CN203810739U - Delayed type double-heat-source drinking water heating device - Google Patents

Delayed type double-heat-source drinking water heating device Download PDF

Info

Publication number
CN203810739U
CN203810739U CN201420113469.1U CN201420113469U CN203810739U CN 203810739 U CN203810739 U CN 203810739U CN 201420113469 U CN201420113469 U CN 201420113469U CN 203810739 U CN203810739 U CN 203810739U
Authority
CN
China
Prior art keywords
heater
heating
drinking water
secondary heater
thermal source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420113469.1U
Other languages
Chinese (zh)
Inventor
冯海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420113469.1U priority Critical patent/CN203810739U/en
Application granted granted Critical
Publication of CN203810739U publication Critical patent/CN203810739U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Control Of Resistance Heating (AREA)

Abstract

The utility model discloses a delayed type double-heat-source drinking water heating device. The delayed type double-heat-source drinking water heating device comprises a first heater, a second heater and a control circuit, wherein two output ends of the control circuit are respectively connected with the first heater and the second heater. The delayed type double-heat-source drinking water heating device is characterized in that a delayed switching device is added between the control circuit and the second heater to enable the switching device to be delayed to the setting time to switch on the second heater power source to heat after the first heater is switched on a power source and performs heating operation. According to the delayed type double-heat-source drinking water heating device, the two heat sources are used in a matching mode, the second heater is switched on to operate when the time of electrified operation of the first heater achieves the setting time due to the delayed switching device, the disadvantage that the second heater is heated in an empty mode due to the fact that water does not flows out form the first heater in time is overcame, and the structure is simple and reasonable.

Description

The two thermal source drinking water heating devices of the formula of delaying
Technical field
The utility model relates to drinking water heating device technical field, particularly a kind of two thermal source drinking water heating devices of formula of delaying.
Background technology
At present, drinking water heating device, its structure and a great variety of models, as: the tea-making facility of band thermal source (electric heater unit), it is on tea tray seat, to be provided with two independently thermals source, one as heating to boil water (as: Instant heating type pipeline heater), another is that teacup is carried out to heating disinfection (as: electromagnetic oven), above-mentioned drinking water heating device, still have the following disadvantages: (1) two thermal source is due to work independent of one another, cannot coordinate together heating to boil water, as: jointly coordinate, as once heating and post bake are used, reduce post bake spent time, meet user's user demand, (2) two thermals source are used in conjunction with, if start (same) switch, and the work of simultaneously switching on of two thermals source, secondary heat source is easily because of water outlet in time of thermal source, and causes dry combustion method, even makes secondary heat source damage.
Utility model content
The purpose of this utility model is to overcome the deficiency that above-mentioned prior art exists, and provides a kind of simple and reasonable for structure, both can make two thermals source be used in conjunction with, and can allow again secondary heat source delay work, to prevent the drinking water heating device of secondary heat source dry combustion method.
The purpose of this utility model is achieved in that
The two thermal source drinking water heating devices of the formula of delaying, comprise primary heater, secondary heater and control circuit, two outputs of control circuit connect respectively primary heater and secondary heater, it is characterized in that, between described control circuit and secondary heater, also have additional and delay switching device, so that primary heater switches on power, after heating work, delay switching device and delay to setting-up time, then connect secondary heater power supply, heating work; This kind of drinking water heating device, two thermals source are used in conjunction with, and delay switching device by setting, make to reach setting-up time after primary heater energising work, secondary heater is (delaying) energising work, prevents from, because of not water outlet in time of primary heater, causing the deficiency of secondary heater dry combustion method, and it is simple and reasonable for structure.
The utility model can also solve by following technical measures:
As scheme more specifically, described in to delay switching device can be that mechanical type is delayed switch.
Above-mentioned mechanical type is delayed switch and is comprised switch open in usual and gravity sensor, gravity sensor is arranged on the heating platform of secondary heater, for responding to the heating vessel weight that is placed in heating platform surface, and its switch series open in usual is associated between control circuit and secondary heater; During work, gravity sensor senses that heating platform (the vessel storage water yield) weight of secondary heater reaches setting value, and switch picked up signal open in usual closed energising, connect secondary heater power supply, makes secondary heater energising heating work.
Described mechanical type is delayed switch and is comprised tongue tube and ball float magnetic patch, ball float magnetic patch is arranged in the heating vessel of secondary heater and the lifting with the fluctuation in stage in heating vessel, tongue tube be arranged on the height of water level place that heating vessel sets and be connected on control circuit and secondary heater between; During work, the water in the heating vessel of secondary heater reaches a certain amount of (water level rising), and ball float magnetic patch is raised to desired location, touches tongue tube, makes tongue tube closed action, connects secondary heater power supply, makes secondary heater energising heating work.
The described switching device of delaying can be also that electronic type is delayed switch.
Above-mentioned electronic type is delayed switch and is comprised delay circuit and switch open in usual thereof, and delay circuit and primary heater are electrically connected, and switch series open in usual is associated between control circuit and secondary heater; During work, delay circuit presets the delay power working time of secondary heater, makes primary heater energising heating work, delay circuit starts timing and reaches Preset Time value, the closed energising of switch open in usual, now, the secondary heater heating work of just switching on, prevents dry combustion method.
Described primary heater can be Instant heating type pipeline heater; And on primary heater, be also provided with balanced reservoir, balanced reservoir is arranged on by the position of Instant heating type pipeline heater top outlet, balanced reservoir comprises water inlet and delivery port, and water inlet connects inlet pipeline, and delivery port connects Instant heating type pipeline heater bottom entrance; The balanced reservoir here, to play to guarantee that primary heater " Instant heating type pipeline heater " cooks boiled water, this be because, when primary heater tool is independently used, the height of water level of balanced reservoir approaches the height of water level of Instant heating type pipeline heater top outlet, and to guarantee that the water level in " Instant heating type pipeline heater " still has one section of suitable distance apart from its top outlet, hot water only boils, by self boiling power, boiling water just flows out through its top outlet.
Wherein, Instant heating type pipeline heater can be " quartz glass pipe heater ", or other pipeline heater.
As scheme more specifically, the heated seats of described secondary heater frenulum heating board, this secondary heater tool, because secondary heater is provided with heating board, water storage vessel (as: metal or nonmetal kettle) are directly placed on heating on heating plate, water storage vessel are not subject to materials limitations, nonmetallic water storage vessel, as: the non-metallic vessels such as purple casserole, ceramic pan, all can be conducted heat by heating board, therefore, water storage vessel are unrestricted.
As better embodiment, on the heating board of described secondary heater, also have additional blue and white enamel coating, blue and white enamel coating is close to heating board surface; Blue and white enamel coating is close to heating board surface; Blue and white enamel coating is create an aesthetic feeling both, can not affect being heated of water storage vessel again, and plays the effect of protection heating board.
Described primary heater and secondary heater are respectively arranged with shell, and between them, are that removable separate type connects; Like this, primary heater and secondary heater can be by partition, and independent heating work, is fully utilized two heaters.
The beneficial effects of the utility model are as follows:
(1) this kind of drinking water heating device, two thermals source are used in conjunction with, and delay switching device by setting, make to reach setting-up time after primary heater energising work, secondary heater is (delaying) energising work, prevents from, because of not water outlet in time of primary heater, causing the deficiency of secondary heater dry combustion method, and it is simple and reasonable for structure.
