CN103763733B - One kind measurement realization method and system - Google Patents

One kind measurement realization method and system Download PDF

Info

Publication number
CN103763733B
CN103763733B CN201310411220.9A CN201310411220A CN103763733B CN 103763733 B CN103763733 B CN 103763733B CN 201310411220 A CN201310411220 A CN 201310411220A CN 103763733 B CN103763733 B CN 103763733B
Authority
CN
China
Prior art keywords
measurement
measurement task
task
mid
uploaded state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310411220.9A
Other languages
Chinese (zh)
Other versions
CN103763733A (en
Inventor
黄亚达
陈中明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201310411220.9A priority Critical patent/CN103763733B/en
Priority claimed from CN200910077917.0A external-priority patent/CN101795468B/en
Publication of CN103763733A publication Critical patent/CN103763733A/en
Application granted granted Critical
Publication of CN103763733B publication Critical patent/CN103763733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

Implementation method is measured the invention discloses one kind, this method includes:UE measurement task uploaded state from after the completion of not completing and be changed into, delete the measurement task.System is realized the invention also discloses one kind measurement, the system includes:Delete unit, for UE measurement task uploaded state from after the completion of not completing and be changed into, delete the measurement task.Using the present invention, measurement can be realized, and UE is reduced unnecessary measurement, so as to reduce UE power consumption, and UE other resources energy consumption expense.

Description

One kind measurement realization method and system
This case be Application No. 200910077917.0, the applying date be on 02 03rd, 2009, it is entitled " one kind survey The divisional application of the patent application of amount realization method and system ".
Technical field
The present invention relates to the measurement realization method and system of e measurement technology, more particularly to a kind of optimization.
Background technology
In mobile communication system, cell reselection and switching are its important functions.In order to smoothly realize cell reselection, use Family terminal(UE, User Equipment)Need to measure the signal quality of different districts, to select suitable cell It is resident.After UE sets up and is connected in some cell and network, UE still needs to be entered to the signal quality of its neighbor cell Row measurement, to select suitable cell to switch over, meets mobility requirement.Under connected state, in measurement, network side will be surveyed Amount control message is sent to UE, and UE need to be according to the content reporting measurement reports in the measurement control message.Here, measurement control disappears The content encapsulated in breath includes:Measurement object(MO, Measurement Object), measurement report configuration information(RC, Report Configuration), measurement mark(MID, Measurement ID), measurement thresholding(s-Measure), measurement matter Amount configuration and the configuration of measurement gap.Wherein, MO can be one group of cell on a frequency, one group of frequency or frequency;RC Attribute for configuring measurement report, such as be event triggering report or periodic triggers report and each triggering property on The corresponding configuration of report;MID is the mark of one specific measurement task of correspondence, and MID associates MO and RC; S-Measure is the measurement threshold value of the signal quality of the current persistent districts of UE;Measurement quality is configured to indicate that specific survey Measure quality;Measurement gap is configured to the configuration informations such as different-frequency measure.
It is pointed out that the measurement task being related in measurement can be understood as:By MID corresponding MO and corresponding RC institutes One MO of the measurement task of composition, such as MID1 correspondence is frequency A, and corresponding RC is configured to have cell on frequency A The measurement that event triggering is reported when signal quality is more than s-Measure, performs measurement task afterwards.MID, which is used to identify, to be configured Measurement task, so that UE may know that the number for the measurement task being configured with by the MID numbers configured, pass through MID pairs The MO and RC that answer obtain the attribute of the measurement task, such as measurement frequency point A or B, and event should be taken to trigger Measurement that report or periodic triggers are reported etc..After UE receives measurement control message, related configuration content will be measured and protected In the presence of in the VarMeasurementConfiguration variables of itself, i.e. VarMeasurementConfiguration variables The configuration content related for preserving measurement, the related configuration content of the measurement includes:The MO lists of configuration, RC lists, MID row Table, in addition to s-Measure, measurement quality the configuration configuration related to the measurement such as measurement gap.
3G (Third Generation) Moblie Long Term Evolution(LTE, Long Term Evolution)In system, UE is according to following measurement Rule is measured.
MID, i.e., the MID preserved in VarMeasurementConfiguration variables are configured for all, such as In the case that really the corresponding MO of the MID need allocating and measuring gap, and measurement gap has been configured, and meet necessity of measurement Precondition is that the signal measurement quality of persistent district where UE is less than the s-Measure of configuration or is configured without s- Measure, then UE MOs corresponding to the MID measure.
That is, after the prerequisite condition is met, in the case that persistent district wireless quality is good enough, i.e., this When persistent district where UE signal measurement quality be more than s-Measure, UE do not do any measurement, can so reduce UE survey Amount.Or, measured for the MO of alien frequencies, it is desirable to have special measurement gap, if measurement gap is not present, not to the measurement Task is measured.Always to be measured for remaining other MID.
For reporting configuration to be divided into measurement:Event triggering is reported reports both modes with periodic triggers.Thing Part triggering report triggered measurement report need to meet be:Need to measure the signal measurement quality that MID corresponds to MO first, its Secondary, MO signal measurement quality need to meet just triggering measurement after event triggering report condition, such as the event triggering met Report condition is:During the big 3db of the signal measurement quality of persistent district where the measurement mass ratio UE of adjacent cell wireless signal, then touch Send out an event.On give the correct time and only can report once, or reported repeatedly with Fixed Time Interval.It is event as shown in Figure 1 Property triggering reporting measurement report in schematic diagram, Fig. 1, UE is received after the measurement control message that network side is issued, in event triggering Afterwards, reporting schemes are triggered with event, multiple reporting measurement reports is spaced according to reporting.Another periodic triggers, which are reported, to be touched The measurement of hair, which is reported, only need to get the amount of reporting and start to report, and be different from event triggering and report, it is not necessary to meet a thing Part triggering report condition is that can be achieved to report, and report cycle interval is met between reporting for each time.It is illustrated in figure 2 and periodically touches Reporting in schematic diagram, Fig. 2 for reporting measurement is sent out, UE is received after the measurement control message that network side is issued, with periodic triggers Report mode, multiple reporting measurement reports are spaced according to reporting.In order to save Internet resources, being reported for periodic triggers to lead to Cross the maximum set and report number of times, number of times is reported to limit, i.e., network side is allocated to the measurement of UE a cycles, and UE is to survey every time Amount task starts to create a node after reporting in the VarMeasurementReports variables of itself, VarMeasurementReports variables be only used for preserve MID and it is corresponding with MID report count value, VarMeasurementReports variables exist in the form of tabular form or structure of arrays, Each node in VarMeasurementReports variables is using MID as keyword, wherein each node preserves this measurement Task reports count value, and this reports count value often to report once just Jia one, when reporting of reporting the count value to be added to specify is secondary After number, i.e., the cumulative maximum for reporting count value to be equal to setting is reported to be stopped reporting after number of times.VarMeasurementReports Using MID as the node of keyword in variable, when correspondence MID, or MID corresponding MO or RC are reconfigured into, the node is clear All nodes in sky, VarMeasurementReports variables can be emptied when switching or setting up and rebuild.
The problem of prior art is present be:Based on existing measurement rules, after measurement report reports end, UE can also be right The corresponding MO of the MID are measured, UE upper electricity always during measurement, so as to add UE power consumption, and UE other resources Energy consumption expense.At present, for this problem, also without effective solution.
The content of the invention
In view of this, it is a primary object of the present invention to provide a kind of two kinds of solution party for measuring realization method and system Case, can realize measurement, and UE is reduced unnecessary measurement, so as to reduce UE power consumption, and UE other resources Energy consumption expense.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
One kind measurement implementation method, this method includes:The uploaded state of measurement task is detected, current measurement task is When completing or will not continue to the uploaded state reported, user terminal UE is no longer measured to the current measurement task;Or,
When current measurement task is does not complete or still may proceed to the uploaded state reported, the UE appoints to the current measurement Business proceeds measurement.
Wherein, the measurement object MO of the measurement task needs measurement is:The corresponding MO of measurement task signified one or Cell in the class frequency of person one.
Wherein, the measurement task for can persistently report or without completion status is not detected, all the time to the measurement Task is measured.
Wherein, the measurement task is the measurement task that event triggers reporting schemes.
Wherein, this method further comprises:
A1, initial setting up the STATUS variable corresponding with the MID of current measurement task, the STATUS variables are identified Measurement task uploaded state in being currently running;According to the measurement task uploaded state of the mark, current measurement is detected The uploaded state of task is:Current measurement task does not complete or still may proceed to the uploaded state reported, then the UE continue pair with Cell in the MO corresponding MID of current measurement task signified one or a class frequency is measured;
A2, judge that reporting types corresponding with the MID of current measurement task are the reporting schemes of periodic triggers, and When reporting count value equal to or more than number of times is reported equal to the maximum set, by the measurement task uploaded state of the mark more Newly it is set to complete;The measurement task uploaded state identified according to updating after setting, detects reporting for current measurement task State is:Current measurement task has completed or will not continue to the uploaded state reported, then the UE do not continue to pair with it is current Cell in the MO corresponding MID of measurement task signified one or a class frequency is measured.
Wherein, during UE measurement initial configuration, UE occurs when measurement when reconfiguring, UE switch or UE connections are weighed When building, for all corresponding MID of measurement task, the initial setting up STATUS variable corresponding with the MID is described The measurement task uploaded state that STATUS variables are identified is in being currently running;
When current measurement task is completed, current MID corresponding for the current measurement task, will with it is described current The measurement task uploaded state that STATUS variables corresponding MID are identified, which updates, to be set to complete.
Wherein, this method further comprises:
B1, basis are sentenced to the correlation of the MID corresponding nodes of current measurement task in VarMeasurementReports variables Disconnected result, to detect the uploaded state of current measurement task, appoints if current judged result does not find current measurement for the UE The corresponding nodes of MID of business;Or the MID reporting schemes of current measurement task are event triggering reporting schemes;Or it is current The MID reporting schemes of measurement task are periodic triggers reporting schemes, and UE finds the corresponding sections of MID of current measurement task Report count value to be less than the maximum set in point and the node and report number of times, then detect the uploaded state of current measurement task For:Current measurement task does not complete or still may proceed to the uploaded state reported, MID of the UE continuation pair with current measurement task Cell in corresponding MO signified one or a class frequency is measured;
If current judged result is:The MID reporting schemes of current measurement task are periodic triggers reporting schemes, and UE, which is found, reports count value to be equal to or more than equal to setting in the corresponding nodes of MID and the node of current measurement task Maximum reports number of times, then the uploaded state for detecting current measurement task is:Current measurement task has been completed or will not continue to The uploaded state reported, the UE does not continue to signified one or one of couple MO corresponding with the MID of current measurement task Cell in class frequency is measured;
B2, the corresponding nodes of MID for preserving current measurement task in VarMeasurementReports variables all the time.
Wherein, the step B2 is further:All the time current measurement in VarMeasurementReports variables is preserved to appoint The corresponding nodes of MID of business, measurement task is reached completed or will not continue to the uploaded state that reports after also do not delete, always To UE occur measurement reconfigure, UE switch or UE connection reconstructions untill.
Wherein, this method further comprises:Associated MID is reported in triggering periodic measurement report with periodic triggers Accuse report after, when the measurement report reported report count value be equal to or more than equal to set maximum report number of times when, Terminate one of pair MO meanings corresponding with the associated MID or the measurement of the cell in a class frequency.
System is realized in one kind measurement, and the system includes:Detection unit and measurement strategies processing unit;Wherein,
Detection unit, the uploaded state for detecting measurement task;
Measurement strategies processing unit, for detecting that the uploaded state of current measurement task is in the detection unit:When Preceding measurement task has completed or will not continue to the uploaded state reported, and the UE is no longer surveyed to the current measurement task Amount;Or,
Measurement strategies processing unit, for detecting that the uploaded state of current measurement task is in the detection unit:When Preceding measurement task does not complete or still may proceed to the uploaded state reported, and the UE proceeds to survey to the current measurement task Amount.
One kind measurement implementation method, this method includes:UE measurement task uploaded state from do not complete be changed into after the completion of, Delete the measurement task.
Wherein, the deletion measurement task is further:Delete the mark of the measurement task preserved.
Wherein, the measurement described in VarMeasurementConfiguration variables that is designated of the measurement task is appointed The MID of business.
Wherein, this method further comprises:Associated MID is reported in triggering periodic measurement report with periodic triggers Report after, when the measurement report reported report count value be less than set maximum report number of times when, the measurement task Uploaded state is unfinished uploaded state;
It is described when the measurement report reported is when reporting count value equal to or more than number of times is reported equal to the maximum set The uploaded state of measurement task is the uploaded state that completes, terminate one of pair MO meanings corresponding with the associated MID or The measurement of cell in the class frequency of person one.
Wherein, this method also includes:When UE switches or rebuilds, the measurement task that periodic triggers are reported is deleted Corresponding MID.
Wherein, this method also includes:When UE switches or rebuilds, touched for the periodicity for having completed and having stopped The measurement reported is sent out, eNB needs, by reconfiguring UE, to add MID, restart measurement task.
System is realized in one kind measurement, and the system includes:Delete unit, for UE measurement task uploaded state by not complete Into after the completion of being changed into, the measurement task is deleted.
Wherein, unit is deleted, is further used for deleting measurement described in VarMeasurementConfiguration variables The MID of task.
Uploaded state association corresponding with measurement task is detected the current uploaded state of current measurement task, UE by the present invention To the MO of current measurement task, the processing of corresponding measurement strategies is realized.Specifically, reporting for current measurement task is detected State is:Current measurement task has completed or will not continue to the uploaded state reported, and UE is no longer carried out to current measurement task Measurement;Or, the uploaded state for detecting current measurement task is:Current measurement task do not complete or still may proceed to report it is upper Report state, UE proceeds measurement to current measurement task.
Due to the measurement task that periodic triggers are reported, count value is reported to be added to reporting after number of times of specifying, UE is again This MID measurement report will not be reported to network side, therefore, current UE is not necessarily to again MO meanings corresponding to the MID Cell in one or a class frequency is measured.Using prior art, based on existing measurement rules when measuring simultaneously Can measurement not accounted for finally report, such as after reporting measurement reports terminate by the way of being reported using periodic triggers, UE Cell that can also be in MO corresponding to the MID signified one or a class frequency carries out unnecessary measurement, so as to add Energy consumption expense unnecessary UE.And it is of the invention, uploaded state association corresponding with measurement task, to the MO of measurement task, is taken The processing of different measurement strategies.Such as current uploaded state be current measurement task completed or will not continue to report it is upper Report under state status, the processing for the corresponding measurement strategies taken is:UE does not continue to survey the MO of current measurement task Amount.So as to which measurement can be realized using the present invention, while making UE avoid performing unnecessary survey without above giving the correct time in measurement task Amount, reduces UE measurement burden.
Brief description of the drawings
Fig. 1 reports schematic diagram for event triggering reporting measurement;
Fig. 2 reports schematic diagram for periodic triggers reporting measurement;
Fig. 3 is the implementation process schematic diagram of a method of the invention;
Fig. 4 is the implementation process schematic diagram of another method of the present invention.
Embodiment
The present invention basic thought be:By uploaded state association corresponding with measurement task, working as current measurement task is detected Preceding uploaded state, UE realizes the processing of corresponding measurement strategies to the MO of current measurement task.It is in current uploaded state:When When preceding measurement task has completed or will not continue to the uploaded state reported, the processing for the corresponding measurement strategies taken is:UE Do not continue to measure current measurement task;It is in current uploaded state:Current measurement task is not completed or still may proceed to The uploaded state reported, UE proceeds measurement to current measurement task.
The implementation to technical scheme is described in further detail below in conjunction with the accompanying drawings.
The present invention includes two kinds of solutions, and the concrete processing procedure of the first solution includes two kinds of situations.Just For the first solution of the present invention, as shown in figure 3, a kind of measurement implementation method, this method comprises the following steps:
Step 101, UE detect the current uploaded state of current measurement task.
Step 102, current measurement task is when having completed or will not continue to the uploaded state reported, UE are to current measurements Task is no longer measured.
Here, step 102 can also be step 102a:Current measurement task is reporting for not completing or still may proceed to report During state, UE proceeds measurement to current measurement task.
Here, the MO of measurement task needs measurement is:One signified the corresponding MO of measurement task or a class frequency On cell.
Here, the measurement task for can persistently report or without completion status can not be detected, all the time to measurement Task is measured.The measurement task can trigger the measurement task of reporting schemes for event.
Here, the measurement realization side for being made up of 101~step 102 of above step or step 101~step 102a For method, that is to say, that on the one hand, it is in the uploaded state for detecting current measurement task:Current measurement task has been completed Or the uploaded state that reports is will not continue to, the processing of corresponding measurement strategies is:The UE pairs of survey corresponding with current uploaded state Cell in the MO of amount task signified one or a class frequency is no longer measured.On the other hand, current survey is being detected The uploaded state of amount task is:Current measurement task does not complete or still may proceed to the uploaded state reported, corresponding measurement strategies Processing be:Cell in the MO of UE pairs of measurement task corresponding with current uploaded state signified one or a class frequency Proceed measurement.The concrete processing procedure to the measurement implementation method different situations is specifically addressed below.
The first situation, the concrete processing procedure of measurement implementation method comprises the following steps:
Step 201, initial setting up the STATUS variable corresponding with the MID of current measurement task, the STATUS variables Uploaded state mark is properly termed as, the measurement task uploaded state that STATUS variables are identified is in being currently running(RUNNING), STATUS=RUNNING is set;The measurement task uploaded state identified according to STATUS variables, to detect that current measurement is appointed The uploaded state of business;UE realizes the processing of corresponding measurement strategies to the MO of current measurement task.
Step 202, judge that reporting types corresponding with current MID are the reporting schemes of periodic triggers and report meter When numerical value equal to the maximum set equal to or more than number of times is reported, the measurement task uploaded state that STATUS variables are identified Renewal is set to complete(FINISH), that is, update and STATUS=FINISH be set;Marked according to STATUS variables after setting are updated The measurement task uploaded state of knowledge, to detect the uploaded state of current measurement task;UE realizes phase to the MO of current measurement task The processing of correspondence measurement strategies.
Here, the MO of corresponding measurement task is specially:One or one group of the MO meaning corresponding with current MID Cell in frequency.In step 201, the measurement task uploaded state identified according to STATUS variables detects current measurement Task uploaded state is:Current measurement task do not complete or still may proceed to the uploaded state reported, then corresponding measurement strategies It is processed as:The cell that UE continues in one of couple MO corresponding with current MID meaning or a class frequency is measured.Step In 202, according to the measurement task uploaded state that STATUS variables are identified after setting is updated, detect that current measurement task is reported State is:Current measurement task has completed or will not continue to the uploaded state reported, then the processing of corresponding measurement strategies is: The cell that UE is not continued in couple MO corresponding with current MID signified one or a class frequency is measured.
Moreover, when UE measures initial configuration, UE occurs when measurement when reconfiguring, UE switch or UE connection reconstructions When, for all corresponding MID of measurement task, initial setting up STATUS=RUNNING;It is right when current measurement task is completed In the corresponding current MID of current measurement task, the STATUS variable corresponding with current MID is updated setting, and set STATUS=FINISH。
It is pointed out that the concrete processing procedure of measurement implementation further comprises:Reported with periodic triggers Associated MID after triggering the reporting of periodic measurement report, when the measurement report reported report count value be equal to or When maximum more than or equal to setting reports number of times, terminate pair to report associated MID corresponding MO meanings with periodic triggers One or the measurement of the cell in a class frequency.
Second of situation, the concrete processing procedure of measurement implementation method comprises the following steps:
The correlated judgment knot of step 301, basis to current MID corresponding nodes in VarMeasurementReports variables Really, current measurement task uploaded state is detected;UE realizes the processing of corresponding measurement strategies to the MO of current measurement task.
Here, the MO of corresponding measurement task is specially:One or one group of the MO meaning corresponding with current MID Cell in frequency.Step 301 is specially:If current judged result, which is UE, does not find the corresponding nodes of current MID;Or work as Preceding MID reporting schemes are event triggering reporting schemes;Or current MID reporting schemes are periodic triggers reporting schemes, and And UE finds the maximum for reporting count value to be less than setting in the corresponding nodes of current MID and the node and reports number of times, then detects Currently measurement task uploaded state is:Current measurement task does not complete or still may proceed to the uploaded state reported;Corresponding measurement Strategy processing be:The cell that UE continues in one of couple MO corresponding with current MID meaning or a class frequency is surveyed Amount.If current judged result is:Current MID reporting schemes are periodic triggers reporting schemes, and UE finds current MID pairs The node answered and report count value to be equal to or more than in the node to report number of times equal to the maximum set, then detect current survey Amount task uploaded state is:Current measurement task has completed or will not continue to the uploaded state reported;Corresponding measurement strategies Processing be:The cell that UE is not continued in couple MO corresponding with current MID signified one or a class frequency is surveyed Amount.
The corresponding nodes of current MID in step 302, all the time preservation VarMeasurementReports variables.
Here, step 302 is further:Continue to preserve current MID in VarMeasurementReports variables corresponding Node, measurement task is reached completed or will not continue to the uploaded state that reports after also do not delete, until UE is measured Reconfigure, UE switch or UE connection reconstructions untill.
It is pointed out that the concrete processing procedure of measurement implementation further comprises:Reported with periodic triggers Associated MID after triggering the reporting of periodic measurement report, when the measurement report reported report count value be equal to or When maximum more than or equal to setting reports number of times, terminate pair to report associated MID corresponding MO meanings with periodic triggers One or the measurement of the cell in a class frequency.
System is realized in one kind measurement, and the system includes:Detection unit and measurement strategies processing unit.Wherein, detection unit, Uploaded state for detecting measurement task.Measurement strategies processing unit, for detecting current measurement task in detection unit Uploaded state be:Current measurement task has completed or will not continue to the uploaded state reported, UE to current measurement task not Measure again;Or, measurement strategies processing unit, the uploaded state for detecting current measurement task in detection unit For:Current measurement task does not complete or still may proceed to the uploaded state reported, and UE proceeds measurement to current measurement task.
For second of solution of the present invention, one kind measurement implementation method includes:UE is reported measurement task State from do not complete be changed into after the completion of, delete the measurement task.Its concrete processing procedure is as shown in figure 4, comprise the following steps:
MO step 401, UE corresponding to all MID in VarMeasurementConfiguration variables is surveyed Amount.
Step 402, UE are deleted when the uploaded state of measurement task is revised as completing by not completing The MID of the measurement task in VarMeasurementConfiguration variables.
Here, the concrete processing procedure of measurement implementation method further comprises:Associated MID is reported with periodic triggers After triggering the reporting of periodic measurement report, report count value to be less than the maximum that sets to report time when the measurement report reported During number, the uploaded state of the measurement task is unfinished uploaded state.Count value is reported to be equal to when the measurement report reported Or when more than or equal to the maximum of setting reporting number of times, the uploaded state of the measurement task is the uploaded state that completes, terminate pair The corresponding MO of MID associated with this signified one or the cell in a class frequency measurement.
Here, this method also includes:When UE switches or rebuilds, the measurement task that periodic triggers are reported is deleted Corresponding MID.
System is realized in one kind measurement, and the system includes:Delete unit, for UE measurement task uploaded state by not complete Into after the completion of being changed into, the measurement task is deleted.
Here, unit is deleted, is further used for deleting the measurement in VarMeasurementConfiguration variables and appoints The MID of business.
Here, it is specially to the configuring condition that three below example is based on:In LTE system, when UE resides in service Frequency A where cell S1, the value of serving cell S1 signal measurement quality is sA, UE is in connected state, and network side, which is sent, to be measured Control message is to UE.Wherein, the measurement control message includes the LTE cells that MO1 is set on frequency A;RC1 is set to event Property triggering report, and event triggering report condition be:Adjacent cell 2db better than UE persistent districts signal quality, that is, meet the thing Part triggers an event when triggering report condition;And the corresponding MID1 of MO1 and RC1.MO2 is the LTE cells on frequency B; The periodic triggers that RC2 is set to reportStrongestCells types are reported, that is, report signal measurement in MO2 best in quality Several cells;Maximum is set to report number of times and report cycle interval;And the corresponding MID2 of MO2 and RC2.Measurement thresholding is set Value be s-Measure, measurement gap is configured.Example one, example two and example three are specifically addressed below.
Example one is:On the basis of VarMeasurementReports variables, extra increase STATUS variables should STATUS variables are used to identify measurement task uploaded state, the measurement task uploaded state energy identified based on the STATUS variables Preferably uploaded state is detected, so as to detect to work as based on the measurement task uploaded state that the STATUS variables are identified Preceding uploaded state, the MO of the UE pairs of measurement task corresponding with current uploaded state realizes the processing of corresponding measurement strategies.Survey The processing of amount strategy is divided into two kinds, is in the uploaded state for detecting current measurement task:Current measurement task completed or The uploaded state reported is will not continue to, then the processing of the first measurement strategies is:UE is no longer carried out to the MO of current measurement task Measurement;It is in the uploaded state for detecting current measurement task:Measurement task does not complete or still may proceed to the uploaded state reported, The then processing of second of measurement strategies is:UE proceeds measurement to the MO of current measurement task.
Here it is noted that for VarMeasurementReports variables, when In the presence of VarMeasurementReports variables are with tabular form, the table can be:Identify MID and this measurement task The index relative table of count value is reported, and index key is MID, index relative table includes:MID, and it is corresponding with MID Report count value.In the presence of VarMeasurementReports variables are in the form of the structure of arrays, the array data in array Including:MID, and it is corresponding with MID report count value, and MID is array keyword.
In this example, because MID2 reports associated with periodic triggers, therefore, fixation on triggering reports week Every that can terminate, there is the completion status of determination in period, then UE becomes the STATUS that associated MID2 is reported with periodic triggers Amount is initially set to RUNNING.Because the triggering of MID1 and event reports associated, triggered by event, therefore, unlike the cycle Property report equally exist determine completion status, then UE RUNNING can be initially set to MID1 STATUS variables, also may be used To be not provided with, provide not checking the uploaded state that event triggering is reported in measurement.
Specifically, for scene when UE is performing measurement, in traversal VarMeasurementReports variables All MID.For MID1, work as sA<When s-Measure or s-Measure are configured without, on UE measurement frequency points A All LTE cells.For MID2, work as sA<When s-Measure or s-Measure are configured without and measurement gap All LTE cells on configuration, UE measurement frequency points B.It can be seen that, as long as the prerequisite condition for meeting measurement is UE, place is resident The s of cellALess than configuration s-Measure or be configured without s-Measure, then UE MOs corresponding to the MID is surveyed Amount.
For reporting associated MID2 with periodic triggers, the implementation process of measurement implementation method includes following step Suddenly:
The measurement task uploaded state that step 501, initial setting up the STATUS variable corresponding with MID2 are identified is: RUNNING, the measurement task uploaded state identified according to this, to detect the uploaded state of current measurement task;UE is to current The MO of measurement task, realizes the processing of corresponding measurement strategies.
Here, because MID is corresponding with measurement task, therefore, the MO of the corresponding measurement task is:With MID2 Corresponding MO2.
Here, the measurement task uploaded state that initial setting up STATUS=RUNNING, i.e. STATUS variables are identified is RUNNING, represents that current measurement task is currently running, current measurement task is not yet completed.So as to the measurement identified based on this Task uploaded state detects that the uploaded state of current measurement task is:Current measurement task does not complete or still may proceed to what is reported Uploaded state, the processing for the corresponding measurement strategies now realized is:It is on frequency B that UE, which continues a couple MO2 associated with MID2, Cell measure.UE is measured after the cell on frequency B, and what is reported is the best several cells of wireless quality, is above given the correct time by survey Value from high to low, reports evolved node B(eNB).
Moreover, when UE performs measurement task, often reporting once, with MID2 in VarMeasurementReports variables Corresponding reports count value plus 1.
Step 502, when judge it is corresponding with MID2 report count value be equal to set maximum report number of times when, will The measurement task uploaded state that STATUS variables are identified, which updates, is set to FINISH, STATUS variables institute after being set according to renewal The measurement task uploaded state of mark, to detect the uploaded state of current measurement task;UE is realized to the MO of current measurement task The processing of corresponding measurement strategies.
Here, after reporting count value equal to or more than number of times is reported equal to the maximum set, update and set MID2's The measurement task uploaded state that STATUS=FINISH, i.e. STATUS variables are identified is updated to FINISH, represents that current measurement is appointed Business has been completed.So as to the measurement task uploaded state that STATUS variables are identified after being set based on the renewal, detect current The uploaded state of measurement task is:Current measurement task has completed or will not continue to the uploaded state reported, now realizes The processing of corresponding measurement strategies is:The cell that UE is not continued on couple MO2 associated with MID2 i.e. frequency B is measured.
Step 503, empty the corresponding nodes of MID2 in VarMeasurementReports variables.
Here, emptying the corresponding nodes of MID2 in VarMeasurementReports variables can be:When In the presence of VarMeasurementReports variables are with tabular form, list item note of the index key corresponding to MID2 is emptied Record.In the presence of VarMeasurementReports variables are in the form of the structure of arrays, array keyword is emptied right for MID2 The array data answered.
Here, when UE performs the detection before measurement again, for MID2, s is worked asA<S-Measure or s- When Measure is configured without and measurement gap is configured, because MID2 is associated with the measurement that periodic triggers are reported, therefore, need The STATUS variable corresponding with MID2 is checked, with the measurement task uploaded state identified based on STATUS variables, to examine Survey the uploaded state of current measurement task.STATUS=FINISH is now found, so that UE will not be again to MO2 correspondences after this Frequency B on LTE cells measure again, only a frequency A corresponding to MO1 measure.
For the scene that UE occurs when measurement is reconfigured, include but is not limited to following several situations.The first situation For:The corresponding MO2 of MID2 are reconfigured into as C frequencies, and corresponding RC2 is constant.Second of situation be:The corresponding RC2 of MID2 It is reconfigured into the one of which reporting schemes reported for periodic triggers, i.e. reportStrongestCellsForSON cycle Property the measurement that reports of triggering.The third situation is:MO2 and RC2 are reconfigured into.4th kind of situation be:When MID2 is reconfigured into, The corresponding STATUS variables of MID2 are re-set as RUNNING by FINISH, to proceed the measurement of new measurement task. Measurement is reconfigured under scene, for associated MID is reported for periodic triggers, can also be taken:UE is performing measurement field Measurement implementation method under scape, be:Initial setting up and renewal set the STATUS variable corresponding with MID, according to this The measurement task uploaded state that STATUS variables are identified, to detect the uploaded state of current measurement task.
For scene when UE switches or rebuilds, the fact that including but not limited to following.For MID2 Corresponding STATUS variables are re-set as RUNNING by FINISH, so that UE does not reconfigure survey in no handoff procedure Amount can also restart measurement after handover.Under handoff scenario, for associated MID is reported for periodic triggers, It can take:Measurement implementation methods of the UE in the case where performing measurement scene, be:Initial setting up and renewal set relative with MID The STATUS variables answered, the measurement task uploaded state identified according to the STATUS variables, to detect current measurement task Uploaded state.
Example two is:Do not increase the STATUS variables for identifying measurement task uploaded state additionally, by it is existing from Body variable is whether VarMeasurementReports variables are currently running with regard to the current measurement task of can be known, is based only upon VarMeasurementReports variables detect the uploaded state of current measurement task, are:For In VarMeasurementReports variables for the MID of correspondence periodic triggers reporting measurement, by directly judging In VarMeasurementReports variables corresponding to MID in node report count value whether to be less than, equal to or more than etc. Number of times is reported in the maximum of setting to judge whether the measurement task should measure.So as to be based on being somebody's turn to do VarMeasurementReports variables detect the uploaded state of current measurement task, and UE pairs upper with current measurement task The MO of the corresponding measurement task of report state, realizes the processing of corresponding measurement strategies.Moreover, terminating in current measurement task Afterwards, i.e., in VarMeasurementReports variables it is current corresponding to MID in node report count value be equal to or more than etc. When the maximum of setting reports number of times, the corresponding nodes of current MID in VarMeasurementReports variables are not emptied, i.e., MID is preserved in VarMeasurementReports variables, and count value is reported corresponding to MID.
Specifically, for scene when UE is performing measurement, in traversal VarMeasurementReports variables All MID.For MID1, work as sA<When s-Measure or s-Measure are configured without, on UE measurement frequency points A All LTE cells.For MID2, work as sA<When s-Measure or s-Measure are configured without and measurement gap All LTE cells on configuration, UE measurement frequency points B.It can be seen that, as long as the prerequisite condition for meeting measurement is UE, place is resident The s of cellALess than configuration s-Measure or be configured without s-Measure, then UE MOs corresponding to the MID is surveyed Amount.
For reporting associated MID2 with periodic triggers, the implementation process of measurement implementation method includes following step Suddenly:
Step 601, according to the correlated judgment results of MID2 corresponding nodes in VarMeasurementReports variables, To detect the uploaded state of current measurement task;UE realizes the processing of corresponding measurement strategies to the MO of current measurement task.
Here, because MID is corresponding with measurement task, therefore, the MO of the corresponding measurement task is:With MID2 Corresponding MO2.
Here, UE is searched the corresponding nodes of MID2 and judges in VarMeasurementReports variables, if currently sentenced Disconnected result is:The corresponding nodes of MID2 are not found;Or current MID reporting schemes are event triggering reporting schemes;Or work as Preceding MID reporting schemes are periodic triggers reporting schemes, and UE finds in the corresponding nodes of MID2 and the node and reports counting Value is less than the maximum set and reports number of times.So as to detect that the uploaded state of current measurement task is based on current judged result: Current measurement task does not complete or still may proceed to the uploaded state reported, and the processing for the corresponding measurement strategies now realized is: UE thinks that the measurement task has not been completed, and it is that the cell on frequency B is measured to continue couple MO2 associated with MID2.
Moreover, when UE performs measurement task, often reporting once, with MID2 in VarMeasurementReports variables Corresponding reports count value plus 1.UE continues to search in VarMeasurementReports variables the corresponding nodes of MID2 and sentenced It is disconnected, if current judged result is:Current MID reporting schemes are periodic triggers reporting schemes, and UE finds MID2 correspondences Node and the node in report count value be equal to or more than equal to set maximum report number of times.So as to based on current judgement As a result the uploaded state for detecting current measurement task is:What current measurement task had completed or will not continue to report reports shape State, the processing for the corresponding measurement strategies now realized is:UE, which is no longer performed, reports and continues couple MO2 associated with MID2 i.e. Cell on frequency B is measured.
The corresponding nodes of MID2 in step 602, all the time preservation VarMeasurementReports variables.I.e. pair The corresponding nodes of MID2 do not empty processing in VarMeasurementReports variables.
Here, processing not being emptied can be:In the presence of VarMeasurementReports variables are with tabular form, List item record of the index key corresponding to MID2 is not emptied.When VarMeasurementReports variables are with structure of arrays Form in the presence of, it is the array data corresponding to MID2 that array keyword is not emptied.
Here, when UE performs the detection before measurement again, for MID2, s is worked asA<S-Measure or s- When Measure is configured without and measurement gap is configured, due to saving in VarMeasurementReports variables MID2 pairs The node answered, therefore, it can, by the correlated judgment to MID2 corresponding nodes in VarMeasurementReports variables, obtain Know that current judged result is:Report count value secondary equal to or more than being reported equal to the maximum set in the corresponding nodes of MID2 Number, so that UE no longer needs reporting measurement reports after this, the LTE that UE will not be again on frequency B corresponding to MO2 afterwards is small Area is measured again, and only frequency A corresponding to MO1 is measured.
For the scene that UE occurs when measurement is reconfigured, include but is not limited to following several situations.The first situation For:The corresponding MO2 of MID2 are reconfigured into as C frequencies, and corresponding RC2 is constant.Second of situation be:The corresponding RC2 of MID2 It is reconfigured into the measurement reported for reportStrongestCellsForSON periodic triggers.The third situation is:MO2 and RC2 is reconfigured into.4th kind of situation be:When MID2 is reconfigured into, correspondence MID2 in VarMeasurementReports variables Node can all be cleared, so that UE starts the measurement of new measurement task.
For scene when UE switches or rebuilds, all sections in VarMeasurementReports variables Point can all be cleared, so that UE starts the measurement of new measurement task, that is to say, that UE can start all MID's in new cell Measurement task.
Example three is:The STATUS variables for measurement task uploaded state are not increased additionally, by complete in measurement task It is into rear:For periodic measurement task, in being VarMeasurementReports variables by existing own variable MID corresponding nodes report count value to be reported equal to or more than maximum after number of times, and UE deletes corresponding MID configurations, to survey Traversal is less than the MID during amount, also with regard to stopped the measurement to the corresponding measurement tasks of the MID naturally.
For scene when UE switches or rebuilds, associated measurement is reported to appoint for periodic triggers Business, is deleted in the corresponding MID of VarMeasurementConfiguration.For eNB, for having completed and having stopped The measurement that periodic triggers only are reported is, it is necessary to by reconfiguring UE, add MID, to restart measurement task.
Specifically, for scene when UE is performing measurement, traveling through existing own variable is All MID in VarMeasurementConfiguration variables.For MID1, work as sA<S-Measure or s- When Measure is configured without, all LTE cells on UE measurement frequency points A.For MID2, work as sA<S-Measure or When s-Measure is configured without and measurement gap is configured, all LTE cells on UE measurement frequency points B.It can be seen that, as long as full The prerequisite condition of foot measurement is the s of persistent district where UEALess than configuration s-Measure or be configured without s- Measure, then UE MOs corresponding to the MID measure.
For reporting associated MID2 with periodic triggers, the implementation process of measurement implementation method includes following step Suddenly:
MO step 701, UE corresponding to all MID in VarMeasurementConfiguration variables is surveyed Amount.That is UE searches MID lists in VarMeasurementConfiguration variables, continue if MID2 is found pair with MO2 associated MID2 is that the cell on frequency B is measured.
Moreover, when UE performs measurement task, often reporting once, with MID2 in VarMeasurementReports variables Corresponding reports count value plus 1.When MID2 it is corresponding report count value be equal to or more than equal to set maximum report During number of times, UE is no longer performed and reported.
Step 702, UE are when the uploaded state of measurement task is revised as completing by not completing, and UE is automatically deleted MID2 in VarMeasurementConfiguration variables in MID lists, is emptied simultaneously The corresponding nodes of MID2 in VarMeasurementReports variables.
Here, emptying the corresponding nodes of MID2 in VarMeasurementReports variables can be:When In the presence of VarMeasurementReports variables are with tabular form, list item note of the index key corresponding to MID2 is emptied Record.In the presence of VarMeasurementReports variables are in the form of the structure of arrays, array keyword is emptied right for MID2 The array data answered.
Here, when UE performs the detection before measuring next time, due to VarMeasurementConfiguration variables Middle MID2 is deleted, therefore, and the LTE cells that UE will not be again on frequency B corresponding to MO2 are measured again, only to MO1 correspondences Frequency A measure.
For scene when UE switches or rebuilds, associated measurement is reported to appoint for periodic triggers Business, is automatically deleted the corresponding MID2 in VarMeasurementConfiguration variables.
When eNB thinks to start periodic measurement task MID2 again, reconfigured by occurring measurement to UE, MID2 adds When aggravating configuration, MID2 is re-added in the MID lists of VarMeasurementConfiguration variables, and UE starts Remeasure the corresponding MO of MID2.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.

Claims (8)

1. one kind measurement implementation method, it is characterised in that this method includes:
By uploaded state association corresponding with measurement task, the uploaded state of current measurement task is detected;UE is in the upper of measurement task Report state deletes the measurement task from after the completion of not completing and be changed into;The deletion measurement task also includes:UE switch or When person rebuilds, the measurement task is deleted.
2. according to the method described in claim 1, it is characterised in that the deletion measurement task is further:Delete what is preserved The mark of the measurement task.
3. method according to claim 2, it is characterised in that the measurement task is designated The MID of the measurement task in VarMeasurementConfiguration variables.
4. according to the method described in claim 1, it is characterised in that this method further comprises:Phase is reported with periodic triggers The MID of association reports count value to be less than what is set after triggering the reporting of periodic measurement report when the measurement report reported When maximum reports number of times, the uploaded state of the measurement task is unfinished uploaded state;
When the measurement report reported report count value be equal to or more than equal to set maximum report number of times when, the measurement The uploaded state of task is the uploaded state completed, terminate pair MO meanings corresponding with the associated MID one or one The measurement of cell in class frequency.
5. method according to claim 3, it is characterised in that this method also includes:When UE switches or rebuilds, Delete the corresponding MID of measurement task that periodic triggers are reported.
6. method according to claim 3, it is characterised in that this method also includes:When UE switches or rebuilds, The measurement reported for the periodic triggers for having completed and having stopped, eNB needs, by reconfiguring UE, to add MID, restarting Measurement task.
7. system is realized in one kind measurement, it is characterised in that the system includes:Unit is deleted, for UE by uploaded state with measuring Task correspondence is associated, and detects the uploaded state of current measurement task, and be changed into from not completing in the uploaded state of measurement task Cheng Hou, deletes the measurement task, wherein, the deletion measurement task also includes:When UE switches or rebuild, institute is deleted State measurement task.
8. system according to claim 7, it is characterised in that delete unit, is further used for deleting The MID of measurement task described in VarMeasurementConfiguration variables.
CN201310411220.9A 2009-02-03 2009-02-03 One kind measurement realization method and system Active CN103763733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310411220.9A CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200910077917.0A CN101795468B (en) 2009-02-03 2009-02-03 Methods and systems for realizing measurement
CN201310411220.9A CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN200910077917.0A Division CN101795468B (en) 2009-02-03 2009-02-03 Methods and systems for realizing measurement

Publications (2)

Publication Number Publication Date
CN103763733A CN103763733A (en) 2014-04-30
CN103763733B true CN103763733B (en) 2017-10-03

Family

ID=50530878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310411220.9A Active CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Country Status (1)

Country Link
CN (1) CN103763733B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110278574B (en) * 2018-03-16 2021-06-04 维沃移动通信有限公司 Measurement method, measurement configuration method, terminal and network equipment
CN112305402B (en) * 2020-02-27 2022-12-27 青岛众鑫科技有限公司 Controller special for testing hybrid integrated circuit product

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008087535A2 (en) * 2007-01-18 2008-07-24 Nokia Corporation Network oriented control of self-optimization measurements
CN101312408A (en) * 2007-05-25 2008-11-26 华为技术有限公司 Control method and terminal equipment for uploading measurement report

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7233331B2 (en) * 2000-03-16 2007-06-19 Square Enix Co., Ltd. Parallel object task engine and processing method
DE102005020637B4 (en) * 2005-05-03 2007-05-24 Infineon Technologies Ag Method for processing measurement control messages and mobile radio communication terminal
CN101114875A (en) * 2006-07-25 2008-01-30 中兴通讯股份有限公司 Mobile communications network link performance measuring system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008087535A2 (en) * 2007-01-18 2008-07-24 Nokia Corporation Network oriented control of self-optimization measurements
CN101312408A (en) * 2007-05-25 2008-11-26 华为技术有限公司 Control method and terminal equipment for uploading measurement report

Also Published As

Publication number Publication date
CN103763733A (en) 2014-04-30

Similar Documents

Publication Publication Date Title
CN101795468B (en) Methods and systems for realizing measurement
CN101998482B (en) Method and system for measuring and reporting
CN101959263B (en) Method and device for transmitting radio link failure information
CN102550078B (en) Create the neighbor cell lists of successively rank
CN104955016B (en) A kind of method and terminal device being automatically added to ZigBee-network
CN102638831B (en) Handover parameter optimization method and system
CN105072643B (en) A kind of report method and device of cell measurement results
CN105101313A (en) Terminal cell reselection method and terminal cell reselection device
WO2009120137A1 (en) Method for automatically selecting a physical cell identity (pci) of a long term evolution (lte) radio. cell
CN103581999B (en) Adjacent cell list update method, metrical information report method, terminal and base station
CN109151927A (en) Cell reselection or switching method and system
CN103763733B (en) One kind measurement realization method and system
CN108040351A (en) A kind of automatic adding method in adjacent area and equipment
CN110418388A (en) Control method, device and the mobile terminal of cell reselection
CN111294879B (en) Method and system for configuring neighbor cell before cell switching
CN103369603B (en) The mutual operation method of self-organizing network and device
WO2012024924A1 (en) Cell reselection method in time division-synchronous code division multiple access (td-scdma) network and terminal equipment
WO2016065759A1 (en) Method and apparatus for optimizing neighbour cell list
CN102104898B (en) A kind of mobility parameter matching performance detection method and system
CN112437477B (en) Wireless sensor network routing method and system
CN107801220A (en) The method and computer-readable recording medium of automatic switchover cell type
CN105992190A (en) Method and device for mobility management
CN102625379B (en) Cell information processing method and device in an enhanced forward access channel state
WO2012174867A1 (en) Cell handover method and system
CN107241750B (en) Information identification method and equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant