CN103758696B - Aerogenerator unit safe status evaluation method based on SCADA temperature parameter - Google Patents

Aerogenerator unit safe status evaluation method based on SCADA temperature parameter Download PDF

Info

Publication number
CN103758696B
CN103758696B CN201410011095.7A CN201410011095A CN103758696B CN 103758696 B CN103758696 B CN 103758696B CN 201410011095 A CN201410011095 A CN 201410011095A CN 103758696 B CN103758696 B CN 103758696B
Authority
CN
China
Prior art keywords
temperature
wind
scada
parameter
temperature parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410011095.7A
Other languages
Chinese (zh)
Other versions
CN103758696A (en
Inventor
顾煜炯
苏璐玮
宋磊
吴冠宇
钟阳
周振宇
房丽萍
李鹏
任朝旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Group Technology Innovation Center Co Ltd
Original Assignee
North China Electric Power University
Huaneng Group Technology Innovation Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University, Huaneng Group Technology Innovation Center Co Ltd filed Critical North China Electric Power University
Priority to CN201410011095.7A priority Critical patent/CN103758696B/en
Publication of CN103758696A publication Critical patent/CN103758696A/en
Application granted granted Critical
Publication of CN103758696B publication Critical patent/CN103758696B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a kind of aerogenerator unit safe status evaluation method based on SCADA temperature parameter that belongs to device security status evaluation technical field. First carry out the selected of SCADA temperature parameter; Then analyze the temperature parameter being associated with the each system failure of wind-powered electricity generation unit, structure comprises the relevance between duty parameter and the SCADA temperature parameter of environment temperature and wind speed, determine the standard that unit operation operating mode is divided, and the Gauss model of Criterion, as the reference model of evaluating unit operation situation; By contrasting with standard Gauss model, the degree of deviation of calculated curve and master pattern, thereby the operation conditions of measurement unit. The present invention promotes the utilization rate to wind-powered electricity generation unit monitoring level, raising equipment, effectively reduces operating cost. Set up reliable, effective wind-powered electricity generation unit device security status evaluation mechanism, avoided the deterioration of unit hidden danger to fault and accident, formed aerogenerator unit safe, stable, efficient operating environment.

Description

Aerogenerator unit safe status evaluation method based on SCADA temperature parameter
Technical field
The invention belongs to device security status evaluation technical field, particularly a kind of based onSCADA (SupervisoryControlAndDataAcquisition, data acquisition and supervisor control)The aerogenerator unit safe status evaluation method of temperature parameter is by wind-powered electricity generation unit SCADA is collected specificallyProcessing and the calculating of temperature data, wind-powered electricity generation unit device security situation is evaluated.
Background technology
Wind generating technology is because the feature of its low pollution, environmental protection and sustainable development becomes the world todayThe main flow energy in new forms of energy development tide. Along with wind-powered electricity generation unit is to the future development of large single-machine capacity, wind turbineThe 26S Proteasome Structure and Function of group equipment is day by day complicated, and wind-powered electricity generation enterprise wants for normal, the safety of equipment, even runningAsk more and more higher. The operation and maintenance level that wind-powered electricity generation enterprise must constantly promote unit ensures the height of wind-powered electricity generation unitEffect safe handling.
Because the cost of wind-powered electricity generation unit is higher, and installation site is all the area remote, environment is severe, hands overLogical inconvenience brought great difficulty to operation and maintenance, and these factors become wind-powered electricity generation industry and pursue the efficient output valueObstacle. The larger cost of single-machine capacity of wind-powered electricity generation unit is higher, higher to the operation stability requirement of unit, works as windWhen electric field spare part is not enough, once generation unit fault tends to cause the shutdown of unit, cause certain economy to damageLose. Under this background, how to utilize effective monitoring of equipment technology, signal processing technology and data miningTechnology realizes the evaluation of wind-powered electricity generation unit equipment health status, and scenting a hidden danger early, prevents that hidden danger from developing into faultAnd accident, and adjust operation and arrangement maintenance in advance, become focus and technological difficulties that wind-powered electricity generation industry is paid close attention to.
The condition monitoring and fault diagnosis that develops into wind-powered electricity generation unit of vibration monitoring and acoustic monitoring technology providesEffectively technical basis, but vibration monitoring often need to install vibration monitoring measuring point additional on wind-powered electricity generation unit, invisibleThe middle O&M cost that increases wind-powered electricity generation unit, and acoustic monitoring is often used the method for off-line monitoring, is difficult to realizeThe on-line operation state evaluation of wind-powered electricity generation unit. Under this background, numerous research institutions and scholar start to focus on SCADAThe research of data, associated by between the deep research SCADA data of data digging method and operating states of the unitsProperty, thus the stable degree of unit reflected by SCADA data mining Output rusults, wherein temperature parameterIt is often closely bound up with the operation conditions of unit typical components as most important performance parameter in SCADA data,The parameters such as such as pitch motor temperature, gear case oil liquid temp, bearing temperature are often with pitch motor, gear-boxAnd the running status of the each bearing of unit is closely related. The present invention intends by unique SCADA data probability statisticsAnalyze the abnormal conditions of SCADA data with data digging method, thereby reflect the operation of the each parts of wind-powered electricity generation unitSituation. What the present invention built whereby is a kind of wind-powered electricity generation unit on-line operation shape based on SCADA data digging methodThe evaluation method of condition, advantage is additionally not increase under the prerequisite of monitoring equipment, realizes the on-line operation peace of unitFull evaluation.
Summary of the invention
The object of the invention is to propose a kind of aerogenerator unit safe status evaluation side based on SCADA temperature parameterMethod, is characterized in that, comprises the steps:
1) carry out the selected of SCADA temperature parameter;
2) analyze the temperature parameter being associated with the each system failure of wind-powered electricity generation unit, build and comprise environment temperature and windRelevance between duty parameter and the SCADA temperature parameter of speed, determines the standard that unit operation operating mode is divided;
3) according to above-mentioned steps 2) duty parameter and SCADA temperature parameter between relevance, matching operating mode ginsengInvariance curve between number and SCADA temperature parameter, and rejecting " abnormity point ";
4) according to above-mentioned steps 3) in the invariance curve characteristic of matching, formulate rationally based on intending analysis temperature parameterOperating condition interval division criterion;
5) the SCADA temperature data when training at least one annual unit normally to move, to divided working statusTemperature parameter in interval carries out probability density curve matching, and the Gauss model of Criterion, as evaluation machineThe reference model of group operation conditions;
6) carry out probability density matching, the temperature constructing for what evaluate SCADA temperature data in the periodParameter distribution curve, by contrasting with standard Gauss model, the degree of deviation of calculated curve and master pattern,Thereby weigh the operation conditions of unit.
The temperature parameter that described step 1) is selected, requires selected temperature parameter to want to reflect the fortune of equipmentRow state, be to the misoperation sensitivity of equipment; By analysis, specifically choose the gentle gear of gear box lubricating oilAxle box bearing temperature; Choose generator drive side bearing temperature, generator non-drive side bearing temperature and generator aroundGroup temperature, pitch-controlled system is chosen pitch motor temperature.
Described step 2), 3) be the operating condition difference based on wind-powered electricity generation unit, the temperature parameter of each subsystemAlso different, operating mode is corresponding with temperature; Environment temperature can affect the basal temperature of equipment; Heat radiation can affectThe operating temperature of equipment; And for mechanically operated wind-powered electricity generation unit, the rotating speed of air speed influence unit, and rotating speed is highThe low operating temperature that determines again equipment. Selected temperature parameter and wind speed and environment temperature are closely related, instituteTo select wind speed and environment temperature as the parameter of dividing operating mode.
Described step 4) formulate rational operating condition interval division criterion based on intending analysis temperature parameter; Comply withAccording to environment temperature and two parameters of wind speed, the operating condition of wind-powered electricity generation unit is segmented:
(1) historical data of environment temperature is added up, determine maximum temperature TmaxAnd Tmin, according to not littleIn TmaxThe multiple of minimum 5 get the upper bound, be not more than TminThe multiple of maximum 5 take off boundary. Taking 5 degrees Celsius asInterval, carries out first step division to operating condition, establishes and is divided into m section;
(2) undertaken after operating mode division by environment temperature, then according to wind speed, operating condition is carried out to second step division.With the incision wind speed V of wind-powered electricity generation unitinFor lower bound, with the cut-out wind speed V of wind-powered electricity generation unitoutFor the upper bound, according to IECStandard, can be divided into n traffic coverage,
n = V out - V in 0.5 - - - ( 1 )
In formula, n is integer;
Ready-portioned traffic coverage is labeled as to Oij, wherein i=1,2,3 ... m; J=1,2,3 ... n; To normally transportSample data under row operating mode puts corresponding operating mode space under by above-mentioned operating mode division methods, and each interval censored data is enteredRow probability density statistics, meets normal distribution; Its distribution is carried out to matching by Gaussian function, obtain fitting function
F ij ( x ) = 1 2 π σ ij e ( x - μ ij ) 2 2 σ ij 2 - - - ( 2 )
μ in formulaijAnd σijFor average and the standard deviation of the interval temperature parameter of corresponding operating mode, as standard value.
The invention has the beneficial effects as follows: wind-powered electricity generation unit device security situation is evaluated, instructed operation and dimensionRepair work, the initial data that the monitored data of the SCADA system that wind-powered electricity generation unit is carried is evaluated as safe condition,Promote the utilization rate to wind-powered electricity generation unit monitoring level, raising equipment, effectively reduce operating cost. Set up reliable,Effectively wind-powered electricity generation unit device security status evaluation mechanism, has avoided the deterioration of unit hidden danger to fault and accident,Aerogenerator unit safe, stable, efficient operating environment are formed.
Brief description of the drawings
Fig. 1 is the wind-powered electricity generation based on operating condition is divided and temperature parameter probability density curve fitness bias degree calculatesAssociation analysis result between unit safety situation and parameter;
Fig. 2 is for the running of wind generating set peace of calculating based on temperature parameter probability density curve fitness bias degreeThe flow chart of full status evaluation method.
Detailed description of the invention
Selecting of step 1 SCADA temperature parameter
The aerogenerator unit safe status evaluation method of analyzing based on temperature parameter, requires selected temperature parameterWant to reflect the running status of equipment, be to the misoperation sensitivity of equipment; By analysis, choose gear-boxLubricating oil temperature and box bearing temperature; Choose generator drive side bearing temperature, generator non-drive side bearingTemperature and generator windings temperature, pitch-controlled system is chosen pitch motor temperature (as shown in Figure 1).
The duty parameter that step 2 analysis is associated with selected SCADA temperature parameter
The operating condition difference of wind-powered electricity generation unit, the temperature parameter of each subsystem is also different, and operating mode is relative with temperatureShould; Environment temperature can affect the basal temperature of equipment; Heat radiation can affect the operating temperature of equipment; And forMechanically operated wind-powered electricity generation unit, the rotating speed of air speed influence unit, and rotating speed height has determined the work temperature of equipmentDegree. Selected temperature parameter and wind speed and environment temperature are closely related, so selected wind speed and environment temperature are doneFor dividing the parameter of operating mode.
Step 3 is removed zero energy point and singular point, sets up normal operating condition sample
In the service data of wind-powered electricity generation unit, comprising that unit is not worked, cancel closedown and singular value data point,These data are not the data of unit while normally moving, can exert an influence to the reliability of result, are setting up wind-powered electricity generationWhen sample data under unit normal running (operation) conditions, reject above-mentioned data.
The determination methods of the idle data point of unit is that power output is still 0 in the time that wind speed is greater than incision wind speedOr the point of negative value; Wind-powered electricity generation unit incision wind speed more than, power below cut-out wind speed from normal value be reduced to 0 orThe point of negative value is the cancel closedown point of wind-powered electricity generation unit, deletes the point (wind of these points and first three stopping processIn group of motors historical data base, data are the mean value of 10 minute datas, delete three points and are about the number of 30 minutesAccording to). In like manner, incision wind speed more than, wind-powered electricity generation unit power output by 0 or negative value cumulative be added on the occasion of mistakeJourney is startup more than wind-powered electricity generation unit incision wind speed, deletes the point of these points and rear three start-up courses; NumberAccording in singular point index strong point in abnormal data, may be due to the reason such as sensor fault, communication abnormalityProduce, should be removed. With reference to the Bin method in IEC standard, wind speed range according between 0.5m/sEvery being divided into some intervals (Bin), the integral multiple that the central value of each Bin is 0.5m/s. Calculate each intervalThe average value mu of temperature data and standard deviation sigma, can with the data point that is greater than μ+3 σ for being less than μ-3 σTo remove as singular point. Substantially deleted the data point larger to analyzing influence by these processing, can recognizeFor remaining data are the historical data under wind-powered electricity generation unit normal running (operation) conditions.
Collect every typhoon group of motors 1 year or above SCADA service data, reject unit and do not work, extremelyShut down and singular value data point, foundation can reflect the sample of normal operating condition of unit.
Step 4 subdividing running operating mode
As shown in Figure 2, because selected temperature parameter is relevant with two duty parameters of environment temperature to wind speed,Therefore the present invention segments the operating condition of wind-powered electricity generation unit according to environment temperature and two parameters of wind speed:
(1) historical data of environment temperature is added up, determine maximum temperature TmaxAnd Tmin, according to not littleIn TmaxThe multiple of minimum 5 get the upper bound, be not more than TminThe multiple of maximum 5 take off boundary. Taking 5 degrees Celsius asInterval, carries out first step division to operating condition, establishes and is divided into m section.
(2) undertaken after operating mode division by environment temperature, then according to wind speed, operating condition is carried out to second step division.With the incision wind speed V of wind-powered electricity generation unitinFor lower bound, with the cut-out wind speed V of wind-powered electricity generation unitoutFor the upper bound, according to IECStandard, can be divided into n traffic coverage.
n = V out - V in 0.5 - - - ( 1 )
In formula, n is integer.
Ready-portioned traffic coverage is labeled as to Oij, (i=1,2,3 ... m; J=1,2,3 ... n) will normally move workSample data under condition puts corresponding operating mode space under by above-mentioned operating mode division methods, and each interval censored data is carried out generallyRate Statistics of Density, meets normal distribution. Its distribution is carried out to matching by Gaussian function, obtain fitting function
F ij ( x ) = 1 2 π σ ij e ( x - μ ij ) 2 2 σ ij 2 - - - ( 2 )
μ in formulaijAnd σijFor average and the standard deviation of the interval temperature parameter of corresponding operating mode, as standard value.
The corresponding relation of setting up according to SCADA temperature parameter and machine set system, utilizes good operating unit 1 yearOr above SCADA temperature data carries out probability density statistical analysis, foundation to each system representation temperature ginseng respectivelyThe Gaussian distribution model of SCADA temperature parameter by stages in each correlation model, and simulate standard Gaussian distribution songWhether well line, as weighing the machine set system reference value of operation, can set up respectively pitch-controlled system, gear-box systemThe standard evaluation curve of system, generator system.
Step 5 is calculated total deviation degree C
Unit actual operating data (at least one month or more than) is divided into corresponding operating mode district by step 4Between, draw probability density distribution figure and the probability density curve of each interval early warning temperature data, and calculate each intervalThe Gauss model fitting function G of probability density distributionij(x). Define this interval fitting degree of deviation Cij
G ij = ∫ - ∞ + ∞ | G ij ( x ) - F ij ( x ) | dx - - - ( 3 )
Calculate the actual operating data distribution of all traffic coverages and the degree of deviation of master pattern, then for instituteSome traffic coverages calculate total deviation degree C
C = Σ i = 1 , j = 1 i = m , j = n P ij C ij - - - ( 4 )
In formula, Pij is the percentage of data point in interval Oij, is tried to achieve by following formula
P ij = N ij N - - - ( 5 )
N in formulaijFor dropping on interval OijInterior data point number, N is data point sum.
From equation (3), can show that wind-powered electricity generation unit is healthy in the time of C ≈ 0, as C > wind turbine is being just 0 timeDeparting from normal running status, health status is degenerated. And health status is degenerated more serious, the value of C becomesXiang Yuyue is large. Can judge intuitively by the size of C value the safe condition of wind-powered electricity generation unit equipment.
According to the scheme proposing in step 5, each machine set system model is carried out to unit operation evaluation, evaluate weekIssue is according to being at least the data of month, every month pitch-controlled system, gearbox system to wind-powered electricity generation unit and send outTemperature parameter in electric system carries out evaluation analysis, each monthly to pitch-controlled system, gearbox system and generatingThe matching total deviation of machine system is evaluated, and judges the security of operation state of the each system of wind-powered electricity generation unit.

Claims (4)

1. the aerogenerator unit safe status evaluation method based on SCADA temperature parameter, is characterized in that, comprises the steps:
1) carry out the selected of SCADA temperature parameter;
2) analyze the temperature parameter being associated with the each system failure of wind-powered electricity generation unit, build the relevance between duty parameter and the SCADA temperature parameter that comprises environment temperature and wind speed, determine the standard that unit operation operating mode is divided;
3) according to above-mentioned steps 2) duty parameter and SCADA temperature parameter between relevance, the invariance curve between matching duty parameter and SCADA temperature parameter, and reject " abnormity point ";
4) according to above-mentioned steps 3) in the invariance curve characteristic of matching, formulate rational operating condition interval division criterion based on intending analysis temperature parameter;
5) the SCADA temperature data when training at least one annual unit normally to move, carries out probability density curve matching to the temperature parameter in divided working status interval, and the Gauss model of Criterion, as the reference model of evaluating unit operation situation;
6) carry out probability density matching for what evaluate SCADA temperature data in the period, construct temperature parameter distribution curve, by contrasting with standard Gauss model, the degree of deviation of calculated curve and master pattern, thereby the operation conditions of measurement unit.
2. the aerogenerator unit safe status evaluation method based on SCADA temperature parameter according to claim 1, it is characterized in that, described step 1) selected temperature parameter, require selected temperature parameter to want to reflect the running status of equipment, be to the misoperation sensitivity of equipment; By analysis, specifically choose the gentle box bearing temperature of gear box lubricating oil; Choose generator drive side bearing temperature, generator non-drive side bearing temperature and generator windings temperature, pitch-controlled system is chosen pitch motor temperature.
3. the aerogenerator unit safe status evaluation method based on SCADA temperature parameter according to claim 1, it is characterized in that, described step 2), 3) be the operating condition difference based on wind-powered electricity generation unit, the temperature parameter of each subsystem is also different, operating mode is corresponding with temperature; Environment temperature can affect the basal temperature of equipment; Heat radiation can affect the operating temperature of equipment; And for mechanically operated wind-powered electricity generation unit, the rotating speed of air speed influence unit, and rotating speed height has determined the operating temperature of equipment; Selected temperature parameter and wind speed and environment temperature are closely related, so selected wind speed and environment temperature are as the parameter of dividing operating mode.
4. the aerogenerator unit safe status evaluation method based on SCADA temperature parameter according to claim 1, is characterized in that described step 4) formulate rational operating condition interval division criterion based on intending analysis temperature parameter; According to environment temperature and two parameters of wind speed, the operating condition of wind-powered electricity generation unit is segmented:
(1) historical data of environment temperature is added up, determine maximum temperature TmaxWith minimum temperature Tmin, according to being not less than TmaxThe multiple of minimum 5 get the upper bound, be not more than TminThe multiple of maximum 5 take off boundary; Taking 5 degrees Celsius as interval, operating condition is carried out to first step division, establish and be divided into m section;
(2) undertaken after operating mode division by environment temperature, then according to wind speed, operating condition is carried out to second step division, with the incision wind speed V of wind-powered electricity generation unitinFor lower bound, with the cut-out wind speed V of wind-powered electricity generation unitoutFor the upper bound, according to IEC standard, can be divided into n traffic coverage,
In formula, n is integer;
Ready-portioned traffic coverage is labeled as to Oij, wherein i=1,2,3 ... m; J=1,2,3 ... n; Put the sample data under accidental conditions under corresponding operating mode space by above-mentioned operating mode division methods, each interval censored data is carried out to probability density statistics, meet normal distribution; Its distribution is carried out to matching by Gaussian function, obtain fitting function
μ in formulaijAnd σijFor average and the standard deviation of the interval temperature parameter of corresponding operating mode, as standard value.
CN201410011095.7A 2014-01-09 2014-01-09 Aerogenerator unit safe status evaluation method based on SCADA temperature parameter Expired - Fee Related CN103758696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410011095.7A CN103758696B (en) 2014-01-09 2014-01-09 Aerogenerator unit safe status evaluation method based on SCADA temperature parameter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410011095.7A CN103758696B (en) 2014-01-09 2014-01-09 Aerogenerator unit safe status evaluation method based on SCADA temperature parameter

Publications (2)

Publication Number Publication Date
CN103758696A CN103758696A (en) 2014-04-30
CN103758696B true CN103758696B (en) 2016-05-25

Family

ID=50525990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410011095.7A Expired - Fee Related CN103758696B (en) 2014-01-09 2014-01-09 Aerogenerator unit safe status evaluation method based on SCADA temperature parameter

Country Status (1)

Country Link
CN (1) CN103758696B (en)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131950B (en) * 2014-07-24 2017-02-01 重庆大学 Partitioning determination method for threshold value of temperature characteristic quantity of wind generating set
WO2016086360A1 (en) * 2014-12-02 2016-06-09 Abb Technology Ltd Wind farm condition monitoring method and system
CN104537791A (en) * 2014-12-18 2015-04-22 北京天诚同创电气有限公司 Fire monitoring method and device
CN105894391B (en) * 2016-01-26 2020-08-14 沈阳工业大学 Wind turbine generator torque control performance evaluation method based on SCADA operation data extraction
CN106194600A (en) * 2016-07-29 2016-12-07 中车株洲电力机车研究所有限公司 A kind of wind power generating set temperature fault tolerant control method
CN106321368B (en) * 2016-08-12 2019-02-15 峰能斯格尔(北京)可再生能源科技有限公司 Marine wind electric field wake losses measurement method based on operation blower SCADA data
CN108071562B (en) * 2016-11-17 2021-01-15 中国电力科学研究院 Wind turbine generator energy efficiency state diagnosis method based on energy flow
CN106640547B (en) * 2016-11-24 2020-08-18 东北电力大学 Method and system for monitoring state of wind turbine generator
ES2917417T3 (en) 2017-05-18 2022-07-08 Gen Electric System and procedure to estimate the motor temperature of a wind turbine pitch system
CN107527093B (en) * 2017-07-14 2023-01-24 中国电力科学研究院 Wind turbine generator running state diagnosis method and device
CN108629095A (en) * 2018-04-23 2018-10-09 明阳智慧能源集团股份公司 A kind of modeling method of gearbox of wind turbine bearing temperature
CN110412966B (en) * 2018-04-27 2021-05-25 新疆金风科技股份有限公司 Method and device for monitoring temperature abnormity of variable pitch motor
CN108693438B (en) * 2018-05-28 2020-04-28 国电联合动力技术有限公司 Intelligent diagnosis system and method for generator winding faults of wind turbine generator
CN108897954A (en) * 2018-06-29 2018-11-27 龙源(北京)风电工程技术有限公司 Wind turbines temperature pre-warning method and its system based on BootStrap confidence calculations
CN108953073A (en) * 2018-08-07 2018-12-07 绵阳鼎飞益电子科技有限公司 Running status of wind generator monitoring method
CN109356798B (en) * 2018-11-08 2020-04-17 内蒙古科技大学 Wind driven generator gearbox state monitoring method based on co-integration analysis
CN109919199A (en) * 2019-02-13 2019-06-21 东南大学 The detection method of Wind turbines abnormal data based on image procossing
CN110083896B (en) * 2019-04-12 2023-03-24 沈阳工业大学 Standard reaching conformity degree evaluation method for wind turbine generator operating power curve
CN110374798B (en) * 2019-06-27 2020-05-19 沈阳工程学院 Preventive cabin temperature control method based on real-time power of fan unit
CN110533092B (en) * 2019-08-23 2022-04-22 西安交通大学 Wind generating set SCADA data classification method based on operation condition and application
TWI749416B (en) * 2019-11-29 2021-12-11 中國鋼鐵股份有限公司 Method for diagnosing abnormality of equipment having variable rotation speeds
CN111242411B (en) * 2019-12-27 2022-08-19 中国电力科学研究院有限公司 Wind turbine generator power characteristic evaluation method and system
EP4162160A1 (en) 2020-06-04 2023-04-12 Vestas Wind Systems A/S Temperature estimation in a wind turbine
CN111785051B (en) * 2020-06-29 2021-06-25 广东荣文科技集团有限公司 Road condition indication control method, intelligent street lamp and related products
CN111929579B (en) * 2020-09-22 2021-02-09 北京京能能源技术研究有限责任公司 Generator online fault diagnosis method and device and computer device
CN112598210A (en) * 2020-10-23 2021-04-02 河北新天科创新能源技术有限公司 Wind turbine generator performance evaluation and early warning method
CN112598209A (en) * 2020-10-23 2021-04-02 河北新天科创新能源技术有限公司 Evaluation and early warning method for generator heat dissipation system of wind turbine generator
CN112286920B (en) * 2020-10-27 2023-02-21 浙江中控技术股份有限公司 Equipment running state monitoring method, device and equipment
CN112696481A (en) * 2020-12-11 2021-04-23 龙源(北京)风电工程技术有限公司 Intelligent diagnosis method and device for shaft temperature abnormity of wind turbine generator gearbox

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858312A (en) * 2010-05-31 2010-10-13 重庆大学 System and method thereof for evaluating real-time running state of wind generating set
CN102016303A (en) * 2008-10-03 2011-04-13 三菱重工业株式会社 Evaluation index setting method and program thereof
CN102032107A (en) * 2010-12-07 2011-04-27 北京交通大学 Method and device for processing wind power monitoring system data
CN102330645A (en) * 2011-09-19 2012-01-25 吴建华 Health monitoring system and method for wind generator system structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7013203B2 (en) * 2003-10-22 2006-03-14 General Electric Company Wind turbine system control
US7896613B2 (en) * 2009-06-03 2011-03-01 General Electric Company System and method for wind turbine noise control and damage detection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102016303A (en) * 2008-10-03 2011-04-13 三菱重工业株式会社 Evaluation index setting method and program thereof
CN101858312A (en) * 2010-05-31 2010-10-13 重庆大学 System and method thereof for evaluating real-time running state of wind generating set
CN102032107A (en) * 2010-12-07 2011-04-27 北京交通大学 Method and device for processing wind power monitoring system data
CN102330645A (en) * 2011-09-19 2012-01-25 吴建华 Health monitoring system and method for wind generator system structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于运行工况辨识的风电机组健康状态实时评价方法;董玉亮等;《中国电机工程学报》;20130415;第33卷(第11期);第88-95页 *
风电机组齿轮箱温度趋势状态监测及分析方法;郭鹏等;《中国电机工程学报》;20111115;第31卷(第32期);第129-136页 *

Also Published As

Publication number Publication date
CN103758696A (en) 2014-04-30

Similar Documents

Publication Publication Date Title
CN103758696B (en) Aerogenerator unit safe status evaluation method based on SCADA temperature parameter
EP2612025B1 (en) Method and implementation of a fast real-time estimator for remaining battery life for wind energy applications
CN101858312B (en) System and method thereof for evaluating real-time running state of wind generating set
CN109543210A (en) A kind of Wind turbines failure prediction system based on machine learning algorithm platform
CN102022264B (en) System and method for wind turbine health management
CN103400302B (en) A kind of wind power base cascading failure risk perceptions method for early warning
CN202645852U (en) Control system for vertical shaft wind generating set
CN105550943A (en) Method for identifying abnormity of state parameters of wind turbine generator based on fuzzy comprehensive evaluation
CN108027908A (en) Analogy method and system
CN105787584A (en) Wind turbine malfunction early warning method based on cloud platform
CN106815771A (en) A kind of long-term evaluation method of wind power plant load
CN109242322A (en) Thermal power generation unit general level of the health appraisal procedure based on data analysis
CN103852255B (en) Based on neutral net wind power generating set typical case's drive failures intelligent diagnosing method
Abedi et al. Numerical modelling of neutral atmospheric boundary layer flow through heterogeneous forest canopies in complex terrain (a case study of a Swedish wind farm)
EP3702613B1 (en) System and method for predicting wind turbine shutdowns due to excessive vibration
CN114033617B (en) Controllable wind power generation method and system with control parameters adjusted in self-adaptive mode
CN103675357A (en) Anemometer fault warning method and system
CN113761692B (en) Method for identifying running states of multiple wind turbine generators based on migration component analysis
Fan et al. An intelligent condition-based monitoring and maintenance system for wind turbine
Li Optimization of Computer Communication Monitoring System for Wind Turbine Speed
Yang et al. Condition Monitoring for Wind Turbine Pitch System Using Multi-parameter Health Indicator
Guo et al. Site-specific assessment of wind turbine residual life and health status
KR102456262B1 (en) Prediction Method and Systems of Wind Turbine Load and Life-time Based On Vibration Data
He Enhancing standardisation and digital management of wind power
Pennanen Enhancing the efficiency and reliability of renewable energy systems with the integration of Internet of Things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA HUANENG GROUP R + D CENTER

Effective date: 20141229

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20141229

Address after: 102206 Beijing city Changping District Zhu Daxinzhuang North Agricultural Road No. 2

Applicant after: North China Electric Power University

Applicant after: Huaneng Group Technology Innovation Center

Address before: 102206 Beijing city Changping District Zhu Daxinzhuang North Agricultural Road No. 2

Applicant before: North China Electric Power University

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20200109