CN103726859B - Air filling type mine rubber support - Google Patents
Air filling type mine rubber support Download PDFInfo
- Publication number
- CN103726859B CN103726859B CN201410038824.8A CN201410038824A CN103726859B CN 103726859 B CN103726859 B CN 103726859B CN 201410038824 A CN201410038824 A CN 201410038824A CN 103726859 B CN103726859 B CN 103726859B
- Authority
- CN
- China
- Prior art keywords
- support
- inner liner
- rubber layer
- supporting
- steel arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Underground coal mine is along with the propelling of work plane, and the support in stope drift active workings also needs to remove in time.If adopt shed shoring in stope drift active workings, then support material not easily reclaims, and will be embedded in down-hole; Bar timbering is coordinated, then higher the and supporting restricted lifetime of cost according to hydraulic prop; In addition, along with coal mining depth is deepened, roof weighting can occur often, and rigid support plastic strain can occur when being subject to so large impact, and support is destroyed.It is low that its solution applies a kind of cost exactly, the plasticity air filling type rubber standoff easily reclaimed.During supporting, inflated by support, the support of inflation is heaved, and with top plate contact, both plays support action, and also available buffer acts on suddenly the pressure on support simultaneously, and support is not destroyed when pressing suddenly; When removing support, support is exitted, then by support disassembly & recycling.This supporting structure is simple, novel, unique, and using simple, convenient, is that of roadway support field innovates greatly, remarkable in economical benefits.
Description
Technical field
The present invention relates to a kind of New-support of colliery tunnel support, is a kind of air filling type mine rubber support.
Background technology
At present, underground coal mine is along with the propelling of coal-face, and the support in stope drift active workings also needs to remove in time.Adopt shed shoring in stope drift active workings, then support material not easily reclaims, and will be embedded in down-hole; Bar timbering is coordinated, then higher the and supporting restricted lifetime of cost according to hydraulic prop; In addition, along with coal mining depth is deepened, roof weighting can occur often, and rigid support plastic strain can occur when being subject to so large impact, and support is destroyed.Be badly in need of a kind of supporting easy, reclaim easily, the new type mining support acting on suddenly pressure on support can be cushioned.
Summary of the invention
It is easy that object of the present invention is just to provide a kind of supporting, reclaims easily, can cushion a kind of new type mining support acting on suddenly pressure on support.
The present invention includes steel arch, inner liner and rubber layer, rubber layer is wrapped in inner liner and is closely connected with steel arch, and inner liner is connected with rubber outer by valve inside.During supporting, inflator pump is inflated to inner liner by valve inside, rubber layer is heaved, roof supporting.Because the part being close to rock is rubber, so support can cushion roof pressure, all supports can carry roof pressure jointly, alleviate the pressure that each support carries.Puffer-type mining bracket, its feature is the sudden change of energy compensator or trimmer pressure, makes steel arch that deformation be less likely to occur.
The present invention is applied to the temporary lining in stope drift active workings.
The present invention is owing to adopting said structure, and namely by inner liner and the rubber layer supporting roof of inflation, and steel arch and top board directly do not contact; Steel arch can not directly bear the impact of pressing suddenly on the one hand, also makes support and cancel support more simple and convenient on the other hand.In addition the waste of support material in stope drift active workings can not also be caused.
Accompanying drawing explanation
Fig. 1 is braced structures and A-A, B-B profile position schematic diagram of support
Fig. 2 is the A-A sectional drawing of support
Fig. 3 is the B-B sectional drawing of support
Fig. 4 is the structural representation of venting after-poppet
Detailed description of the invention
The present invention does below in conjunction with drawings and Examples with detailed description.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the present invention includes rubber layer (1), steel arch (2) is closely connected by draw-in groove (5), have inner liner (3) in rubber layer and the interior cavity formed of steel arch, inner liner (3) is connected with rubber layer (1) by valve inside (4).
When erection bracket, valve inside (4) is exitted, support is easily set up.After the good support of supporting place frame, inflator pump is utilized to be inflated in inner liner by valve inside (4).Inner liner after inflation is by the rubber layer jack-up of outside high strength, and tunnel top contact, plays support action.By valve inside (4) venting when reclaiming support, the inner liner (3) after venting and rubber layer is flat gets off, departs from top, tunnel, recovery after then being fallen by support.The object of the invention is to improve jointly bearing pressure and improving the rate of recovery of support of support.Supporting structure of the present invention is simple, novel, unique, uses simple, convenient, is that of temporary working supporting field, colliery innovates greatly, applies and have great Social benefit and economic benefit.
Claims (1)
1. an air filling type mine rubber support, comprises rubber layer (1), steel arch (2) and inner liner (3), it is characterized in that:
Rubber layer (1) is wrapped in inner liner (3) and is closely connected with steel arch (2), has inner liner (3) in rubber layer (1) and the interior cavity formed of steel arch (2); Inner liner (3) is connected with rubber layer (1) by valve inside (4); Rubber layer is closely connected by draw-in groove (5) with steel arch (2); When erection bracket, valve inside (4) is exitted, support is easily set up, after the good support of supporting place frame, utilize inflator pump by valve inside (4) inflation in inner liner (3), inner liner (3) after inflation is by rubber layer (1) jack-up of outside high strength, and tunnel top contact, plays support action; By valve inside (4) venting when reclaiming support, the inner liner (3) after venting and rubber layer (1) is flat gets off, departs from top, tunnel, recovery after then being fallen by support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410038824.8A CN103726859B (en) | 2014-01-27 | 2014-01-27 | Air filling type mine rubber support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410038824.8A CN103726859B (en) | 2014-01-27 | 2014-01-27 | Air filling type mine rubber support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103726859A CN103726859A (en) | 2014-04-16 |
CN103726859B true CN103726859B (en) | 2015-10-07 |
Family
ID=50451126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410038824.8A Active CN103726859B (en) | 2014-01-27 | 2014-01-27 | Air filling type mine rubber support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103726859B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105298520B (en) * | 2015-11-25 | 2017-06-27 | 安徽理工大学 | A kind of mining bracket |
CN105401964B (en) * | 2015-11-25 | 2017-09-22 | 安徽理工大学 | It is a kind of to indicate the mining bracket of roof pressure |
CN106351678B (en) * | 2016-09-14 | 2018-05-18 | 安徽理工大学 | A kind of mining bracket for being capable of adjust automatically support stiffness |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2248245Y (en) * | 1995-07-29 | 1997-02-26 | 周长英 | Novel underground coal mine support with tire |
CN103321654A (en) * | 2013-07-04 | 2013-09-25 | 中国矿业大学 | Method for managing roof collapse of coal mine roadway by aid of flexible air bags |
CN203515611U (en) * | 2013-08-21 | 2014-04-02 | 王新丰 | Inflated rubber circular-arc metal support |
CN203847134U (en) * | 2014-01-27 | 2014-09-24 | 河南理工大学 | Inflatable mining rubber support |
-
2014
- 2014-01-27 CN CN201410038824.8A patent/CN103726859B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2248245Y (en) * | 1995-07-29 | 1997-02-26 | 周长英 | Novel underground coal mine support with tire |
CN103321654A (en) * | 2013-07-04 | 2013-09-25 | 中国矿业大学 | Method for managing roof collapse of coal mine roadway by aid of flexible air bags |
CN203515611U (en) * | 2013-08-21 | 2014-04-02 | 王新丰 | Inflated rubber circular-arc metal support |
CN203847134U (en) * | 2014-01-27 | 2014-09-24 | 河南理工大学 | Inflatable mining rubber support |
Also Published As
Publication number | Publication date |
---|---|
CN103726859A (en) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101725368B (en) | Thick seam large mining height working face gob-side entry retaining method | |
CN103321654B (en) | The method of flexible air-bag process coal mine roadway roof collapse | |
CN102606152B (en) | Novel quick digging and anchoring integrated machine for rectangular coal roadway | |
CN103485820B (en) | Ya Hu lane filled wall and construction method thereof is allowed without coal column filling mining flexibility | |
US20180187547A1 (en) | Longwall mine construction method n00 | |
CN103557000B (en) | Method for preventing gob-side entry rock burst through side-drawing filling | |
CN103726859B (en) | Air filling type mine rubber support | |
CN104088638B (en) | Large-inclination-angle coal bed longwell large-mining-height working surface coal wall caving and roof fall control technology | |
CN102777180A (en) | Method for actively and regionally preventing and controlling rock burst in coal mines | |
CN105003299A (en) | Flexible filling bag for gob-side entry retaining and its application method | |
CN103557023A (en) | Hydraulic bracket for extremely soft coal bed | |
CN105240012A (en) | F-type section coal-mining method allowing commingled mining of coal pillars | |
CN104863599B (en) | Fully-mechanized mining working synchronously expands side installation method and support system | |
CN204283488U (en) | A kind of constant-resistance allows presses gob side entry retaining filling air bag | |
CN203756173U (en) | Delay filling original roadway coal-pillar-free gob-side entrydriving system | |
CN203847134U (en) | Inflatable mining rubber support | |
CN203685287U (en) | Coal pillar-free cut and fill mining flexible yielding entry protection filling wall | |
CN104500071B (en) | Seam mining avoids the gob-side entry retaining method of dynamic pressure impact | |
CN206129303U (en) | Great mining height rib wall caving reinforcing apparatus | |
CN104018868A (en) | Integrated gate type fore support | |
CN103195446A (en) | Yielding buffer device for floor heave of soft rock roadway and method for constructing yielding buffer device | |
CN102425417A (en) | Anchor cable and rough wall combined method for gob-side entry retaining stage under collapsible roof | |
CN205154208U (en) | Novel multi -functional stock | |
CN204729108U (en) | One allows presses and early warning u-shaped concrete steel pipe holder | |
CN103758483A (en) | Secondary hole sealing method for treating broken area after extraction of crossing hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |