缆隧道施工领域,具体是一种高水位地质条件下电缆隧道快速施工方法。对于该高水位地址条件下的电缆隧道首先分段,在分段的区域内,首先挖一个集水坑,进行集中排水,使得水位降低到合适的水平;在分段区域内按照施工图纸,开挖电缆隧道,开挖深度币正常电缆隧道深1米;在开挖的隧道内首先填入一层大块石头,要使得石头之间的缝隙能够满足排水,然后在大块石头的上层填入一层小块石头,小块石头不堵塞大块石头之间的排水缝隙,在小块石头的上层填入碎石子与石粉混合料,在碎石子与石粉混合料上层用水泥打一层垫层,保持从大石头层到垫层的厚度总和为1米,垫层凝固后开始常规隧道施工。

Description

高水位地质条件下电缆隧道快速施工方法
技术领域
本发明属于电缆隧道施工领域,具体是一种高水位地质条件下电缆隧道快速施工方法。
背景技术
通常情况下对于高地下水位地质条件下的电缆隧道施工,需要多出打深水井进行降水位,然后开始修建排水水渠,在排水水渠上再开始常规隧道施工,这种方法速度慢,不利于快速施工。
发明内容
本发明所要解决的技术问题是:如何解决高地下水位地质条件下的电缆隧道施工成本高,施工慢的问题。
本发明所采用的技术方案是:高水位地质条件下电缆隧道快速施工方法,按照如下的步骤进行:
步骤一,对于该高水位地址条件下的电缆隧道首先分段,在分段的区域内,首先挖一个集水坑,进行集中排水,使得水位降低到合适的水平;
步骤二,在分段区域内按照施工图纸,开挖电缆隧道,开挖深度币正常电缆隧道深1米;
步骤三,在开挖的隧道内首先填入一层大块石头,要使得石头之间的缝隙能够满足排水,然后在大块石头的上层填入一层小块石头,小块石头不堵塞大块石头之间的排水缝隙,在小块石头的上层填入碎石子与石粉混合料,在碎石子与石粉混合料上层用水泥打一层垫层,保持从大石头层到垫层的厚度总和为1米,垫层凝固后开始常规隧道施工。
本发明的有益效果是:本发明使用无需打井、分段排水、控制水位的方法解决了地下水位高对电缆隧道施工工期与施工质量的影响,操作简便、节省成本投资、施工周期大幅缩短。
附图说明
图1是本实用新型的示意图;
其中,1、大块石头层,2、小块石头层,3、碎石子与石粉混合料层,4、集水坑,5、水泵,6、垫层。
具体实施方式
如图1所示,本发明用于高水位地质条件下电缆隧道快速施工,施工过程,首先选择施工的任一段区域,在这段区域内,开挖一个集水坑用水泵进行排水,然后在分段区域内按照施工图纸,开挖电缆隧道,开挖深度比正常电缆隧道深1米,最后在开挖的隧道内首先填入一层大块石头,要使得石头之间的缝隙能够满足排水,然后在大块石头的上层填入一层小块石头,小块石头不堵塞大块石头之间的排水缝隙,在小块石头的上层填入碎石子与石粉混合料,在碎石子与石粉混合料上层用水泥打一层垫层,保持从大石头层到垫层的厚度总和为1米,垫层凝固后开始常规隧道施工,施工完这段后,在与其相邻的另一端可以直接施工,而无需排水,水直接从上一段的集水坑中排出,这样,依次开挖隧道,速度大大的提高。

Claims (1)

1.高水位地质条件下电缆隧道快速施工方法,其特征在于按照如下的步骤进行:
步骤一,对于该高水位地址条件下的电缆隧道首先分段,在分段的区域内,首先挖一个集水坑,进行集中排水,使得水位降低到合适的水平;
步骤二,在分段区域内按照施工图纸,开挖电缆隧道,开挖深度比正常电缆隧道深1米;
步骤三,在开挖的隧道内首先填入一层大块石头,要使得石头之间的缝隙能够满足排水,然后在大块石头的上层填入一层小块石头,小块石头不堵塞大块石头之间的排水缝隙,在小块石头的上层填入碎石子与石粉混合料,在碎石子与石粉混合料上层用水泥打一层垫层,保持从大石头层到垫层的厚度总和为1米,垫层凝固后开始常规隧道施工。
CN201410084791.0A 2014-03-10 2014-03-10 高水位地质条件下电缆隧道快速施工方法 Active CN103821525B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410084791.0A CN103821525B (zh) 2014-03-10 2014-03-10 高水位地质条件下电缆隧道快速施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410084791.0A CN103821525B (zh) 2014-03-10 2014-03-10 高水位地质条件下电缆隧道快速施工方法

