Tailored version liquefaction of sand experimental demonstration system
Technical field
The present invention relates to the experimental provision of sand liquefaction after a kind of earthquake, particularly relate to a kind of tailored version liquefaction of sand experiment and drill
Show system.
Background technology
At present, on the earth, still earthquake takes place frequently, and as a example by Beijing, Beijing area is located in the east of North China Plate, against Tan (a state in the Zhou Dynasty)
Hut major rupture, is affected by Pacific Plate subduction, is the active region of earthquake.Owing to Pekinese's building major part build Gu in
On old Yongdinghe River alluvial fan, there are the material conditions of earthquake stonebrash liquefaction.After earthquake disaster occurs, for building
The maximum key element of destructive power is setting of ground and the house crack caused after sand liquefaction and collapses.Current capital accelerates city
Building and develop to surrounding area, groups of building are to development in pluralism, and in some areas, skyscraper is built more and more, more build more
Height, has increased the weight of the carrying burden in soil.Under the new situation, from environmental conservation with prevent and reduce natural disasters angle, planning and construction of the city
In be necessary the distribution in Study of Seismic sand liquefaction district, provide reliable scientific basis for urban construction safety.Earthquake system
The performance of a kind of geodynamic effect, it causes instantaneous catastrophic event.When Modern seismic occurs, except showing as house
Collapse, destroy road, cause outside a series of disasters such as fire, also cause modern sand liquefaction (i.e. to sandblast and emit in deposit
Water), ground cracking (ground fissure) etc..
Three class experts are had the present age to be concerned about Seismic Problems:
1) seismologist's attention concentrates dry earthquake prediction (at a specified future date, recent and imminent earthquake);
2) Seismology and Geology scholar concentrates in the tectonic setting that earthquake occurs, and provides the most detailed for earthquake prediction
Thin geologic setting data;
3) building scholar only notes the anti-seismic performance of constructure inner structure.
Sandy soil under only ecoenvironmental geology man focuses more on building produce flowing because of liquefaction, cause building to fall
The serious problems collapsed.Owing to, in certain distance around earthquake epicenter, deposit easily produces earthquake liquefaction, to the modern times
Urban architecture facility destroys greatly, and liquefaction of sand problem is directly connected to people's life and property peace as earthquake intensity
Entirely, it should cause the concern of more and more people.
The liquefaction of sand impact on Beijing Urban Construction: ancient city of Beijing build that lake is numerous in and ancient Yongdinghe River alluvial fan wet
On the ground, the few tall and big house of building, and be mostly timber framed construction complete be main Chinese courtyard house, shock resistance is extremely strong.But
It is that, along with the development of after liberation urban construction, ancient Beijing occurs huge change.Building is many, story height, right
The static pressure on ground increases thousands of times.Owing to Beijing is located in meizoseismal area, once possesses above-mentioned earthquake liquefaction of sand bar
Part, ground will occur uneven subsidence, and its ground skyscraper will be it may happen that tilt even to collapse.
In existing art, it is all a part of phenomenon with artificial method demonstration earthquake stonebrash liquefaction, artifical influence factor is big,
Data stability is poor, can not play research effect.
Summary of the invention
It is an object of the invention to provide a kind of tailored version liquefaction of sand experimental demonstration system that can demonstrate earthquake stonebrash liquefaction.
It is an object of the invention to be achieved through the following technical solutions:
The tailored version liquefaction of sand experimental demonstration system of the present invention, including base vibration table, sand room, described sand room leads to
Crossing hanger suspending above described base vibration table, the bottom of described sand room is provided with funnel, and described suspension bracket is fixed on institute
State on base vibration table.
As seen from the above technical solution provided by the invention, the tailored version liquefaction of sand experiment that the embodiment of the present invention provides
Demo system, owing to including base vibration table, sand room, sand room by hanger suspending above base vibration table,
The bottom of sand room is provided with funnel, and suspension bracket is fixed on base vibration table.Can truly reflect nature liquefaction of sand phenomenon,
Artifical influence factor is little, data stabilization.
Accompanying drawing explanation
The Facad structure schematic diagram of the tailored version liquefaction of sand experimental demonstration system that Fig. 1 provides for the embodiment of the present invention;
The side structure schematic diagram of the tailored version liquefaction of sand experimental demonstration system that Fig. 2 provides for the embodiment of the present invention;
The planar structure schematic diagram of the tailored version liquefaction of sand experimental demonstration system that Fig. 3 provides for the embodiment of the present invention.
In figure: 1, base vibration table, 2, funnel, 3, sand room, 4, suspension bracket.
Detailed description of the invention
The embodiment of the present invention will be described in further detail below.
The tailored version liquefaction of sand experimental demonstration system of the present invention, its preferably detailed description of the invention is:
Including base vibration table, sand room, described sand room by hanger suspending above described base vibration table, institute
The bottom stating sand room is provided with funnel, and described suspension bracket is fixed on described base vibration table.
The sidewall of described sand room is transparent material.
Described sand indoor are provided with soil pressure case.
Described base vibration table is provided with vibrating motor, and described vibrating motor is provided with variable-frequency governor.
Described sand room is provided with the regulation of upper and lower amplitude and locking device and horizontal vibration amplitude regulation and locking device.
During earthquake, due to moment suddenly by the strong effect of brisance hugely, the interstitial water in sandy soil layer has little time row
Going out, space pressure raises suddenly, causes sandy soil layer to present suddenly the physical form of liquid, under causing foundation bearing capacity significantly
Fall, makes above ground structure sink in the drift sand formed, produces and destroy greatly.It is generally believed that sandblasting during earthquake emits
Water phenomenon, is also that the sandy soil layer being embedded in underground produces the result liquefied.The tailored version liquefaction of sand experimental demonstration system of the present invention
System, can truly reflect nature liquefaction of sand phenomenon, can regulate frequency of vibration by frequency control, reaches expection effect
Really, soil pressure case is used to observe variable condition before and after soil pressure.It is the most convenient that equipment integrated design makes to construct.
The design of plant capacity minimization is greatly lowered use cost.Can regulate and locking level and upper and lower amplitude, make laboratory
Equipment is greatly lowered noise.
In concrete application, electric supply installation can be more than 10kw 380v power current.
The present invention can not only clearly show the Nature Disasters, it is also possible to carries out various experiment, thus understands sandy soil liquid
Change Producing reason, method can be researched and solved.Traditional Man demonstration can be solved, directly study at big-and-middle college teaching
And training organization shows natural disaster, simple to operate, it is simple to popularization and application.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto,
Any those familiar with the art in the technical scope of present disclosure, the change that can readily occur in or replace
Change, all should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with claims
Protection domain is as the criterion.