CN103808017B - One kind delays the double thermal source drinking water heating devices of formula - Google Patents

One kind delays the double thermal source drinking water heating devices of formula Download PDF

Info

Publication number
CN103808017B
CN103808017B CN201410091979.8A CN201410091979A CN103808017B CN 103808017 B CN103808017 B CN 103808017B CN 201410091979 A CN201410091979 A CN 201410091979A CN 103808017 B CN103808017 B CN 103808017B
Authority
CN
China
Prior art keywords
heater
heating
secondary heater
drinking water
formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410091979.8A
Other languages
Chinese (zh)
Other versions
CN103808017A (en
Inventor
冯海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan City Four Seasons Tea Set Co., Ltd.
Original Assignee
冯海涛
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 冯海涛 filed Critical 冯海涛
Priority to CN201410091979.8A priority Critical patent/CN103808017B/en
Publication of CN103808017A publication Critical patent/CN103808017A/en
Application granted granted Critical
Publication of CN103808017B publication Critical patent/CN103808017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses one kind delays the double thermal source drinking water heating devices of formula, including primary heater, secondary heater and control circuit, two outfans of control circuit connect primary heater and secondary heater respectively, it is characterized in that, also have additional between the control circuit and secondary heater and delay switching device, so that primary heater switches on power, after heating work, delays switching device and delay to setting time, then connect secondary heater power supply, heating work;Such drinking water heating device, two thermals source are used cooperatively, and delay switching device by arranging, and setting time is reached after making primary heater energization work, and secondary heater is(Delay)Energization work, prevents from, because of primary heater not water outlet in time, causing the deficiency of secondary heater dry combustion method, and, which is simple and reasonable for structure.

Description

One kind delays the double thermal source drinking water heating devices of formula
Technical field
The present invention relates to drinking water heating device technical field, more particularly to one kind delay the double thermal source drinking water heating dresses of formula Put.
Background technology
At present, drinking water heating device, its structure and a great variety of models, such as:Band thermal source(Electric heater unit)Tea-making facility, It is that two independent thermals source are provided with tea tray seat, and one used as heating to boil water(Such as:Instant heating type pipeline heater), it is another Individual system carries out heating disinfection to teacup(Such as:Electromagnetic oven), above-mentioned drinking water heating device still suffers from following weak point:(1)Two Individual thermal source is due to work independently of one another, it is impossible to coordinate heating to boil water together, such as:It is common to coordinate, add with secondary as once heating Heat is used, and is reduced post bake spent time, is met user's use demand;(2)Two thermals source are used cooperatively, if starting(It is same) Switch, two thermals source are while the work that is powered, secondary heat source is easily because of a thermal source not water outlet in time, and causes dry combustion method, or even makes Secondary heat source is damaged.
The content of the invention
It is an object of the invention to overcome the shortcomings of that above-mentioned prior art is present, and provide a kind of simple and reasonable for structure, both Use cooperatively can two thermals source, secondary heat source can be allowed again to delay work, dress is heated with the drinking water for preventing secondary heat source dry combustion method Put.
The object of the present invention is achieved like this:
Delay the double thermal source drinking water heating devices of formula, including primary heater, secondary heater and control circuit, control electricity Two outfans on road connect primary heater and secondary heater respectively, it is characterized in that, the control circuit is heated with second Also have additional between device and delay switching device, so that primary heater switches on power, after heating work, delays switching device and delay To setting time, then connect secondary heater power supply, heating work;Such drinking water heating device, two thermals source are used cooperatively, And switching device is delayed by arranging, and setting time is reached after making primary heater energization work, secondary heater is(Delay) Energization work, prevents from, because of primary heater not water outlet in time, causing the deficiency of secondary heater dry combustion method, and, its simple structure, Rationally.
The present invention can also be solved by following technical measures:
Used as more specifically scheme, the switching device of delaying can be that mechanical type delays switch.
Above-mentioned mechanical type delays switch includes switch open in usual and gravity sensor, and gravity sensor is arranged on the second heating The heating vessel weight on heating platform surface is placed on the heating platform of device, for sensing, its switch open in usual is connected on control Between circuit and secondary heater;During work, gravity sensor senses the heating platform of secondary heater(Vessel store water Amount)Weight reaches setting value, and switch open in usual obtains signal and closes energization, connects secondary heater power supply, make the second heating Device electrified regulation works.
The mechanical type delays switch includes tongue tube and ball float magnetic piece, and ball float magnetic piece is arranged on the heating of secondary heater In vessel, and lift with the fluctuation in stage in heating vessel, tongue tube is arranged at the height of water level of heating vessel setting, and It is connected between control circuit and secondary heater;During work, the water in the heating vessel of secondary heater reaches a certain amount of(Water Position raises), ball float magnetic piece is raised to setting position, touches tongue tube, make tongue tube closed action, connect secondary heater power supply, Secondary heater electrified regulation is made to work.
The switching device of delaying can also be that electronic type delays switch.
Above-mentioned electronic type delays switch includes delay circuit and its switch open in usual, and delay circuit is electrical with primary heater Connection, switch open in usual are connected between control circuit and secondary heater;During work, delay circuit presets secondary heater The delay power working time, make primary heater electrified regulation work, delay circuit starts timing and reaches preset time value, Switch closure open in usual is powered, and now, the work of secondary heater ability electrified regulation prevents dry combustion method.
The primary heater can be Instant heating type pipeline heater;And on primary heater, it is additionally provided with balanced reservoir, Balanced reservoir is arranged on by the position of Instant heating type pipeline heater upper outlet, and balanced reservoir includes water inlet and outlet, enters The mouth of a river connects inlet pipeline, and outlet connects Instant heating type pipeline heater lower entrances;Here balanced reservoir, is to play guarantee Primary heater " Instant heating type pipeline heater " cooks boiled water, this is because, when primary heater is independently used, equilibrium water The height of water level of case is close to the height of water level of Instant heating type pipeline heater upper outlet, to ensure in " Instant heating type pipeline heater " Water level still have one section of suitable distance apart from its upper outlet, hot water only boils, by itself boiling power, its top of boiled water ability Jing Outlet is flowed out.
Wherein, Instant heating type pipeline heater can be " quartz glass pipe heater ", or other pipeline heaters.
As more specific scheme, the heated seats of the secondary heater frenulum heating board, this secondary heater, due to Secondary heater is provided with heating board, water storage vessel(Such as:Metal or nonmetallic kettle)It is directly placed in heating plate and heats i.e. Can, water storage vessel are not limited by material, nonmetallic water storage vessel, such as:The non-metallic vessels such as purple casserole, ceramic pan, can quilt Heating board conducts heat, therefore, water storage vessel are unrestricted.
As more preferably embodiment, blue and white enamel coating, blue and white enamel coating on the heating board of the secondary heater, are also had additional It is close to heating plate surface;Blue and white enamel coating is close to heating plate surface;Blue and white enamel coating was both created an aesthetic feeling, and did not interfered with water receiver again Ware is heated, and plays a part of to protect heating board.
The primary heater and secondary heater are respectively arranged with shell, and are removable separate type connection between them; So, primary heater and secondary heater can make two heaters be fully utilized by partition, independent heating work.
Beneficial effects of the present invention are as follows:
(1)Such drinking water heating device, two thermals source are used cooperatively, and delay switching device by arranging, and make first Setting time is reached after heater energization work, secondary heater is(Delay)Energization work, prevent because primary heater not and When water outlet, cause the deficiency of secondary heater dry combustion method, and, which is simple and reasonable for structure.
