CN103743935A - Method for measuring system capacitance current in power supply system in coalmine production - Google Patents

Method for measuring system capacitance current in power supply system in coalmine production Download PDF

Info

Publication number
CN103743935A
CN103743935A CN201310741809.5A CN201310741809A CN103743935A CN 103743935 A CN103743935 A CN 103743935A CN 201310741809 A CN201310741809 A CN 201310741809A CN 103743935 A CN103743935 A CN 103743935A
Authority
CN
China
Prior art keywords
voltage
zero sequence
current
measurement
open delta
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310741809.5A
Other languages
Chinese (zh)
Inventor
马磊
赵铁雷
田自明
陈建东
李志平
张兴宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenhua Group Corp Ltd
Shenhua Ningxia Coal Industry Group Co Ltd
Original Assignee
Shenhua Group Corp Ltd
Shenhua Ningxia Coal Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenhua Group Corp Ltd, Shenhua Ningxia Coal Industry Group Co Ltd filed Critical Shenhua Group Corp Ltd
Priority to CN201310741809.5A priority Critical patent/CN103743935A/en
Publication of CN103743935A publication Critical patent/CN103743935A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for measuring a system capacitance current in a power supply system in coalmine production. Three primary-side phase lines of a busbar of the power supply system are connected to the primary side of a voltage transformer. The method for measuring the system capacitance current in the power supply system in coalmine production is characterized by comprising the following steps: respectively connecting the primary-side phase lines of the busbar with a measurement capacitor by virtue of isolation disconnecting links, grounding the measurement capacitor by virtue of a current measuring device; measuring the voltage of a secondary-side measuring line; closing the isolation disconnecting links of the measurement capacitor and the primary-side phase line, acquiring the current of the measurement capacitor, and acquiring a measured zero-sequence opening triangular voltage; calculating the system capacitance current. According to the method, the measurement capacitor is respectively connected with the primary-side phase lines so as to be measured. The operation method is simple, the testing time is improved, the testing result is more accurate and more stable; meanwhile, the measurement capacitor is adopted, so that the breakdown possibility is less; compared with the existing method of adopting a resistor for measurement, the method disclosed by the invention is relatively higher in safety.

Description

A kind of system capacitive current measuring method of the electric power system for coal production
Technical field
The present invention relates to transformer station's correlative technology field, particularly a kind of system capacitive current measuring method of the electric power system for coal production.
Background technology
The electricity consumption that is used for the transformer station of colliery system has clear and definite safety requirements, in < < safety regulations in coal mine > >, clearly stipulate, single-phase-to-ground current is no more than 20A, relate to the particular surroundings of high gas under electric arc that trouble spot ground current forms and coal mine, eliminate the electric arc of trouble spot ground current, avoid the gas explosion causing because of arc light, there is very important effect.Therefore, for the capacity of arc suppression coil under selecting properly different running method and the mode of extinguishing arc, reach the requirement that reduces system capacitive current, need to carry out Measurement accuracy to the system capacitive current of electric power system.
The existing system capacitive current measuring method to electric power system is high resistance method, yet high resistance method testing capacitor current practice process is numerous and diverse, resistance easily heating is breakdown, test result out of true, undulatory property is large and dangerous high, easily causes the person and equipment breakdown.
Summary of the invention
Based on this, be necessary to adopt high resistance method to measure the system capacitive current for the electric power system of coal production for prior art, test result out of true, undulatory property is large and dangerous high, easily cause the technical matters of the person and equipment breakdown, a kind of system capacitive current measuring method of the electric power system for coal production is provided.
A kind of system capacitive current measuring method of the electric power system for coal production, the primary side of three primary side phase line access voltage transformer (VT) of the bus of described electric power system, the system capacitive current measuring method of the described electric power system for coal production comprises:
Step 11, is connected by isolation switch three primary side phase lines of described bus respectively with measurement electric capacity, described measurement electric capacity is by current measuring device ground connection;
Step 12, measures the secondary side line voltage of described voltage transformer secondary side, obtains secondary side slotted line voltage;
Step 13, the isolation switch of described measurement electric capacity and primary side phase line that closes, obtains the current measurement value of described current measuring device, obtains measuring capacitance current, the zero sequence open delta voltage that obtains described voltage transformer secondary side, obtains measuring zero sequence open delta voltage;
Step 14, according to described measurement capacitance current, measurement zero sequence open delta voltage and secondary side slotted line voltage, computing system capacitance current.
Further, described step 12 specifically comprises: measure respectively three secondary side line voltages of described voltage transformer secondary side, calculate the mean value of three secondary side line voltages as secondary side slotted line voltage.
Further, carrying out between described step 11 and step 12, also comprise: measure the zero sequence open delta voltage of described voltage transformer secondary side as opening voltage.
Further, if described opening voltage is greater than default load balance threshold value, described step 13 specifically comprises:
The isolation switch of described measurement electric capacity and the first primary side phase line closes, obtain the current measurement value of described current measuring device as the first capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the first zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the first primary side phase line, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the second primary side phase line closes, obtain the current measurement value of described current measuring device as the second capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the second zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the second primary side phase line, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the 3rd primary side phase line closes, obtain the current measurement value of described current measuring device as the 3rd capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the 3rd zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the 3rd primary side phase line;
Described measurement capacitance current is the mean value of described the first capacitance current, the second capacitance current and the 3rd capacitance current, and described measurement zero sequence open delta voltage is the mean value of described the first zero sequence open delta voltage, the second zero sequence open delta voltage and the 3rd zero sequence open delta voltage.
Further, if described opening voltage is less than or equal to default load balance threshold value, described step 13 specifically comprises:
The isolation switch of described measurement electric capacity and one of them primary side phase line closes, obtain the current measurement value of described current measuring device as measuring capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as measuring zero sequence open delta voltage.
Further, described step 14 specifically comprises:
Calculate described system capacitive current=secondary side slotted line voltage/measurement zero sequence open delta voltage * measurement capacitance current.
Further, carrying out between described step 11 and step 12, also comprising: exiting the arc suppression coil being connected with electric power system, disconnect the load on the zero sequence open delta voltage of described voltage transformer secondary side.
Further, the load on the zero sequence open delta voltage of described voltage transformer secondary side is secondary resonance eliminator.
Further, three of described bus primary side phase lines are also connected with isolation switch by disconnector, isolating switch respectively successively.
The present invention, by being connected respectively with primary side phase line measuring electric capacity, measures.Method of operating is simple, has improved the test duration, and test result more accurately and stable, meanwhile, is measured electric capacity owing to adopting, and is not easy breakdownly, and with respect to the method for existing employing resistance measurement, security is relatively high.
Accompanying drawing explanation
Fig. 1 is the workflow diagram of the system capacitive current measuring method of a kind of electric power system for coal production of the present invention;
Fig. 2 is the schematic diagram of electric power system;
Fig. 3 is the workflow diagram of an example of system capacitive current measuring method of a kind of electric power system for coal production of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Be illustrated in figure 1 the workflow diagram of the system capacitive current measuring method of a kind of electric power system for coal production of the present invention, wherein, be illustrated in figure 2 the circuit connection diagram while measuring.Three of the bus of electric power system primary side phase line 221(A phases as shown in Figure 2), 222(B phase), 223(C phase) be connected with the primary side of voltage transformer (VT) 21 respectively, the system capacitive current measuring method of the described electric power system for coal production, comprises as shown in Figure 1:
Step 11, is connected by isolation switch 23 three primary side phase lines of described bus respectively with measurement electric capacity 24, described measurement electric capacity 24 is by current measuring device 25 ground connection;
Step 12, measures the secondary side line voltage of described voltage transformer secondary side, obtains secondary side slotted line voltage;
Step 13, the isolation switch 23 of described measurement electric capacity and primary side phase line that closes, obtains the current measurement value of described current measuring device, obtains measuring capacitance current, the zero sequence open delta voltage that obtains described voltage transformer secondary side, obtains measuring zero sequence open delta voltage;
Step 14, according to described measurement capacitance current, measurement zero sequence open delta voltage and secondary side slotted line voltage, computing system capacitance current.
Step 11 increases measures electric capacity, in step 12, measure three line voltages between secondary side phase line, obtain secondary side slotted line voltage, the isolation switch of described measurement electric capacity and primary side phase line closes in step 13, one of them primary side phase line is connected ground connection with measurement electric capacity, obtain the current measurement value of described current measuring device, obtain measuring capacitance current, obtain the zero sequence open delta voltage of described voltage transformer secondary side, obtain measuring zero sequence open delta voltage, finally, in step 14, calculate system capacitive current.
Mode with respect to existing employing resistance measurement, adopt electric capacity to measure, because electric capacity has power-on time, the time of the isolation switch of described measurement electric capacity and the primary side phase line of therefore closing can be longer, and can be not breakdown, therefore the precision of test result is higher, can reduce the risk of personal injury simultaneously.
In an embodiment, described step 12 specifically comprises therein: measure respectively three secondary side line voltages of described voltage transformer secondary side, calculate the mean value of three secondary side line voltages as secondary side slotted line voltage.
By testing three secondary side line voltages, average, the accuracy of secondary side slotted line voltage is higher.
In an embodiment, carrying out between described step 11 and step 12, also comprise: measure the zero sequence open delta voltage of described voltage transformer secondary side as opening voltage therein.
In an embodiment, if described opening voltage is greater than default load balance threshold value, described step 13 specifically comprises therein:
The isolation switch of described measurement electric capacity and the first primary side phase line 221 closes, obtain the current measurement value of described current measuring device as the first capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the first zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the first primary side phase line 221, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the second primary side phase line 222 closes, obtain the current measurement value of described current measuring device as the second capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the second zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the second primary side phase line 222, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the 3rd primary side phase line 223 closes, obtain the current measurement value of described current measuring device as the 3rd capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the 3rd zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the 3rd primary side phase line 223;
Described measurement capacitance current is the mean value of described the first capacitance current, the second capacitance current and the 3rd capacitance current, and described measurement zero sequence open delta voltage is the mean value of described the first zero sequence open delta voltage, the second zero sequence open delta voltage and the 3rd zero sequence open delta voltage.
Preferably, described default load balance threshold value is 0.4 volt.Wherein, when opening voltage is greater than default load balance threshold value, be illustrated in the laod unbalance on the zero sequence open delta voltage of described voltage transformer secondary side, A now, B, system capacitive current on C three-phase is not identical, therefore, respectively to the first primary side phase line 221, the second primary side phase line 222 and the 3rd primary side phase line 223 are measured, by computation and measurement capacitance current, it is described the first capacitance current, the mean value of the second capacitance current and the 3rd capacitance current, measuring zero sequence open delta voltage is described the first zero sequence open delta voltage, the mean value of the second zero sequence open delta voltage and the 3rd zero sequence open delta voltage, thereby obtain suitable system capacitive current.
Further, if described opening voltage is less than or equal to default load balance threshold value, described step 13 specifically comprises:
The isolation switch of described measurement electric capacity and one of them primary side phase line closes, obtain the current measurement value of described current measuring device as measuring capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as measuring zero sequence open delta voltage.
Preferably, described default load balance threshold value is 0.4 volt.Wherein, when opening voltage is less than or equal to default load balance threshold value, be illustrated in the load balance on the zero sequence open delta voltage of described voltage transformer secondary side, now the system capacitive current on A, B, C three-phase is identical, therefore, only need to measure any road of the first primary side phase line 221, the second primary side phase line 222 and the 3rd primary side phase line 223, can obtain suitable system capacitive current.
In an embodiment, described step 14 specifically comprises therein:
Calculate described system capacitive current=secondary side slotted line voltage/measurement zero sequence open delta voltage * measurement capacitance current.
Therein in an embodiment, carrying out between described step 11 and step 12, also comprising: exiting the arc suppression coil being connected with electric power system, disconnect the load on the zero sequence open delta voltage of described voltage transformer secondary side.Arc suppression coil can produce certain building-out capacitor electric current, causes interference, exits the arc suppression coil being connected with electric power system and can reduce measurements interference.
Further, the load on the zero sequence open delta voltage of described voltage transformer secondary side is secondary resonance eliminator.
Secondary resonance eliminator also can produce and disturb computing system capacitance current, therefore disconnects secondary resonance eliminator and can reduce calculating interference.
Further, three of described bus primary side phase lines are also connected with isolation switch by disconnector, isolating switch respectively successively.Disconnector 261,262 and 263 is controlled respectively the first primary side phase line 221, the second primary side phase line 222 is connected with isolating switch 27 with the 3rd primary side phase line 223.Wherein, disconnector 261,262,263 and isolating switch 27 are all placed in the reserve tank of electric power system, and are connected with the 3rd primary side phase line 223 with the first primary side phase line 221, the second primary side phase line 222, therefore, the present embodiment is only to use existing equipment setting, safer convenience.
As an example of the present invention, its workflow as shown in Figure 3, comprising:
Step S301, first exits the arc suppression coil in electric power system before measurement, and the load on the zero sequence open delta voltage of described voltage transformer secondary side is broken;
Step S302, measures the zero sequence open delta voltage U0 of described voltage transformer secondary side with multimeter;
Step S303, measures and records secondary side line voltage U AB, UBC and UAC;
Step S304, calculates UL=(UAB+UBC+UAC)/3;
Step S305, test connection is complete according to connecting shown in Fig. 2, and check errorless;
Step S306, measures the first primary side phase line 221, and the isolation switch that first closes makes the first primary side phase line 221 be connected with measurement electric capacity 24, then the isolating switch that closes.With multimeter, measure the zero sequence open delta voltage Ujd01 value of described voltage transformer secondary side simultaneously, observe current measuring device reading I1 value, and record;
Step S307, finishes the measurement to the first primary side phase line 221, first cut-off breaker, then disconnect isolation switch, and will measure capacitor discharge;
Step S308, if U0>0.4V performs step S309, otherwise makes I=I1, Ujd0=Ujd01, execution step S312
Step S309, measures the second primary side phase line 222, and the isolation switch that first closes makes the second primary side phase line 222 be connected with measurement electric capacity 24, then the isolating switch that closes.With multimeter, measure the zero sequence open delta voltage of described voltage transformer secondary side simultaneously, observe current measuring device reading I2 value, and record;
Step S310, finishes the measurement to the second primary side phase line 222, first cut-off breaker, then disconnect isolation switch, and will measure capacitor discharge;
Step S311, measures the 3rd primary side phase line 223, and the isolation switch that first closes makes the 3rd primary side phase line 223 be connected with measurement electric capacity 24, then the isolating switch that closes.With multimeter, measure the zero sequence open delta voltage Ujd03 value of described voltage transformer secondary side simultaneously, observe current measuring device reading I3 value, and record;
Step S312, finishes the measurement to the 3rd primary side phase line 223, first cut-off breaker, then disconnect isolation switch, and will measure capacitor discharge;
Step S313, makes I=(I1+I2+I3)/3, Ujd0=(Ujd01+Ujd02+Ujd03)/3;
Step S314, computing system capacitance current IC=(UL/Ujd0) * I.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (9)

1. the system capacitive current measuring method for the electric power system of coal production, the primary side of three primary side phase line access voltage transformer (VT) of the bus of described electric power system, it is characterized in that, the system capacitive current measuring method of the described electric power system for coal production comprises:
Step (11), is connected by isolation switch three primary side phase lines of described bus respectively with measurement electric capacity, described measurement electric capacity is by current measuring device ground connection;
Step (12), measures the secondary side line voltage of described voltage transformer secondary side, obtains secondary side slotted line voltage;
Step (13), the isolation switch of described measurement electric capacity and primary side phase line that closes, obtains the current measurement value of described current measuring device, obtains measuring capacitance current, the zero sequence open delta voltage that obtains described voltage transformer secondary side, obtains measuring zero sequence open delta voltage;
Step (14), according to described measurement capacitance current, measurement zero sequence open delta voltage and secondary side slotted line voltage, computing system capacitance current.
2. the system capacitive current measuring method of the electric power system for coal production according to claim 1, it is characterized in that, described step (12) specifically comprises: measure respectively three secondary side line voltages of described voltage transformer secondary side, calculate the mean value of three secondary side line voltages as secondary side slotted line voltage.
3. the system capacitive current measuring method of the electric power system for coal production according to claim 1, it is characterized in that, carrying out between described step (11) and step (12), also comprise: measure the zero sequence open delta voltage of described voltage transformer secondary side as opening voltage.
4. the system capacitive current measuring method of the electric power system for coal production according to claim 3, is characterized in that, if described opening voltage is greater than default load balance threshold value, described step (13) specifically comprises:
The isolation switch of described measurement electric capacity and the first primary side phase line closes, obtain the current measurement value of described current measuring device as the first capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the first zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the first primary side phase line, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the second primary side phase line closes, obtain the current measurement value of described current measuring device as the second capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the second zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the second primary side phase line, wait for described measurement capacitor discharge;
The isolation switch of described measurement electric capacity and the 3rd primary side phase line closes, obtain the current measurement value of described current measuring device as the 3rd capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as the 3rd zero sequence open delta voltage;
Disconnect the isolation switch of described measurement electric capacity and the 3rd primary side phase line;
Described measurement capacitance current is the mean value of described the first capacitance current, the second capacitance current and the 3rd capacitance current, and described measurement zero sequence open delta voltage is the mean value of described the first zero sequence open delta voltage, the second zero sequence open delta voltage and the 3rd zero sequence open delta voltage.
5. the system capacitive current measuring method of the electric power system for coal production according to claim 3, is characterized in that, if described opening voltage is less than or equal to default load balance threshold value, described step (13) specifically comprises:
The isolation switch of described measurement electric capacity and one of them primary side phase line closes, obtain the current measurement value of described current measuring device as measuring capacitance current, measure the zero sequence open delta voltage of described voltage transformer secondary side as measuring zero sequence open delta voltage.
6. the system capacitive current measuring method of the electric power system for coal production according to claim 1, is characterized in that, described step (14) specifically comprises:
Calculate described system capacitive current=(secondary side slotted line voltage/measurement zero sequence open delta voltage) * measurement capacitance current.
7. the system capacitive current measuring method of the electric power system for coal production according to claim 1, it is characterized in that, carrying out between described step (11) and step (12), also comprise: exit the arc suppression coil being connected with electric power system, disconnect the load on the zero sequence open delta voltage of described voltage transformer secondary side.
8. the system capacitive current measuring method of the electric power system for coal production according to claim 7, is characterized in that, the load on the zero sequence open delta voltage of described voltage transformer secondary side is secondary resonance eliminator.
9. the system capacitive current measuring method of the electric power system for coal production according to claim 1, is characterized in that, three primary side phase lines of described bus are also connected with isolation switch by disconnector, isolating switch respectively successively.
CN201310741809.5A 2013-12-27 2013-12-27 Method for measuring system capacitance current in power supply system in coalmine production Pending CN103743935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310741809.5A CN103743935A (en) 2013-12-27 2013-12-27 Method for measuring system capacitance current in power supply system in coalmine production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310741809.5A CN103743935A (en) 2013-12-27 2013-12-27 Method for measuring system capacitance current in power supply system in coalmine production

Publications (1)

Publication Number Publication Date
CN103743935A true CN103743935A (en) 2014-04-23

Family

ID=50500971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310741809.5A Pending CN103743935A (en) 2013-12-27 2013-12-27 Method for measuring system capacitance current in power supply system in coalmine production

Country Status (1)

Country Link
CN (1) CN103743935A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602516A (en) * 2016-11-23 2017-04-26 苏州立旭智能电气有限公司 PT secondary harmonic eliminating device and harmonic eliminating method
CN109888732A (en) * 2018-01-09 2019-06-14 广东电网有限责任公司电力调度控制中心 A kind of generator stator ground load inverse time-lag protection method based on earth-fault current

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0862267A (en) * 1994-08-24 1996-03-08 Tokyo Electric Power Co Inc:The Measuring method for dielectric loss tangent of insulator, and diagnostic method for insulation degradation of power cable
CN1560640A (en) * 2004-03-04 2005-01-05 保定浪拜迪电气股份有限公司 Indirect measuring method for electric network capacitance current
CN2916647Y (en) * 2006-02-17 2007-06-27 王亮山 High voltage switch insulation measuring apparatus
CN101625382A (en) * 2009-08-12 2010-01-13 中国矿业大学 Method for continuously tracking and measuring grounding current of automatic compensating device of arc suppression coil
CN202815063U (en) * 2012-09-21 2013-03-20 淮南矿业(集团)有限责任公司 Switch current state monitoring system
CN103439558A (en) * 2013-07-30 2013-12-11 河北旭辉电气股份有限公司 Capacitance current measuring method of phase-control type arc suppression coil

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0862267A (en) * 1994-08-24 1996-03-08 Tokyo Electric Power Co Inc:The Measuring method for dielectric loss tangent of insulator, and diagnostic method for insulation degradation of power cable
CN1560640A (en) * 2004-03-04 2005-01-05 保定浪拜迪电气股份有限公司 Indirect measuring method for electric network capacitance current
CN2916647Y (en) * 2006-02-17 2007-06-27 王亮山 High voltage switch insulation measuring apparatus
CN101625382A (en) * 2009-08-12 2010-01-13 中国矿业大学 Method for continuously tracking and measuring grounding current of automatic compensating device of arc suppression coil
CN202815063U (en) * 2012-09-21 2013-03-20 淮南矿业(集团)有限责任公司 Switch current state monitoring system
CN103439558A (en) * 2013-07-30 2013-12-11 河北旭辉电气股份有限公司 Capacitance current measuring method of phase-control type arc suppression coil

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙方汉: "《变电所运行调试及故障处理》", 31 May 2002, article "隔离开关(隔离刀闸)的技术性能" *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602516A (en) * 2016-11-23 2017-04-26 苏州立旭智能电气有限公司 PT secondary harmonic eliminating device and harmonic eliminating method
CN106602516B (en) * 2016-11-23 2019-02-26 苏州立旭智能电气有限公司 PT secondary resonance elimination device and harmonic elimination method
CN109888732A (en) * 2018-01-09 2019-06-14 广东电网有限责任公司电力调度控制中心 A kind of generator stator ground load inverse time-lag protection method based on earth-fault current

Similar Documents

Publication Publication Date Title
CN105785157B (en) Double main transformer longitudinal differential protection cyclization test methods
CN202854255U (en) Capacitor type potential transformer testing device
CN106771647A (en) A kind of low current neutral grounding electric network capacitance current measurement method
CN102540001A (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
CN201327509Y (en) High-voltage transmission line parameter measuring device and system thereof
CN103472425B (en) A kind of application process of line selection device for low current performance testing platform
CN201666902U (en) High-voltage line parameter testing and protecting device
KR20140009622A (en) Current transformer protector
CN101403779B (en) Parameter measuring apparatus and system for high tension power line
CN103983895B (en) The online N line multipoint earth faults detection method of PT secondary circuit
CN202093082U (en) Split type synchronously resistive current live line measurement device of metallic oxide lightning arrester
CN105067998A (en) Voltage and current fluctuation detector
CN102944762B (en) Debugging method of phase sequences of loops at two sides of synchronization point before commissioning of generator set
CN204241590U (en) Movable switch cubicle commissioning test comprehensive test platform
CN204479711U (en) A kind of integrated apparatus detecting substation relay protection device relay performance
CN104155627B (en) Error characteristic detection method of extra high voltage capacitive voltage transformer
CN103743935A (en) Method for measuring system capacitance current in power supply system in coalmine production
CN205123247U (en) Modular overvoltage protection device power frequency discharge detection test device
CN103616581A (en) Method for testing reactive compensation device without dismounting leads
CN103048586A (en) Verification method for wiring correction of voltage transformer
CN203658510U (en) Voltage transformer secondary circuit grounding detector
CN201945654U (en) Secondary grounding tester of voltage transformer
CN105203947A (en) Performance characteristic testing method of high-voltage circuit breaker
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN204203383U (en) Testing apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140423

RJ01 Rejection of invention patent application after publication