CN103805216A - Tamping station with 7.63m top-mounted coke oven improved into tamping coking - Google Patents
Tamping station with 7.63m top-mounted coke oven improved into tamping coking Download PDFInfo
- Publication number
- CN103805216A CN103805216A CN201410050814.6A CN201410050814A CN103805216A CN 103805216 A CN103805216 A CN 103805216A CN 201410050814 A CN201410050814 A CN 201410050814A CN 103805216 A CN103805216 A CN 103805216A
- Authority
- CN
- China
- Prior art keywords
- tamping
- coal
- coking
- tower
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P20/00—Technologies relating to chemical industry
- Y02P20/10—Process efficiency
- Y02P20/133—Renewable energy sources, e.g. sunlight
Landscapes
- Coke Industry (AREA)
Abstract
The invention relates to a tamping station with a 7.63m top-mounted coke oven improved into tamping cooking. The tamping station is characterized by consisting of a coal distribution belt, a tamping coal tower, a tamping charging car, a tamping machine, a shaking feeder, a wind power coal vibration device, an equipment operation overhauling platform, a coal bunker discharge spout and rain/snow-proof facilities, wherein the coal distribution belt is arranged at the upper part of the tamping coal tower; the coal bunker discharge spout is positioned at the lower part of the tamping coal tower; the shaking feeder is arranged below the coal bunker discharge spout; the tamping charging car is arranged below the shaking feeder; the tamping machine is arranged above the tamping charging car; the wind power coal vibration device and the equipment operation overhauling platform are arranged in the tamping coal tower; the rain/snow-proof facilities are arranged at the periphery and top of the tamping coal tower. The tamping station provided by the invention guarantees reasonable stress and safe and reliable structure of a structure, has a short construction cycle and is improved into a coking system which maintains the original function of top-mounted coal charging and coking, and also has a tamping coking function to realize the characteristics of switching between top-mounted coking and tamping coking and production flexibility.
Description
Technical field
The present invention is a kind of station of making firm by ramming for tamping coking, and particularly dress coke oven in a kind of 7.63m of employing top is improved to the station of making firm by ramming of tamping coking under end-of-life state not.
Background technology
Current domestic metallurgy industry, becomes volume to be slightly less than after the briquette of coking chamber making tamping in case firm by ramming mixed coal, pushes high temperature carbonization in coking chamber by supporting plate from the pusher side of coke oven, is called tamping coking.Tamping coking can be widened coking coal source by the accounting that improves high volatile, weak caking coal in coal blending, the method coking of making firm by ramming is the direction of mechanical coke development, and the active demand of many enterprises changes top dress coke oven into tamping coking to reduce coal blending cost, to improve Business Economic Benefit.One of difficult point is how the top dress coke oven in producing to be improved to tamping coking, and the normal production that whole transformation process does not affect existing system is current problem demanding prompt solution; Two of difficult point is to fill coke oven for the large-scale top of having gone into operation in the world at present, and especially 7.63m top dress coke oven is not improved to the precedent of tamping coking.
Summary of the invention
The present invention has overcome the defect of above-mentioned existence, and object is the station technology of making firm by ramming that is improved to tamping coking for solving the 7.63m top dress coke oven of having gone into operation under end-of-life state not, provides a kind of 7.63m top dress coke oven to be improved to the station of making firm by ramming of tamping coking.
What 7.63m of the present invention top dress coke oven was improved to tamping coking makes station content Description firm by ramming:
7.63m of the present invention top dress coke oven is improved to the station of making firm by ramming of tamping coking, it is characterized in that: be by cloth coal belt, coal tamping tower, tamping charging car, plug ramming machine, shake material feeder, wind-force shake device for coal, operation of equipment inspection platform, coal bunker is let slip a remark and rain and snow installation composition, cloth coal belt is arranged on the top of coal tamping tower, coal bunker is let slip a remark and is positioned at the bottom of coal tamping tower, coal bunker arranges shake material feeder under leting slip a remark, below shake material feeder, be provided with tamping charging car, the top of tamping charging car is provided with plug ramming machine, coal tamping tower inside is provided with wind-force shake device for coal and operation of equipment inspection platform, the periphery of coal tamping tower and top are provided with rain and snow device.
7.63m of the present invention top dress coke oven is improved to the station of making firm by ramming of tamping coking, guarantee that structures reasonable stress, structural safety are reliable, there is short construction period, be subject to that site condition restriction is little, transformation process does not stop production does not affect production, be improved to coking system and retained the coaling function of coking of former top, and possesses the function of tamping coking, the feature that has realized top dress coking and tamping coking switching and production handiness, has stronger market adaptability to changes.
Accompanying drawing explanation
Fig. 1 be 7.63m top dress coke oven be improved to tamping coking make station structure schematic diagram firm by ramming;
Fig. 2 be 7.63m top dress coke oven be improved to tamping coking make station sectional view firm by ramming;
In figure: the 1st, cloth coal belt, the 2nd, coal tamping tower, the 3rd, tamping charging car, the 4th, plug ramming machine, the 5th, shake material feeder, the 6th, wind-force shake device for coal, the 7th, operation of equipment inspection platform, the 8th, coal bunker lets slip a remark, the 9th, rain and snow device.
Embodiment
The station of making firm by ramming that 7.63m of the present invention top dress coke oven is improved to tamping coking is achieved in that below in conjunction with accompanying drawing and illustrates.See Fig. 1, Fig. 2, 7.63m of the present invention top dress coke oven is improved to the station of making firm by ramming of tamping coking, by cloth coal belt 1, coal tamping tower 2, tamping charging car 3, plug ramming machine 4, shake material feeder 5, wind-force shake device for coal 6, operation of equipment inspection platform 7, coal bunker let slip a remark 8 and rain and snow device 9 form, cloth coal belt 1 is arranged on the top of coal tamping tower 2, coal bunker 8 bottoms that are positioned at coal tamping tower 2 of leting slip a remark, coal bunker is let slip a remark shake material feeder 5 is set for 8 times, below shake material feeder 5, be provided with tamping charging car 3, the top of tamping charging car 3 is provided with plug ramming machine 4, coal tamping tower 2 inside are provided with wind-force shake device for coal 6 and operation of equipment inspection platform 7, the periphery of coal tamping tower 2 and top are provided with rain and snow device 9.
What the present invention relates to is a kind of station of making firm by ramming that is not modified into tamping coking at 7.63m top dress coke oven under end-of-life state, mainly concentrate on the improvement of coke oven machine side, be close to the make station for tamping coking of tower in pusher side construction of coalingging, existing top, two coal stores being set for making firm by ramming of tamping coking in station and the two cover systems of making firm by ramming are 1#, two coal bunkers of 2#, single storehouse coal storage is more than 500t, 1# coke oven uses 1# coal bunker and 1# to make system firm by ramming, and 2# coke oven uses 2# coal bunker and 2# to make system firm by ramming.In coal tamping tower 2 both sides, plug ramming machine device 4 is set, in coal tamping tower 2 inside, wind-force coal vibrator 6, operation of equipment inspection platform 7 is set, coal bunker let slip a remark 8 bottoms establish shake feeding device 5, be provided with rain and snow device 9 at periphery and the top of coal tamping tower 2.
Cloth coal belt 1 is transported to coal charge in the warehouse of coal tamping tower 2.Coal tamping tower 2 agent structure forms are take steel construction as main, can store 1000 tons of coal charges and carry the weight of the equipment such as plug ramming machine 4, shake material feeder 5, wind-force shake device for coal 6, operation of equipment inspection platform 7 and rain and snow device 9 and structure.Coal charge in coal tamping tower 2 warehouses by coal bunker bicker 8 through shake material feeder 5 evenly deliver in the coal bin of tamping charging car 3, plug ramming machine 4 is by the coal charge tamping of being scattered, tamping charging car 3 is responsible for carrying coal charge in whole process.Wind-force shake device for coal 6 can effectively prevent that coal tamping tower 2 warehouses from stopping up, being arranged on coal tamping tower 2 inside operation of equipment inspection platform 7 is everywhere that operation and service work facilitate, and the rain and snow device 9 at coal tamping tower 2 peripheries and top effectively attended operation environment is not subject to outside natural environment influence.
7.63m of the present invention top dress coke oven is improved to the station of making firm by ramming of tamping coking, both retained its top dress function of coke oven, make again coke oven possess tamping coking function, be conducive to push up the break-in filling with stamp charging mode between transformation and trial production period, can reach again the object of meeting the market requirement after transforming, flexible production.And do not affect the normal production of original system in process of construction, shorten the transformation cycle, saving improvement is this, improves Business Economic Benefit.
7.63m of the present invention top dress coke oven is improved to the station of making firm by ramming of tamping coking, guarantee that structures reasonable stress, structural safety are reliable, there is short construction period, be subject to that site condition restriction is little, transformation process does not stop production does not affect production, be improved to coking system and retained the coaling function of coking of former top, and possesses the function of tamping coking, the feature that has realized top dress coking and tamping coking switching and production handiness, has stronger market adaptability to changes.
Claims (1)
1. 7.63m top dress coke oven is improved to the station of making firm by ramming of tamping coking, it is characterized in that: be by cloth coal belt (1), coal tamping tower (2), tamping charging car (3), plug ramming machine (4), shake material feeder (5), wind-force shake device for coal (6), operation of equipment inspection platform (7), coal bunker is let slip a remark (8) and rain and snow device (9) composition, cloth coal belt (1) is arranged on the top of coal tamping tower (2), coal bunker let slip a remark (8) be positioned at the bottom of coal tamping tower (2), coal bunker is let slip a remark shake material feeder (5) is set under (8), below shake material feeder (5), be provided with tamping charging car 3, the top of tamping charging car (3) is provided with plug ramming machine (4), coal tamping tower (2) inside is provided with wind-force shake device for coal (6) and operation of equipment inspection platform (7), the periphery of coal tamping tower (2) and top are provided with rain and snow device (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410050814.6A CN103805216A (en) | 2014-02-14 | 2014-02-14 | Tamping station with 7.63m top-mounted coke oven improved into tamping coking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410050814.6A CN103805216A (en) | 2014-02-14 | 2014-02-14 | Tamping station with 7.63m top-mounted coke oven improved into tamping coking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103805216A true CN103805216A (en) | 2014-05-21 |
Family
ID=50702615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410050814.6A Pending CN103805216A (en) | 2014-02-14 | 2014-02-14 | Tamping station with 7.63m top-mounted coke oven improved into tamping coking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103805216A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103992803A (en) * | 2014-06-09 | 2014-08-20 | 济钢集团国际工程技术有限公司 | Coke oven equipment capable of producing tamped coke and top-mounted coke |
CN104531190A (en) * | 2015-01-16 | 2015-04-22 | 中国矿业大学 | Process for simultaneously producing machine coke and molded coke by use of stamp-charging coke oven |
CN107298981A (en) * | 2016-04-15 | 2017-10-27 | 北京众联盛化工工程有限公司 | A kind of 7.3m tops dress makes dual-purpose type coke oven production technology firm by ramming |
CN108315023A (en) * | 2018-03-30 | 2018-07-24 | 中冶焦耐(大连)工程技术有限公司 | It is a kind of to be suitable for pushing up the coal supply system that dress makes integrated coke oven firm by ramming |
CN108329934A (en) * | 2018-03-30 | 2018-07-27 | 中冶焦耐(大连)工程技术有限公司 | A kind of top dress makes the coal supply system of integrated coke oven firm by ramming |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3329367C1 (en) * | 1983-08-13 | 1984-11-29 | Gewerkschaft Schalker Eisenhütte, 4650 Gelsenkirchen | Coking oven |
CN201686663U (en) * | 2010-01-26 | 2010-12-29 | 北京首钢国际工程技术有限公司 | Stamp-charging station used in transforming top mounted coke oven into stamp-charging coke oven |
CN102041918A (en) * | 2009-10-22 | 2011-05-04 | 中冶天工建设有限公司 | Construction method of hyperboloidal concrete structure of coal tower storage bunker incline wall |
-
2014
- 2014-02-14 CN CN201410050814.6A patent/CN103805216A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3329367C1 (en) * | 1983-08-13 | 1984-11-29 | Gewerkschaft Schalker Eisenhütte, 4650 Gelsenkirchen | Coking oven |
CN102041918A (en) * | 2009-10-22 | 2011-05-04 | 中冶天工建设有限公司 | Construction method of hyperboloidal concrete structure of coal tower storage bunker incline wall |
CN201686663U (en) * | 2010-01-26 | 2010-12-29 | 北京首钢国际工程技术有限公司 | Stamp-charging station used in transforming top mounted coke oven into stamp-charging coke oven |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103992803A (en) * | 2014-06-09 | 2014-08-20 | 济钢集团国际工程技术有限公司 | Coke oven equipment capable of producing tamped coke and top-mounted coke |
CN104531190A (en) * | 2015-01-16 | 2015-04-22 | 中国矿业大学 | Process for simultaneously producing machine coke and molded coke by use of stamp-charging coke oven |
CN107298981A (en) * | 2016-04-15 | 2017-10-27 | 北京众联盛化工工程有限公司 | A kind of 7.3m tops dress makes dual-purpose type coke oven production technology firm by ramming |
CN108315023A (en) * | 2018-03-30 | 2018-07-24 | 中冶焦耐(大连)工程技术有限公司 | It is a kind of to be suitable for pushing up the coal supply system that dress makes integrated coke oven firm by ramming |
CN108329934A (en) * | 2018-03-30 | 2018-07-27 | 中冶焦耐(大连)工程技术有限公司 | A kind of top dress makes the coal supply system of integrated coke oven firm by ramming |
CN108315023B (en) * | 2018-03-30 | 2024-02-13 | 中冶焦耐(大连)工程技术有限公司 | Coal feeding system suitable for top-loading tamping integrated coke oven |
CN108329934B (en) * | 2018-03-30 | 2024-02-13 | 中冶焦耐(大连)工程技术有限公司 | Coal feeding system of top-loading tamping integrated coke oven |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103805216A (en) | Tamping station with 7.63m top-mounted coke oven improved into tamping coking | |
CN104109755B (en) | A kind of dedusting ash is colded pressing metal pelletizing production system and method | |
CN103436646B (en) | Banking method for damping down of large blast furnace | |
CN103992803B (en) | A kind of stamp-charging coke that can produce can produce again the coke oven for iron that top dress is burnt | |
CN106281387A (en) | A kind of vast scale that realizes allocates the coke production method of low-order coal into | |
CN102226233A (en) | Method and system for pretreating lateritic nickel ore | |
CN202272936U (en) | Material distributing apparatus | |
CN202343286U (en) | Blended coal crushing device | |
CN202938719U (en) | Disc vibration bright-bead filling machine for fireworks | |
Madias et al. | A review on stamped charging of coals | |
CN101941598B (en) | Method for weighing and loading granular goods | |
CN204022910U (en) | A kind of dedusting ash is colded pressing metal pelletizing production system | |
CN203095975U (en) | Recycling device for dry-quenching secondary dust-removal coke powder | |
CN102839244A (en) | Device and method for hot loading of metallized pellets of rotary hearth furnace into blast furnace | |
CN202498022U (en) | System for screening and recycling blast furnace return ore | |
CN201686663U (en) | Stamp-charging station used in transforming top mounted coke oven into stamp-charging coke oven | |
CN201746509U (en) | Iron box stamping coal blending coking test device | |
CN207375997U (en) | Tamping tool | |
CN104315853A (en) | Electric furnace burden feeding conveyance device | |
CN105331374B (en) | A kind of large-scale coking coal cake makes method firm by ramming | |
CN203638792U (en) | Surplus coal recovery device of feeding machine | |
CN201706989U (en) | Fully automatic cartridge sorting machine for industrial explosive packaging lines | |
CN201581104U (en) | Integrated charging set for reduced iron | |
CN207313530U (en) | A kind of staged mixed coal low temperature distillation uniform distribution device | |
CN203890291U (en) | Coke oven equipment capable of producing stamp-charged coke and top-charged coke |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140521 |