(2) have, delaying switching device can be the switch of delaying of mechanical type or electronic type again, and they all can be realized secondary heater and delay heating work, prevent dry combustion method, and it is simple and reasonable for structure, easily realizes.
(3) this kind of drinking water heating device, on its primary heater tool, be also provided with balanced reservoir, the balanced reservoir here, to play to guarantee that primary heater " Instant heating type pipeline heater " cooks boiled water, this be because, when primary heater tool is independently used, the height of water level of balanced reservoir approaches the height of water level of Instant heating type pipeline heater top outlet, to guarantee that the water level in " Instant heating type pipeline heater " still has one section of suitable distance apart from its top outlet, hot water only boils, by self boiling power, boiling water just flows out through its top outlet.
Accompanying drawing explanation
Fig. 1 is that the utility model is delayed the two thermal source drinking water heating device schematic diagrames of formula.
Fig. 2 is that the secondary heater of two thermal source drinking water heating devices of Fig. 1 enters large figure.
Fig. 3 is another embodiment schematic diagram of Fig. 1.
Fig. 4 is that electronic type is delayed switch application at the electrical schematic diagram of this patent drinking water heating device.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment mono-: as depicted in figs. 1 and 2, the two thermal source drinking water heating devices of the formula of delaying, comprise primary heater 1, secondary heater 2 and control circuit 3, two outputs of control circuit 3 connect respectively primary heater 1 and secondary heater 2, it is characterized in that, between described control circuit 3 and secondary heater 2, also have additional and delay switching device 4, so that primary heater 1 switches on power, after heating work, delay switching device 4 and delay to setting-up time, then connect secondary heater 2 power supplys, heating work.
Take the present embodiment as example, and described primary heater 1 is Instant heating type pipeline heater;
Wherein, on primary heater 1, be also provided with balanced reservoir 17, balanced reservoir 17 is arranged on by the position of Instant heating type pipeline heater top outlet, balanced reservoir 17 comprises water inlet 1701, delivery port 1702 and refluxing opening, water inlet 1701 connects inlet pipeline 16, inlet pipeline 16 can also be connected with water pump, to draw water into balanced reservoir 17, delivery port 1702 connects Instant heating type pipeline heater bottom entrance; The balanced reservoir 17 here, to play to guarantee that primary heater " Instant heating type pipeline heater " cooks boiled water, this be because, when the 1 independent use of primary heater tool, the height of water level of balanced reservoir 17 approaches the height of water level of Instant heating type pipeline heater top outlet, and to guarantee that the water level in " Instant heating type pipeline heater " still has one section of suitable distance apart from its top outlet, hot water only boils, by self boiling power, boiling water just flows out through its top outlet.
And refluxing opening on balanced reservoir 17 can be balanced reservoir 17 edge of opening, or return port is set specially in balanced reservoir 17 bottoms, to surpass the superfluous water of water level, can flow out through refluxing opening, to guarantee the designated water level height of balanced reservoir 17.
In figure, Instant heating type pipeline heater is quartz glass pipe heater, cold water through glass tube tube chamber by time be rapidly heated to design temperature, then, wander on the heating vessel 7 of secondary heater of below, then heated by secondary heater 2.
Wherein, the heated seats 22 of described secondary heater 2 frenulum heating boards 21, is also connected with temperature controller 23 on heating board 12, and temperature controller 23 is connected in series with heating board 21; On heating board 12, also have additional blue and white enamel coating 24, blue and white enamel coating 24 is close to heating board 21 surfaces; During 2 work of secondary heater tool, heating vessel 7 need to be placed on to blue and white enamel coating 24 surfaces, during work, the tube chamber of cold water by primary heater " quartz glass pipe heater " be by rapidly once after heating, then by secondary heater " heating board 21 ", water is carried out to post bake, at this moment, because water is heated for the first time, so the post bake time is less, be applicable to the use needs of different purposes.
Above-mentioned primary heater 1 and secondary heater 2 are respectively arranged with shell 12, and between them, are that removable separate type connects; Be conducive to primary heater 1 and secondary heater and split out for 2 minutes, separately independent use.
Take the present embodiment as example: described in to delay switching device 4 be that mechanical type is delayed switch; Mechanical type is delayed switch and is comprised switch 5 open in usual and gravity sensor 6, gravity sensor 6 is arranged on the heating platform of secondary heater 2, for responding to heating vessel 7 weight that are placed in heating platform surface, and its switch 5 open in usual is connected between control circuit 3 and secondary heater 2.
Operation principle: during work, opening switch, 1 pair of cold water passing through of primary heater carries out Fast Heating, in heating vessel 7 on secondary heater 2 below the current of once heating are fallen, gravity sensor 6 senses that heating platform (the vessel storage water yield) weight of secondary heater 2 reaches setting value, and switch 5 picked up signal open in usual closed energising, connect secondary heater 2 power supplys, make secondary heater 2 energising heating works, prevent heating vessel 7 no-water dry combustions.
Embodiment bis-, as shown in Figure 3, this embodiment is close with above-described embodiment one, difference is only: described mechanical type is delayed switch and comprised tongue tube 8 and ball float magnetic patch 9, ball float magnetic patch 9 is arranged in the heating vessel 7 of secondary heater 2 and the lifting with the fluctuation in stage in heating vessel 7, tongue tube 8 be arranged on the height of water level place that heating vessel 7 sets and be connected on control circuit 3 and secondary heater 2 between.
Operation principle: during work, opening switch, 1 pair of cold water passing through of primary heater carries out Fast Heating, and in the heating vessel 7 on the secondary heater 2 below the current of once heating are fallen, the water in the heating vessel 7 of secondary heater 2 reaches a certain amount of (water level rising), ball float magnetic patch 9 is raised to desired location, touch (touch-control) tongue tube, make tongue tube closed action, connect secondary heater power supply, make secondary heater 2 energising heating works, prevent heating vessel 7 no-water dry combustions.
Certainly, the described switching device 4 of delaying also can series electron formula be delayed switch 12: its concrete scheme system, as shown in Figure 4, described electronic type is delayed switch and is comprised delay circuit 10 and switch open in usual 11 thereof, delay circuit 10 is electrically connected with primary heater 1, and switch 11 open in usual is connected between control circuit 3 and secondary heater 2; Above-mentioned said delay circuit 10, can be traditional delay circuit, can be also time relay circuit, no longer describes in detail here.

Claims (10)

1. the two thermal source drinking water heating devices of the formula of delaying, comprise primary heater (1), secondary heater (2) and control circuit (3), two outputs of control circuit (3) connect respectively primary heater (1) and secondary heater (2), it is characterized in that, between described control circuit (3) and secondary heater (2), also have additional and delay switching device (4), so that primary heater (1) switches on power, after heating work, delay switching device (4) and delay to setting-up time, then connect secondary heater (2) power supply, heating work.
2. the two thermal source drinking water heating devices of the formula of delaying according to claim 1, is characterized in that, described in to delay switching device (4) be that mechanical type is delayed switch.
3. the two thermal source drinking water heating devices of the formula of delaying according to claim 2, it is characterized in that, described mechanical type is delayed switch and is comprised switch open in usual (5) and gravity sensor (6), gravity sensor (6) is arranged on the heating platform of secondary heater (2), for responding to, is placed in heating vessel (7) weight on heating platform surface, and its switch open in usual (5) is connected between control circuit (3) and secondary heater (2).
4. the two thermal source drinking water heating devices of the formula of delaying according to claim 2, it is characterized in that, described mechanical type is delayed switch and is comprised tongue tube (8) and ball float magnetic patch (9), ball float magnetic patch (9) is arranged in the heating vessel (7) of secondary heater (2) and the lifting with the fluctuation in stage in heating vessel (7), tongue tube (8) be arranged on the height of water level place that heating vessel (7) sets and be connected on control circuit (3) and secondary heater (2) between.
5. the two thermal source drinking water heating devices of the formula of delaying according to claim 1, is characterized in that, described in to delay switching device (4) be that electronic type is delayed switch.
6. the two thermal source drinking water heating devices of the formula of delaying according to claim 5, it is characterized in that, described electronic type is delayed switch and is comprised delay circuit (10) and switch open in usual (11) thereof, delay circuit (10) is electrically connected with primary heater (1), and switch open in usual (11) is connected between control circuit (3) and secondary heater (2).
7. the two thermal source drinking water heating devices of the formula of delaying according to claim 1, it is characterized in that, described primary heater (1) is Instant heating type pipeline heater, and on primary heater tool (1), be also provided with balanced reservoir (17), balanced reservoir (17) is arranged on by the position of Instant heating type pipeline heater top outlet, balanced reservoir (17) comprises water inlet (1701) and delivery port (1702), water inlet (1701) connects inlet pipeline (3), and delivery port (1702) connects Instant heating type pipeline heater bottom entrance.
8. the two thermal source drinking water heating devices of the formula of delaying according to claim 1, is characterized in that the heated seats (22) of described secondary heater (2) frenulum heating board (21).
9. the two thermal source drinking water heating devices of the formula of delaying according to claim 8, is characterized in that, on the heating board (12) of described secondary heater (2), also have additional blue and white enamel coating (24), blue and white enamel coating (24) is close to heating board (21) surface.
10. the two thermal source drinking water heating devices of the formula of delaying according to claim 1, is characterized in that, described primary heater (1) and secondary heater (2) are respectively arranged with shell (12), and between them, are that removable separate type connects.
CN201420113469.1U 2014-03-13 2014-03-13 Delayed type double-heat-source drinking water heating device Withdrawn - After Issue CN203810739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420113469.1U CN203810739U (en) 2014-03-13 2014-03-13 Delayed type double-heat-source drinking water heating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420113469.1U CN203810739U (en) 2014-03-13 2014-03-13 Delayed type double-heat-source drinking water heating device

Publications (1)

Publication Number Publication Date
CN203810739U true CN203810739U (en) 2014-09-03

Family

ID=51449479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420113469.1U Withdrawn - After Issue CN203810739U (en) 2014-03-13 2014-03-13 Delayed type double-heat-source drinking water heating device

Country Status (1)

Country Link
CN (1) CN203810739U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103808017A (en) * 2014-03-13 2014-05-21 冯海涛 Delayed-type double-heat-source drinking water heating device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103808017A (en) * 2014-03-13 2014-05-21 冯海涛 Delayed-type double-heat-source drinking water heating device
CN103808017B (en) * 2014-03-13 2017-04-05 冯海涛 One kind delays the double thermal source drinking water heating devices of formula

Similar Documents

Publication Publication Date Title
CN102357003B (en) Ultra high-speed preparation method for tea making water
CN102331080B (en) Electric heating water boiler with separated water storage tank
CN102687990A (en) Automatic cooking device for supplying drinking water
CN102342737A (en) Cooking control method of electric rice cooker
CN104026985A (en) Instant-heating-type 100-DEG C tea tray machine
CN103767526B (en) Pseudo-boiling energy-saving kitchen range and utilize it to carry out the method heated
CN206560321U (en) Insulating pot
CN203576303U (en) Hot water and coffee all-in-one machine
CN201658229U (en) Ceramic boiler accepting multiple heating ways
CN103431767A (en) Heating pipeline and instant heating type water dispenser comprising same
CN204274140U (en) To cook a meal meal attemperator
KR101575753B1 (en) The instant ramen cooker
CN203757986U (en) Split type drinking water heating device
CN103822347B (en) A kind of split type drinking water heating device
CN102551532B (en) Quick water heating device
CN109527975A (en) A kind of double-layered vacuum heat-insulation pot set for electric cooker
CN202567797U (en) Device for preparing tea-making water rapidly
CN103808017B (en) One kind delays the double thermal source drinking water heating devices of formula
CN203555545U (en) Electromagnetic dim sum steamer
CN202938496U (en) Novel electric-heating water boiler
CN202489776U (en) Multifunctional water heater
CN208754575U (en) Electromagnetic control type automatic constant-temperature thermal insulation cabinet
CN207341626U (en) A kind of electromagnetism electric ceramic heaters
CN106691204B (en) a burning furnace
CN208192832U (en) Electric water bottle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20140903

Effective date of abandoning: 20170405