CN103761872B - The analysis method of BRT stations overpass and platform integrity service level - Google Patents

The analysis method of BRT stations overpass and platform integrity service level Download PDF

Info

Publication number
CN103761872B
CN103761872B CN201410032889.1A CN201410032889A CN103761872B CN 103761872 B CN103761872 B CN 103761872B CN 201410032889 A CN201410032889 A CN 201410032889A CN 103761872 B CN103761872 B CN 103761872B
Authority
CN
China
Prior art keywords
service level
road
brt
platform
basic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410032889.1A
Other languages
Chinese (zh)
Other versions
CN103761872A (en
Inventor
黄玲
卢凯
赖众燿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201410032889.1A priority Critical patent/CN103761872B/en
Publication of CN103761872A publication Critical patent/CN103761872A/en
Application granted granted Critical
Publication of CN103761872B publication Critical patent/CN103761872B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a kind of BRT stations overpass and the analysis method of platform integrity service level, comprise the following steps:S1 obtains the basic document of BRT station overpasses and platform, and the basic document includes road segment classification and overall width, length, the gradient and the barrier in each section;S2 carries out basic road division to target BRT station overpasses and platform, and using basic road as analytic unit;S3 calculates the analytical parameters of basic road;S4 determines the service level of basic road;S5 determines bottleneck road according to the service level of basic road;S6 determines target BRT station overpasses and platform integrity service level.The present invention provides quantitative basis for the analysis of BRT stations overpass and platform integrity service level with improvement.

Description

The analysis method of BRT stations overpass and platform integrity service level
Technical field
The present invention relates to field of traffic control, and in particular to a kind of BRT stations overpass and platform integrity service level Analysis method.
Background technology
BRT stations overpass and platform integrity service level refer to overpass and all sections of platform in BRT stations The service level that entirety is embodied, i.e. BRT stations overpass and platform integrity service level.
Overpass and platform integrity service level are the comprehensive embodiments of BRT stations service ability and level in BRT stations, Scientific and reasonable analysis and evaluation is carried out to it and understands BRT operating administrations BRT stations operation situation, improve BRT stations fortune Battalion's integrity service level, improves user satisfaction, it is to avoid produce that pedestrian is crowded in peak period and tread event etc. has very big Meaning, but at present, corresponding method is lacked in China's BRT operation management to BRT stations overpass and platform integrity service Level carries out science, the analysis of quantitative and system.
Most of researchs at present are all carried out just for single pedestrian facility such as overline bridge, stair, waiting station platform, pavement etc. Analysis in terms of service level, is not yet found and BRT is entered the station overpass and platform regards an entirety as and carries out service level point Analysis document explanation.
The content of the invention
For the shortcoming and deficiency that overcome prior art to exist, the present invention provides BRT station overpasses and platform entirety The analysis method of service level.
The present invention is adopted the following technical scheme that:
A kind of BRT stations overpass and the analysis method of platform integrity service level, comprise the following steps:
S1 is obtained the basic document of target BRT station overpasses and platform by electronic map or plane design drawing, described Basic document includes road segment classification, overall width, length, the gradient and barrier, wherein the barrier wide reference U.S.《Road Ability handbook》The relevant regulations of the 18th chapter in 2000;Pavement and platform are waited the fringing in area:0.5m;Overpass lateral rail: 0.5m;Bushes:0.7m;Side building wall:0.5m;Trees:0.2m
S2 carries out basic road division according to road segment classification to target BRT station overpasses and platform, and with basic road Duan Zuowei analytic units;
The road segment classification includes that horizontal sidewalk, stair, ramp pavement, booking enter the station area and platform is waited area.
S3 calculates the analytical parameters of basic road, the effective width of analytical parameters including pavement, per capita space, OK People's per flow rate, pedestrian stream speed, V/C ratios and booking residence time;
The effective width on the pavement refers to the part that pedestrian can effectively utilize in Route for pedestrians.
The computing formula of pavement effective width is as follows:
WE=WT-WO
In formula:
WE- pavement effective width (m),
WT- pavement overall width (m),
WO- barrier width with pass round obstacle distance sum (m).
Pedestrian's per flow rate Vp (people/min/m):
Vp=V15/(15*WE)
Wherein, VP- pedestrian per flow rate (people/min/m);V15The 15 minutes flow rates (people/15min) in-peak;WE- people row Road effective width (m).
The pedestrian stream speed S:
BRT stations overpass and the integrity service level of platform to being completed are analyzed, and S is specific for pedestrian stream speed Numerical value can calculate sample average and obtain according to field observation:
S=(∑ Si)/n
Wherein, Si is i-th sample walking speed (m/s);N is sample size.
BRT stations overpass and the integrity service level of platform in planning and designing is analyzed, can basis《Road Traffic capacity handbook》In recommendation:" pedestrian walking speed depends on the ratio of pedestrian the elderly (being higher than 65 years old).If 0%~20% pedestrian is the elderly, and when calculating pavement, pedestrian walking speed can use 1.2 meter per seconds;If it exceeds 20% Pedestrian be the elderly, pedestrian walking speed can use 1 meter per second.In addition, when the gradient is more than 3%, the gradient often increases by 10%, Walking speed 0.1 meter per second of reduction.”
The pace of the space S per capita (m2/p):
Space=1/k
K=60*Vp/S
Wherein:K is pedestrian's current density, p/m2;Vp is pedestrian's per flow rate, people/min/m;
S is pedestrian stream speed, m/s.
The V/C ratios:
It is assumed that the pavement traffic capacity is C=75 people/min/m, then V/C is:
V/C=Vp/75;Wherein Vp is pedestrian's per flow rate.
The booking residence time:
The booking residence time refers to passenger enters the station the time that area terminates to booking from into booking, to the BRT cars being completed Stand passenger's average booking residence time when can directly count 15 minutes highest passenger flows, i.e.,:
Tw=∑s (TOi-TIi)/n (7)
In formula, TOi is i-th moment of passenger's completion booking, and TIi is moment of i-th passenger into booking area, and n is Sample size.
Not yet build up such as target BRT stations, also N number of M/M/1 rows as can be regarded booking area of entering the station using the method for queueing theory Team system, then booking residence time Tw be:
Tw=(∑ Twi)/N (8)
Twi=1/ (μ i- λ i) (9)
In formula, Twi is the residence time of i-th booking mouthful, and N is counted out for booking, and λ i are represented in the unit interval and averagely arrived Up to the passenger flow number of booking mouthful i, μ i represent in the unit interval that booking service finishes the average passenger flow number for leaving booking mouthful i, and μ i>λi It is that queuing system keeps stable premise.
S4 determines the service level of basic road, specially:The service level LOS of basic road divides leading indicator and behaves Equal spatial parameter Space, is aided with pedestrian flow rate, walking speed and saturation degree V/C, with worst LOS as final result.
The level of service division standard difference of all types of basic roads is as follows:
When basic road is plane pavement, service level is divided according to following standard:
Plane pavement level of service division standard
"-" represents that data do not know in above table.
When basic road type is stair, service level is divided according to following standard:
Stair level of service division standard
"-" represents that data do not know in above table.
Wherein Level Walking speed SHFor
SH=LH/t
It is Level Walking speed, unit m/s in formula;LHIt is stair horizontal range, unit m;T is average for observation sample Walking time.
The ramp pavement, the gradient in the ramp is more than ± 3%;
The level of service division standard of ramp basic road is identical with plane pavement, simply the size and climb and fall of the gradient Walking speed S can be influenceed, so that the parameter such as pedestrian space, pedestrian flow rate, saturation degree V/C changes, consequently, it is possible to shadow Ring LOS levels.
Platform is waited area:
BRT station platforms area's level of service division standard of waiting is as follows:
Booking is entered the station area:
The booking area's level of service division standard that enters the station in BRT stations is as follows:
The service level LOS of S5 and then each type basic road according to above-mentioned determination, service level class is minimum Basic road j is bottleneck road, and the bottleneck road may more than one.
S6 determines target BRT station overpasses and platform integrity service level;
LOSW=LOSj
Wherein, LOSj is the service level of bottleneck road.
Because BRT stations overpass and platform pedestrian stream are continuous, therefore improve BRT station overpasses and platform The horizontal LOS of integrity serviceWMaximally effective measure is exactly the service level LOSj for improving bottleneck road.
The present invention carries out quantitative analysis to BRT stations overpass and platform integrity service level, determines bottleneck road Service level, finally determines BRT station overpasses and platform integrity service level.
Beneficial effects of the present invention:
The present invention can be analyzed to the BRT stations overpass and platform that are completed, it is also possible to the BRT cars in design Stand overpass and platform is analyzed;And method is simple and easy to apply, can be to China BRT station overpasses and station using the method The integrity service level of platform is analyzed, and carries out specific aim improvement accordingly, therefore the present invention has very big actual promotion price Value.
Brief description of the drawings
Fig. 1 is workflow diagram of the invention;
Fig. 2 is the division schematic diagram of basic road in the specific embodiment of the invention;
Specific embodiment
With reference to embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not It is limited to this.
Embodiment
The present embodiment obtains the station overpass and platform by taking Guangzhou BRT stations overpass and platform as an example The analysis method of integrity service level, comprises the following steps:As shown in figure 1,
S1 obtains the basic document of BRT station overpasses and platform;
S2 carries out basic road division to target BRT station overpasses and platform, and with basic road as analytic unit, As shown in Figure 2;
S3 calculates the analytical parameters of basic road, the effective width of analytical parameters including pavement, per capita space, OK People's per flow rate, pedestrian stream speed, V/C ratios and booking residence time, table specific as follows;
The analytical parameters value of each basic road is as shown in the table:
Note:Section 1 and 4 is entered the station area for booking, and its level of service division standard only relies on one parameter of booking residence time; Section 2 and 3 is platform, and its level of service division standard only relies on one, space parameter per capita.
Then S4 determines the service level in each rank section according to each analytical parameters value and level of service division standard, as follows Shown in table.
Basic road Service level LOS Basic road Service level LOS
1 C 7 C
2 B 8 C
3 D 9 C
4 C 10 C
5 F 11 B
6 C
S5 determines the minimum basic road 5 of service level by upper table, and its service level is that F, i.e. stair section 5 are Guangzhou The bottleneck road at BRT stations.
Service levels of the S6 finally according to bottleneck road, it may be determined that Guangzhou BRT stations overpass and platform Integrity service level is F.Show the Guangzhou BRT stations overpass and platform integrity service level error, service level is urgently Lifting, and the bottleneck road 5 for improving is first had to, its integrity service level can just bring up to D grades;If further improved basic Section 3, then the BRT stations overpass and platform integrity service level can bring up to C grades.
The basic road level of service division standard Primary Reference U.S. of the invention《HCM》.
Above-described embodiment is the present invention preferably implementation method, but embodiments of the present invention are not by the embodiment Limitation, it is other it is any without departing from Spirit Essence of the invention and the change, modification, replacement made under principle, combine, simplification, Equivalent substitute mode is should be, is included within protection scope of the present invention.

Claims (2)

1. the analysis method of a kind of BRT stations overpass and platform integrity service level, it is characterised in that including following step Suddenly:
S1 obtains the basic document of BRT station overpasses and platform, and the basic document includes road segment classification and each section Overall width, length, the gradient and barrier;
S2 carries out basic road division to target BRT station overpasses and platform, and make with basic road according to road segment classification It is analytic unit;
S3 calculates the analytical parameters of basic road, and the analytical parameters include pavement effective width, per capita space, pedestrian's unit Flow rate, pedestrian stream speed, V/C ratios and booking residence time;
S4 determines the service level of basic road, specially:The level of service division index of basic road is space, pedestrian per capita Per flow rate, pedestrian stream speed and V/C ratios, with worst value as final result;
S5 determines bottleneck road according to the service level of basic road, and the minimum section of service level class is bottleneck road;
S6 determines target BRT station overpasses and platform integrity service level, i.e.,
LOSW=LOSj
Wherein, LOSj is the service level of bottleneck road.
2. analysis method according to claim 1, it is characterised in that in the S2 road segment classification include horizontal sidewalk, Stair, ramp pavement, booking enter the station area and platform is waited area.
CN201410032889.1A 2014-01-23 2014-01-23 The analysis method of BRT stations overpass and platform integrity service level Active CN103761872B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410032889.1A CN103761872B (en) 2014-01-23 2014-01-23 The analysis method of BRT stations overpass and platform integrity service level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410032889.1A CN103761872B (en) 2014-01-23 2014-01-23 The analysis method of BRT stations overpass and platform integrity service level

Publications (2)

Publication Number Publication Date
CN103761872A CN103761872A (en) 2014-04-30
CN103761872B true CN103761872B (en) 2017-06-06

Family

ID=50529103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410032889.1A Active CN103761872B (en) 2014-01-23 2014-01-23 The analysis method of BRT stations overpass and platform integrity service level

Country Status (1)

Country Link
CN (1) CN103761872B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015612A (en) * 2006-07-03 2008-01-24 Hitachi Ltd Regular-route bus operation management system, regular-route bus operation management method, regular-route bus operation management program
CN101751788A (en) * 2009-12-31 2010-06-23 浙江工业大学 Public transit exclusive lane resource sharing method and system for guaranteeing bus rapid transit priority
CN102071605A (en) * 2010-11-02 2011-05-25 王玉爽 Urban seamed-joint monorail mass transit system
CN102074114A (en) * 2011-01-18 2011-05-25 山东大学 Device and method for controlling speed of BRT (bus rapid transit)
CN102426797A (en) * 2011-11-16 2012-04-25 东南大学 Vehicle-mounted information interaction method and system of passenger vehicles
CN103085898A (en) * 2013-02-01 2013-05-08 吉林大学 Middle wheel steering articulated brotherhood of railroad trainmen (BRT) bus

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7246559B2 (en) * 2005-03-07 2007-07-24 Sky Trolley Inc. Elevated bus rapid transit system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015612A (en) * 2006-07-03 2008-01-24 Hitachi Ltd Regular-route bus operation management system, regular-route bus operation management method, regular-route bus operation management program
CN101751788A (en) * 2009-12-31 2010-06-23 浙江工业大学 Public transit exclusive lane resource sharing method and system for guaranteeing bus rapid transit priority
CN102071605A (en) * 2010-11-02 2011-05-25 王玉爽 Urban seamed-joint monorail mass transit system
CN102074114A (en) * 2011-01-18 2011-05-25 山东大学 Device and method for controlling speed of BRT (bus rapid transit)
CN102426797A (en) * 2011-11-16 2012-04-25 东南大学 Vehicle-mounted information interaction method and system of passenger vehicles
CN103085898A (en) * 2013-02-01 2013-05-08 吉林大学 Middle wheel steering articulated brotherhood of railroad trainmen (BRT) bus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"广州快速公交系统(BRT)设计方案研究";朱晓冬;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20111215(第S1期);C034-399:正文全文 *

Also Published As

Publication number Publication date
CN103761872A (en) 2014-04-30

Similar Documents

Publication Publication Date Title
Durán-Hormazábal et al. Estimation of travel time variability for cars, buses, metro and door-to-door public transport trips in Santiago, Chile
Fournier et al. A sinusoidal model for seasonal bicycle demand estimation
Hänseler et al. Assessing the usage and level-of-service of pedestrian facilities in train stations: A Swiss case study
CN108151756A (en) The travel time computation method and device of a kind of urban public tranlport system
CN101964085A (en) Method for distributing passenger flows based on Logit model and Bayesian decision
Farid et al. A new approach for calibrating safety performance functions
CN106779492A (en) A kind of urban road network asset evaluation method
Rhoads et al. A sustainable strategy for Open Streets in (post) pandemic cities
CN108665178A (en) A kind of building staircase passenger flow forecast method in the subway station based on AFC
CN110400045B (en) Method for evaluating walking accessibility of track station radiation area based on micro-area
Srikukenthiran et al. Mixed logit model of vertical transport choice in Toronto subway stations and application within pedestrian simulation
Duduta et al. Understanding platform overcrowding at bus rapid transit stations
Rahman A GIS-based, microscale walkability assessment integrating the local topography
Liang et al. A stated preference approach for measuring walking accessibility
CN103761872B (en) The analysis method of BRT stations overpass and platform integrity service level
Shah et al. Determination of pedestrian level of service for undivided stairways at suburban rail stations in developing countries
Ho et al. Metrobuses in Sydney: How high capacity and high frequency services are benefiting the Metropolitan fringe
Jiten et al. Effect of stairway width on pedestrian flow characteristics at railway stations
Wu et al. Crowdedness classification method for island platform in metro station
Cepolina et al. Pedestrian level of service: the impact of social groups on pedestrian flow characteristics
Czogalla et al. Parameters determining route choice in pedestrian networks
Banerjee et al. A comparative study of pedestrian movement behavior over foot over bridges under similar land-use type
CN108492571B (en) Urban public transport passenger flow congestion index calculation method based on passenger's subjective perception
Yuanqing et al. OD matrix estimation for urban expressway
Jiten et al. Estimation of free speed of pedestrian flow on stairways at busy suburb rail transit station in India

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant