CN103779872B - 一种小区变压器经济投切调度方法 - Google Patents
一种小区变压器经济投切调度方法 Download PDFInfo
- Publication number
- CN103779872B CN103779872B CN201310646571.8A CN201310646571A CN103779872B CN 103779872 B CN103779872 B CN 103779872B CN 201310646571 A CN201310646571 A CN 201310646571A CN 103779872 B CN103779872 B CN 103779872B
- Authority
- CN
- China
- Prior art keywords
- transformer
- load
- switching
- sequence
- scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000012360 testing method Methods 0.000 claims abstract description 4
- 238000012937 correction Methods 0.000 claims description 11
- 230000008901 benefit Effects 0.000 claims description 9
- 238000005457 optimization Methods 0.000 claims description 9
- 230000008859 change Effects 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 abstract description 5
- 238000004364 calculation method Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310646571.8A CN103779872B (zh) | 2013-12-06 | 2013-12-06 | 一种小区变压器经济投切调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310646571.8A CN103779872B (zh) | 2013-12-06 | 2013-12-06 | 一种小区变压器经济投切调度方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103779872A CN103779872A (zh) | 2014-05-07 |
CN103779872B true CN103779872B (zh) | 2016-08-24 |
Family
ID=50571840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310646571.8A Active CN103779872B (zh) | 2013-12-06 | 2013-12-06 | 一种小区变压器经济投切调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103779872B (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102761128A (zh) * | 2011-04-25 | 2012-10-31 | 河海大学 | 一种在线变压器经济运行和无功优化协调自动控制方法 |
CN102969787A (zh) * | 2012-09-26 | 2013-03-13 | 江西省电力科学研究院 | 一种配电变压器经济运行控制方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8195484B2 (en) * | 2005-06-15 | 2012-06-05 | Hartford Steam Boiler Inspection And Insurance Company | Insurance product, rating system and method |
-
2013
- 2013-12-06 CN CN201310646571.8A patent/CN103779872B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102761128A (zh) * | 2011-04-25 | 2012-10-31 | 河海大学 | 一种在线变压器经济运行和无功优化协调自动控制方法 |
CN102969787A (zh) * | 2012-09-26 | 2013-03-13 | 江西省电力科学研究院 | 一种配电变压器经济运行控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103779872A (zh) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Heydari et al. | A novel composite neural network based method for wind and solar power forecasting in microgrids | |
CN103280810B (zh) | 一种提高配电网负载率的优化调度方法 | |
CN107239874B (zh) | 一种面向轨道交通的电能质量及节能分析系统 | |
CN104167730B (zh) | 一种复杂约束限制下的梯级水电站群实时优化调度方法 | |
CN103034961B (zh) | 一种电网节能水平的判定方法 | |
CN102426674B (zh) | 一种基于马尔科夫链的电力系统负荷预测方法 | |
CN107153885B (zh) | 考虑火电机组深度调峰的实时发电计划优化方法 | |
CN102930351B (zh) | 一种综合节能优化调度日计划生成方法 | |
CN102509173B (zh) | 一种基于马尔科夫链的电力系统负荷准确预测方法 | |
CN104484723A (zh) | 一种基于寿命数据的电力变压器经济寿命预测方法 | |
CN104778503A (zh) | 一种考虑实时气象因素的公共楼宇空调短时基线负荷预测方法 | |
CN101764405B (zh) | 多周期多维度一体化检修计划优化与安全分析的方法 | |
CN106875058B (zh) | 一种电力业扩可开放容量智能判断方法 | |
CN110176765A (zh) | 一种峰谷电价驱动的储能调峰日前优化调度方法 | |
CN102800032A (zh) | 一种可再生能源分布式发电运营模式的成本效益分析方法 | |
CN111342459A (zh) | 一种电力需量决策分析系统及方法 | |
CN103745267A (zh) | 一种分布式光伏系统并网影响的评价方法 | |
CN106682843A (zh) | 一种配电网滚动规划后评价模型建模方法 | |
CN105787603A (zh) | 一种考虑需求侧资源的电网负荷预测方法和装置 | |
CN104376372A (zh) | 基于源网荷互动模式的智能配电网调度业务优化方法 | |
CN102722760B (zh) | 一种光伏电站群区域功率预测方法 | |
CN109546652B (zh) | 配变台区的电力负荷预测方法 | |
CN205212447U (zh) | 一种含复合储能微电网的多目标优化系统 | |
CN104134102B (zh) | 基于leap模型的电网中长期电力需求分布预测方法 | |
CN103824124A (zh) | 一种针对电网公司的节能潜力评估方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Di Xuefeng Inventor after: Lv Hui Inventor after: Liu Zhong Inventor after: Li Cheng Inventor after: Xie Linfeng Inventor after: Wang Hongxing Inventor after: Yin Jun Inventor after: Wang Qiujun Inventor after: Yang Chuan Inventor after: Zheng Haiyan Inventor before: Di Xuefeng Inventor before: Lv Hui Inventor before: Liu Zhong Inventor before: Li Cheng Inventor before: Xie Linfeng Inventor before: Wang Hongxing Inventor before: Yin Jun Inventor before: Wang Qiujun Inventor before: Yang Chuan Inventor before: Zheng Haiyan |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |