CN103821134B - A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon - Google Patents

A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon Download PDF

Info

Publication number
CN103821134B
CN103821134B CN201410066135.8A CN201410066135A CN103821134B CN 103821134 B CN103821134 B CN 103821134B CN 201410066135 A CN201410066135 A CN 201410066135A CN 103821134 B CN103821134 B CN 103821134B
Authority
CN
China
Prior art keywords
draining board
plastic draining
sheet metal
iron wire
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410066135.8A
Other languages
Chinese (zh)
Other versions
CN103821134A (en
Inventor
彭典华
黄涛
杨放仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN201410066135.8A priority Critical patent/CN103821134B/en
Publication of CN103821134A publication Critical patent/CN103821134A/en
Application granted granted Critical
Publication of CN103821134B publication Critical patent/CN103821134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon.A kind of method solving seriously to rewind during plastic draining board sets, its step is as follows: " u "-shaped iron wire (3) is tightened through two circular holes (2) on sheet metal (1) twisting, plastic draining (4) passes when setting plastic draining board the length of " u "-shaped iron wire (3) more than inflection 150mm, and the plastic draining board (4) of inflection is filled in insertion and is intubated in (5) and strain by operator.Its advantage is: can meeting plastic draining board and set prescription, what improve again plastic draining board sets efficiency, and when plastic draining board is inserted to relatively Soft Soil Layer, steel plate hard-pressed bale intubates bottom, not easily occurs into mud plugging phenomenon;When being inserted to harder sandy soils, there is steel plate protection draining board, disconnected plate phenomenon not easily occurs, improves the effect plugging plastic draining board, also ensure that the construction quality of plastic draining board.Verify through several engineering practice, it is possible to be prevented effectively from when setting plastic draining board and occur rewinding phenomenon, meet engineering design and code requirement.

Description

A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon
Technical field
The present invention relates to a kind of steel plate shoe and eliminate during plastic draining board sets the method rewinding phenomenon, belong to draining pre-pressing and reinforcing soft earth foundation processing technology field.
Background technology
At present, vertical drainage passage plastic draining board in pre-pressing and reinforcing soft earth foundation instead of conventional sand wick substantially, generally plastic draining board plate bottom in soft plasticviscosity soil, silt clay and without the sand of artesian water in set construction smoothly, without substantially rewinding phenomenon, but to rewind phenomenon in setting construction extremely serious for plastic draining board when plastic draining board plate bottom is in floating silt, plastic flow mud, plastic flow mud matter clay and in having the sand of artesian water, even cannot complete to set construction, have a strong impact on construction quality and the progress of plastic draining board.
Summary of the invention
It is an object of the invention to design a kind of steel plate shoe and eliminate during plastic draining board sets the method rewinding phenomenon, plastic draining board can be met and set prescription, what improve again plastic draining board sets efficiency, and the cost of this steel plate shoe is only the 50% ~ 80% of a linear meter(lin.m.) plastic draining board fee of material.
A kind of steel plate shoe of the present invention eliminates during plastic draining board sets the method rewinding phenomenon, includes S1 and S2, totally two steps;
Described step S1 is for making steel plate shoe;
Described step S2 be plastic draining board set enforcement.
Described step S1 comprises again 101 to 103 totally 3 steps:
Step 101: cut sheet metal 1, and the sheet metal length cut is 140mm ~ 200mm, wide for 60mm ~ 100mm, thickness is 0.2mm ~ 0.8mm, described sheet metal 1, and its material can be ferrum, steel etc., such as sheet iron, thin steel roll etc.;
Step 102: 1 circular hole 2 of each brill in distance minor face 25mm place on the width center line of sheet metal 1, Circularhole diameter is 2mm ~ 5mm, and described Circularhole diameter is slightly larger than the diameter of iron wire 3;Iron wire 3 is converted into "U" shaped traverse two circular holes 2 of steel-sheet, and bind together stubborn at the back side of sheet metal 1 for the two ends of iron wire 3, the gap reserving 8mm ~ 10mm when pricking between sheet metal front " u "-shaped iron wire 3 and sheet metal 1 twisted by iron wire 3, the material of described iron wire 3 or be ferrum or steel, also can be the rope of same intensity, diameter can be 2mm ~ 5mm, and iron wire length is 120mm ~ 300mm;
Step 103: or " u "-shaped iron wire 3 is welded on the position (not be used on sheet metal during welding and bore circular hole) of above-mentioned circular hole 2, when iron wire 3 welds, the gap of reserved 8mm ~ 10mm between " u "-shaped iron wire 3 and sheet metal 1 on sheet metal face, the material of described iron wire 3 or be ferrum or steel, diameter can be 2mm ~ 5mm, and iron wire length is 120mm ~ 300mm.
Described step S2 includes again 201 to 203 totally 3 steps:
Step 201: by plastic draining board 4 from board-plugging device intubate 5 bottom pull-out, through " u "-shaped iron wire 3 and turn back, the length 150mm that turns back ~ 250mm;
Step 202: the operator of feed strain the other end of plastic draining board 4, the plastic draining board 4 turned back is inserted into along pulling force plug and intubates in 5 by the operator of upper shoe, makes sheet metal shoe and the bottom intubating 5 is close to;
Step 203: the machinery operator of board-plugging device will intubate 5 and be placed in a site insertion soil body, the operator of feed are along intubating 5 deepen continuously and loose one's grip and make plastic draining board 4 to enter the soil body together with intubating 5 gradually, intubate sheet metal shoe when pulling out 5 times and stay in the soil body, it is ensured that the wrench of plastic draining board 4 is not extracted with intubating 5.
A kind of steel plate shoe of the present invention eliminates during plastic draining board sets the advantage of the method rewinding phenomenon: when plastic draining board is inserted to relatively Soft Soil Layer, steel plate hard-pressed bale intubates bottom, not easily occurs into mud plugging phenomenon;When being inserted to harder sandy soils, there is steel plate protection draining board, disconnected plate phenomenon not easily occurs, not only increases the effect plugging plastic draining board, also ensure that the construction quality of plastic draining board simultaneously.Verifying through several engineering practice, this shoe can be prevented effectively to be occurred rewinding phenomenon when setting plastic draining board, meets engineering design and code requirement.
Accompanying drawing explanation
Fig. 1 is steel plate shoe front elevation;
Fig. 2 is steel plate shoe back view;
Fig. 3 is the profile that steel plate shoe A-A place opens section;
Fig. 4 is steel plate shoe scheme of installation when setting plastic draining board.
Detailed description of the invention
A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon, includes S1 and S2, totally two steps;
Described step S1 is for making steel plate shoe;
Described step S2 be plastic draining board set enforcement.
Described step S1 comprises again 101 to 103 totally 3 steps:
Step 101: cut the sheet metal 1 of thick 0.2mm according to long 160mm, wide 90mm;
Step 102: the circular hole 2 of each 1 the diameter 4mm of brill in distance minor face 25mm place on the width center line of sheet metal 1;
Step 103: by the iron wire 3(φ 2mm of long 260mm ~ 300mm) it is converted into "U" shaped traverse two circular holes 2 of steel-sheet, and bind together stubborn at the back side of sheet metal 1 for the two ends of iron wire 3, the gap reserving 8mm ~ 10mm when pricking between sheet metal front " u "-shaped iron wire 3 and sheet metal 1 twisted by iron wire 3;
Described step S2 includes again 201 to 203 totally 3 steps:
Step 201: by plastic draining board 4 from board-plugging device intubate 5 bottom pull-out, through " u "-shaped iron wire 3 and turn back, the length 150mm that turns back ~ 250mm;
Step 202: the operator of feed strain the other end of plastic draining board 4, the plastic draining board 4 turned back is inserted into along pulling force plug and intubates in 5 by the operator of upper shoe, makes sheet metal shoe and the bottom intubating 5 is close to;
Step 203: the machinery operator of board-plugging device will intubate 5 and be placed in a site insertion soil body, the operator of feed are along intubating 5 deepen continuously and loose one's grip and make plastic draining board 4 to enter the soil body together with intubating 5 gradually, intubate sheet metal shoe when pulling out 5 times and stay in the soil body, it is ensured that the wrench of plastic draining board 4 is not extracted with intubating 5.
Described sheet metal 1, its material can be ferrum, steel etc., and thickness can be 0.2mm ~ 0.8mm, and such as sheet iron, thin steel ring etc., sheet metal length can be 140mm ~ 200mm, and wide is 60mm ~ 100mm.
Described circular hole 2, is fixed on sheet metal 1 for " u "-shaped iron wire 3, and Circularhole diameter is slightly larger than the diameter of iron wire 3, and the solderable position at circular hole 2 of " u "-shaped iron wire 3 (not be used on sheet metal and bores circular hole) during welding.
Described iron wire 3, its material can be ferrum or steel, and diameter can be 2mm ~ 5mm, also can be the rope of same intensity, and iron wire length can be 120mm ~ 300mm.