Publications (2)

Publication Number Publication Date
CN103821525A CN103821525A (zh) 2014-05-28
CN103821525B true CN103821525B (zh) 2015-10-28

Family

ID=50756787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410084791.0A Active CN103821525B (zh) 2014-03-10 2014-03-10 高水位地质条件下电缆隧道快速施工方法

Country Status (1)

Country Link
CN (1) CN103821525B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978679A (zh) * 2018-07-04 2018-12-11 山西太钢不锈钢股份有限公司 一种电缆隧道在高水位区域施工的方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1044839A (zh) * 1988-09-21 1990-08-22 陈昭桐 地下建筑物渗排水方法
CN1158938A (zh) * 1996-08-02 1997-09-10 北京市地下铁道建设公司 一种地下铁道排水施工方法
CN2667759Y (zh) * 2003-11-03 2004-12-29 刘鹏 一种防火电缆隧道
CN201391337Y (zh) * 2009-04-07 2010-01-27 胡贵民 电缆隧道自动排水系统
CN101725369A (zh) * 2008-10-16 2010-06-09 牡丹江电业局 电缆隧道自动排水系统
CN201620914U (zh) * 2010-01-13 2010-11-03 煤炭工业济南设计研究院有限公司 仿心脏结构煤矿排水系统
CN103306683A (zh) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 一种开挖深埋隧道时洞内综合降水的施工方法
CN203429767U (zh) * 2013-09-22 2014-02-12 国家电网公司 电缆井远程监控自动排水系统

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1044839A (zh) * 1988-09-21 1990-08-22 陈昭桐 地下建筑物渗排水方法
CN1158938A (zh) * 1996-08-02 1997-09-10 北京市地下铁道建设公司 一种地下铁道排水施工方法
CN2667759Y (zh) * 2003-11-03 2004-12-29 刘鹏 一种防火电缆隧道
CN101725369A (zh) * 2008-10-16 2010-06-09 牡丹江电业局 电缆隧道自动排水系统
CN201391337Y (zh) * 2009-04-07 2010-01-27 胡贵民 电缆隧道自动排水系统
CN201620914U (zh) * 2010-01-13 2010-11-03 煤炭工业济南设计研究院有限公司 仿心脏结构煤矿排水系统
CN103306683A (zh) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 一种开挖深埋隧道时洞内综合降水的施工方法
CN203429767U (zh) * 2013-09-22 2014-02-12 国家电网公司 电缆井远程监控自动排水系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
新江湾城电力电缆隧道设计;薛丽伟等;《上海电力》;20060710(第3期);全文 *
长沙地区砂卵石地层的基坑降水设计与施工技术探讨;向晓辉;《铁道建筑技术》;20120720(第7期);全文 *

Also Published As

Publication number Publication date
CN103821525A (zh) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN103924987B (zh) 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN205260041U (zh) 一种水平旋喷冻结法支护结构
CN205012284U (zh) 建于覆盖层上的大坝坝基防渗结构
CN204371365U (zh) 深孔止水注浆系统
CN204435430U (zh) 一种适用于上游式尾矿库的反向排渗系统及上游式尾矿库
CN105569062A (zh) 渗透弱化减排降水法
CN205742299U (zh) 一种超浅埋盾构法隧道的抗浮结构
CN103821525B (zh) 高水位地质条件下电缆隧道快速施工方法
CN202132053U (zh) Ⅵ级围岩双线隧道衬砌支护结构
CN204551481U (zh) 用于软土地层加固的分段注浆管
CN104294806B (zh) 一种深基坑隔水层上方桩间水开挖引排方法
CN203960941U (zh) 一种承压水取水井
CN104179506B (zh) 一种盾构结泥饼的处理方法
CN102720176A (zh) 一种地基加固处理方法
CN104929129A (zh) 无盖重结合异孔引管混凝土盖重固结灌浆方法
CN102425156A (zh) 变截面地下连续墙及其施工方法
CN204212168U (zh) 一种利用溶洞联合筑坝的大坝挡水结构
CN104895117B (zh) Gxj钢橡胶止水带接头箱侧向剥离装置及其施工方法
CN208152063U (zh) 一种超高渗透系数砂卵地层地下水控制系统
CN207672587U (zh) 一种基岩面地下压力涌水的疏导结构
CN206942777U (zh) 一种隧道进洞结构
CN204040022U (zh) 灌注桩冲裂结构
CN110185051A (zh) 深窄基坑开挖施工排水方法
CN108265703A (zh) 一种用于薄壁连续墙无缝成槽机的刀具装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant