CN103763733A - Measurement realization method and system - Google Patents

Measurement realization method and system Download PDF

Info

Publication number
CN103763733A
CN103763733A CN201310411220.9A CN201310411220A CN103763733A CN 103763733 A CN103763733 A CN 103763733A CN 201310411220 A CN201310411220 A CN 201310411220A CN 103763733 A CN103763733 A CN 103763733A
Authority
CN
China
Prior art keywords
measurement
task
mid
report
uploaded state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310411220.9A
Other languages
Chinese (zh)
Other versions
CN103763733B (en
Inventor
黄亚达
陈中明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201310411220.9A priority Critical patent/CN103763733B/en
Priority claimed from CN200910077917.0A external-priority patent/CN101795468B/en
Publication of CN103763733A publication Critical patent/CN103763733A/en
Application granted granted Critical
Publication of CN103763733B publication Critical patent/CN103763733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The invention discloses a measurement realization method which includes: deleting a measurement task when a reporting state of the measurement task of UE is changed from unfinished to finished. The invention also discloses a measurement realization system which includes a deletion unit used for deleting the measurement task when the reporting state of the measurement task of the UE is changed from unfinished to finished. Through adoption of the measurement realization method and system, measurement can be realized and the UE is enabled to reduce unnecessary measurement and thus power consumption of the UE and power consumption cost of other resources of the UE are reduced.

Description

A kind of measurement implementation method and system
This case is that application number is 200910077917.0, the applying date is dividing an application of on 02 03rd, 2009, the denomination of invention patent application that is " a kind of measurement implementation method and system ".
Technical field
The present invention relates to measuring technique, relate in particular to a kind of measurement implementation method and system of optimization.
Background technology
In mobile communication system, cell reselection and switching are its important functions.In order to realize smoothly cell reselection, user terminal (UE, User Equipment) need to be measured the signal quality of different districts, so that it is resident to select suitable community to carry out.When UE is after certain community and network connect, UE still needs the signal quality of its neighbor cell to measure, to select suitable community to switch, meets mobility requirement.Under connected state, in measurement, network side sends to UE by measurement control message, and UE need measure the content reporting measurement reports in control message according to this.Here, measuring the content encapsulating in control message comprises: measuring object (MO, Measurement Object), the configuration information (RC of measurement report, Report Configuration), measure the configuration of sign (MID, Measurement ID), measurement thresholding (s-Measure), measurement quality configuration and measurement clearance.Wherein, MO can be Yi Zu community on a frequency, one group of frequency or frequency; RC is for the attribute of allocating and measuring report, such as be event trigger report or periodic triggers reports and respectively triggering property report corresponding configuration; MID is the sign of a corresponding concrete measurement task, and MID associates a MO and a RC; S-Measure is the measurement threshold value of the signal quality of the current persistent district of UE; Measurement quality is configured for the concrete measurement quality of indication; Measurement clearance be configured for the configuration informations such as different-frequency measure.
It is to be noted, the measurement task relating in measurement can be understood as: the measurement task consisting of MO corresponding to MID and corresponding RC, such as the corresponding MO of MID1 is frequency A, and corresponding RC is configured to event when the signal quality of frequency A Shang You community is greater than s-Measure and triggers the measurement reporting, and carries out afterwards measurement task.MID is for identifying the measurement task having configured, thereby UE can know the number of the measurement task having configured by the MID number of configuration, by MO corresponding to MID and RC, obtain the attribute of this measurement task, such as measuring frequency A or B, and should take event triggering to report measurement that still periodic triggers reports etc.When receiving, measures after control message UE, by measuring relevant deploy content, be kept in the VarMeasurementConfiguration variable of self, be that VarMeasurementConfiguration variable is measured relevant deploy content for preserving, this is measured relevant deploy content and comprises: the MO list of configuration, RC list, MID list, also comprises the relevant configurations of measurement such as s-Measure, measurement quality configuration and measurement clearance.
In 3G (Third Generation) Moblie Long Term Evolution (LTE, Long Term Evolution) system, UE measures according to following measurement rules.
For all MID that configured, the MID preserving in VarMeasurementConfiguration variable, if the MO that this MID is corresponding needs allocating and measuring gap, and in the situation that measurement clearance has been configured, and the signal measurement quality that the prerequisite condition that meets measurement is persistent district, UE place is less than the s-Measure of configuration or does not configure s-Measure, and UE measures MO corresponding to this MID.
That is to say, after meeting this prerequisite condition, when persistent district wireless quality is enough in good situation, now the signal measurement quality of persistent district, UE place is greater than s-Measure, and UE does not do any measurement, can reduce like this measurement of UE.Or, for the MO of alien frequencies, measure, need to there is special measurement clearance, if measurement clearance does not exist, this measurement task is not measured.For other remaining MID, always to measure.
For the configuration that reports in measuring, be divided into: event triggers to report with periodic triggers and reports this two kinds of modes.Event triggering reports triggered measurement to report to be needed to meet: the signal measurement quality that first needs to record the corresponding MO of MID, secondly, the signal measurement quality of MO just triggers and measures after need meeting event triggering report condition, such as satisfied event triggers report condition, be: the measurement quality of adjacent cell wireless signal during than the large 3db of signal measurement quality of persistent district, UE place, triggers an event.On give the correct time and can only report once, or report repeatedly with Fixed Time Interval.The event that is illustrated in figure 1 triggers the schematic diagram that reports of reporting measurement, and in Fig. 1, UE receives after the measurement control message that network side issues, after Event triggered, triggers and report mode, according to reporting repeatedly reporting measurement reports of interval with event.Another kind of periodic triggers reports triggered measurement to report only need to get the amount of reporting and starts to report, and the event that is different from triggers and reports, and does not need to meet an event triggering report condition and can realize and reporting, and between each time reports, meets report cycle interval.Be illustrated in figure 2 the schematic diagram that reports of periodic triggers reporting measurement, in Fig. 2, UE receives after the measurement control message that network side issues, reports mode, according to reporting repeatedly reporting measurement reports of interval with periodic triggers.In order to save Internet resources, for periodic triggers, report and can report number of times by the maximum arranging, limit and report number of times, be that network side configures to UE one-period and measures, UE creates a node after each measurement task is started to report in the VarMeasurementReports variable of self, VarMeasurementReports variable is only for preserving MID and corresponding with the MID count value that reports, VarMeasurementReports variable exists with the form of tabular form or structure of arrays, each node in VarMeasurementReports variable be take MID as keyword, wherein each node is preserved this count value that reports of measuring task, this reports count value often to report once just to add one, when reporting count value to be added to reporting after number of times of appointment, after the cumulative maximum that reports count value to equal to arrange reports number of times, stop reporting.The node that the MID of take in VarMeasurementReports variable is keyword, as corresponding MID, or the MO that MID is corresponding or RC are re-equipped while putting, this node is cleared, and all nodes in VarMeasurementReports variable can empty when switching or set up reconstruction.
The problem that prior art exists is: based on existing measurement rules, at measurement report, report after end, UE also can measure MO corresponding to this MID, and during measurement, UE powers on always, thereby has increased the power consumption of UE, and the energy consumption expense of other resources of UE.At present, for this problem, also there is no effective solution.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of two kinds of solutions measuring implementation method and system, can realize measurement, and makes UE can reduce unnecessary measurement, thereby has reduced the power consumption of UE, and the energy consumption expense of other resources of UE.
For achieving the above object, technical scheme of the present invention is achieved in that
A measurement implementation method, the method comprises: detect the uploaded state of measurement task, when pre-test task for completed or can not continue to report uploaded state time, user terminal UE no longer measures when pre-test task described; Or,
When pre-test task be or still can continue to report uploaded state time, described UE proceeds to measure when pre-test task to described.
Wherein, the measuring object MO that described measurement task need to be measured is: one or a class frequency Shang community of the MO indication that measurement task is corresponding.
Wherein, for meeting, continue to report or do not have the measurement task of completion status not detect, all the time described measurement task being measured.
Wherein, described measurement task is that event triggers the measurement task that reports mode.
Wherein, the method further comprises:
A1, the initial setting up STATUS variable corresponding with the MID that works as pre-test task, the measurement task uploaded state that described STATUS variable identifies is for being just in operation; According to the measurement task uploaded state of described sign, the uploaded state detecting when pre-test task is: the uploaded state that does not complete or still can continue to report when pre-test task, and described UE continues one of the corresponding MO indication of the MID with when pre-test task or a class frequency Shang community to measure;
A2, judge and be the mode that reports of periodic triggers when reporting types corresponding to the MID of pre-test task, and while reporting count value to be equal to, or greater than to equal the maximum arranging to report number of times, the measurement task uploaded state of described sign upgrades and is set to complete; The measurement task uploaded state of rear sign is set according to renewal, the uploaded state detecting when pre-test task is: the uploaded state that has completed or can not continue to report when pre-test task, described UE no longer continues one of the corresponding MO indication of the MID with when pre-test task or a class frequency Shang community to measure.
Wherein, when described UE measures initial configuration, when UE occurs to measure while reshuffling, UE switches or during UE connection reconstruction, for MID corresponding to all measurement tasks, the STATUS variable that initial setting up is corresponding with described MID, the measurement task uploaded state that described STATUS variable identifies is for being just in operation;
When pre-test task completes, for described, as current MID corresponding to pre-test task, the measurement task uploaded state that the STATUS variable corresponding with described current MID identifies upgrades and is set to complete.
Wherein, the method further comprises:
B1, basis are to working as the correlated judgment result of the MID corresponding node of pre-test task in VarMeasurementReports variable, detect the uploaded state when pre-test task, if current, judgment result is that described UE does not find the corresponding node as the MID of pre-test task; Or be that event triggers the mode that reports when the MID of pre-test task reports mode; Or be that periodic triggers reports mode when the MID of pre-test task reports mode, and UE finds the maximum that reports count value to be less than setting in node corresponding to the MID of pre-test task and described node to report number of times, the uploaded state detecting when pre-test task is: when the uploaded state that pre-test task does not complete or still can continue to report, described UE continues one of the corresponding MO indication of the MID with when pre-test task or a class frequency Shang community to measure;
If current, judgment result is that: when the MID of pre-test task reports mode, be that periodic triggers reports mode, and UE finds and in node corresponding to the MID of pre-test task and described node, reports count value to be equal to, or greater than to equal the maximum arranging to report number of times, the uploaded state detecting when pre-test task is: when the uploaded state that pre-test task has completed or can not continue to report, described UE no longer continue to when one of the corresponding MO indication of the MID of pre-test task or a class frequency Shang community, measure;
B2, preserve in VarMeasurementReports variable node corresponding to MID when pre-test task all the time.
Wherein, described step B2 is further: preserve all the time the node corresponding to MID of working as pre-test task in VarMeasurementReports variable, measurement task is not deleted after arriving the uploaded state completed or can not continue to report yet, until UE occur to measure reshuffle, UE switches or UE connection reconstruction till.
Wherein, the method further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, finish the measurement to of the MO indication corresponding with the described MID that is associated or a class frequency Shang community.
Measurement realizes a system, and this system comprises: detecting unit and measurement strategies processing unit; Wherein,
Detecting unit, for detection of the uploaded state of the task of measurement;
Measurement strategies processing unit, for the uploaded state detecting when pre-test task at described detecting unit is: when the uploaded state that pre-test task has completed or can not continue to report, described UE no longer measures the described pre-test task of working as; Or,
Measurement strategies processing unit, for the uploaded state detecting when pre-test task at described detecting unit is: when the uploaded state that pre-test task does not complete or still can continue to report, described UE proceeds to measure to the described pre-test task of working as.
A measurement implementation method, the method comprises: UE after not completing and having become, deletes described measurement task at the uploaded state of measuring task.
Wherein, described deletion measurement task is further: the sign of deleting the described measurement task of preserving.
Wherein, described measurement task is designated the MID that measures task described in VarMeasurementConfiguration variable.
Wherein, the method further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the maximum that reports count value to be less than setting of the measurement report reporting reports number of times, the uploaded state of described measurement task is uncompleted uploaded state;
When the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, the uploaded state that the uploaded state of described measurement task has been, finishes the measurement to of the MO indication corresponding with the described MID that is associated or a class frequency Shang community.
Wherein, the method also comprises: when UE switches or rebuilds, delete MID corresponding to measurement task that periodic triggers reports.
Wherein, the method also comprises: when UE switches or rebuilds, and the measurement reporting for the periodic triggers completing and stop, eNB need to add MID by reshuffling UE, restarts measurement task.
Measurement realizes a system, and this system comprises: delete cells, for UE at the uploaded state of measuring task after not completing and having become, delete described measurement task.
Wherein, delete cells, is further used for deleting the MID that measures task described in VarMeasurementConfiguration variable.
The present invention is corresponding associated with measurement task by uploaded state, detects the current uploaded state when pre-test task, and UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.Specifically, the uploaded state detecting when pre-test task is: when the uploaded state that pre-test task has completed or can not continue to report, UE is to no longer measuring when pre-test task; Or the uploaded state detecting when pre-test task is: when the uploaded state that pre-test task does not complete or still can continue to report, UE measures proceeding when pre-test task.
The measurement task reporting due to periodic triggers, report count value to be added to reporting after number of times of appointment, UE reports the measurement report of this MID to network side never again, and therefore, current UE there is no need one of MO indication corresponding to this MID or a class frequency Shang community to measure again.Adopt prior art, based on existing measurement rules, when measuring, do not consider to measure finally can report, such as after adopting mode reporting measurement reports that periodic triggers reports to finish, UE also can carry out unnecessary measurement to one of MO indication corresponding to this MID or a class frequency Shang community, thereby has increased the unnecessary energy consumption expense of UE.And the present invention is corresponding associated with measurement task by uploaded state, to measuring the MO of task, take the processing of different measuring strategy.Such as current uploaded state for when pre-test task, completed or the uploaded state situation that can not continue to report under, being treated to of the corresponding measurement strategies of taking: UE no longer continues the MO when pre-test task to measure.Thereby, adopt the present invention can realize measurement, make simultaneously UE measurement task without on give the correct time and avoid carrying out unnecessary measurement, reduced the measurement burden of UE.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that reports that event triggers reporting measurement;
Fig. 2 is the schematic diagram that reports of periodic triggers reporting measurement;
Fig. 3 is the realization flow schematic diagram of the present invention's one method;
Fig. 4 is the realization flow schematic diagram of other method of the present invention.
Embodiment
Basic thought of the present invention is: uploaded state is corresponding associated with measurement task, detect the current uploaded state when pre-test task, and UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.At current uploaded state, be: when pre-test task completed or can not continue to report uploaded state time, being treated to of the corresponding measurement strategies of taking: UE no longer continues measuring when pre-test task; At current uploaded state, be: when the uploaded state that pre-test task does not complete or still can continue to report, UE measures proceeding when pre-test task.
Below in conjunction with accompanying drawing, the enforcement of technical scheme is described in further detail.
The present invention includes two kinds of solutions, and the concrete processing procedure of the first solution comprises two kinds of situations.With regard to the first solution of the present invention, as shown in Figure 3, a kind of measurement implementation method, the method comprises the following steps:
Step 101, UE detect the current uploaded state when pre-test task.
Step 102, when pre-test task for completed or can not continue to report uploaded state time, UE is to no longer measuring when pre-test task.
Here, step 102 can also be step 102a: when pre-test task be or still can continue to report uploaded state time, UE is to proceeding to measure when pre-test task.
Here, the MO that this measurement task need to be measured is: one or a class frequency Shang community of the MO indication that measurement task is corresponding.
Here, for meeting, continue to report or do not have the measurement task of completion status not detect, all the time measurement task being measured.This measurement task can trigger the measurement task that reports mode for event.
Here, for the measurement implementation method being formed by above step 101~step 102 or step 101~step 102a, that is to say, on the one hand, at the uploaded state detecting when pre-test task, be: when the uploaded state that pre-test task has completed or can not continue to report, being treated to of corresponding measurement strategies: of the MO indication of the UE pair of measurement task corresponding with current uploaded state or a class frequency Shang community are no longer measured.On the other hand, at the uploaded state detecting when pre-test task, be: when the uploaded state that pre-test task does not complete or still can continue to report, being treated to of corresponding measurement strategies: of the MO indication of the UE pair of measurement task corresponding with current uploaded state or a class frequency Shang community are proceeded to measure.Below the concrete processing procedure of these measurement implementation method different situations is specifically addressed.
The first situation, the concrete processing procedure of measuring implementation method comprises the following steps:
Step 201, the initial setting up STATUS variable corresponding with the MID that works as pre-test task, this STATUS variable also can be called uploaded state sign, the measurement task uploaded state that STATUS variable identifies is be just in operation (RUNNING), and STATUS=RUNNING is set; The measurement task uploaded state identifying according to STATUS variable, detects the uploaded state when pre-test task; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Step 202, judge the reporting types corresponding with current MID be periodic triggers report mode and report count value to be equal to, or greater than the maximum that equals to arrange to report number of times time, the measurement task uploaded state that STATUS variable identifies upgrades and is set to complete (FINISH), upgrades STATUS=FINISH is set; According to renewal, the measurement task uploaded state that rear STATUS variable identifies is set, detects the uploaded state when pre-test task; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Here, the MO of corresponding measurement task is specially: one or a class frequency Shang community of the MO indication corresponding with current MID.In step 201, the measurement task uploaded state identifying according to STATUS variable, detect when pre-test task uploaded state and be: the uploaded state that does not complete or still can continue to report when pre-test task, being treated to of corresponding measurement strategies: UE continues one of the MO indication corresponding with current MID or a class frequency Shang community to measure.In step 202, according to renewal, the measurement task uploaded state that rear STATUS variable identifies is set, detect when pre-test task uploaded state and be: the uploaded state that has completed or can not continue to report when pre-test task, being treated to of corresponding measurement strategies: UE no longer continues one of the MO indication corresponding with current MID or a class frequency Shang community to measure.
And, when UE measures initial configuration, when UE occurs to measure while reshuffling, UE switches or during UE connection reconstruction, for MID corresponding to all measurement tasks, initial setting up STATUS=RUNNING; When pre-test task completes, for as current MID corresponding to pre-test task, the STATUS variable corresponding with current MID upgraded to setting, and STATUS=FINISH is set.
It is to be noted, the concrete processing procedure of measuring implementation further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, finish reporting one or the measurement of a class frequency Shang community of the MO indication that the MID that is associated is corresponding with periodic triggers.
The second situation, the concrete processing procedure of measuring implementation method comprises the following steps:
Step 301, the correlated judgment result of basis to current MID corresponding node in VarMeasurementReports variable, detect when pre-test task uploaded state; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Here, the MO of corresponding measurement task is specially: one or a class frequency Shang community of the MO indication corresponding with current MID.Step 301 is specially: if the current UE of judgment result is that does not find the node that current MID is corresponding; Or it is that event triggers the mode that reports that current MID reports mode; Or it is that periodic triggers reports mode that current MID reports mode, and UE finds the maximum that reports count value to be less than setting in node that current MID is corresponding and this node to report number of times, detect when pre-test task uploaded state and be: the uploaded state that does not complete or still can continue to report when pre-test task; Being treated to of corresponding measurement strategies: UE continues one of the MO indication corresponding with current MID or a class frequency Shang community to measure.If current, judgment result is that: it is that periodic triggers reports mode that current MID reports mode, and UE finds the maximum that reports count value to be equal to, or greater than in node that current MID is corresponding and this node to equal to arrange to report number of times, detect when pre-test task uploaded state and be: the uploaded state that has completed or can not continue to report when pre-test task; Being treated to of corresponding measurement strategies: UE no longer continues one of the MO indication corresponding with current MID or a class frequency Shang community to measure.
Step 302, preserve node corresponding to current MID in VarMeasurementReports variable all the time.
Here, step 302 is further: continue to preserve node corresponding to current MID in VarMeasurementReports variable, measurement task is not deleted after arriving the uploaded state completed or can not continue to report yet, until UE occur to measure reshuffle, UE switches or UE connection reconstruction till.
It is to be noted, the concrete processing procedure of measuring implementation further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, finish reporting one or the measurement of a class frequency Shang community of the MO indication that the MID that is associated is corresponding with periodic triggers.
Measurement realizes a system, and this system comprises: detecting unit and measurement strategies processing unit.Wherein, detecting unit, for detection of the uploaded state of the task of measurement.Measurement strategies processing unit, for the uploaded state detecting at detecting unit when pre-test task is: when the uploaded state that pre-test task has completed or can not continue to report, UE is to no longer measuring when pre-test task; Or measurement strategies processing unit, for the uploaded state detecting at detecting unit when pre-test task is: when the uploaded state that pre-test task does not complete or still can continue to report, UE measures proceeding when pre-test task.
With regard to the second solution of the present invention, a kind of measurement implementation method comprises: UE after not completing and having become, deletes this measurement task at the uploaded state of measuring task.Its concrete processing procedure as shown in Figure 4, comprises the following steps:
Step 401, UE measure the corresponding MO of all MID in VarMeasurementConfiguration variable.
Step 402, UE by not completing while being revised as, delete that in VarMeasurementConfiguration variable, this measures the MID of task at the uploaded state of the task of measurement.
Here, the concrete processing procedure of measuring implementation method further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the maximum that reports count value to be less than setting of the measurement report reporting reports number of times, the uploaded state of this measurement task is uncompleted uploaded state.When the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, the uploaded state that the uploaded state of this measurement task has been, finishes the measurement to of the MO indication corresponding with this MID that is associated or a class frequency Shang community.
Here, the method also comprises: when UE switches or rebuilds, delete MID corresponding to measurement task that periodic triggers reports.
Measurement realizes a system, and this system comprises: delete cells, for UE at the uploaded state of measuring task after not completing and having become, delete this measurement task.
Here, delete cells, is further used for deleting the MID of this measurement task in VarMeasurementConfiguration variable.
Here, to following three examples based on configuring condition be specially: in LTE system, when UE resides in S1 place, Serving cell frequency A, the value of the signal measurement quality of Serving cell S1 is s a, UE is in connected state, and network side sends measures control message to UE.Wherein, this measurement control message comprises that MO1 is set to frequency A Shang LTE community; The event that is set to RC1 triggers and reports, and event triggering report condition is: adjacent cell, than the good 2db of UE persistent district signal quality, triggers an event while meeting this event triggering report condition; And MO1 and MID1 corresponding to RC1.MO2 is frequency B Shang LTE community; The periodic triggers that RC2 is set to reportStrongestCells type reports, and reports the top-quality several communities of signal measurement in MO2; Maximum is set and reports number of times and report cycle interval; And MO2 and MID2 corresponding to RC2.The value that measurement thresholding is set is s-Measure, and measurement clearance configures.Below example one, example two and example three are specifically addressed.
Example one is: on VarMeasurementReports variable basis, the extra STATUS variable that increases, this STATUS variable is used for identifying measurement task uploaded state, the measurement task uploaded state identifying based on this STATUS variable can better detect uploaded state, thereby the measurement task uploaded state identifying based on this STATUS variable detects current uploaded state, the MO of the UE pair of measurement task corresponding with current uploaded state, realizes the processing of corresponding measurement strategies.The processing of measurement strategies is divided into two kinds, at the uploaded state detecting when pre-test task, be: when the uploaded state that pre-test task has completed or can not continue to report, being treated to of the first measurement strategies: UE no longer measures the MO when pre-test task; At the uploaded state detecting when pre-test task, be: the uploaded state that measurement task does not complete or still can continue to report, being treated to of the second measurement strategies: UE proceeds to measure to the MO when pre-test task.
Here be pointed out that, for VarMeasurementReports variable, when VarMeasurementReports variable exists with tabular form, this table can be: the index relative table that reports count value of sign MID and this measurement task, and index key is MID, index relative table comprises: MID, and corresponding with the MID count value that reports.When VarMeasurementReports variable exists with the form of structure of arrays, the array data in array comprises: MID, and corresponding with the MID count value that reports, and MID is array keyword.
In this example, because MID2 reports and is associated with periodic triggers, therefore, the fixing report cycle interval after triggering can be finished, have definite completion status, UE will report the STATUS variable of the MID2 being associated to be initially set to RUNNING with periodic triggers.Because triggering to report with event, MID1 is associated, pass through Event triggered, therefore, unlike periodically reporting, there is definite completion status, UE can be initially set to RUNNING to the STATUS variable of MID1, can not arrange, be defined in while measuring and do not check that this event triggers the uploaded state reporting yet.
Specifically, the scene for UE when carrying out measurement, all MID in traversal VarMeasurementReports variable.For MID1, work as s awhen <s-Measure or s-Measure do not configure, UE measures all LTE community on frequency A.For MID2, work as s awhen <s-Measure or s-Measure do not configure and measurement clearance configure, UE measures all LTE community on frequency B.Visible, as long as meet the s that the prerequisite condition of measuring is persistent district, UE place abe less than the s-Measure of configuration or do not configure s-Measure, UE measures MO corresponding to this MID.
For reporting with periodic triggers the MID2 being associated, the realization flow of measuring implementation method comprises the following steps:
The measurement task uploaded state that step 501, the initial setting up STATUS variable corresponding with MID2 identify is: RUNNING, and the measurement task uploaded state identifying according to this, detects the uploaded state when pre-test task; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Here, because MID is corresponding with measurement task, therefore, the MO of described corresponding measurement task is: the MO2 corresponding with MID2.
Here, initial setting up STATUS=RUNNING, the measurement task uploaded state that STATUS variable identifies is RUNNING, represents to move when pre-test task, when pre-test task not yet completes.Thereby the uploaded state that the measurement task uploaded state identifying based on this detects when pre-test task is: the uploaded state that does not complete or still can continue to report when pre-test task, being treated to of the corresponding measurement strategies now realizing: it is that frequency B Shang community is measured to the MO2 being associated with MID2 that UE continues.UE measures behind frequency B Shang community, and what report is the best several communities of wireless quality, above gives the correct time by measured value from high to low, reports evolved Node B (eNB).
And, when UE carries out measurement task, often reporting once, the count value that reports corresponding with MID2 in VarMeasurementReports variable adds 1.
Step 502, when judging corresponding with the MID2 maximum that reports count value to equal to arrange and report number of times, the measurement task uploaded state that STATUS variable identifies upgrades and is set to FINISH, according to renewal, the measurement task uploaded state that rear STATUS variable identifies is set, detects the uploaded state when pre-test task; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Here, when reporting count value to be equal to, or greater than to equal the maximum arranging to report after number of times, upgrade the STATUS=FINISH that MID2 is set, the measurement task uploaded state that STATUS variable identifies is updated to FINISH, represents to complete when pre-test task.Thereby based on this renewal, the measurement task uploaded state that rear STATUS variable identifies is set, the uploaded state detecting when pre-test task is: when the uploaded state that pre-test task has completed or can not continue to report, and being treated to of the corresponding measurement strategies now realizing: the MO2 that UE no longer continues being associated with MID2 is that frequency B Shang community is measured.
Step 503, empty node corresponding to MID2 in VarMeasurementReports variable.
Here, emptying the node that in VarMeasurementReports variable, MID2 is corresponding can be: when VarMeasurementReports variable exists with tabular form, emptying index key is the corresponding list item record of MID2.When VarMeasurementReports variable exists with the form of structure of arrays, emptying array keyword is the corresponding array data of MID2.
Here, when UE carries out the detection before measurement again, for MID2, work as s awhen <s-Measure or s-Measure do not configure and measurement clearance configures, due to MID2 association the measurement that reports of periodic triggers, therefore, need to check the STATUS variable corresponding with MID2, measurement task uploaded state to be identified based on STATUS variable, detects the uploaded state when pre-test task.Now find STATUS=FINISH, thereby UE can not measure to frequency B Shang LTE community corresponding to MO2 more after this, only frequency A corresponding to MO1 be measured.
Scene when generation is measured and reshuffled for UE, includes but not limited to following several situation.The first situation is: the MO2 that MID2 is corresponding is re-equipped and is set to C frequency, and corresponding RC2 is constant.The second situation is: the RC2 that MID2 is corresponding is re-equipped and is set to wherein a kind of mode that reports that periodic triggers reports, the measurement that periodic triggers of reportStrongestCellsForSON reports.The third situation is: MO2 and RC2 are re-equipped and put.The 4th kind of situation is: MID2 is re-equipped while putting, and the STATUS variable that MID2 is corresponding is re-set as RUNNING by FINISH, to proceed newly to measure the measurement of task.Under scene is reshuffled in measurement, for periodic triggers, report the MID being associated, also can take: UE is carrying out the measurement implementation method of measuring under scene, be: initial setting up and renewal arrange the STATUS variable corresponding with MID, the measurement task uploaded state identifying according to this STATUS variable, detects the uploaded state when pre-test task.
Scene when switching or rebuilding for UE, includes but not limited to following this situation.The STATUS variable corresponding for MID2 is re-set as RUNNING by FINISH, so that UE reshuffles measurement in there is no handoff procedure, also can after switching, not restart to measure.Under handoff scenario, for periodic triggers, report the MID being associated, also can take: UE is carrying out the measurement implementation method of measuring under scene, be: initial setting up and renewal arrange the STATUS variable corresponding with MID, the measurement task uploaded state identifying according to this STATUS variable, detects the uploaded state when pre-test task.
Example two is: additionally do not increase for identifying the STATUS variable of measurement task uploaded state, by existing own variable, be whether VarMeasurementReports variable just can be known current measurement task and move, only based on VarMeasurementReports variable, detect the uploaded state when pre-test task, be: for the MID of corresponding periodic triggers reporting measurement in VarMeasurementReports variable, by the count value that reports in MID institute corresponding node in the direct VarMeasurementReports of judgement variable, whether be less than, being equal to, or greater than the maximum that equals to arrange reports number of times to judge whether this measurement task should be measured.Thereby based on this VarMeasurementReports variable, detect the uploaded state when pre-test task, the MO of the UE pair of measurement task corresponding with the uploaded state of working as pre-test task, realizes the processing of corresponding measurement strategies.And, after finishing when pre-test task, be when in VarMeasurementReports variable, the maximum that reports count value to be equal to, or greater than to equal to arrange in current MID institute corresponding node reports number of times, do not empty node corresponding to current MID in VarMeasurementReports variable, in VarMeasurementReports variable, preserve MID, and the corresponding count value that reports of MID.
Specifically, the scene for UE when carrying out measurement, all MID in traversal VarMeasurementReports variable.For MID1, work as s awhen <s-Measure or s-Measure do not configure, UE measures all LTE community on frequency A.For MID2, work as s awhen <s-Measure or s-Measure do not configure and measurement clearance configure, UE measures all LTE community on frequency B.Visible, as long as meet the s that the prerequisite condition of measuring is persistent district, UE place abe less than the s-Measure of configuration or do not configure s-Measure, UE measures MO corresponding to this MID.
For reporting with periodic triggers the MID2 being associated, the realization flow of measuring implementation method comprises the following steps:
Step 601, the correlated judgment result of basis to MID2 corresponding node in VarMeasurementReports variable, detect the uploaded state when pre-test task; UE, to the MO when pre-test task, realizes the processing of corresponding measurement strategies.
Here, because MID is corresponding with measurement task, therefore, the MO of described corresponding measurement task is: the MO2 corresponding with MID2.
Here, UE searches node the judgement that in VarMeasurementReports variable, MID2 is corresponding, judgment result is that: do not find the node that MID2 is corresponding if current; Or it is that event triggers the mode that reports that current MID reports mode; Or it is that periodic triggers reports mode that current MID reports mode, and UE finds the maximum that reports count value to be less than setting in node that MID2 is corresponding and this node to report number of times.Thereby the uploaded state detecting when pre-test task based on current judged result is: the uploaded state that does not complete or still can continue to report when pre-test task, being treated to of the corresponding measurement strategies now realizing: UE thinks that this measurement task does not also complete, continuing is that frequency B Shang community is measured to the MO2 being associated with MID2.
And, when UE carries out measurement task, often reporting once, the count value that reports corresponding with MID2 in VarMeasurementReports variable adds 1.UE continues to search node the judgement that in VarMeasurementReports variable, MID2 is corresponding, if current, judgment result is that: it is that periodic triggers reports mode that current MID reports mode, and UE finds the maximum that reports count value to be equal to, or greater than in node that MID2 is corresponding and this node to equal to arrange to report number of times.Thereby the uploaded state detecting when pre-test task based on current judged result is: the uploaded state that has completed or can not continue to report when pre-test task, being treated to of the corresponding measurement strategies now realizing: it is that frequency B Shang community is measured that UE no longer carries out the MO2 that reports and continue being associated with MID2.
Step 602, preserve node corresponding to MID2 in VarMeasurementReports variable all the time.The node that in VarMeasurementReports variable, MID2 is corresponding is not emptied to processing.
Here, not emptying processing can be: when VarMeasurementReports variable exists with tabular form, not emptying index key is the corresponding list item record of MID2.When VarMeasurementReports variable exists with the form of structure of arrays, not emptying array keyword is the corresponding array data of MID2.
Here, when UE carries out the detection before measurement again, for MID2, work as s awhen <s-Measure or s-Measure do not configure and measurement clearance configures, owing to having preserved node corresponding to MID2 in VarMeasurementReports variable, therefore, can pass through the correlated judgment to MID2 corresponding node in VarMeasurementReports variable, know that the maximum that reports count value to be equal to, or greater than in the node that current judgment result is that: MID2 is corresponding to equal to arrange reports number of times, thereby UE has no longer needed reporting measurement reports after this, UE can not measure frequency B Shang LTE community corresponding to MO2 more afterwards, only frequency A corresponding to MO1 measured.
Scene when generation is measured and reshuffled for UE, includes but not limited to following several situation.The first situation is: the MO2 that MID2 is corresponding is re-equipped and is set to C frequency, and corresponding RC2 is constant.The second situation is: the RC2 that MID2 is corresponding is re-equipped and is set to the measurement that the periodic triggers of reportStrongestCellsForSON reports.The third situation is: MO2 and RC2 are re-equipped and put.The 4th kind of situation is: MID2 is re-equipped while putting, and in VarMeasurementReports variable, corresponding MID2 node all can be cleared, so that UE starts newly to measure the measurement of task.
Scene when switching or rebuilding for UE, in VarMeasurementReports variable, all nodes all can be cleared, so that UE starts newly to measure the measurement of task, that is to say that UEXin community can start the measurement task of all MID.
Example three is: additionally do not increase for measuring the STATUS variable of task uploaded state, after completing in measurement task, be: for periodic measurement task, by existing own variable be in VarMeasurementReports variable MID corresponding node report count value to be equal to, or greater than maximum to report after number of times, UE deletes corresponding MID configuration, so that traversal is less than this MID while measuring, also just naturally stopped the measurement to measurement task corresponding to this MID.
Scene when switching or rebuilding for UE, reports the measurement task being associated for periodic triggers, delete at MID corresponding to VarMeasurementConfiguration.For eNB, the measurement reporting for the periodic triggers completing and stop, need to add MID by reshuffling UE, restarts measurement task.
Specifically, the scene for UE when carrying out measurement, traveling through existing own variable is all MID in VarMeasurementConfiguration variable.For MID1, work as s awhen <s-Measure or s-Measure do not configure, UE measures all LTE community on frequency A.For MID2, work as s awhen <s-Measure or s-Measure do not configure and measurement clearance configure, UE measures all LTE community on frequency B.Visible, as long as meet the s that the prerequisite condition of measuring is persistent district, UE place abe less than the s-Measure of configuration or do not configure s-Measure, UE measures MO corresponding to this MID.
For reporting with periodic triggers the MID2 being associated, the realization flow of measuring implementation method comprises the following steps:
Step 701, UE measure the corresponding MO of all MID in VarMeasurementConfiguration variable.Be that UE searches MID list in VarMeasurementConfiguration variable, if find MID2, the MO2 continuing being associated with MID2 is that frequency B Shang community is measured.
And, when UE carries out measurement task, often reporting once, the count value that reports corresponding with MID2 in VarMeasurementReports variable adds 1.When MID2 corresponding report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, UE no longer carries out and reports.
Step 702, UE at the uploaded state of the task of measurement by not completing while being revised as, UE deletes the MID2 in MID list in VarMeasurementConfiguration variable automatically, empties node corresponding to MID2 in VarMeasurementReports variable simultaneously.
Here, emptying the node that in VarMeasurementReports variable, MID2 is corresponding can be: when VarMeasurementReports variable exists with tabular form, emptying index key is the corresponding list item record of MID2.When VarMeasurementReports variable exists with the form of structure of arrays, emptying array keyword is the corresponding array data of MID2.
Here, when UE carries out the detection before next time measuring, because MID2 in VarMeasurementConfiguration variable is deleted, therefore, UE can not measure frequency B Shang LTE community corresponding to MO2 more again, only frequency A corresponding to MO1 is measured.
Scene when switching or rebuilding for UE, reports the measurement task being associated for periodic triggers, automatically delete MID2 corresponding in VarMeasurementConfiguration variable.
When eNB thinks to want the measurement task MID2 of start-up period again, by being occurred to measure, UE reshuffles, MID2 occurs to add while reshuffling, and MID2 is added in the MID list of VarMeasurementConfiguration variable again, and UE starts to remeasure the MO that MID2 is corresponding.
The above, be only preferred embodiment of the present invention, is not intended to limit protection scope of the present invention.

Claims (8)

1. measure an implementation method, it is characterized in that, the method comprises: UE after not completing and having become, deletes described measurement task at the uploaded state of the task of measurement.
2. method according to claim 1, is characterized in that, described deletion is measured task and is further: the sign of deleting the described measurement task of preserving.
3. method according to claim 2, is characterized in that, the MID that is designated the described measurement task in VarMeasurementConfiguration variable of described measurement task.
4. method according to claim 1, it is characterized in that, the method further comprises: report the MID that is associated after triggering the reporting of periodic measurement report with periodic triggers, when the maximum that reports count value to be less than setting of the measurement report reporting reports number of times, the uploaded state of described measurement task is uncompleted uploaded state;
When the measurement report reporting report count value to be equal to, or greater than to equal the maximum arranging to report number of times time, the uploaded state that the uploaded state of described measurement task has been, finishes the measurement to of the MO indication corresponding with the described MID that is associated or a class frequency Shang community.
5. method according to claim 3, is characterized in that, the method also comprises: when UE switches or rebuilds, delete MID corresponding to measurement task that periodic triggers reports.
6. method according to claim 3, is characterized in that, the method also comprises: when UE switches or rebuilds, the measurement reporting for the periodic triggers completing and stop, eNB need to add MID by reshuffling UE, restarts measurement task.
7. measurement realizes a system, it is characterized in that, this system comprises: delete cells, for UE at the uploaded state of measuring task after not completing and having become, delete described measurement task.
8. system according to claim 7, is characterized in that, delete cells is further used for deleting the MID that measures task described in VarMeasurementConfiguration variable.
CN201310411220.9A 2009-02-03 2009-02-03 One kind measurement realization method and system Active CN103763733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310411220.9A CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200910077917.0A CN101795468B (en) 2009-02-03 2009-02-03 Methods and systems for realizing measurement
CN201310411220.9A CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN200910077917.0A Division CN101795468B (en) 2009-02-03 2009-02-03 Methods and systems for realizing measurement

Publications (2)

Publication Number Publication Date
CN103763733A true CN103763733A (en) 2014-04-30
CN103763733B CN103763733B (en) 2017-10-03

Family

ID=50530878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310411220.9A Active CN103763733B (en) 2009-02-03 2009-02-03 One kind measurement realization method and system

Country Status (1)

Country Link
CN (1) CN103763733B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110278574A (en) * 2018-03-16 2019-09-24 维沃移动通信有限公司 Measurement method, measuring configuration method, terminal and the network equipment
CN112305402A (en) * 2020-02-27 2021-02-02 青岛众鑫科技有限公司 Controller special for testing hybrid integrated circuit product

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010051971A1 (en) * 2000-03-16 2001-12-13 Toshiaki Kato Parallel object task engine and processing method
CN101114875A (en) * 2006-07-25 2008-01-30 中兴通讯股份有限公司 Mobile communications network link performance measuring system and method
US20080167026A1 (en) * 2005-05-03 2008-07-10 Infineon Technologies Ag Method for Processing Measurement Control Messages and Mobile Radio Communications Terminal
WO2008087535A2 (en) * 2007-01-18 2008-07-24 Nokia Corporation Network oriented control of self-optimization measurements
CN101312408A (en) * 2007-05-25 2008-11-26 华为技术有限公司 Control method and terminal equipment for uploading measurement report

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010051971A1 (en) * 2000-03-16 2001-12-13 Toshiaki Kato Parallel object task engine and processing method
US20080167026A1 (en) * 2005-05-03 2008-07-10 Infineon Technologies Ag Method for Processing Measurement Control Messages and Mobile Radio Communications Terminal
CN101114875A (en) * 2006-07-25 2008-01-30 中兴通讯股份有限公司 Mobile communications network link performance measuring system and method
WO2008087535A2 (en) * 2007-01-18 2008-07-24 Nokia Corporation Network oriented control of self-optimization measurements
CN101312408A (en) * 2007-05-25 2008-11-26 华为技术有限公司 Control method and terminal equipment for uploading measurement report

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110278574A (en) * 2018-03-16 2019-09-24 维沃移动通信有限公司 Measurement method, measuring configuration method, terminal and the network equipment
CN110278574B (en) * 2018-03-16 2021-06-04 维沃移动通信有限公司 Measurement method, measurement configuration method, terminal and network equipment
CN112305402A (en) * 2020-02-27 2021-02-02 青岛众鑫科技有限公司 Controller special for testing hybrid integrated circuit product
CN112305402B (en) * 2020-02-27 2022-12-27 青岛众鑫科技有限公司 Controller special for testing hybrid integrated circuit product

Also Published As

Publication number Publication date
CN103763733B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN101795468B (en) Methods and systems for realizing measurement
CN101998482B (en) Method and system for measuring and reporting
CN101808358B (en) Measurement switching method and device in mobile communication
US8600458B2 (en) Method of reducing power consumption in a UE when the UE is in idle mode
CN102088685B (en) Network side device and method for updating system information block (SIB)
CN101031152B (en) Method for shortening user-terminal re-selection time delay under empty mode
EP2567564A1 (en) Method and telecommunications infrastructure for activating an inactive cell
CN103298012A (en) AP failure detection method and device
CN101808381A (en) Method and device for switching judgment
CN101500287B (en) Cell reselection implementing method, apparatus and user terminal
CN102761897A (en) Method and system for realizing automatic neighbor cell relation measurement
CN102595523A (en) Cell list processing method and device, and mobile terminal
CN109151927A (en) Cell reselection or switching method and system
CN103581945A (en) Measurement configuration processing method and device
CN104581841B (en) Mobile terminal and its residence reselecting and device
CN103369603B (en) The mutual operation method of self-organizing network and device
CN103763733A (en) Measurement realization method and system
CN101516100B (en) Measuring collocation method, device and system
CN112437473A (en) Cell measurement method, wireless communication device and storage medium
CN103648128A (en) Method and device for determining switching threshold between systems
CN101835180A (en) Subdistrict measured result processing method and system
CN102547826B (en) The report method of neighbor measurement information and system, terminal equipment
CN102104898B (en) A kind of mobility parameter matching performance detection method and system
CN114980166A (en) Cell selection method, device, equipment and storage medium
GB2607119A (en) Network and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant