CN103818392A - Method for adjusting train operation curve - Google Patents

Method for adjusting train operation curve Download PDF

Info

Publication number
CN103818392A
CN103818392A CN201410084042.8A CN201410084042A CN103818392A CN 103818392 A CN103818392 A CN 103818392A CN 201410084042 A CN201410084042 A CN 201410084042A CN 103818392 A CN103818392 A CN 103818392A
Authority
CN
China
Prior art keywords
time
train
operation curve
checkpoint
train operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410084042.8A
Other languages
Chinese (zh)
Inventor
耿晨歌
吴苏娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGHE ELECTROMECHANICAL CO Ltd
Original Assignee
ZHEJIANG ZHONGHE ELECTROMECHANICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGHE ELECTROMECHANICAL CO Ltd filed Critical ZHEJIANG ZHONGHE ELECTROMECHANICAL CO Ltd
Priority to CN201410084042.8A priority Critical patent/CN103818392A/en
Publication of CN103818392A publication Critical patent/CN103818392A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a method for adjusting a train operation curve. A plurality of check points are arranged between stations; an ATO (automatic train operation) system in a train calculates the train operation curve according to train operation time, which is issued by an ATS (automatic train supervision) system, between the two stations and determines scheduled arrival time of each check point between the two stations; and the ATO system adjusts the train operation curve according to actual arrival time and the scheduled arrival time of the train at each check point. Thus, the ATO system can adjust the operation curve while operating according to the operation curve, and the on-schedule rate of the train is improved.

Description

A kind of train operation curve method of adjustment
Technical field
The present invention relates to urban track traffic field, especially a kind of train operation curve method of adjustment.
Background technology
Urban track traffic is just becoming the trip mode that a city becomes more and more important, and punctual punctuality rate is as an important critical for the evaluation of this trip mode.
Adjustment mode to time of run between train station in industry at present: ATS(Automatic Train Supervision, train automatic monitoring) system issues Operation class between station, ATO(Automatic train operation, automatic train operation) system calculates and adjusts the run curve between two stations according to this Operation class, and control train by this run curve operation, thereby realize the operation on schedule of train.But there is certain defect in this adjustment mode, what run curve was adjusted is ATS system, ATO system and control train by run curve operation, ATS system is after train arrival, relatively the actual arrival time of train and plan arrival time is poor, whether on schedule just can calculate train, thereby calculate the Operation class between the train next stop, then be handed down to ATO system, the Operation class that ATO system issues according to ATS system is operation between station, be equivalent to running velocity in the whole process of train between station also can not become in the situation that speed limit is constant, cannot adjust according to actual change, the actual run time of train than the time of ATS system planning by variant, thereby cause train to be adjusted to from non-that to move the required time elongated on schedule on schedule, the punctuality rate that is finally presented as train declines.
Summary of the invention
The object of this invention is to provide a kind of train operation curve method of adjustment, when ATO system is moved by run curve, can adjust run curve, improve the punctuality rate of train.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme: a kind of train operation curve method of adjustment: between station, establish multiple checkpoints; Train Schedule between two stations that the ATO system in train issues according to ATS system calculates train run curve, and determines the plan time of advent of the each checkpoint between described two stations; And described ATO system is adjusted train operation curve according to the train actual time of arrival of checkpoint the time of advent with planning.
Preferably, when train travels to checkpoint by run curve, the ATO systematic comparison train actual time of arrival and plan the time of advent, if the absolute value of both differences exceedes predetermined threshold value, ATO system is changed train operation curve according to the train actual time of arrival, otherwise does not change train operation curve.
Preferably, after train operation curve is changed, ATO system recalculates the plan time of advent of follow-up each checkpoint.
Preferably, described ATO system according to known line information generate each checkpoint information and station between operation the shortest time of run, Train Schedule and the shortest described time of run between two stations that ATO system issues in conjunction with ATS system obtain distributing the time.
Preferably, the information of described checkpoint at least comprises the position of each checkpoint, arrives the shortest reach time of each checkpoint and can be assigned with the percentum of time from platform, and described ATO system determines that train arrives the formula of plan time of advent of each checkpoint and is:
plan_reach_time=least_reach_time+distributable_time*percentage
Plan_reach_time is for planning the time of advent; Least_reach_time is the shortest reach time; Distributable_time is for can distribute the time; Percentage is percentum.
Preferably, described line information obtains from track data storehouse.
Preferably, thus adjust time of run between the station of train by adjusting described train operation curve.
Preferably, between two described stations, be between continuous two platforms.
Preferably, the checkpoint described in each is uniformly-spaced built between two stations.
Adopt after technique scheme, the present invention compared with prior art has following outstanding advantages:
By multiple checkpoints are set, ATO system is in the time running to each checkpoint according to run curve, to train actual time of arrival and the train plan comparison time of advent, thereby adjust the run curve of train, because the adjustment to run curve and execution are ATO system, and by relatively time adjust operation speed of multiple checkpoints fixed point, more fast and flexible, can shorten train from the non-time being adjusted on schedule on schedule, improve the punctuality rate of train.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the train operation curve method of adjustment of the embodiment of the present invention;
Fig. 2 be the former run curve, actual operation curve of the embodiment of the present invention and adjust after run curve between be related to example.
The specific embodiment
For above-mentioned purpose of the present invention, feature and advantage can be become apparent more, below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail.
A lot of details are set forth in the following description so that fully understand the present invention.But the present invention can implement to be much different from alternate manner described here, and those skilled in the art can do similar popularization without prejudice to intension of the present invention in the situation that, and therefore the present invention is not subject to the restriction of following public concrete enforcement.
The invention provides a kind of train operation curve method of adjustment, between station, establish multiple checkpoints; Train Schedule between two stations that the ATO system in train issues according to ATS system calculates train run curve, and determines the plan time of advent of the each checkpoint between described two stations; And described ATO system is adjusted train operation curve according to the train actual time of arrival of checkpoint the time of advent with planning.Those skilled in the art can understand, thereby can adjust time of run between the station of train by adjusting described train operation curve, because ATO system is adjusted train operation curve according to true train time of run,, when train ATO system is during by train operation curve controlled train operation after adjusting, can improve the punctuality rate of train arrival.
As preferred embodiment, between two described stations, be between continuous two platforms; Checkpoint described in each is uniformly-spaced built between two stations, is appreciated that those skilled in the art can adjust as required the location gap of checkpoint and not depart from the scope of the present invention in practice.
Fig. 1 shows the train operation curve method of adjustment of the embodiment of the present invention, and the method comprises the following steps:
Step S1: establish multiple checkpoints between station.
Described ATO system generates the information of each checkpoint according to known line information, line information can obtain from track data storehouse, from track data storehouse, obtain the shortest time of run moving between station simultaneously, the information of described checkpoint at least comprises the position of each checkpoint, arrive the shortest reach time of each checkpoint and can be assigned with the percentum of time from platform, which checkpoint has been travelled to for mark train the position of each checkpoint, thereby be convenient to locate and obtain corresponding information, the percentum that arrives the shortest reach time of each checkpoint and can be assigned with the time from platform is for calculating plan time of advent of train of each checkpoint.
Train Schedule between two stations that step S2:ATO system issues according to ATS system calculates train run curve, and determines the plan time of advent of the each checkpoint between described two stations.
Step S2 carries out from platform at train, Train Schedule and the shortest described time of run between two stations that ATO system issues in conjunction with ATS system obtain distributing the time, and described ATO system determines that train arrives the formula of plan time of advent of each checkpoint and is:
plan_reach_time=least_reach_time+distributable_time*percentage
Plan_reach_time is for planning the time of advent; Least_reach_time is the shortest reach time; Distributable_time is for can distribute the time; Percentage is percentum.
According to one embodiment of present invention, described plan also can be issued by ATS system the time of advent.
Step S3: described ATO system is adjusted train operation curve according to the train actual time of arrival of checkpoint the time of advent with planning.
When train travels to checkpoint by run curve, the ATO systematic comparison train actual time of arrival and plan the time of advent, if the absolute value of both differences exceedes predetermined threshold value, ATO system is changed train operation curve according to the train actual time of arrival, otherwise do not change train operation curve, train continues to travel according to the run curve of not changing.Predetermined threshold value can be set by those skilled in the art, and after consideration error component, numerical value is chosen suitably.
Step S4: after train operation curve is changed, ATO system recalculates the plan time of advent (optional) of follow-up each checkpoint.
Train driving performs step S3 and step S4 during to each check point again, until when train in-track platform, re-execute the step S1 to S4 in the present embodiment, according to embodiments of the invention, preferred mode is all to establish multiple checkpoints between all platform, can guarantee that the run curve of train in the process of automatic train operation and actual train operation curve more press close to, thereby improve the punctuality rate of train, certainly, according to putting into practice requirement, also can between the platform that need to set up checkpoint, set up multiple checkpoints.
Fig. 2 be former run curve A, the actual operation curve B of the embodiment of the present invention and adjust after run curve C between be related to example, in the present embodiment, train is sailed to platform P2 from platform P1, between platform P1 and platform P2, be provided with 10 checkpoint CP1, CP2 ... CP10, from Fig. 2, train is before platform P1 sets out, ATO system basis is from the platform P1 of ATS system acquisition to time of run the station of platform P2, calculate run curve between the station of mating with this time of run, be former run curve A, and determine the plan time of advent of the train of each checkpoint.In the time that ATO system control train is pressed former run curve A operation process CP1 to CP5, the difference that train arrives the actual time of arrival of each checkpoint and plans the time of advent is in pre-set threshold value, and therefore ATO system control train continues to press former run curve A operation; In the time that ATO system control train operation arrives CP6, detect the actual time of arrival be less than plan the time of advent, and the absolute value of both differences is greater than pre-set threshold value, arrive this checkpoint too early, train driving need slow down speed during to rear, thereby ATO system adjusts the plan run curve after CP6, the run curve C after adjusting adjusts plan time of advent of CP7-CP10 simultaneously; When run curve C after ATO system is pressed adjustment moves through CP7-CP10, the difference that inspection train arrives the actual time of arrival of each checkpoint and plans the time of advent is in pre-set threshold value, and the run curve C that ATO control train continues to press after adjustment moves.In Fig. 2, also list the actual operation curve B of train in contrast, as seen from the figure, after the run curve of train being adjusted in the time that train arrives CP6 by the present invention, train is according to the run curve C operation after adjusting, real-world operation is as the actual operation curve B in figure, and train will arrive at a station on schedule; If run curve is not adjusted in the time that train arrives CP6, still according to former run curve A, differ far away with guarantee the actual operation curve B that train can arrive at a station on schedule, the speed that is train can be faster, also be more early in-track platform of train, thereby cause the decline of punctuality rate, facts have proved that arrival time that the present invention makes train by ATO system to the adjustment of Train Schedule more on schedule.
Although the present invention with preferred embodiment openly as above; but it is not for limiting claim; any those skilled in the art without departing from the spirit and scope of the present invention; can make possible variation and modification, therefore protection scope of the present invention should be as the criterion with the scope that the claims in the present invention were defined.

Claims (9)

1. a train operation curve method of adjustment, is characterized in that: between station, establish multiple checkpoints; Train Schedule between two stations that the ATO system in train issues according to ATS system calculates train run curve, and determines the plan time of advent of the each checkpoint between described two stations; And described ATO system is adjusted train operation curve according to the train actual time of arrival of checkpoint the time of advent with planning.
2. train operation curve method of adjustment according to claim 1, it is characterized in that: when train travels to checkpoint by run curve, the ATO systematic comparison train actual time of arrival and plan the time of advent, if the absolute value of both differences exceedes predetermined threshold value, ATO system is changed train operation curve according to the train actual time of arrival, otherwise does not change train operation curve.
3. train operation curve method of adjustment according to claim 2, is characterized in that: after train operation curve is changed, ATO system recalculates the plan time of advent of follow-up each checkpoint.
4. train operation curve method of adjustment according to claim 1, it is characterized in that: described ATO system according to known line information generate each checkpoint information and station between operation the shortest time of run, Train Schedule and the shortest described time of run between two stations that ATO system issues in conjunction with ATS system obtain distributing the time.
5. train operation curve method of adjustment according to claim 4, it is characterized in that: the information of described checkpoint at least comprises the position of each checkpoint, arrives the shortest reach time of each checkpoint and can be assigned with the percentum of time from platform, described ATO system determines that train arrives the formula of plan time of advent of each checkpoint and is:
Plan_reach_time=least_reach_time+distributable_time*perc entage plan_reach_time is for planning the time of advent; Least_reach_time is the shortest reach time; Distributable_time is for can distribute the time; Percentage is percentum.
6. train operation curve method of adjustment according to claim 4, is characterized in that: described line information obtains from track data storehouse.
7. train operation curve method of adjustment according to claim 1, is characterized in that: thus adjust time of run between the station of train by adjusting described train operation curve.
8. train operation curve method of adjustment according to claim 1, is characterized in that: between two described stations between continuous two platforms.
9. train operation curve method of adjustment according to claim 1, is characterized in that: the checkpoint described in each is uniformly-spaced built between two stations.
CN201410084042.8A 2014-03-10 2014-03-10 Method for adjusting train operation curve Pending CN103818392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410084042.8A CN103818392A (en) 2014-03-10 2014-03-10 Method for adjusting train operation curve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410084042.8A CN103818392A (en) 2014-03-10 2014-03-10 Method for adjusting train operation curve

Publications (1)

Publication Number Publication Date
CN103818392A true CN103818392A (en) 2014-05-28

Family

ID=50753763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410084042.8A Pending CN103818392A (en) 2014-03-10 2014-03-10 Method for adjusting train operation curve

Country Status (1)

Country Link
CN (1) CN103818392A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104228887A (en) * 2014-09-29 2014-12-24 中国铁道科学研究院 Method and system for automatically adjusting operation level of train in real time
CN106314486A (en) * 2015-07-10 2017-01-11 河南思维自动化设备股份有限公司 Method for drawing locomotive turnover actual diagram and integrating with map diagram
CN107878510A (en) * 2016-12-29 2018-04-06 比亚迪股份有限公司 Automatic train control method and device, vehicle-mounted ATO
CN109165830A (en) * 2018-08-10 2019-01-08 安徽库讯自动化设备有限公司 A kind of Intelligentized regulating and controlling system of AGV trolley travelling state
CN109249959A (en) * 2018-08-15 2019-01-22 北京交通大学 The bullet train automatic driving control system and control method of anti-overrun a signal
CN110704695A (en) * 2019-09-29 2020-01-17 杭州数梦工场科技有限公司 Updating method and device of mobile plan
CN111223300A (en) * 2020-01-21 2020-06-02 爱易成技术(天津)有限公司 Method for guiding speed of public transport section
WO2020108599A1 (en) * 2018-11-29 2020-06-04 中车长春轨道客车股份有限公司 High-speed train operation control method and system
CN111376949A (en) * 2018-12-29 2020-07-07 交控科技股份有限公司 Method for calculating adjustment speed of ATO quasi-point curve
CN112572548A (en) * 2019-09-30 2021-03-30 比亚迪股份有限公司 Vehicle operation information display method and system
CN115946741A (en) * 2023-03-09 2023-04-11 卡斯柯信号(北京)有限公司 Train operation control method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04283163A (en) * 1991-03-08 1992-10-08 Toshiba Corp Train operation management control device
JPH10250581A (en) * 1997-03-12 1998-09-22 Mitsubishi Electric Corp Train operation arrangement device
CN101973291A (en) * 2010-09-27 2011-02-16 浙江浙大网新众合轨道交通工程有限公司 Equal interval regulation method of urban rail traffic train
CN102442323A (en) * 2011-10-25 2012-05-09 中国电子科技集团公司第三十二研究所 Method for achieve automatic driving curve generation between stations during operation by automatic train driving system
CN102717819A (en) * 2012-06-27 2012-10-10 李志恒 Train scheduling system and method capable of being accurate to seconds for high-speed railway

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04283163A (en) * 1991-03-08 1992-10-08 Toshiba Corp Train operation management control device
JPH10250581A (en) * 1997-03-12 1998-09-22 Mitsubishi Electric Corp Train operation arrangement device
CN101973291A (en) * 2010-09-27 2011-02-16 浙江浙大网新众合轨道交通工程有限公司 Equal interval regulation method of urban rail traffic train
CN102442323A (en) * 2011-10-25 2012-05-09 中国电子科技集团公司第三十二研究所 Method for achieve automatic driving curve generation between stations during operation by automatic train driving system
CN102717819A (en) * 2012-06-27 2012-10-10 李志恒 Train scheduling system and method capable of being accurate to seconds for high-speed railway

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
万传军: "列车自动控制系统的设计与实现", 《西安石油学院学报(自然科学版)》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104228887B (en) * 2014-09-29 2016-05-25 广州地铁集团有限公司 The method and system that a kind of ATO grade is adjusted in real time
CN104228887A (en) * 2014-09-29 2014-12-24 中国铁道科学研究院 Method and system for automatically adjusting operation level of train in real time
CN106314486B (en) * 2015-07-10 2019-03-26 河南思维自动化设备股份有限公司 The fusion method of Locomotive Turnround practical figure and planning chart
CN106314486A (en) * 2015-07-10 2017-01-11 河南思维自动化设备股份有限公司 Method for drawing locomotive turnover actual diagram and integrating with map diagram
CN107878510B (en) * 2016-12-29 2019-04-19 比亚迪股份有限公司 Automatic train control method and device, vehicle-mounted ATO
WO2018121691A1 (en) * 2016-12-29 2018-07-05 比亚迪股份有限公司 Train automatic control method and apparatus, and vehicle-mounted automatic train operation system
CN107878510A (en) * 2016-12-29 2018-04-06 比亚迪股份有限公司 Automatic train control method and device, vehicle-mounted ATO
CN109165830A (en) * 2018-08-10 2019-01-08 安徽库讯自动化设备有限公司 A kind of Intelligentized regulating and controlling system of AGV trolley travelling state
CN109249959A (en) * 2018-08-15 2019-01-22 北京交通大学 The bullet train automatic driving control system and control method of anti-overrun a signal
WO2020108599A1 (en) * 2018-11-29 2020-06-04 中车长春轨道客车股份有限公司 High-speed train operation control method and system
CN111376949A (en) * 2018-12-29 2020-07-07 交控科技股份有限公司 Method for calculating adjustment speed of ATO quasi-point curve
CN111376949B (en) * 2018-12-29 2022-02-15 交控科技股份有限公司 Method for calculating adjustment speed of ATO quasi-point curve
CN110704695A (en) * 2019-09-29 2020-01-17 杭州数梦工场科技有限公司 Updating method and device of mobile plan
CN112572548A (en) * 2019-09-30 2021-03-30 比亚迪股份有限公司 Vehicle operation information display method and system
CN111223300A (en) * 2020-01-21 2020-06-02 爱易成技术(天津)有限公司 Method for guiding speed of public transport section
WO2021147393A1 (en) * 2020-01-21 2021-07-29 爱易成技术(天津)有限公司 Public transportation interval speed guiding method
CN115946741A (en) * 2023-03-09 2023-04-11 卡斯柯信号(北京)有限公司 Train operation control method and device

Similar Documents

Publication Publication Date Title
CN103818392A (en) Method for adjusting train operation curve
CN107878510B (en) Automatic train control method and device, vehicle-mounted ATO
US9889870B2 (en) Driving curve creation device, driving assistance device, driving control device, and driving curve creation method
JP6563757B2 (en) Travel pattern creation device, automatic train operation system with travel pattern creation device and automatic train operation device, and drive support system with travel pattern creation device and operation support device
CN104228887B (en) The method and system that a kind of ATO grade is adjusted in real time
MX2019012074A (en) Driving control method and driving control device.
WO2015162670A1 (en) Train travel prediction device and train travel prediction method
CN103253286B (en) A kind of orbital-elements measurement method
CN111026122B (en) Speed planning method, device and system for unmanned vehicle
JP2015161966A (en) lane change planning device and lane change planning method
WO2016084197A1 (en) Train operation interval control system, and train operation interval control device
MX2018003821A (en) Travel control method and travel control device.
CN106494463B (en) Track train method of adjustment and device at equal intervals
AU2019236700A1 (en) Energy management system and method for vehicle systems
WO2020125297A1 (en) Time for passage of a platoon of vehicles
EP4254123A3 (en) A method and system for autonomous controlling of movements of container handling vehicles operating in an automated storage and retrieval system
CN106292654A (en) A kind of method and apparatus of drawing area map
CN104648443A (en) Subway scheduling method and system capable of realizing exact second-level station dwell time change
CN103616895A (en) Method and system for controlling trolley traveling positioning based on discrete coordinate system
CN103676953A (en) Automatic recovery method for transformer substation robot magnetic navigation derailment
JP6173976B2 (en) Train control system, train control device, and on-board device
CN104952243A (en) Method and device for allocating passage time lengths
CN109017884B (en) Train automatic operation control method based on learning
JP5986961B2 (en) Automatic train driving device
CN102372014B (en) Automatic locomotive collision prevention method in molten iron transportation logistics simulation system of metallurgical works

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140528

RJ01 Rejection of invention patent application after publication