CN103793569B - The segmentation docking calculation of large hydraulic natural gas storage conveyor module - Google Patents
The segmentation docking calculation of large hydraulic natural gas storage conveyor module Download PDFInfo
- Publication number
- CN103793569B CN103793569B CN201410044040.6A CN201410044040A CN103793569B CN 103793569 B CN103793569 B CN 103793569B CN 201410044040 A CN201410044040 A CN 201410044040A CN 103793569 B CN103793569 B CN 103793569B
- Authority
- CN
- China
- Prior art keywords
- modules
- computer
- coordinate
- docked
- docking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Image Processing (AREA)
Abstract
The invention discloses the segmentation docking calculation of large hydraulic natural gas storage conveyor module, it comprises the following steps: two modules to be docked are individually positioned on axis vehicle by (1), then adjusts two axis vehicles to adjust the relative position of to be docked two module;(2) waiting that the sustained height docking two modules sets a coordinate basis point, it is ensured that this coordinate basis point can be taken in two photos during shooting;(3) use photographic equipment two complete images treating interface of shooting, then image is passed to computer;(4) computer accepts to come from the view data of photographic equipment, use computer according to coordinate basis o'clock to two width image rendering rectangular coordinate systems, and two images photographed are respectively adopted method of least square be fitted, comparison, calculate adjustment body and need adjusted value, then output needs the control command of adjusted value to loading the axis vehicle adjusting body, adjusts the state of axis vehicle.This method is used to improve safety.
Description
Technical field
The present invention relates to the segmentation docking calculation of module, particularly relate to dividing of large hydraulic natural gas storage conveying module
Section docking calculation.
Background technology
Large hydraulic natural gas (LNG) is that compressed intensification, at the work of mix refrigerant by after natural gas purification processing
Under with, remove impurity therein, finally give the natural gas of-162 degree liquid forms.At present, International Crude Oil rises, domestic
The demand sharp increase of outer natural gas.Characteristic due to LNG itself so that it is increasingly favored by countries in the world.To liquefaction
The research tool of natural gas and equipment thereof has very important significance.
Due to the feature that own vol is the highest with precision prescribed so that it must be carried out sub-module and build to ensure module
The construction precision of each unit module, meets requirement to the general assembly precision that module is last and lays a good foundation.In practical set process
In, owing to large hydraulic natural gas (LNG) storage conveying is with involved critical piece such as pipeline, mostly belong to curved surface, generally
There is the features such as complex contour, volume and weight is huge, therefore, digitized dock oneself so become large-sized mechanical components manufacture and
One of requisite key link in assembling.
Summary of the invention
It is an object of the invention to overcome the deficiency of prior art, it is provided that one can safety, accurately mobile docking object,
Improve the segmentation docking calculation of the large hydraulic natural gas storage conveyor module of merging precision simultaneously.
In order to achieve the above object, the technical solution used in the present invention is:
The segmentation docking calculation of the large hydraulic natural gas storage conveyor module of the present invention, it comprises the following steps:
(1) two modules to be docked are individually positioned on axis vehicle, then adjust two axis vehicles with adjust treat right
Two of two modules connect treat the relative position of interface;
(2) set a coordinate basis point respectively at the sustained height waiting to dock two modules, when ensureing shooting simultaneously
The coordinate basis point of this respective modules can be taken in by two photos;
(3) use photographic equipment two complete images treating interface of shooting, then image is passed to computer;
(4) computer accepts to come from the view data of photographic equipment, uses computer according to coordinate basis o'clock to two width
Image rendering rectangular coordinate system, and two images photographed are respectively adopted method of least square are fitted obtaining two profile diagrams
Coordinate basis point use computer is overlapped by sigmoid curves again, and two such fitted figure is in same coordinate system,
Then on the basis of one of them contour pattern curve, using another contour pattern curve as adjusting body to two after matching
Contour pattern curve is compared, if the comparison error control of two contour pattern curves is in set point, then and computer
Output control command is to axis vehicle, it is achieved two docking treating interface of two modules to be docked, if two profile diagrams
Sigmoid curves comparison error is outside set point, then computer is according to matrix conversion, sets up the coordinate on image and world coordinate system
Relation, calculate adjustment body need adjusted value, then output need adjusted value control command give load adjust body axis vehicle, adjust
The state of whole axis vehicle, then repeats described step (3) and (4) until two of two modules to be docked are treated interface
Till being docking together exactly.
The invention has the beneficial effects as follows: be possible not only to effectively, accurately the object needing docking moved, also simultaneously
It can be made to be docking together with higher precision, improve safety, minimizing accident occurs.
Accompanying drawing explanation
Fig. 1 is that the module docking of the segmentation docking calculation of the large hydraulic natural gas storage conveyor module of this employing invention is shown
It is intended to;
Fig. 2 is the process schematic setting up rectangular coordinate system according to datum mark;
Fig. 3 is the complex face schematic diagram needing matching.
Detailed description of the invention
The as shown in drawings segmentation docking calculation of the large hydraulic natural gas storage conveyor module of the present invention, it include with
Lower step:
(1) two modules to be docked are individually positioned on axis vehicle 1, then adjust two axis vehicles with adjust treat right
Two of two modules connect treat the relative position of interface.
Described axis vehicle is commercially available, and axis vehicle mainly has techniques below feature: axis vehicle uses all-hydraulic suspension type
Vehicle frame, independent hydraulic system can control the height of each wheel, local wheel uniform load;The every axle of axis vehicle is equipped with two groups
Wheel, often group wheel independently controls to turn to, and completes to advance, retreats, turns to and the action such as rotation;Axis vehicle use one group of four axle or
The modularized design of six one group of axles, can carry out arbitrarily laterally or longitudinally combining;Axis vehicle is the highest to ground requirement for bearing capacity, only
Wanting reasonable Arrangement, usual prevailing roadway just can meet driving requirements.Due to these advantages so that be easy to change the appearance of docking object
State position, the feature having that docking efficiency is high, environmental suitability is strong etc..
(2) set a coordinate basis point respectively at the sustained height waiting to dock two modules 2, when ensureing shooting simultaneously
The coordinate basis point of this respective modules can be taken in by two photos;
(3) use photographic equipment 3 to shoot two complete images treating interface, then and by image pass to computer;
If butting surface is clear-cut, then can directly shoot, if unclear, on two mechanical part surfaces especially
It is docking measuring surface near zone, pastes a number of feature mark poiX, treat respective shape spy of interface obtaining two
Levy.
(4) computer accepts to come from the view data of photographic equipment, uses computer according to coordinate basis o'clock to two width
Image rendering rectangular coordinate system, process is as in figure 2 it is shown, and be respectively adopted method of least square to two images photographed and be fitted
Obtaining two contour pattern curves, then overlapped by coordinate basis point use computer, two such fitted figure is at
In same coordinate system, then on the basis of one of them contour pattern curve, using another contour pattern curve as adjustment
Two contour pattern curves after matching are compared by body, if the comparison error control of two contour pattern curves is setting
In the range of, then computer export control command is to axis vehicle, it is achieved two docking treating interface of two modules to be docked,
If two contour pattern curve comparison errors are outside set point, then computer is according to matrix conversion, sets up the seat on image
Mark and the relation of world coordinate system, calculate adjustment body and need adjusted value, and then output needs the control command of adjusted value to adjust to loading
Overall axis vehicle, adjusts the state of axis vehicle, then repeats described step (3) and (4) until two moulds to be docked
Till two of block treat that interface is docking together exactly.
Using method of least square to be fitted in this step, known another characteristic is generally circular in cross section or oval special
Levy.But method for solving is consistent.Concrete solution procedure is:
First pixel is transformed under image coordinate system
(o, u, v)-image pixel coordinates system,
(o, x, y)-plane of delineation coordinate system,
(u0,v0The initial point of)-plane of delineation coordinate system coordinate under image pixel coordinates system.
dxAnd dy-each pixel physical length in x-axis and y-axis direction
(1) equation then making ellipse is x2+axy+by2+ cx+dy=e
Deviation δ=x2+axy+by2+cx+dy-e
The sum of squares function of deviation If thinking elliptic curve
Matching best, it is only necessary to makeAn available equation group about x Yu y, from gained
To figure in select the point of five nonlinear correlations and bring into wherein, available a, b, c, d, e, i.e. obtain elliptic equation.
(2) if justifying then b=1, thenNeed to select four points to bring into wherein, obtain circle side
Journey.Calculate ellipse or the center of circle (x of circle according to formula simultaneously0,y0), due to the accuracy meeting of the oval area endpoint detections
Have impact on final elliptical center location.Edge difference is carried out the ellipse fitting of more than five times, then it is averaged
I.e.
Each fit solution is uniformly looked on ellipse 10 points bring into
Equation, detects it, removes the equation as reality of minimum.Reject the marginal point that deviation is bigger, thereby may be ensured that plan
The legal elliptical center coordinate tried to achieve can reach higher positioning precision.
(3) for general feature, the method that piecewise fitting can be used, irregular figure as shown in Figure 3.
In coordinate system OXY, owing to whole contour pattern is irregular, but every part can regard again rule as
Straight line and circular curve.So can be with piecewise fitting when of being fitted.
Can first set for straight line and take its curvilinear equation as y=a0+a1X, then as choosing three some A, B, C as shown in Figure.
A, B be from linear end slightly close to 2 points, and C point is A, B midpoint.Then use the method for minimum quadratic fit by other straight line
Equation is obtained.The most once can obtain the equation of another two straight lines.The equation of circle can be asked according to (1) (2) described mode
Take.End product is the comprehensive of all equation formulas.
According to matrix conversion in this step, set up on image the detailed process of the relation of Coordinate Conversion in June, 2009 north
Capital university of communications Master's thesis " moving object position and attitude measures a systematic study " literary composition is described in detail.
Embodiment 1
(1) two modules to be docked are individually positioned on axis vehicle, then adjust two axis vehicles with adjust treat right
Two of two modules connect treat the relative position of interface;
(2) set a coordinate basis point respectively at the sustained height waiting to dock two modules, when ensureing shooting simultaneously
The coordinate basis point of respective modules can be taken in by two photos;
(3) use photographic equipment two complete images treating interface of shooting, then image is passed to computer;
(4) computer accepts to come from the view data of photographic equipment, uses computer according to coordinate basis o'clock to two width
Image rendering rectangular coordinate system, and two images photographed are respectively adopted method of least square are fitted obtaining two profile diagrams
Sigmoid curves, then coordinate basis point use computer is overlapped, two such fitted figure is in same coordinate system,
Then on the basis of one of them contour pattern curve, using another contour pattern curve as adjusting body to two after matching
Contour pattern curve is compared, if the comparison error control of two contour pattern curves is in set point, then and computer
Output control command is to axis vehicle, it is achieved two docking treating interface of two modules to be docked, if two profile diagrams
Sigmoid curves comparison error is outside set point, then computer is according to matrix conversion, sets up the coordinate on image and world coordinate system
Relation, calculate adjustment body need adjusted value, then output need adjusted value control command give load adjust body axis vehicle, adjust
The state of whole axis vehicle, then repeats described step (3) and (4) until two of two modules to be docked are treated interface
Till being docking together exactly.
Use this method to be possible not only to effectively, accurately the object needing docking moved, can also be made it simultaneously
Being docking together with higher precision, improve safety, minimizing accident occurs.
Claims (1)
1. the segmentation docking calculation of large hydraulic natural gas storage conveyor module, it is characterised in that it comprises the following steps:
(1) two modules to be docked are individually positioned on axis vehicle, then adjust two axis vehicles to be docked to adjust
Two of two modules treat the relative position of interface;
(2) waiting that the sustained height docking two modules sets a coordinate basis point respectively, at two simultaneously when ensureing to shoot
The coordinate basis point of this respective modules can be taken in by photo;
(3) use photographic equipment two complete images treating interface of shooting, then image is passed to computer;
(4) computer accepts to come from the view data of photographic equipment, uses computer according to coordinate basis o'clock to two width images
Draw rectangular coordinate system, and two images photographed are respectively adopted method of least square are fitted obtaining two contour pattern songs
Coordinate basis point use computer is overlapped by line again, and two such fitted figure is in same coordinate system, then
On the basis of one of them contour pattern curve, using another contour pattern curve as adjusting body to two profiles after matching
Graph curve is compared, if the comparison error control of two contour pattern curves is in set point, then and computer export
Control command is to axis vehicle, it is achieved two docking treating interface of two modules to be docked, if two contour pattern songs
Line comparison error is outside set point, then computer is according to matrix conversion, sets up the pass of the coordinate on image and world coordinate system
System, calculates adjustment body and needs adjusted value, and then output needs the control command of adjusted value to loading the axis vehicle adjusting body, adjusts axle
The state of line car, then repeats described step (3) and (4) until two of two modules to be docked are treated that interface is accurate
Be docking together till;
In this step, employing method of least square for the Feature Segmentation fit procedure of general profile is:
Straight line is first set and takes its curvilinear equation as y=a0+a1X, then chooses three points on straight line, and wherein 2 is from directly
2 points that line end is the nearest, another point is the midpoint of described 2, then uses the method for minimum quadratic fit by other
Linear equation is obtained, and in the feature of described general profile, the equation of circle is asked for according to formula one and formula two mode;
If formula one oval feature, then the equation making ellipse is x2+axy+by2+ cx+dy=e
Deviation δ=x2+axy+by2+cx+dy-e
The sum of squares function of deviationIf thinking, matching obtains
Good elliptic curve, then makeObtain an equation group about x Yu y, from step (3)
The point selecting five nonlinear correlations in the figure treating interface that shooting obtains is brought into wherein, available a, b, c, d, e, i.e. obtains
Elliptic equation;
Formula two is if justifying then b=1, thenNeed to select four points to bring into wherein, obtain circle side
Journey.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410044040.6A CN103793569B (en) | 2014-01-28 | 2014-01-28 | The segmentation docking calculation of large hydraulic natural gas storage conveyor module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410044040.6A CN103793569B (en) | 2014-01-28 | 2014-01-28 | The segmentation docking calculation of large hydraulic natural gas storage conveyor module |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103793569A CN103793569A (en) | 2014-05-14 |
CN103793569B true CN103793569B (en) | 2016-11-16 |
Family
ID=50669231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410044040.6A Active CN103793569B (en) | 2014-01-28 | 2014-01-28 | The segmentation docking calculation of large hydraulic natural gas storage conveyor module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103793569B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104574502A (en) * | 2014-12-22 | 2015-04-29 | 博迈科海洋工程股份有限公司 | Laser cross section feature identification method based on steel structure model |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3903453A1 (en) * | 1989-02-06 | 1990-08-09 | Licentia Gmbh | Sealing frame for an assembled luminaire housing |
CN102744584A (en) * | 2012-07-03 | 2012-10-24 | 天津博迈科海洋工程有限公司 | Method for cutting and installing iron mineral hopper liner plate |
CN202756354U (en) * | 2012-07-03 | 2013-02-27 | 天津博迈科海洋工程有限公司 | Centering device of large-scale mining structure for installing horizontal piece and vertical piece |
-
2014
- 2014-01-28 CN CN201410044040.6A patent/CN103793569B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3903453A1 (en) * | 1989-02-06 | 1990-08-09 | Licentia Gmbh | Sealing frame for an assembled luminaire housing |
CN102744584A (en) * | 2012-07-03 | 2012-10-24 | 天津博迈科海洋工程有限公司 | Method for cutting and installing iron mineral hopper liner plate |
CN202756354U (en) * | 2012-07-03 | 2013-02-27 | 天津博迈科海洋工程有限公司 | Centering device of large-scale mining structure for installing horizontal piece and vertical piece |
Non-Patent Citations (1)
Title |
---|
基于视觉定位跟踪的大型机械部件数字化对接关键技术研究;谭启蒙;《中国优秀博士学位论文全文数据库》;20130115(第01期);第1-155页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103793569A (en) | 2014-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106649983B (en) | Vehicle dynamic model modeling method for the planning of automatic driving vehicle high-speed motion | |
CN103480534B (en) | Control During Paint Spraying by Robot curve surface of workpiece formative method | |
CN106216843A (en) | A kind of self adaptation laser peening corrector based on big data platform and method | |
CN104462646A (en) | Quality evaluating method for vessel line heating plates | |
CN103793569B (en) | The segmentation docking calculation of large hydraulic natural gas storage conveyor module | |
CN103302162B (en) | Mould positioning method based on feature distance | |
CN111347294A (en) | High-gradient optical mirror surface error polishing correction processing method | |
CN103268597B (en) | A kind of bearing calibration of pattern distortion | |
CN111123985A (en) | Multi-vehicle automatic posture adjusting following system based on laser scanning | |
CN115937468A (en) | Automatic generation method for machining program of countless-module robot | |
CN111381244B (en) | Vehicle positioning enhancement method and device, vehicle and readable storage medium | |
CN106736605B (en) | The device and its localization method that roof process equipment is quickly positioned | |
CN106043718B (en) | A kind of rigid oiling automatic control interconnection method of Aircraft Air | |
CN103925854A (en) | Method for horizontally measuring missiles on basis of three-dimensional coordinate transformation principle | |
CN105403187A (en) | High-speed motor train unit body three-dimensional dimension detection method | |
CN110750890B (en) | Load calculation method for hydrostatic test of amphibious aircraft | |
CN110414095B (en) | Data preprocessing method in fluid-solid load spline interpolation conversion | |
CN106021781B (en) | Universal airplane fuselage axis type load processing method | |
CN104097195A (en) | Three-dimensional scribing method for large-scale diesel engine rack | |
CN103487947A (en) | Evaluation method of free cambered lens with high curvature and large caliber and design processing method thereof | |
CN102658481B (en) | A kind of carriage of mining self-unloading vehicle annex rivet welding device and using method | |
CN106802226A (en) | The positional error compensation method that decoupling six-freedom mechanism support sting length change causes | |
CN103699722A (en) | Design method of sheet metal component technical lug | |
CN113715907B (en) | Attitude adjusting method and automatic driving method suitable for wheeled equipment | |
CN112632696A (en) | Self-checking method for reconfigurable discrete die curved surface forming nail die position |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |