CN103802318A - Preparation device for three-dimensional structure - Google Patents

Preparation device for three-dimensional structure Download PDF

Info

Publication number
CN103802318A
CN103802318A CN201410050945.4A CN201410050945A CN103802318A CN 103802318 A CN103802318 A CN 103802318A CN 201410050945 A CN201410050945 A CN 201410050945A CN 103802318 A CN103802318 A CN 103802318A
Authority
CN
China
Prior art keywords
nozzle
shower nozzle
preparation
stereochemical structure
shower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410050945.4A
Other languages
Chinese (zh)
Inventor
黄洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Shang Hui Information Technology Co Ltd
Original Assignee
Qingdao Shang Hui Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Shang Hui Information Technology Co Ltd filed Critical Qingdao Shang Hui Information Technology Co Ltd
Priority to CN201410050945.4A priority Critical patent/CN103802318A/en
Publication of CN103802318A publication Critical patent/CN103802318A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a preparation device for a three-dimensional structure. The shortcomings of relatively high time consumption and relatively low efficiency in a conventional FDM (fused deposition modeling)-technology-based preparation device for the preparation of the three-dimensional structure are overcome. The device comprises a first spraying head, a second spraying head and a feeding part capable of feeding materials to the first and second spraying heads, wherein a first nozzle is arranged on the first spraying head; a second nozzle is arranged on the second spraying head; when the materials are fed to the first and second spraying heads through the feeding part, the softened materials can be simultaneously extruded out of the first and second nozzles to prepare a layer of three-dimensional structure according to a two-dimensional slice of a three-dimensional model in a joint way. According to the preparation device, the preparation time is greatly shortened, and the preparation efficiency is remarkably improved.

Description

A kind of preparation facilities of stereochemical structure
Technical field
The present invention relates to a kind of preparation facilities, relate in particular to a kind of preparation facilities of stereochemical structure.
Background technology
Increase material manufacturing technology gradually by industrial quarters cognition, and start to be applied to multiple industries.Existing based on fusion sediment moulding (Fused Deposition Modeling, FDM) preparation facilities of technology, although formed precision and the article intensity preparing can meet direct applied industrial requirement, also can significantly shorten the R&D cycle of product design, reduce research and development of products cost, but its preparation process is consuming time longer, and efficiency is lower.
Summary of the invention
Technical problem to be solved by this invention is to overcome the lower deficiency of more long-acting rate consuming time in the time of preparation stereochemical structure of the preparation facilities based on FDM technology at present.
In order to solve the problems of the technologies described above, the invention provides a kind of preparation facilities of stereochemical structure, the threedimensional model of described stereochemical structure obtains multiple two dimension slicings after layering is processed; Wherein, this device comprises:
The first shower nozzle, the second shower nozzle and can be the infeed mean of described the first shower nozzle and the second shower nozzle feeding material; On described the first shower nozzle, be provided with the first nozzle, on described the second shower nozzle, be provided with second nozzle; When described infeed mean is described the first shower nozzle and the second shower nozzle feeding material, can from described the first nozzle and second nozzle, extrude softening material, to combine a layer preparing described stereochemical structure according to described threedimensional model two dimension slicing simultaneously.
Preferably, this device comprises:
With described the first nozzle and the equidistant workbench of second nozzle.
Preferably, described the first nozzle and second nozzle on the first direction that is parallel to described workbench at a distance of the first distance.
Preferably, described the first nozzle and second nozzle are at a distance of second distance in the second direction that is parallel to described workbench, and described first direction and described second direction are not parallel.
Preferably, this device comprises:
Framework and be arranged on the traversing carriage on described framework;
Described the first shower nozzle and the second shower nozzle are arranged on described traversing carriage, and described traversing carriage drives described the first shower nozzle and the second shower nozzle in the direction of the one deck perpendicular to described stereochemical structure, to carry out rectilinear motion.
Preferably, described infeed mean comprises and can being the second feeding mechanism of described the second shower nozzle feeding material for the first feeding mechanism of described the first shower nozzle feeding material.
Preferably, when described the first nozzle is positioned at the position that needs filling, described the first feeding mechanism is described the first shower nozzle feeding material; Otherwise described the first feeding mechanism stops as described the first shower nozzle feeding material; When described second nozzle is positioned at the position that needs filling, described the second feeding mechanism is described the second shower nozzle feeding material; Otherwise described the second feeding mechanism stops as described the second shower nozzle feeding material.
Preferably, in described the first nozzle, be provided with the first valve, in described second nozzle, be provided with the second valve; When described the first nozzle is positioned at the position that needs filling, described the first valve opening is to extrude softening material from described the first nozzle, otherwise described the first valve closing; When described second nozzle is positioned at the position that needs filling, described the second valve opening is to extrude softening material from described second nozzle, otherwise described the second valve closing.
Compared with prior art, the application's embodiment can be prepared by two nozzles at synchronization simultaneously, two nozzles just can be prepared two line segments in stereochemical structure one deck through a rectilinear motion, have significantly shortened preparation time, significantly improve preparation efficiency.
Partial Feature of the present invention and advantage will be set forth in the following description, and, partly from description, become apparent, or understand by implementing the present invention.Object of the present invention and other advantages can be realized and be obtained by specifically noted structure or flow process in description, claims and accompanying drawing.
Accompanying drawing explanation
Accompanying drawing is used to provide the further understanding to technical solution of the present invention, and forms a part for description, is used from and explains technical scheme of the present invention with the application's embodiment mono-, does not form the restriction to technical solution of the present invention.
Fig. 1 is the schematic diagram in a first direction of preparation facilities of the stereochemical structure of the embodiment of the present application.
Fig. 2 is the preparation facilities of stereochemical structure of the embodiment of the present application schematic diagram in second direction.
Fig. 3 is the first nozzle and the projected position schematic diagram of second nozzle on workbench in the preparation facilities of stereochemical structure of the embodiment of the present application.
Fig. 4 is a two dimension slicing schematic diagram.
The specific embodiment
Describe embodiments of the present invention in detail below with reference to drawings and Examples, to the present invention, how application technology means solve technical problem whereby, and the implementation procedure of reaching technique effect can fully understand and implement according to this.Each feature in the embodiment of the present application and embodiment is the mutually combining under prerequisite of not conflicting mutually, all within protection scope of the present invention.
Those skilled in the art are through research discovery, and the preparation facilities based on FDM technology is in the time of a stereochemical structure of preparation at present, and the same time is all that single spraying head carries out work, and this is one of reason that the preparation facilities operating efficiency based on FDM technology is lower at present.Although part preparation facilities has configured two or more shower nozzles, these shower nozzles can't be used for preparing same stereochemical structure simultaneously.Some is to prepare independently of one another the stereochemical structure that structure is identical, and this class preparation facilities can be prepared multiple duplicate stereochemical structures simultaneously; Some is to prepare stage by stage same stereochemical structure, the material that this class preparation facilities can adopt different nozzles to extrude different colours is prepared respectively the part of same stereochemical structure differing heights, or adopts different nozzles to carry out the preparation of different demands for the different parts of same stereochemical structure (such as smooth outer surface and be positioned at inner comparatively sparse filling part).But these preparation facilities, in the time of a stereochemical structure of preparation, still only have a shower nozzle in work at synchronization, therefore this class preparation facilities is in the time preparing single stereochemical structure, and efficiency is difficult to improve.
The preparation facilities of the stereochemical structure of the embodiment of the present application, is mainly used in preparing stereochemical structure according to the threedimensional model of stereochemical structure.Normally, threedimensional model is carried out to layering and process a series of two dimension slicings that obtain this threedimensional model, then successively prepare according to this series of two dimension slicing, by successively piling up this stereochemical structure of last acquisition.
As depicted in figs. 1 and 2, the preparation facilities of the stereochemical structure of the embodiment of the present application, mainly includes the first shower nozzle 11, the second shower nozzle 12, and is infeed mean 20 of the first shower nozzle 11 and the second shower nozzle 12 feeding materials etc.On the first shower nozzle 11, be provided with on the first nozzle 110, the second shower nozzles 12 and be provided with second nozzle 120.When infeed mean 20 is the first shower nozzle 11 and the second shower nozzle 12 feeding material, by to modes such as material heat, can from the first nozzle 110 and second nozzle 120, extrude softening material simultaneously, with according to the threedimensional model of stereochemical structure two dimension slicing, be positioned at workbench 30 below the first shower nozzle 11 and the second shower nozzle 12 or other are prepared in plane, combining one deck corresponding to this two dimension slicing of preparing stereochemical structure.Alternatively, according to the needed formed precision of stereochemical structure, to allow the factor such as time of this stereochemical structure of preparation, the thickness (hereinafter referred to as floor height) of one deck of stereochemical structure can be 0.1 millimeter, 0.2 millimeter etc.Usually, floor height is less, and the formed precision of stereochemical structure is higher, correspondingly consuming time also longer.
The first nozzle 110 and second nozzle 120 equate with the distance of workbench 30.Distance between the first nozzle 110 and second nozzle 120 and workbench 30 is adjusted to suitable size, in the time that infeed mean 20 is the first shower nozzle 11 and the second shower nozzle 12 feeding material, from the first nozzle 110 and second nozzle 120, extrude that softening material just can be bonded at workbench 30 or other are prepared in plane, thereby can prepare one deck of stereochemical structure.Such as, in preparation process, the softening material that each nozzle is extruded also can be deposited on one deck of this stereo product of previously having prepared, thus one deck that preparation makes new advances, and one deck of now previously having prepared is a preparation plane.
As shown in Figure 1, Figure 2 and shown in Fig. 3, in the application's embodiment, the first nozzle 110 and second nozzle 120 on the first direction that is parallel to workbench 30 at a distance of first apart from x, in the second direction that is parallel to workbench 30, at a distance of second distance y, this first direction and this second direction are not parallel.In Fig. 3, some A represents the projected position of the first nozzle 110 on workbench 30, and some B represents the projected position of second nozzle 120 on workbench 30.Typically, this first direction is mutually vertical with second direction.Such as, this first direction can be the X-direction in three-dimensional system of coordinate, this second direction can be the Y direction in three-dimensional system of coordinate.This can equate first apart from x and second distance y, also can be unequal.
As depicted in figs. 1 and 2, the preparation facilities of the stereochemical structure of the embodiment of the present application, also comprises traversing carriage 40 and framework 50 etc.The first shower nozzle 11 and the second shower nozzle 12 are fixedly linked with infeed mean 20, and infeed mean 20 is arranged on traversing carriage 40, and traversing carriage 40 and workbench 30 etc. is arranged on framework 50.Traversing carriage 40 can carry out rectilinear motion in the direction perpendicular to workbench 30, thereby drives the first shower nozzle 11 and the second shower nozzle 12 in the direction perpendicular to workbench 30, to carry out rectilinear motion.Wherein, when aforesaid first direction and second direction are respectively X-direction in three-dimensional system of coordinate and Y direction, can be just Z-direction perpendicular to the direction of workbench 30.
The preparation facilities of the embodiment of the present application, infeed mean 20 be the first shower nozzle 11 and the second shower nozzle 12 feedings be that filamentary material is such as plastic wire etc.Common plastic wire is such as having PLA plastic wire or ABS plastic silk etc.In other embodiments, infeed mean 20 be the first shower nozzle 11 and the second shower nozzle 12 feedings can be also that softening material ratio is as the chocolate in soft state, or concrete etc., thus can prepare the stereochemical structure take chocolate as raw material that can eat, or building etc.
The preparation facilities of the embodiment of the present application, before application, has carried out layering processing to the threedimensional model of stereochemical structure, obtains a series of two dimension slicing of threedimensional model.Fig. 4 shows and is applicable to the two dimension slicing that the preparation facilities of the embodiment of the present application is prepared.This two dimension slicing shown in Fig. 4, expression be the square-section that inside includes two circular holes, the upper left corner that operation original position is this two dimension slicing.Two nozzles preparation path and preparation direction on this two dimension slicing, is illustrated in Fig. 4 with lines and arrow respectively.Wherein, what solid line represented is the preparation path of the first nozzle, and what dotted line represented is the preparation path of second nozzle.
It should be noted that, the two dimension slicing shown in Fig. 4, has comprised two circles that are positioned at this square-section marginal position of being prepared by second nozzle, is equivalent to the border of this square-section.In the application's embodiment, this border is to be completed separately by second nozzle, and inner filling is combined preparation by the first nozzle and second nozzle.Certainly,, as two circles on the border of this square-section, it is equally also feasible being completed separately by the first nozzle.
When the outer profile size of stereochemical structure in aforementioned second direction is greater than the first nozzle and the distance of second nozzle in second direction, the preparation facilities of a embodiment of the present application rectilinear motion in a first direction just can be prepared two line segments on of a stereochemical structure layer simultaneously.Thereby, for a layer of stereochemical structure, constantly change the first nozzle and the second nozzle position relationship with respect to workbench by traversing carriage etc., can be according to corresponding two dimension slicing, intactly prepare a layer of this stereochemical structure.
It should be noted that, in the application's embodiment, the first nozzle and the second nozzle rectilinear motion in first direction and/or second direction, can be to keep workbench to realize with respect to the invariant position of framework by mobile the first nozzle and second nozzle, can be also to keep the first nozzle and second nozzle to realize with respect to the invariant position of framework by mobile working platform.That is to say that the first nozzle and the second nozzle rectilinear motion in first direction and/or second direction refers to the first nozzle and second nozzle for workbench.
In the time of specific implementation, can be that the first nozzle and second nozzle can carry out reciprocal rectilinear motion in a first direction, and workbench can carry out reciprocal rectilinear motion in second direction.In this case, the first nozzle and second nozzle rectilinear motion in a first direction, is to drive the first shower nozzle and the second shower nozzle to carry out realizing with respect to the rectilinear motion of framework by traversing carriage; The first nozzle and the second nozzle rectilinear motion in second direction is to realize with respect to the rectilinear motion of framework by workbench.
Certainly, can also there is other specific implementation.Such as, it is fixing that the relative position of workbench and framework keeps, and the first nozzle and second nozzle both can carry out the rectilinear motion with respect to framework in a first direction, also can in second direction, carry out the rectilinear motion with respect to framework.Under this situation, the first nozzle and the second nozzle rectilinear motion in first direction and second direction, is all to drive the first shower nozzle and the second shower nozzle to carry out realizing with respect to the rectilinear motion of framework by traversing carriage.For another example, it is fixing that the relative position of the first shower nozzle and the second shower nozzle and framework keeps, and workbench both can carry out the rectilinear motion with respect to framework in a first direction, also can in second direction, carry out the rectilinear motion with respect to framework.Under this situation, the first nozzle and the second nozzle rectilinear motion in first direction and second direction, is all to be undertaken realizing with respect to the rectilinear motion of framework by mobile working platform.
When the preparation facilities of the embodiment of the present application is prepared stereochemical structure according to the two dimension slicing shown in Fig. 4, the first nozzle is in preparation border in the 7th line segment from top to bottom, and second nozzle is prepared in border first line segment from top to bottom.The first nozzle is in preparation border in the 8th line segment from top to bottom, and second nozzle is prepared in border second line segment from top to bottom.Wherein, the line segment shown in Fig. 4 (being also the preparation path of nozzle) is parallel to aforesaid first direction.
Through reciprocal rectilinear motion, when the first shower nozzle and the second shower nozzle are in the time that second party has moved up aforesaid second distance y, the first nozzle and second nozzle are just combined and have been prepared the width that doubles this second distance y in second direction.Afterwards, the first shower nozzle and the second shower nozzle after moving up this second distance y, second party are proceeded to preparation.As shown in Figure 4, if traversing carriage drives the first shower nozzle and the operation line by line of the second shower nozzle, in direction from top to bottom, altogether (in Fig. 4, this second distance is shown y) with the width sums in 6 preparation paths when mobile second distance y, the first nozzle and second nozzle will be combined and prepared the width that doubles this second distance y in direction from top to bottom, because the first nozzle has been prepared the width of a second distance y in direction from top to bottom, second nozzle has also been prepared the width of a second distance y simultaneously in direction from top to bottom.Then, traversing carriage directly drives the first shower nozzle and the second shower nozzle to continue to move up in the side of falling down from above a second distance y, strides across the part prepared by the first nozzle, then proceeds preparation.In the time that traversing carriage drives the first shower nozzle and the second shower nozzle to stride across this second distance y, the first nozzle and second nozzle will stop preparation, can from nozzle, not extrude softening material.
It should be noted that, the first nozzle and second nozzle are in the time being prepared according to two dimension slicing shown in Fig. 4, do not need the part of filling for circular hole part or other, the first nozzle or second nozzle, stop preparation through out-of-date meeting, can not extrude softening material from nozzle yet.
Therefore, than the preparation facilities of single spraying head (single injector in other words) that can only prepare single line section at every turn, in the preparation facilities of the embodiment of the present application, two shower nozzle synchronization actions, complete a rectilinear motion and just can prepare two line segments simultaneously, therefore can significantly shorten the needed time of stereochemical structure of preparation, significantly improve preparation efficiency.The two dimension slicing that is rectangle for the outline shown in Fig. 4, preparation time can be shortened to single spraying head is prepared approximately 50%.
Certainly, two dimension slicing as shown in Figure 4 and preparation path and direction, if through preparation after a while, the size of remainder in second direction is less than the first nozzle and the distance of second nozzle in second direction, now can select arbitrarily the first nozzle or second nozzle to proceed preparation.
The preparation facilities of the embodiment of the present application, if the preparation path of the first nozzle and second nozzle is parallel to first direction, and stereochemical structure is greater than the first nozzle and the distance of second nozzle in second direction corresponding to the outer profile size of layer in second direction of two dimension slicing, so at least, corresponding to a part for this two dimension slicing, the first nozzle and second nozzle can be prepared simultaneously.The situation that the first nozzle and second nozzle cannot be prepared simultaneously, it is mainly the preparation through the first nozzle and second nozzle, the outer profile size of remainder in second direction on this layer, while being less than distance in second direction of the first nozzle and second nozzle, can only select first or second nozzle carry out independent preparation.
The preparation facilities of the embodiment of the present application, the position relationship of infeed mean and the first shower nozzle and the second shower nozzle, can be the near-end feeding style of close together as depicted in figs. 1 and 2.In other embodiments, infeed mean can be also away from the mounting means of the first shower nozzle and the second shower nozzle, is conventionally referred to as long-range feeding.
For near-end feeding style, infeed mean comprises can being the first feeding mechanism and second feeding mechanism of the first shower nozzle and the second shower nozzle separate feeds.Wherein, the first feeding mechanism is the first shower nozzle charging, and the second feeding mechanism is the second shower nozzle charging, is separate, and the charging operation of the two is not disturbed each other.
In preparation process, in the time that the first nozzle is positioned at the position that needs filling, the first feeding mechanism is the first shower nozzle feeding material, and softening material is extruded to be prepared from the first nozzle; Otherwise in the time that the first nozzle is positioned at the position that does not need filling, it is the first shower nozzle feeding material that the first feeding mechanism stops, and because material softening in the first nozzle does not have the pressure of follow-up charging, thereby can not be extruded.In like manner, when second nozzle is positioned at the position that needs filling, the second feeding mechanism is the second shower nozzle feeding material; Otherwise it is the second shower nozzle feeding material that the second feeding mechanism stops.
No matter the application's embodiment, be the preparation method of near-end feeding or the preparation method of long-range feeding, all can the first valve be set in the first nozzle, and the second valve is set in second nozzle.The first valve opens or closes the first nozzle under the control action of the first controller, and the second valve opens or close second nozzle under the control action of second controller, and the first controller and second controller are separate.When the first nozzle is positioned at the position that needs filling, the first valve opening, material softening in the first nozzle is extruded under the pressure of follow-up charging; Otherwise, in the time that the first nozzle is positioned at the position that does not need filling, the first valve closing, softening material can not be extruded.In like manner, when second nozzle is positioned at the position that needs filling, the second valve opening is to extrude softening material in order to be prepared from second nozzle, otherwise the second valve closing.This first valve and the second valve, such as being needle-valve.
The part that it is apparent to those skilled in the art that the device that above-mentioned the embodiment of the present application provides, they can concentrate on single calculation element, or are distributed on the network that multiple calculation elements form.Alternatively, they can be realized with the executable program code of calculation element.Thereby, they can be stored in storage device and be carried out by calculation element, or they are made into respectively to each integrated circuit modules, or the multiple modules in them or step are made into single integrated circuit module realize.Like this, the present invention is not restricted to any specific hardware and software combination.
Although the disclosed embodiment of the present invention as above, the embodiment that described content only adopts for ease of understanding the present invention, not in order to limit the present invention.Those of skill in the art under any the present invention; do not departing under the prerequisite of the disclosed spirit and scope of the present invention; can in the form of implementing and details, carry out any modification and variation; but scope of patent protection of the present invention, still must be as the criterion with the scope that appending claims was defined.

Claims (8)

1. a preparation facilities for stereochemical structure, the threedimensional model of described stereochemical structure obtains multiple two dimension slicings after layering is processed; Wherein, this device comprises:
The first shower nozzle, the second shower nozzle and can be the infeed mean of described the first shower nozzle and the second shower nozzle feeding material; On described the first shower nozzle, be provided with the first nozzle, on described the second shower nozzle, be provided with second nozzle; When described infeed mean is described the first shower nozzle and the second shower nozzle feeding material, can from described the first nozzle and second nozzle, extrude softening material, to combine a layer preparing described stereochemical structure according to described threedimensional model two dimension slicing simultaneously.
2. device according to claim 1, wherein, this device comprises:
With described the first nozzle and the equidistant workbench of second nozzle.
3. device according to claim 2, wherein:
Described the first nozzle and second nozzle on the first direction that is parallel to described workbench at a distance of the first distance.
4. device according to claim 3, wherein:
Described the first nozzle and second nozzle are at a distance of second distance in the second direction that is parallel to described workbench, and described first direction and described second direction are not parallel.
5. device according to claim 1 and 2, wherein, this device comprises:
Framework and be arranged on the traversing carriage on described framework;
Described the first shower nozzle and the second shower nozzle are arranged on described traversing carriage, and described traversing carriage drives described the first shower nozzle and the second shower nozzle in the direction of the one deck perpendicular to described stereochemical structure, to carry out rectilinear motion.
6. device according to claim 1, wherein:
Described infeed mean comprises and can being the second feeding mechanism of described the second shower nozzle feeding material for the first feeding mechanism of described the first shower nozzle feeding material.
7. device according to claim 6, wherein:
When described the first nozzle is positioned at the position that needs filling, described the first feeding mechanism is described the first shower nozzle feeding material; Otherwise described the first feeding mechanism stops as described the first shower nozzle feeding material;
When described second nozzle is positioned at the position that needs filling, described the second feeding mechanism is described the second shower nozzle feeding material; Otherwise described the second feeding mechanism stops as described the second shower nozzle feeding material.
8. device according to claim 1, wherein:
In described the first nozzle, be provided with the first valve, in described second nozzle, be provided with the second valve;
When described the first nozzle is positioned at the position that needs filling, described the first valve opening is to extrude softening material from described the first nozzle, otherwise described the first valve closing;
When described second nozzle is positioned at the position that needs filling, described the second valve opening is to extrude softening material from described second nozzle, otherwise described the second valve closing.
CN201410050945.4A 2014-02-14 2014-02-14 Preparation device for three-dimensional structure Pending CN103802318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410050945.4A CN103802318A (en) 2014-02-14 2014-02-14 Preparation device for three-dimensional structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410050945.4A CN103802318A (en) 2014-02-14 2014-02-14 Preparation device for three-dimensional structure

Publications (1)

Publication Number Publication Date
CN103802318A true CN103802318A (en) 2014-05-21

Family

ID=50699927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410050945.4A Pending CN103802318A (en) 2014-02-14 2014-02-14 Preparation device for three-dimensional structure

Country Status (1)

Country Link
CN (1) CN103802318A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104162989A (en) * 2014-07-24 2014-11-26 合肥斯科尔智能科技有限公司 Synchronous multi-output three-dimensional printer
CN104175555A (en) * 2014-07-24 2014-12-03 合肥斯科尔智能科技有限公司 Coplanar double-jet three-dimensional printer
CN105172135A (en) * 2015-07-23 2015-12-23 南京师范大学 Printing method of multi-sprayer high-speed FDM model
CN105459400A (en) * 2015-12-19 2016-04-06 天津创天图文设计有限公司 Multifunctional 3D printer
WO2017048865A1 (en) * 2015-09-16 2017-03-23 Applied Materials, Inc. Adjustable z-axis printhead module for additive manufacturing system
CN109910303A (en) * 2019-03-11 2019-06-21 广西电网有限责任公司防城港供电局 A kind of double spray polychrome 3D printers
US11002530B2 (en) 2016-09-20 2021-05-11 Applied Materials, Inc. Tiltable platform for additive manufacturing of a polishing pad
US11446740B2 (en) 2014-07-09 2022-09-20 Applied Materials, Inc. Multiple sequential linear powder dispensers for additive manufacturing

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103496166A (en) * 2013-10-16 2014-01-08 西安科技大学 Rapid-prototyping-technology-based micro-nano sensor production method and device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103496166A (en) * 2013-10-16 2014-01-08 西安科技大学 Rapid-prototyping-technology-based micro-nano sensor production method and device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11446740B2 (en) 2014-07-09 2022-09-20 Applied Materials, Inc. Multiple sequential linear powder dispensers for additive manufacturing
CN104175555B (en) * 2014-07-24 2017-09-22 芜湖林一电子科技有限公司 A kind of coplanar double injection three-dimensional printing machines
CN104175555A (en) * 2014-07-24 2014-12-03 合肥斯科尔智能科技有限公司 Coplanar double-jet three-dimensional printer
CN104162989A (en) * 2014-07-24 2014-11-26 合肥斯科尔智能科技有限公司 Synchronous multi-output three-dimensional printer
CN105172135A (en) * 2015-07-23 2015-12-23 南京师范大学 Printing method of multi-sprayer high-speed FDM model
US10391707B2 (en) 2015-09-16 2019-08-27 Applied Materials, Inc. Additive manufacturing system having laser and dispenser on common support
IL257508A (en) * 2015-09-16 2018-06-28 Applied Materials Inc Adjustable z-axis printhead module for additive manufacturing system
US10350824B2 (en) 2015-09-16 2019-07-16 Applied Materials, Inc. Cantilever support of printhead module for additive manufacturing system
WO2017048865A1 (en) * 2015-09-16 2017-03-23 Applied Materials, Inc. Adjustable z-axis printhead module for additive manufacturing system
US11207826B2 (en) 2015-09-16 2021-12-28 Applied Materials, Inc. Additive manufacturing system having blade and dispenser on common support
CN105459400A (en) * 2015-12-19 2016-04-06 天津创天图文设计有限公司 Multifunctional 3D printer
US11002530B2 (en) 2016-09-20 2021-05-11 Applied Materials, Inc. Tiltable platform for additive manufacturing of a polishing pad
CN109910303A (en) * 2019-03-11 2019-06-21 广西电网有限责任公司防城港供电局 A kind of double spray polychrome 3D printers

Similar Documents

Publication Publication Date Title
CN103802318A (en) Preparation device for three-dimensional structure
CN103802317A (en) Additive manufacturing device
CN105196549B (en) A kind of parallel multistation formula 3D printer
CN103434135B (en) A kind of colored 3D printer and prepare the method for three-dimensional article
US20160039194A1 (en) Additive manufacturing using miscible materials
CN105880593B (en) The device and method of more laser line beam printing-type scanning Rapid Prototyping Manufacturing parts
CN106061717A (en) Method for producing three-dimensionally shaped object
EP3532268B1 (en) Modular additive manufacturing system
CN208194809U (en) A kind of building curtain wall intelligence glue injection units
CN103395207A (en) Three-dimensional (3D) printer and method for preparing three-dimensional products by use of 3D printer
CN105984135B (en) A kind of 3D printing device and implementation method manufacturing Weaving type cloth fabric
CN104162989A (en) Synchronous multi-output three-dimensional printer
CN104695644A (en) Forming method of cement decorating plate with pre-buried hanging pieces and reserved steel wire mesh lap joints
CN203472158U (en) 3D (Three-Dimensional) printing realizing device based on fused deposition modeling
CN103802316A (en) Preparation method of stereostructure
CN103802319A (en) Additive manufacturing method
CN103501662A (en) Method for manufacturing picture frame and system thereof
JP2023535614A (en) Method and system for three-dimensional printing on fabric
CN104162987A (en) Cleaning-type three-dimensional printer
CN107415238A (en) A kind of subregion shaping method and apparatus of three-dimensional body
CN104441605B (en) A kind of footwear boots folder wrinkle machine and folder wrinkle method thereof
CN104175555A (en) Coplanar double-jet three-dimensional printer
CN205097560U (en) Seal device is spouted to three -dimensional
CN104450210A (en) Multi-packed candles and multi-packed candle production line
CN205705349U (en) A kind of many shower nozzles compound molding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140521