(2)Further, it can be that mechanical type or electronic type delay switch to delay switching device, they can realize second Heater delays heating work, prevents dry combustion method, and which is simple and reasonable for structure, easily realizes.
(3)Such drinking water heating device, is additionally provided with balanced reservoir on its primary heater, balanced reservoir here, It is to play guarantee primary heater " Instant heating type pipeline heater " to cook boiled water, this is because, when primary heater independently makes Used time, the height of water level of balanced reservoir are close to the height of water level of Instant heating type pipeline heater upper outlet, to ensure " Instant heating type pipe Water level in channel heater " still has one section of suitable distance apart from its upper outlet, and hot water only boils, and by itself boiling power, opens Water ability Jing its upper outlet flows out.
Description of the drawings
Fig. 1 delays the double thermal source drinking water heating device schematic diagrams of formula for the present invention.
Fig. 2 is that the secondary heater of double thermal source drinking water heating devices of Fig. 1 enters big figure.
Fig. 3 is another embodiment schematic diagram of Fig. 1.
Fig. 4 is that electronic type delays electrical schematic diagram of the switch application in this patent drinking water heating device.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment one:As depicted in figs. 1 and 2, one kind delays the double thermal source drinking water heating devices of formula, including primary heater 1st, secondary heater 2 and control circuit 3, two outfans of control circuit 3 connect primary heater 1 and secondary heater respectively 2, it is characterized in that, also have additional between the control circuit 3 and secondary heater 2 and delay switching device 4, so that primary heater 1 switches on power, after heating work, delay switching device 4 and delay to setting time, then connect 2 power supply of secondary heater, heater Make.
By taking the present embodiment as an example, the primary heater 1 is Instant heating type pipeline heater;
Wherein, balanced reservoir 17 is additionally provided with primary heater 1, balanced reservoir 17 is arranged on Instant heating type pipeline heater By the position of upper outlet, balanced reservoir 17 includes water inlet 1701, outlet 1702 and refluxing opening, water inlet 1701 connect into Water lines 16, inlet pipeline 16 can also be connected with water pump, and to draw water into balanced reservoir 17, outlet 1702 connects Instant heating type Pipeline heater lower entrances;Here balanced reservoir 17, is to play guarantee primary heater " Instant heating type pipeline heater " to boil Go out boiled water, this is because, when primary heater 1 is independent to be used, the height of water level of balanced reservoir 17 is close to Instant heating type pipeline The height of water level of heater upper outlet, to ensure that the water level in " Instant heating type pipeline heater " still has one apart from its upper outlet Section suitable distance, hot water only boils, and by itself boiling power, boiled water ability Jing its upper outlet flows out.
And the refluxing opening on balanced reservoir 17, can be 17 edge of opening of balanced reservoir, or it is special in 17 bottom of balanced reservoir Door arranges return port, to exceed the superfluous water of water level, can Jing refluxing openings flow out, it is high with the designated water level for ensureing balanced reservoir 17 Degree.
In figure, Instant heating type pipeline heater is quartz glass pipe heater, is added when cold water Jing glass tubing tube chambers pass through rapidly Heat arrives design temperature, then, on the heating vessel 7 of the secondary heater for wandering lower section, then is heated by secondary heater 2.
Wherein, the heated seats 22 of 2 frenulum heating board 21 of the secondary heater, are also associated with temperature controller on heating board 21 23, and temperature controller 23 is connected in series with heating board 21;Blue and white enamel coating 24 is had additional on heating board 21 also, blue and white enamel coating 24 is close to 21 surface of heating board;When secondary heater 2 works, need for heating vessel 7 to be placed on 24 surface of blue and white enamel coating, it is during work, cold After water is once heated by the tube chamber of primary heater " quartz glass pipe heater " rapidly, then by secondary heater " heating Plate 21 " carries out post bake to water, at this moment, as water is heated for the first time, so, the post bake time is less, is adapted to not With purposes using needs.
Above-mentioned primary heater 1 and secondary heater 2 are respectively arranged with shell 121,122, and are detachable between them Connect from formula;Primary heater 1 and secondary heater 2 is conducive to decouple out, it is each independent to use.
By taking the present embodiment as an example:The switching device 4 of delaying is that mechanical type delays switch;Mechanical type delays switch including normal Open switch 5 and gravity sensor 6, gravity sensor 6 are arranged on the heating platform of secondary heater 2, are placed in for sensing 7 weight of heating vessel on heating platform surface, its switch open in usual 5 are connected between control circuit 3 and secondary heater 2.
Operation principle:During work, switch is opened, 1 pair of cold water for passing through of primary heater is quickly heated, and Jing once adds The current of heat are fallen in the heating vessel 7 on the secondary heater 2 of lower section, and gravity sensor 6 senses adding for secondary heater 2 Hot platform(Vessel store the water yield)Weight reaches setting value, and switch open in usual 5 obtains signal and closes energization, connects second and heats 2 power supply of device, makes 2 electrified regulation of secondary heater work, prevents 7 no-water dry combustion of heating vessel.
Embodiment two, as shown in figure 3, the embodiment is close with above-described embodiment one, difference is only:The machinery Formula delays switch includes tongue tube 8 and ball float magnetic piece 9, the heating vessel 7 that ball float magnetic piece 9 is arranged on secondary heater 2 is interior, and with Fluctuation in stage in heating vessel 7 and lift, tongue tube 8 is arranged at the height of water level of the setting of heating vessel 7, and be connected on control Between circuit processed 3 and secondary heater 2.
Operation principle:During work, switch is opened, 1 pair of cold water for passing through of primary heater is quickly heated, and Jing once adds The current of heat are fallen in the heating vessel 7 on the secondary heater 2 of lower section, and the water in the heating vessel 7 of secondary heater 2 reaches It is a certain amount of(Water level is raised), ball float magnetic piece 9 is raised to setting position, touches(Touch-control)Tongue tube, makes tongue tube closed action, connects Secondary heater power supply, makes 2 electrified regulation of secondary heater work, prevents 7 no-water dry combustion of heating vessel.
Certainly, it is described delay switching device 4 can also series electron formula delay switch 13:Its concrete scheme system, sees Fig. 4 institutes Show, the electronic type delays switch 13 includes delay circuit 10 and its switch 11 open in usual, delay circuit 10 and primary heater 1 It is electrically connected with, switch open in usual 11 is connected between control circuit 3 and secondary heater 2;Above-mentioned described delay circuit 10, can Being traditional delay circuit, it is also possible to be time relay circuit, I will not elaborate.

Claims (5)

1. one kind delays the double thermal source drinking water heating devices of formula, including primary heater(1), secondary heater(2)With control electricity Road(3), control circuit(3)Two outfans connect primary heater respectively(1)And secondary heater(2), it is characterized in that, institute State control circuit(3)With secondary heater(2)Between also have additional and delay switching device(4), so that primary heater(1)Connect After power supply, heating work, switching device is delayed(4)Delay to setting time, then connect secondary heater(2)Power supply, heater Make, it is described to delay switching device(4)It is that mechanical type delays switch;
The mechanical type delays switch includes switch open in usual(5)And gravity sensor(6), gravity sensor(6)It is arranged on Two heaters(2)Heating platform on, be placed in the heating vessel on heating platform surface for sensing(7)Weight, which is open in usual to open Close(5)It is connected on control circuit(3)With secondary heater(2)Between,
Or the mechanical type is delayed switch and includes tongue tube(8)And ball float magnetic piece(9), ball float magnetic piece(9)It is arranged on the second heating Device(2)Heating vessel(7)It is interior, and with heating vessel(7)Interior fluctuation in stage and lift, tongue tube(8)It is arranged on heater Ware(7)At the height of water level of setting, and it is connected on control circuit(3)With secondary heater(2)Between.
2. the double thermal source drinking water heating devices of formula are delayed according to claim 1, be it is characterized in that, the primary heater(1) It is Instant heating type pipeline heater, and primary heater(1)On be additionally provided with balanced reservoir(17), balanced reservoir(17)Arrange in sight By the position of hot type pipeline heater upper outlet, balanced reservoir(17)Including water inlet(1701)And outlet(1702), enter The mouth of a river(1701)Connection inlet pipeline(16), outlet(1702)Connect Instant heating type pipeline heater lower entrances.
3. the double thermal source drinking water heating devices of formula are delayed according to claim 1, be it is characterized in that, the secondary heater(2) Frenulum heating board(21)Heated seats(22).
4. the double thermal source drinking water heating devices of formula are delayed according to claim 3, be it is characterized in that, the secondary heater(2) Heating board(21)On also have additional blue and white enamel coating(24), blue and white enamel coating(24)It is close to heating board(21)Surface.
5. the double thermal source drinking water heating devices of formula are delayed according to claim 1, be it is characterized in that, the primary heater(1) And secondary heater(2)It is respectively arranged with shell(121、122), and be removable separate type connection between them.
CN201410091979.8A 2014-03-13 2014-03-13 One kind delays the double thermal source drinking water heating devices of formula Active CN103808017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410091979.8A CN103808017B (en) 2014-03-13 2014-03-13 One kind delays the double thermal source drinking water heating devices of formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410091979.8A CN103808017B (en) 2014-03-13 2014-03-13 One kind delays the double thermal source drinking water heating devices of formula

Publications (2)

Publication Number Publication Date
CN103808017A CN103808017A (en) 2014-05-21
CN103808017B true CN103808017B (en) 2017-04-05

Family

ID=50705156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410091979.8A Active CN103808017B (en) 2014-03-13 2014-03-13 One kind delays the double thermal source drinking water heating devices of formula

Country Status (1)

Country Link
CN (1) CN103808017B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5647055A (en) * 1995-09-25 1997-07-08 Bunn-O-Matic Corporation Method for cyclically dispensing water from a heated water apparatus
CN101999843A (en) * 2009-08-29 2011-04-06 杜也兵 External electric heating method for pure water direct drinking machine
CN102113833A (en) * 2009-12-30 2011-07-06 上海市闸北区中小学科技指导站 Safe water dispenser base
CN102635949A (en) * 2012-05-13 2012-08-15 冯海涛 Balanced reservoir for water heater with water nozzle
CN103148595A (en) * 2013-04-02 2013-06-12 冯海涛 Drinking water heating device
CN203810739U (en) * 2014-03-13 2014-09-03 冯海涛 Delayed type double-heat-source drinking water heating device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5647055A (en) * 1995-09-25 1997-07-08 Bunn-O-Matic Corporation Method for cyclically dispensing water from a heated water apparatus
CN101999843A (en) * 2009-08-29 2011-04-06 杜也兵 External electric heating method for pure water direct drinking machine
CN102113833A (en) * 2009-12-30 2011-07-06 上海市闸北区中小学科技指导站 Safe water dispenser base
CN102635949A (en) * 2012-05-13 2012-08-15 冯海涛 Balanced reservoir for water heater with water nozzle
CN103148595A (en) * 2013-04-02 2013-06-12 冯海涛 Drinking water heating device
CN203810739U (en) * 2014-03-13 2014-09-03 冯海涛 Delayed type double-heat-source drinking water heating device

Also Published As

Publication number Publication date
CN103808017A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN102357003B (en) Ultra high-speed preparation method for tea making water
CN106724736A (en) Automatic watering grill pan
CN102687990B (en) Automatic cooking device for supplying drinking water
CN102342737A (en) Cooking control method of electric rice cooker
CN105147046A (en) Draining steamed rice cooker
TWI495399B (en) Electromagnetic induction heater capable of increasing range of heating
CN204445368U (en) Cooking apparatus
CN104274067A (en) Automatic electric rice cooker
CN103284588A (en) Energy-saving airtight steam conduction type food cooking device
CN105455635A (en) Electric kettle
CN206560321U (en) Insulating pot
CN105982526A (en) Cooking method of electric cooker
CN203576303U (en) Hot water and coffee all-in-one machine
CN103808017B (en) One kind delays the double thermal source drinking water heating devices of formula
CN209789486U (en) Commercial noodle cooking stove
CN203810739U (en) Delayed type double-heat-source drinking water heating device
CN106264176A (en) The heating means of the heater of cooking apparatus
CN109106207A (en) With the control method of drink electric hot water bottle
CN103596309A (en) Efficient electromagnetic electric heater and manufacturing method thereof
KR101575753B1 (en) The instant ramen cooker
CN205795498U (en) A kind of Novel steam kettle
CN201911867U (en) Electric steam oven
CN205251213U (en) Electric food warmer body
CN203757986U (en) Split type drinking water heating device
CN207444792U (en) Anti-overflow electric kettle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191219

Address after: 528300 Shangyong Village Industrial Zone, Leliu Street, Shunde District, Foshan City, Guangdong Province

Patentee after: Foshan City Four Seasons Tea Set Co., Ltd.

Address before: 523000, No. three, Lane 1, Yi Town, Lecong Town, Foshan Town, Shunde District, Guangdong

Patentee before: Feng Haitao

TR01 Transfer of patent right