Claims (5)

1. one kind eliminates during plastic draining board sets the method rewinding phenomenon with steel plate shoe, it is characterised in that: include S1 and S2, totally two steps;
Described step S1 is for making steel plate shoe;
Enforcement is set when described step S2 is plastic draining board;
Described step S1 comprises again 101 to 103 totally 3 steps:
Step 101: cut sheet metal (1);
Step 102: 1 circular hole (2) of each brill in distance minor face 25mm place on the width center line of sheet metal (1), Circularhole diameter is 2mm~5mm;Iron wire (3) is converted into "U" shaped traverse two circular holes (2) of steel-sheet, and bind together stubborn at the back side of sheet metal (1) for the two ends of iron wire (3), the gap reserving 8mm~10mm when pricking between sheet metal front " u "-shaped iron wire (3) and sheet metal (1) twisted by iron wire (3);
Step 103: or " u "-shaped iron wire (3) is welded on the position of above-mentioned circular hole (2), it not be used on sheet metal during welding and bore circular hole, during iron wire (3) welding, the gap of reserved 8mm~10mm between " u "-shaped iron wire (3) and sheet metal (1) on sheet metal face.
2. a kind of steel plate shoe according to claim 1 eliminates during plastic draining board sets and rewinds the method for phenomenon, it is characterised in that: described step S2 comprises again 201 to 203 totally 3 steps:
Step 201: by plastic draining board (4) from the bottom pull-out of the intubating of board-plugging device (5), through " u "-shaped iron wire (3) and turn back, the length 150mm that turns back~250mm;
Step 202: the operator of feed strain the other end of plastic draining board (4), the plastic draining board (4) turned back is inserted into along pulling force plug and intubates in (5) by the operator of upper shoe, makes sheet metal shoe and intubate the bottom of (5) to be close to;
Step 203: the machinery operator of board-plugging device will intubate (5) and be placed in a site insertion soil body, the operator of feed loose one's grip and make plastic draining board (4) to enter the soil body together with intubating (5) along intubating deepening continuously of (5) gradually, intubate (5) and return sheet metal shoe when pulling out and stay in the soil body.
3. a kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon as claimed in claim 1, it is characterized in that: described sheet metal (1), the sheet metal length cut is 140mm~200mm, width is 60mm~100mm, thickness is 0.2mm~0.8mm, and its material is ferrum, such as sheet iron, or steel, such as thin steel roll.
4. a kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon as claimed in claim 1, it is characterised in that: described circular hole (2) diameter is slightly larger than the diameter of iron wire (3).
5. a kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon as claimed in claim 1, it is characterized in that: the material of described iron wire (3) or for ferrum or steel, also can being the rope of same intensity, diameter can be 2mm~5mm, and iron wire length is 120mm~300mm.
CN201410066135.8A 2014-02-26 2014-02-26 A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon Active CN103821134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410066135.8A CN103821134B (en) 2014-02-26 2014-02-26 A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410066135.8A CN103821134B (en) 2014-02-26 2014-02-26 A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon

Publications (2)

Publication Number Publication Date
CN103821134A CN103821134A (en) 2014-05-28
CN103821134B true CN103821134B (en) 2016-06-29

Family

ID=50756402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410066135.8A Active CN103821134B (en) 2014-02-26 2014-02-26 A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon

Country Status (1)

Country Link
CN (1) CN103821134B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846801A (en) * 2015-03-19 2015-08-19 南通大学 Plastic-drainage-plate soft soil roadbed processing construction method
CN105113485B (en) * 2015-09-23 2017-07-11 青岛港国际股份有限公司 A kind of drain bar piling machine stake mouth
CN112854187A (en) * 2021-01-05 2021-05-28 十一冶建设集团有限责任公司 Drainage plate inserting device for extremely-low-strength saturated soft clay and construction method
CN113550293A (en) * 2021-07-20 2021-10-26 中国铁道科学研究院集团有限公司 Method for treating foundation above shallow shield tunnel through vacuum preloading

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55122914A (en) * 1979-03-15 1980-09-22 Fudo Constr Co Ltd Method for early improvement of soft ground
JPH02183006A (en) * 1989-01-09 1990-07-17 Sumitomo Metal Ind Ltd Manufacturing method, its ground drainage member and anti-liquefaction method therewith
CN201762701U (en) * 2010-08-27 2011-03-16 上海港务工程公司 Control retaining device of plastic drainage board process quality automatic control system
CN102002937A (en) * 2010-11-30 2011-04-06 中交一航局第四工程有限公司 Super soft soil foundation plastic drainage board disposable pile shoe anchoring method
CN202148525U (en) * 2011-06-29 2012-02-22 浙江大经建设集团股份有限公司 Piling and inserting head device of plastic drainage board
CN202767057U (en) * 2012-09-10 2013-03-06 中国十七冶集团有限公司 Pile shoe for plastic drain board of soft ground treatment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55122914A (en) * 1979-03-15 1980-09-22 Fudo Constr Co Ltd Method for early improvement of soft ground
JPH02183006A (en) * 1989-01-09 1990-07-17 Sumitomo Metal Ind Ltd Manufacturing method, its ground drainage member and anti-liquefaction method therewith
CN201762701U (en) * 2010-08-27 2011-03-16 上海港务工程公司 Control retaining device of plastic drainage board process quality automatic control system
CN102002937A (en) * 2010-11-30 2011-04-06 中交一航局第四工程有限公司 Super soft soil foundation plastic drainage board disposable pile shoe anchoring method
CN202148525U (en) * 2011-06-29 2012-02-22 浙江大经建设集团股份有限公司 Piling and inserting head device of plastic drainage board
CN202767057U (en) * 2012-09-10 2013-03-06 中国十七冶集团有限公司 Pile shoe for plastic drain board of soft ground treatment

Also Published As

Publication number Publication date
CN103821134A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821134B (en) A kind of steel plate shoe eliminates during plastic draining board sets the method rewinding phenomenon
CN104594329B (en) A kind of off-load is processed the devices and methods therefor of road-bridge transition section differential settlement
CN105155598B (en) A kind of prefabricated pile pile body surface strain meter and soil pressure against piles box scene distribution method
CN107724436B (en) Post-cast strip seepage-proofing construction method
CN106121658B (en) Freezing method sinking shaft well wall supporting structure and construction method thereof
CN207619996U (en) Precipitation well construction
KR100789976B1 (en) The soft ground improvement method with drain board having consecutive drainage space
CN104674828A (en) Construction method for vertical draining and seepage well of tailings dam
CN208717950U (en) A kind of subway enters and leaves and wears waterline supportive structure under line shield method
CN201649099U (en) Grout injector metal casting
CN207143961U (en) With reference to the pattern foundation pit supporting structure water-retaining structure of High-pressure Spiral Spray Technology
CN105863729A (en) Method for governing water seeping from outer wall of drilled hole
CN104912057B (en) Construction method of underground continuous wall
CN206554065U (en) A kind of compound conductive plastic drain bar
CN102434718A (en) Method for reinforcing originating end of push bench
CN206570813U (en) Diaphram wall toe of wall grouting behind shaft or drift lining constructing device
CN113322939B (en) PTC (Positive temperature coefficient) tubular pile based on CPDB (compact peripheral component interconnect data) technology and movable anti-blocking device and construction method thereof
CN204728350U (en) For the ruggedized construction that artificial earth fill's slope reinforcement is administered
CN107419730A (en) With reference to the pattern foundation pit supporting structure water-retaining structure and method of High-pressure Spiral Spray Technology
CN204139229U (en) A kind of Metro Deep Excavation dewatering well Accrete clearing device
CN206267135U (en) A kind of drain bar plugs device
CN205475283U (en) Deep well dewatering well mouth blocking device in underground garage foundation pit
JP2004278287A (en) Permeable steel pipe earth-retaining type retaining wall structure
CN206052746U (en) A kind of deep basal pit explosion discharge structure
CN204081040U (en) Floor drain and grit chamber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant