CN103741729A - 一种基础梁下穿电缆沟时的处理方法 - Google Patents

一种基础梁下穿电缆沟时的处理方法 Download PDF

Info

Publication number
CN103741729A
CN103741729A CN201310735021.3A CN201310735021A CN103741729A CN 103741729 A CN103741729 A CN 103741729A CN 201310735021 A CN201310735021 A CN 201310735021A CN 103741729 A CN103741729 A CN 103741729A
Authority
CN
China
Prior art keywords
sliding support
foundation beam
crossbeam
cable duct
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310735021.3A
Other languages
English (en)
Inventor
王景航
杨秀军
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI DATANG NEW POWER ELECTRIC INVESTMENT Co
Original Assignee
SHAANXI DATANG NEW POWER ELECTRIC INVESTMENT Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI DATANG NEW POWER ELECTRIC INVESTMENT Co filed Critical SHAANXI DATANG NEW POWER ELECTRIC INVESTMENT Co
Priority to CN201310735021.3A priority Critical patent/CN103741729A/zh
Publication of CN103741729A publication Critical patent/CN103741729A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种基础梁下穿电缆沟时的处理方法,具体包括:步骤A:将基础梁的横梁固定于框架柱上;步骤B:在横梁下面设置一个滑动支座基础;步骤C:在滑动支座基础和横梁下平面之间设置一个可以横向滑动的滑动支座;步骤D:将滑动支座滑动到合适的位置,使电缆沟穿过;步骤E:将滑动支座移回原位。本发明通过在基础下部增加滑动支座的方式降低基础梁截面高度,从而在不增加电缆沟深度的前提下保证电缆敷设空间;同时基础梁截面减小,节约工程的建设成本。

Description

一种基础梁下穿电缆沟时的处理方法
技术领域
    本发明属于结构设计领域,具体涉及一种基础梁下穿电缆沟时的处理方法。
背景技术
在电厂或变电站设计中,不可避免会出现室内电缆沟穿越外墙到室外。当建筑物是框架结构时,往往带有基础梁,电厂或变电站中,框架柱距一般都比较大,因而导致基础梁截面梁高都比较高,这个时候,电缆沟下穿基础梁,基础梁会将电缆沟大半个断面都挡住,导致电缆沟截面净空只剩下很少一部分,不能满足电缆敷设的要求。目前在处理这一问题时,经常采用的措施是加深电缆沟深度,使不被基础梁挡住的净空部分仍能满足电缆敷设,这样做虽然满足了电缆敷设的基本空间,但带来了新的问题,即电缆沟深度增加,导致连接的室外部分电缆沟同样增加深度,不仅造成材料的成本大大提高,同时施工难度也增大,最终的结果是建筑成本增高。
为此,急需一种既能解决电缆沟敷设空间,同时又不增加甚至降低建设成本的措施。本发明的目的就是在解决电缆敷设空间问题的同时,不仅不增加建设成本,反而降低建设成本。
发明内容
本发明的目的是降低基础梁截面高度,从而在不增加电缆沟深度的前提下保证电缆敷设空间;同时基础梁截面减小,节约工程的建设成本。
为实现上述目的,本发明提供一种基础梁下穿电缆沟时的处理方法,具体包括如下步骤:
步骤A:将基础梁的横梁固定于框架柱上;
步骤B:在横梁下面设置一个滑动支座基础;
步骤C:在滑动支座基础和横梁下平面之间设置一个可以横向滑动的滑动支座;
步骤D:将滑动支座滑动到合适的位置,使电缆沟穿过;
步骤E:将滑动支座移回原位。
本发明的有益效果是:第一,电缆沟截面深度不变,不会导致室外衔接电缆沟断面增大,从而大大节省成本。第二,增加一个滑动支座,基础梁截面大大减小,本发明在解决原有问题的同时大大节了工程建设成本。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是基础梁跨中下部布置滑动支座的平面示意图;
图2是电缆沟下穿基础梁的剖面示意图;
图3是基础梁截面图;
图中:1框架柱;2横梁;3滑动支座;4电缆沟;5聚四氟乙烯隔离层。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例1:
参照图1,本发明提供一种基础梁下穿电缆沟时的处理方法,具体包括如下步骤:
步骤A:将基础梁的横梁2固定于框架柱1上;
步骤B:在横梁2下面设置一个滑动支座基础;
步骤C:在滑动支座基础和横梁2下平面之间设置一个可以横向滑动的滑动支座3;
步骤D:将滑动支座3滑动到合适的位置,使电缆沟4穿过;
步骤E:将滑动支座3移回原位。
本发明一般适用于框架结构柱距不小于4m,因为若柱距小于4m时,横梁2本身截面高度不会很高,若在跨中增加支座来减小横梁2截面,节省的成本很有限,有可能抵不上增加支座的成本;同时柱距较小时横梁2挡电缆沟4的情况一般很少出现。但在电厂和变电站中,尤其是电厂主厂房中,柱距一般都比较大,采用此种措施能有效节省成本,当柱距过大时,可采取在横梁2底增加多个滑动支座3的方式来使横梁2截面较小到需要的高度,从而保证下穿电缆沟4。当上部墙荷载不是很大时,滑动支座3可以采用砖基础、毛石基础、素混凝土基础等形式,进一步节省成本。滑动支座3与横梁2之间的隔离层通长采用聚四氟乙烯,也可采用其他隔离层达到滑动连接的效果。
框架结构横梁2上部一般都布置有外墙,外墙荷载和框架柱1柱距两个因素决定着横梁2的截面高度。因为要承受上部墙体的荷载,横梁2截面过小就难以保证承载力,本发明采取的措施是在横梁2跨中下部增加滑动支座3,用滑动支座3来承受一部分墙体荷载,这样横梁2本身所承受的墙体荷载就大大减小,与此同时横梁2的跨度只需按滑动支座3到框架柱1之间的跨度计算。荷载的减小和计算宽度的减小使横梁2的截面高度大大降低,保证了电缆沟4下穿时所需的空间。新增加的滑动支座3与横梁2之间加聚四氟乙烯隔离层5,保证支座与横梁2支架为滑动连接,避免横梁2把弯矩传给支座,滑动连接的好处是支座仅承受竖向力,故而支座基础较小。横梁2截面减小节省的成本与滑动支座基础所增加的成本相比更大,从而节省了工程建设成本。因此,本发明的有益效果是:第一,电缆沟截面深度不变,不会导致室外衔接电缆沟断面增大,从而大大节省成本。第二,增加一个滑动支座,基础梁截面大大减小,本发明在解决原有问题的同时大大节了工程建设成本。
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。
以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。

Claims (1)

1.一种基础梁下穿电缆沟时的处理方法,具体包括如下步骤:
步骤A:将基础梁的横梁固定于框架柱上;
步骤B:在横梁下面设置一个滑动支座基础;
步骤C:在滑动支座基础和横梁下平面之间设置一个可以横向滑动的滑动支座;
步骤D:将滑动支座滑动到合适的位置,使电缆沟穿过;
步骤E:将滑动支座移回原位。
CN201310735021.3A 2013-12-27 2013-12-27 一种基础梁下穿电缆沟时的处理方法 Pending CN103741729A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310735021.3A CN103741729A (zh) 2013-12-27 2013-12-27 一种基础梁下穿电缆沟时的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310735021.3A CN103741729A (zh) 2013-12-27 2013-12-27 一种基础梁下穿电缆沟时的处理方法

Publications (1)

Publication Number Publication Date
CN103741729A true CN103741729A (zh) 2014-04-23

Family

ID=50498788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310735021.3A Pending CN103741729A (zh) 2013-12-27 2013-12-27 一种基础梁下穿电缆沟时的处理方法

Country Status (1)

Country Link
CN (1) CN103741729A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004963A (zh) * 2019-04-18 2019-07-12 郑州市市政工程总公司 沉井下沉全过程纠偏预防报警系统及沉井下沉纠编方法
CN113006122A (zh) * 2021-01-26 2021-06-22 中国能源建设集团广东省电力设计研究院有限公司 一种gis楼的结构基础

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2227246Y (zh) * 1995-08-06 1996-05-15 中国船舶工业总公司第七研究院第七二五研究所 填充聚四氟乙烯滑动支座
JPH08239861A (ja) * 1995-03-03 1996-09-17 Shimizu Corp 基礎構造および基礎の構築方法
CN1963111A (zh) * 2005-11-10 2007-05-16 张准胜 建筑物整体顶升底层改造为停车场、商场的方法与装置
CN101967832A (zh) * 2009-07-27 2011-02-09 上海艾能电力工程有限公司 变电站所内建筑物底层结构处理方法
CN202099804U (zh) * 2011-05-19 2012-01-04 长业建设集团有限公司 跨越基坑管线贝雷架悬挂托换系统
CN202116979U (zh) * 2011-06-21 2012-01-18 中交通力建设股份有限公司 一种桥梁柔性主梁梁端滑动支承装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08239861A (ja) * 1995-03-03 1996-09-17 Shimizu Corp 基礎構造および基礎の構築方法
CN2227246Y (zh) * 1995-08-06 1996-05-15 中国船舶工业总公司第七研究院第七二五研究所 填充聚四氟乙烯滑动支座
CN1963111A (zh) * 2005-11-10 2007-05-16 张准胜 建筑物整体顶升底层改造为停车场、商场的方法与装置
CN101967832A (zh) * 2009-07-27 2011-02-09 上海艾能电力工程有限公司 变电站所内建筑物底层结构处理方法
CN202099804U (zh) * 2011-05-19 2012-01-04 长业建设集团有限公司 跨越基坑管线贝雷架悬挂托换系统
CN202116979U (zh) * 2011-06-21 2012-01-18 中交通力建设股份有限公司 一种桥梁柔性主梁梁端滑动支承装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈德志等: "复杂环境下辊道基础梁部分预裂切割爆破", 《爆破》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004963A (zh) * 2019-04-18 2019-07-12 郑州市市政工程总公司 沉井下沉全过程纠偏预防报警系统及沉井下沉纠编方法
CN110004963B (zh) * 2019-04-18 2024-02-06 郑州市市政工程总公司 沉井下沉全过程纠偏预防报警系统及沉井下沉纠偏方法
CN113006122A (zh) * 2021-01-26 2021-06-22 中国能源建设集团广东省电力设计研究院有限公司 一种gis楼的结构基础

Similar Documents

Publication Publication Date Title
CN102322071A (zh) 一种220kV变电站主变压器的万能基础结构
CN103741729A (zh) 一种基础梁下穿电缆沟时的处理方法
CN204456189U (zh) 地铁站顶部管廊结构
CN204167849U (zh) 电缆沟及其盖板
CN104988947A (zh) 一种水利工程挡土墙
CN204216501U (zh) 电缆敷设工具
CN202090660U (zh) 交流特高压钢管塔对焊连接变坡节点
CN105335897A (zh) 一种阶梯式配电网网格划分方法
CN204983141U (zh) 框架式模块化机房
CN104028674B (zh) 一种大小可调的钢筋弯圆装置
CN203260979U (zh) 电缆沟及其盖板
CN202164623U (zh) 220kV变电站主变压器的万能基础结构
CN102034014B (zh) 全参数建立水电站混流式水轮机蜗壳三维模型的方法
CN211351260U (zh) 一种用于户内变电站的三层立体式电缆沟道
CN201953104U (zh) 一种发电厂主厂区
CN205509439U (zh) 快捷安装式电缆沟
CN204435856U (zh) 一种特制钢筋混凝土滑模
CN204781606U (zh) 箭型筋楼承板
CN205677623U (zh) 电缆隧道和设备基础综合结构
CN204023522U (zh) 一种混凝土溢流坝与发电厂房重叠的复合结构
CN206673539U (zh) 一种电缆铺设管廊
CN210797609U (zh) 一种危险废物防护结构
CN204691035U (zh) 一种用于预制整浇井字楼盖结构的模板
CN204464805U (zh) 框架式配电柜
CN203924605U (zh) 适用于变电站防洪改造的室内架空地坪结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140423

WD01 Invention patent application deemed withdrawn after publication