The laying method of refuse landfill HDPE geomembrane
Technical field
The present invention relates to a kind of method of laying HDPE geomembrane in refuse landfill, belong to environmental technology field.
Background technology
Refuse landfill reservoir area is normally built on the acclive landform of tool, the terrain slope of reservoir area body exterior is that nature is downward, include seepage control system and guide system, seepage control system refer in the body of reservoir area and reservoir area around substrate soil upper berth establish impervious material, prevent the percolate secondary pollution that permeates the ground; Guide system refers to by laying two-layer pipeline, guide substrate soil gathers because build refuse landfill reservoir area respectively underground water and percolate.
HDPE is high density polyethylene (HDPE), has high anti-seepage effect, and HDPE geomembrane is gradually more for the seepage control system of refuse landfill.After existing HDPE geomembrane overlaps, easily in weld fracture, cause the wasting of resources, and after long-term use, easily occur Seepage while in the end shearing, construction cost is high, and follow-up maintenance cost is high.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of laying method of refuse landfill HDPE geomembrane, not easy to leak of weld consolidation, smooth welded seam, reduces later maintenance cost.
The present invention realizes by following technical scheme:
A laying method for refuse landfill HDPE geomembrane is to realize by following step:
(1) cut out and overlap, HDPE geomembrane is cut out, around reservoir area and reservoir area, overlapping;
(2) sweat soldering, overlap joint upper slice and between lower, blast compressed air, form compressed air channel, at described compressed air channel the right and left, form weld seam, two HDPE geomembranes are carried out to hot melt, after arrival temperature, dock rapidly, and weld in described commissure;
(3) check and repair, the HDPE geomembrane after sweat soldering is completed checks, checks the damage part of the HDPE geomembrane of laying, and damages part and is greater than the more than 10% of every HDPE geomembrane width, this section is sheared, and again lays.
Hot melting temperature in described step (2) is 100-150 ℃.
Welding temperature in described step (2) is 450-480 ℃.
Beneficial effect of the present invention is:
1, weld of the present invention is smooth, and not easy to leak is difficult for tearing;
2, frequency of maintenance of the present invention reduces, and maintenance cost is low.
Accompanying drawing explanation
Fig. 1 is that refuse landfill HDPE geomembrane of the present invention is laid welding schematic diagram
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be further described.
1, cut out and overlap, HDPE geomembrane is cut out, around reservoir area and reservoir area, overlapping;
2, sweat soldering, as Fig. 1, that refuse landfill HDPE geomembrane of the present invention is laid welding schematic diagram, HDPE geomembrane upper slice 61 and lower 62 overlap, overlap joint upper slice and between lower, blast compressed air, form compressed air channel 17, at described compressed air channel the right and left, form weld seam 15 and 16, two HDPE geomembranes are carried out to hot melt, hot melting temperature remains on 100-150 ℃, after arriving temperature, dock rapidly, and weld at described weld seam 15 and 16 places, welding temperature is 450-480 ℃;
3, check and repair, the HDPE geomembrane after sweat soldering is completed checks, checks the damage part of the HDPE geomembrane of laying, and damages part and is greater than the more than 10% of every HDPE geomembrane width, this section is sheared, and again lays.