CN103831973A - Garbage landfill site HDPE geomembrane welding method - Google Patents

Garbage landfill site HDPE geomembrane welding method Download PDF

Info

Publication number
CN103831973A
CN103831973A CN201110456821.2A CN201110456821A CN103831973A CN 103831973 A CN103831973 A CN 103831973A CN 201110456821 A CN201110456821 A CN 201110456821A CN 103831973 A CN103831973 A CN 103831973A
Authority
CN
China
Prior art keywords
hdpe geomembrane
welding
hdpe
compressed air
welding method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110456821.2A
Other languages
Chinese (zh)
Inventor
蒋红伟
程斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU QIANXI ENVIRONMENTAL PROTECTION SCIENCE & TECHNOLOGY Co Ltd
Original Assignee
HANGZHOU QIANXI ENVIRONMENTAL PROTECTION SCIENCE & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU QIANXI ENVIRONMENTAL PROTECTION SCIENCE & TECHNOLOGY Co Ltd filed Critical HANGZHOU QIANXI ENVIRONMENTAL PROTECTION SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201110456821.2A priority Critical patent/CN103831973A/en
Publication of CN103831973A publication Critical patent/CN103831973A/en
Pending legal-status Critical Current

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The present invention discloses a garbage landfill site HDPE geomembrane welding method, which comprises: (1) setting the shear and peel strength of a HDPE geomembrane hot-melting welding piece; (2) carrying out hot-melting welding, wherein compressed air is blown between an upper sheet and a lower sheet to form a compressed air channel, welding seams are formed on the left edge and the right edge of the compressed air channel, hot-melting is performed on two HDPE geomembranes, rapid butt joint is performed after achieving the temperature, and welding is performed on the welding seam position, wherein the upper sheet and the lower sheet are overlapped; and (3) carrying out inspection and repair, wherein the HDPE geomembrane completing the hot-melting welding is checked, the damage position of the spread HDPE geomembrane is checked, the spread HDPE geomembrane is cut if the damage position of the spread HDPE geomembrane is more than 10% of the width of each HDPE geomembrane, and re-spreading is performed. According to the present invention, the compressed air is blown in the middle, and the excess material is cut and tore after completing the spreading, such that the welding seam tearing can not be generated, and the repair cost is reduced.

Description

The welding method of refuse landfill HDPE geomembrane
Technical field
The present invention relates to a kind of method at refuse landfill welded H DPE geomembrane, belong to environmental technology field.
Background technology
Refuse landfill reservoir area is normally built on the acclive landform of tool, the terrain slope of reservoir area body exterior is that nature is downward, include seepage control system and guide system, seepage control system refer in the body of reservoir area and reservoir area around substrate soil upper berth establish impervious material, prevent the percolate secondary pollution that permeates the ground; Guide system refers to by laying two-layer pipeline, guide substrate soil gathers because build refuse landfill reservoir area respectively underground water and percolate.
HDPE geomembrane is the membrane structure of refuse landfill reservoir area seepage control system, anti-seepage effect is good, existing hot melt bridging arrangement weld seam after welding completes is easily torn, if tearing, again lays causing weld seam, or seepage is serious, need a large amount of manpower and materials to keep in repair, follow-up maintenance cost is high.
Summary of the invention
The invention provides a kind of welding method of refuse landfill HDPE geomembrane, smooth welded seam, is difficult for tearing, and meets and shears and disbonded test, reduces maintenance cost.
The present invention realizes by following technical scheme:
A welding method for refuse landfill HDPE geomembrane is to realize by following step:
(1) shearing and the peel strength of setting HDPE geomembrane thermofussion welding fitting;
(2) sweat soldering, overlap joint upper slice and between lower, blast compressed air, form compressed air channel, form weld seam at described compressed air channel the right and left, two HDPE geomembranes are carried out to hot melt, after arrival temperature, dock rapidly, and weld in described commissure;
(3) check and repair, the HDPE geomembrane after sweat soldering is completed checks, checks the damage part of the HDPE geomembrane of laying, and damages part and is greater than the more than 10% of every HDPE geomembrane width, this section is sheared, and again lays.
Shear strength in described step (1) is 14.2MPa, and extruding welding peel strength is 9.1MPa.
Hot melting temperature in described step (2) is 100-150 ℃.
Welding temperature in described step (2) is 450-480 ℃.
In described step (2) overlap joint upper slice and the lap of splice of lower be not less than 200mm.
Beneficial effect of the present invention is:
1, weld of the present invention is smooth, and not easy to leak is difficult for tearing;
2, frequency of maintenance of the present invention reduces, and maintenance cost is low.
Accompanying drawing explanation
Fig. 1 is the welding schematic diagram of refuse landfill HDPE geomembrane of the present invention
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be further described.
1, shearing and the peel strength of setting HDPE geomembrane thermofussion welding fitting, shear strength is 14.2MPa, extruding welding peel strength is 9.1MPa;
2, sweat soldering, as Fig. 1, it is the welding schematic diagram of refuse landfill HDPE geomembrane of the present invention, HDPE geomembrane upper slice 61 and lower 62 overlap, and overlap joint bit length is not less than 200mm, overlap joint upper slice and between lower, blast compressed air, form compressed air channel 17, form weld seam 15 and 16 at described compressed air channel the right and left, two HDPE geomembranes are carried out to hot melt, hot melting temperature is 100-150 ℃.After arriving temperature, dock rapidly, and weld in described commissure, welding temperature is 450-480 ℃;
(3) check and repair, the HDPE geomembrane after sweat soldering is completed checks, checks the damage part of the HDPE geomembrane of laying, and damages part and is greater than the more than 10% of every HDPE geomembrane width, this section is sheared, and again lays.

Claims (5)

1. a welding method for refuse landfill HDPE geomembrane, it is characterized in that realizing by following step:
(1) shearing and the peel strength of setting HDPE geomembrane thermofussion welding fitting;
(2) sweat soldering, overlap joint upper slice and between lower, blast compressed air, form compressed air channel, form weld seam at described compressed air channel the right and left, two HDPE geomembranes are carried out to hot melt, after arrival temperature, dock rapidly, and weld in described commissure;
(3) check and repair, the HDPE geomembrane after sweat soldering is completed checks, checks the damage part of the HDPE geomembrane of laying, and damages part and is greater than the more than 10% of every HDPE geomembrane width, this section is sheared, and again lays.
2. the welding method of refuse landfill HDPE geomembrane as claimed in claim 1, is characterized in that the shear strength in described step (1) is 14.2MPa, and extruding welding peel strength is 9.1MPa.
3. the welding method of refuse landfill HDPE geomembrane as claimed in claim 1, is characterized in that the hot melting temperature in described step (2) is 100-150 ℃.
4. the welding method of refuse landfill HDPE geomembrane as claimed in claim 1, is characterized in that the welding temperature in described step (2) is 450-480 ℃.
5. the welding method of refuse landfill HDPE geomembrane as claimed in claim 1, it is characterized in that overlap joint in described step (2) upper slice and the lap of splice of lower be not less than 200mm.
CN201110456821.2A 2011-12-27 2011-12-27 Garbage landfill site HDPE geomembrane welding method Pending CN103831973A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110456821.2A CN103831973A (en) 2011-12-27 2011-12-27 Garbage landfill site HDPE geomembrane welding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110456821.2A CN103831973A (en) 2011-12-27 2011-12-27 Garbage landfill site HDPE geomembrane welding method

Publications (1)

Publication Number Publication Date
CN103831973A true CN103831973A (en) 2014-06-04

Family

ID=50796016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110456821.2A Pending CN103831973A (en) 2011-12-27 2011-12-27 Garbage landfill site HDPE geomembrane welding method

Country Status (1)

Country Link
CN (1) CN103831973A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020093551A1 (en) * 2018-11-06 2020-05-14 北京高能时代环境技术股份有限公司 Geomembrane construction method
CN111516268A (en) * 2020-04-13 2020-08-11 中建三局集团有限公司 Welding and detection process for HDPE (high-density polyethylene) geomembrane of refuse landfill
CN113392476A (en) * 2021-05-21 2021-09-14 河海大学 Geomembrane weld joint strength nondestructive judgment and weld joint repair method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3834664A1 (en) * 1988-10-12 1990-04-19 Niederberg Chemie Welding and seam testing in an earth trench
KR200441911Y1 (en) * 2007-07-13 2008-09-18 한본인더스트리 주식회사 A protective mat for waterproofing layer
CN101415537A (en) * 2006-04-06 2009-04-22 艾萨帕克控股公司 Thermoplastic tubular packaging body with an embedded strip
CN201713924U (en) * 2010-07-20 2011-01-19 中国轻工业武汉设计工程有限责任公司 Leachate guide exhaust pipe device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3834664A1 (en) * 1988-10-12 1990-04-19 Niederberg Chemie Welding and seam testing in an earth trench
CN101415537A (en) * 2006-04-06 2009-04-22 艾萨帕克控股公司 Thermoplastic tubular packaging body with an embedded strip
KR200441911Y1 (en) * 2007-07-13 2008-09-18 한본인더스트리 주식회사 A protective mat for waterproofing layer
CN201713924U (en) * 2010-07-20 2011-01-19 中国轻工业武汉设计工程有限责任公司 Leachate guide exhaust pipe device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张辛雅: "垃圾填埋场防渗膜施工工艺", 《广东建材》 *
荣保铭等: "浅议HDPE防渗膜在垃圾填埋场中的施工工艺", 《建筑与工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020093551A1 (en) * 2018-11-06 2020-05-14 北京高能时代环境技术股份有限公司 Geomembrane construction method
CN111516268A (en) * 2020-04-13 2020-08-11 中建三局集团有限公司 Welding and detection process for HDPE (high-density polyethylene) geomembrane of refuse landfill
CN113392476A (en) * 2021-05-21 2021-09-14 河海大学 Geomembrane weld joint strength nondestructive judgment and weld joint repair method
CN113392476B (en) * 2021-05-21 2022-08-19 河海大学 Geomembrane weld joint strength nondestructive judgment and weld joint repair method

Similar Documents

Publication Publication Date Title
CN103831973A (en) Garbage landfill site HDPE geomembrane welding method
AU2005291019B2 (en) Drained barrier
CN103802309B (en) Refuse landfill HDPE film welding method
CN111331849A (en) Composite HDPE (high-density polyethylene) film prevention and control system for emergency facility base and construction method
JP4925065B2 (en) Waterproof structure of lining concrete
CN102733829A (en) Water-proof structure of tunnel lining joint in shield-method construction
CN103758157B (en) The laying method of refuse landfill HDPE geomembrane
CN111516268A (en) Welding and detection process for HDPE (high-density polyethylene) geomembrane of refuse landfill
CN105275020A (en) Underground pipeline anti-leakage facility
CN113733572B (en) Construction process for welding joint of new and old impermeable membranes and application thereof
CN103774738B (en) The laying method of refuse landfill HDPE floral tube
CN204736512U (en) High density polyethylene , low density polyethylene waterproof and anti -seepage board
CN201072003Y (en) Gas pipe mend block mending with pressure
CN202430748U (en) Geomembrane welded structure
US9010378B2 (en) Fluid liner fabrication and installation
CN214363911U (en) Sealing structure for waste liquid pipeline at bottom of refuse landfill
CN205858360U (en) For the combination type blood pressure lowering well casing that shield driving is interval
CN103628899A (en) CRD middle partition wall reserving and water sealing flange welding construction technology
CN103758156A (en) Method for paving non-woven geotechnical cloths in refuse landfill
CN202370012U (en) Geomembrane sleeve for laying HDPE (High-Density Polyethylene) floral tube
CN207974387U (en) Butyl self-adhesion EPDM rubber waterproof rolling material constructing structure
CN205369216U (en) Exchange lapped drain bar of preventing
CN207092065U (en) A kind of diaphragm wall seepage repairs structure
CN207952192U (en) Cover film for refuse landfill
KR102504194B1 (en) Repair tube for pipeline rehabilitation and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140604