CN103726571A CN201410015496.XA CN201410015496A CN103726571A CN 103726571 A CN103726571 A CN 103726571A CN 201410015496 A CN201410015496 A CN 201410015496A CN 103726571 A CN103726571 A CN 103726571A
Authority
CN
China
Prior art keywords
well
liner
seepage
transverse tube
borehole wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410015496.XA
Other languages
Chinese (zh)
Inventor
崔占明
刘国良
曹士星
孙金雷
王德印
张振浩
姜秀艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410015496.XA priority Critical patent/CN103726571A/en
Publication of CN103726571A publication Critical patent/CN103726571A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

During construction, some seepage-proofing measures can be carried out in pipeline penetrating positions of well walls of a bilge well and an inspection well, but complete seepage-proofing effect cannot be achieved after operation for a while. Currently, the problem cannot be solved because no good methods or materials exist in China, the bilge well and the inspection well cannot be stopped easily for maintaining during operation, according to the practical technology, under a safe and normal state, lining wells of the bilge well and the inspection well are mounted without production stopping and working stopping, and a pollution source at a certain source is solved. The seepage-proofing capacity of 10 * 10-13 is achieved, the breaking elongation rate can reach the performance of 700%, and commonly, it is better to use an HDPE film with the thickness of 2.0mm. A specially-made lock belt and a sealer are used for sealing at a water in-out pipeline opening.

Description

Sink hole, the manhole interior Seepage method of not cutting off the water
Technical field
Fig. 1 (13) of sink hole, the manhole borehole wall duct penetration placethe anti-Fig. 1 (10) that blends drainage pipealthough also can take some seepage control measures in sealing antiseepage construction, all do not have complete antiseepage effect in operation a period of time process.In service do not have treated sewage, permeates the ground endlessly in water source.Also can constantly there is crackle in the antiseepage cement in the borehole wall, aggravated the pollution to underground water, and the domestic method not had and material solve this problem at present.In addition, sink hole, manhole are difficult to the maintenance of stopping in running, and our practical technique is under the normal state of safety, not stop production, do not stop work the liner well of sink hole, manhole is installed, and solves pollution sources herein.
Background technology
At present domestic manhole, the anti-permeation method of sink hole generally adopt the various fillers such as antiseepage cement, silica gel, pitch to carry out mending-leakage.But actual proof, this seepage control technique does not all have effect for a year or two.Simultaneously due to the bad grasp of impervious material proportioning, so seepage happens occasionally.
Summary of the invention
Select 2.0mm thick, elongation at break reaches 700%, and has 10 × 10 -13the HDPE antiseepage film of seepage capability is good.Pasting sink hole, Fig. 1 of manhole inwall welding liner well, at Fig. 1 (13) of sink hole, the manhole borehole wall duct penetration placecarry out special soldering, in Fig. 1 (10) drainage pipeplace seals antiseepage place.
Accompanying drawing explanation
Fig. 1: the liner well figure of manhole, sink hole.(1) aboveground edge; (2) serve as a contrast aboveground edge; (3) the lining borehole wall; (4) lock strap; (5) sealer; (6) cementation groove; (7) rivet; (8) borehole wall; (9) liner transverse tube; (10) drainage pipe; (11) lining bottom; (12) shaft bottom; (13) duct penetration place.
Fig. 2: fast pneumatic connector connection layout.(1) valve; (2) duct wall; (3) borehole wall; (4) air bag; (5) lock strap; (6) connecting hose; (7) flange; (8) sawtooth.
The specific embodiment
1. for example Fig. 2, first with quick connector by drainage pipe fig. 1 (10)connect.Sewage residual in manhole and sink hole and other foreign material are cleaned out.According to the type of sink hole or manhole, measure the borehole wall fig. 1 (8)and shaft bottom fig. 1 (12)the surface area of (borehole wall area and shaft bottom area below the 5cm of drainage pipe bottom), then cuts out and prefabricated HDPE antiseepage film.
2. first by the HDPE liner well shaft bottom of having welded fig. 1 (11)(lining well shaft bottom be one can folding basin body) be placed on the shaft bottom of sink hole or manhole fig. 1 (12), in order to prevent in periodic inspection process liner well shaft bottom fig. 1 (11)cause damage, put in the above a 10cm thick watermud grout groove fig. 1 (6), make cementation groove fig. 1 (6)apart from drainage pipe fig. 1 (10)10cm left and right, bottom, so that duct penetration place fig. 1 (13)welding.Then, from bottom to up the HDPE antiseepage film of cutting out is close to the borehole wall fig. 1 (8)welding, particularly processes especially at duct penetration place Fig. 1 (13) successively.First to drainage pipe fig. 1 (10)measure, cut out, weld one liner transverse tube Fig. 1 (9)(similar penetrate Magic cap), is pasting " Magic cap " the brim of a hat of circle the borehole wall and is welding, and can prevent to greatest extent like this duct penetration place fig. 1 (13)seepage.
3. liner transverse tube fig. 1 (9)be wrapped in drainage pipe fig. 1 (10)will inevitably there is certain gap, for preventing gap leakage, at liner transverse tube fig. 1 (9)the other end, use sealer fig. 1 (5)gap is filled up, with metal lockmaking band fig. 1 (4)fix and increase pressure.Because sewage mobile in sink hole, manhole contains many kinds of poisonous and harmful substances, there is the effects such as corrosion.So select the lock strap of stainless steel, sealer will have certain toughness and acidproof, alkaline-resisting, oil resistant, high temperature resistant (can reach 70 ℃) etc., finally reaches the object of long-term antiseepage.Apart from the aboveground edge of liner fig. 1 (2)rivet is fixed and stamped in 20cm place with bonding jumper by liner well figure 1 (7).

Claims (5)

1. according to the type of sink hole or manhole, measure the borehole wall fig. 1 (8)and shaft bottom fig. 1 (12)[drainage pipe fig. 1 (10)borehole wall area and the shaft bottom area of bottom below 5cm] surface area, cut out HDPE antiseepage film and weld liner well.Welding liner well divides three parts: lining bottom fig. 1 (11), liner transverse tube fig. 1 (9), liner well the above part of liner transverse tube.
2. serve as a contrast as claimed in claim 1 bottom fig. 1 (11), in order to prevent in periodic inspection process liner well shaft bottom fig. 1 (11)cause damage, put in the above a 10cm thick watermud grout groove fig. 1 (6), make cementation groove fig. 1 (6)apart from drainage pipe fig. 1 (10)10cm left and right, bottom.
3. liner transverse tube as claimed in claim 1 fig. 1 (9), prefabricated liner transverse tube fig. 1 (9)the similar Magic cap having penetrated, is pasting " Magic cap " the brim of a hat of circle the borehole wall and is welding.At liner transverse tube fig. 1 (9)the other end, with acidproof, alkaline-resisting, oil resistant, resistant to elevated temperatures sealer fig. 1 (5)gap is filled up, used stainless steel lock strap fig. 1 (4)fix and increase pressure, wherein lock strap fig. 1 (4)pressure can regulate.
4. sealer as claimed in claim 3 fig. 1 (5), it is characterized in that having certain toughness acidproof, high temperature resistant, alkaline-resisting etc.
5. lock strap as claimed in claim 3 fig. 1 (4), it is characterized in that being difficult for getting rusty, the pressure of lock strap can free adjustment.
CN201410015496.XA 2014-01-14 2014-01-14 Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method Pending CN103726571A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410015496.XA CN103726571A (en) 2014-01-14 2014-01-14 Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410015496.XA CN103726571A (en) 2014-01-14 2014-01-14 Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method

Publications (1)

Publication Number Publication Date
CN103726571A true CN103726571A (en) 2014-04-16

Family

ID=50450842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410015496.XA Pending CN103726571A (en) 2014-01-14 2014-01-14 Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method

Country Status (1)

Country Link
CN (1) CN103726571A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869286A (en) * 2017-02-27 2017-06-20 中国十七冶集团有限公司 A kind of drainage system sewage antiseep inspection shaft and its construction method
CN110541443A (en) * 2019-08-30 2019-12-06 中交第一公路勘察设计研究院有限公司 sewage inspection well structure for dredging without stopping water and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869286A (en) * 2017-02-27 2017-06-20 中国十七冶集团有限公司 A kind of drainage system sewage antiseep inspection shaft and its construction method
CN110541443A (en) * 2019-08-30 2019-12-06 中交第一公路勘察设计研究院有限公司 sewage inspection well structure for dredging without stopping water and construction method thereof
CN110541443B (en) * 2019-08-30 2021-12-14 中交第一公路勘察设计研究院有限公司 Sewage inspection well structure for dredging without stopping water and construction method thereof

Similar Documents

Publication Publication Date Title
CN101498394B (en) Oil gas pipeline rapid pressured plugging apparatus and plugging method
CN206246920U (en) A kind of rapid pipeline repairing device
CN104029248B (en) The PE gas pipeline hole making drill of Operating Pressure
CN203413284U (en) Air bag type explosive medium pipeline plugging device
MY162285A (en) Device for work implementation without stopping flow, and method for work implementation without stopping flow
CN104405973B (en) Flange steel-plastic multiple tube regulates short tube
CN103741695A (en) Embedded grouting pipe installed on waterstop and grouting method
CN103726571A (en) Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method
CN209469886U (en) A kind of waterproof wall bushing
CN205824481U (en) A kind of pipeline pressure guiding pipe root plugging device
CN206246921U (en) A kind of rapid pipeline repairing device
CN108708427B (en) Non-stop production collision opening construction method for pipeline under pressure
CN205025499U (en) Subway contact passageway freezes to excavate guard gate
CN206846178U (en) A kind of LNG conveyance conduits straight tube leakage-stopping instrument
CN201377655Y (en) Fast pressurized plugging device of oil and gas pipeline
CN105672373B (en) Immersed tube tunnel watertight door leakage detection apparatus
KR20160008327A (en) A device for preventing a leakage of water without suspension of water supply
CN108131506A (en) The construction method that a kind of steel pipe is connect with FRP sand tube
CN204783060U (en) Shield constructs hole circle stagnant water system in machine stage of starting
CN203784513U (en) Connection device of grouting pipe and sleeve
CN204420158U (en) A kind of gate sealing configuration
CN203131320U (en) Grouting and glue injecting three-way sealing clamp
CN104213848A (en) Arc-shaped sealing device for opening hole of pipeline or drill rod with pressure and using method
CN206112393U (en) Adaptation environmental protection ha fujie's seal cover
JP6128088B2 (en) Pipe penetration construction method and pipe penetration construction member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140416

WD01 Invention patent application deemed withdrawn after publication