CN103726571A - Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method - Google Patents
Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method Download PDFInfo
- Publication number
- CN103726571A CN103726571A CN201410015496.XA CN201410015496A CN103726571A CN 103726571 A CN103726571 A CN 103726571A CN 201410015496 A CN201410015496 A CN 201410015496A CN 103726571 A CN103726571 A CN 103726571A
- Authority
- CN
- China
- Prior art keywords
- well
- liner
- seepage
- transverse tube
- borehole wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
During construction, some seepage-proofing measures can be carried out in pipeline penetrating positions of well walls of a bilge well and an inspection well, but complete seepage-proofing effect cannot be achieved after operation for a while. Currently, the problem cannot be solved because no good methods or materials exist in China, the bilge well and the inspection well cannot be stopped easily for maintaining during operation, according to the practical technology, under a safe and normal state, lining wells of the bilge well and the inspection well are mounted without production stopping and working stopping, and a pollution source at a certain source is solved. The seepage-proofing capacity of 10 * 10-13 is achieved, the breaking elongation rate can reach the performance of 700%, and commonly, it is better to use an HDPE film with the thickness of 2.0mm. A specially-made lock belt and a sealer are used for sealing at a water in-out pipeline opening.
Description
Technical field
Fig. 1 (13) of sink hole, the manhole borehole wall
duct penetration placethe anti-Fig. 1 (10) that blends
drainage pipealthough also can take some seepage control measures in sealing antiseepage construction, all do not have complete antiseepage effect in operation a period of time process.In service do not have treated sewage, permeates the ground endlessly in water source.Also can constantly there is crackle in the antiseepage cement in the borehole wall, aggravated the pollution to underground water, and the domestic method not had and material solve this problem at present.In addition, sink hole, manhole are difficult to the maintenance of stopping in running, and our practical technique is under the normal state of safety, not stop production, do not stop work the liner well of sink hole, manhole is installed, and solves pollution sources herein.
Background technology
At present domestic manhole, the anti-permeation method of sink hole generally adopt the various fillers such as antiseepage cement, silica gel, pitch to carry out mending-leakage.But actual proof, this seepage control technique does not all have effect for a year or two.Simultaneously due to the bad grasp of impervious material proportioning, so seepage happens occasionally.
Summary of the invention
Select 2.0mm thick, elongation at break reaches 700%, and has 10 × 10
-13the HDPE antiseepage film of seepage capability is good.Pasting sink hole, Fig. 1 of manhole inwall welding
liner well, at Fig. 1 (13) of sink hole, the manhole borehole wall
duct penetration placecarry out special soldering, in Fig. 1 (10)
drainage pipeplace seals antiseepage place.
Accompanying drawing explanation
Fig. 1: the liner well figure of manhole, sink hole.(1) aboveground edge; (2) serve as a contrast aboveground edge; (3) the lining borehole wall; (4) lock strap; (5) sealer; (6) cementation groove; (7) rivet; (8) borehole wall; (9) liner transverse tube; (10) drainage pipe; (11) lining bottom; (12) shaft bottom; (13) duct penetration place.
Fig. 2: fast pneumatic connector connection layout.(1) valve; (2) duct wall; (3) borehole wall; (4) air bag; (5) lock strap; (6) connecting hose; (7) flange; (8) sawtooth.
The specific embodiment
1. for example Fig. 2, first with quick connector by drainage pipe
fig. 1 (10)connect.Sewage residual in manhole and sink hole and other foreign material are cleaned out.According to the type of sink hole or manhole, measure the borehole wall
fig. 1 (8)and shaft bottom
fig. 1 (12)the surface area of (borehole wall area and shaft bottom area below the 5cm of drainage pipe bottom), then cuts out and prefabricated HDPE antiseepage film.
2. first by the HDPE liner well shaft bottom of having welded
fig. 1 (11)(lining well shaft bottom be one can folding basin body) be placed on the shaft bottom of sink hole or manhole
fig. 1 (12), in order to prevent in periodic inspection process liner well shaft bottom
fig. 1 (11)cause damage, put in the above a 10cm thick
watermud grout groove
fig. 1 (6), make cementation groove
fig. 1 (6)apart from drainage pipe
fig. 1 (10)10cm left and right, bottom, so that duct penetration place
fig. 1 (13)welding.Then, from bottom to up the HDPE antiseepage film of cutting out is close to the borehole wall
fig. 1 (8)welding, particularly processes especially at duct penetration place Fig. 1 (13) successively.First to drainage pipe
fig. 1 (10)measure, cut out, weld one
liner transverse tube Fig. 1 (9)(similar penetrate Magic cap), is pasting " Magic cap " the brim of a hat of circle the borehole wall and is welding, and can prevent to greatest extent like this duct penetration place
fig. 1 (13)seepage.
3. liner transverse tube
fig. 1 (9)be wrapped in drainage pipe
fig. 1 (10)will inevitably there is certain gap, for preventing gap leakage, at liner transverse tube
fig. 1 (9)the other end, use sealer
fig. 1 (5)gap is filled up, with metal lockmaking band
fig. 1 (4)fix and increase pressure.Because sewage mobile in sink hole, manhole contains many kinds of poisonous and harmful substances, there is the effects such as corrosion.So select the lock strap of stainless steel, sealer will have certain toughness and acidproof, alkaline-resisting, oil resistant, high temperature resistant (can reach 70 ℃) etc., finally reaches the object of long-term antiseepage.Apart from the aboveground edge of liner
fig. 1 (2)rivet is fixed and stamped in 20cm place with bonding jumper by liner well
figure 1 (7).
Claims (5)
1. according to the type of sink hole or manhole, measure the borehole wall
fig. 1 (8)and shaft bottom
fig. 1 (12)[drainage pipe
fig. 1 (10)borehole wall area and the shaft bottom area of bottom below 5cm] surface area, cut out HDPE antiseepage film and weld liner well.Welding liner well divides three parts: lining bottom
fig. 1 (11), liner transverse tube
fig. 1 (9), liner well the above part of liner transverse tube.
2. serve as a contrast as claimed in claim 1 bottom
fig. 1 (11), in order to prevent in periodic inspection process liner well shaft bottom
fig. 1 (11)cause damage, put in the above a 10cm thick
watermud grout groove
fig. 1 (6), make cementation groove
fig. 1 (6)apart from drainage pipe
fig. 1 (10)10cm left and right, bottom.
3. liner transverse tube as claimed in claim 1
fig. 1 (9), prefabricated liner transverse tube
fig. 1 (9)the similar Magic cap having penetrated, is pasting " Magic cap " the brim of a hat of circle the borehole wall and is welding.At liner transverse tube
fig. 1 (9)the other end, with acidproof, alkaline-resisting, oil resistant, resistant to elevated temperatures sealer
fig. 1 (5)gap is filled up, used stainless steel lock strap
fig. 1 (4)fix and increase pressure, wherein lock strap
fig. 1 (4)pressure can regulate.
4. sealer as claimed in claim 3
fig. 1 (5), it is characterized in that having certain toughness acidproof, high temperature resistant, alkaline-resisting etc.
5. lock strap as claimed in claim 3
fig. 1 (4), it is characterized in that being difficult for getting rusty, the pressure of lock strap can free adjustment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410015496.XA CN103726571A (en) | 2014-01-14 | 2014-01-14 | Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410015496.XA CN103726571A (en) | 2014-01-14 | 2014-01-14 | Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103726571A true CN103726571A (en) | 2014-04-16 |
Family
ID=50450842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410015496.XA Pending CN103726571A (en) | 2014-01-14 | 2014-01-14 | Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103726571A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869286A (en) * | 2017-02-27 | 2017-06-20 | 中国十七冶集团有限公司 | A kind of drainage system sewage antiseep inspection shaft and its construction method |
CN110541443A (en) * | 2019-08-30 | 2019-12-06 | 中交第一公路勘察设计研究院有限公司 | sewage inspection well structure for dredging without stopping water and construction method thereof |
-
2014
- 2014-01-14 CN CN201410015496.XA patent/CN103726571A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869286A (en) * | 2017-02-27 | 2017-06-20 | 中国十七冶集团有限公司 | A kind of drainage system sewage antiseep inspection shaft and its construction method |
CN110541443A (en) * | 2019-08-30 | 2019-12-06 | 中交第一公路勘察设计研究院有限公司 | sewage inspection well structure for dredging without stopping water and construction method thereof |
CN110541443B (en) * | 2019-08-30 | 2021-12-14 | 中交第一公路勘察设计研究院有限公司 | Sewage inspection well structure for dredging without stopping water and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101498394B (en) | Oil gas pipeline rapid pressured plugging apparatus and plugging method | |
CN206246920U (en) | A kind of rapid pipeline repairing device | |
CN104029248B (en) | The PE gas pipeline hole making drill of Operating Pressure | |
CN203413284U (en) | Air bag type explosive medium pipeline plugging device | |
MY162285A (en) | Device for work implementation without stopping flow, and method for work implementation without stopping flow | |
CN104405973B (en) | Flange steel-plastic multiple tube regulates short tube | |
CN103741695A (en) | Embedded grouting pipe installed on waterstop and grouting method | |
CN103726571A (en) | Bilge well and inspection well water-non-stopping inner-seepage-proofing construction method | |
CN209469886U (en) | A kind of waterproof wall bushing | |
CN205824481U (en) | A kind of pipeline pressure guiding pipe root plugging device | |
CN206246921U (en) | A kind of rapid pipeline repairing device | |
CN108708427B (en) | Non-stop production collision opening construction method for pipeline under pressure | |
CN205025499U (en) | Subway contact passageway freezes to excavate guard gate | |
CN206846178U (en) | A kind of LNG conveyance conduits straight tube leakage-stopping instrument | |
CN201377655Y (en) | Fast pressurized plugging device of oil and gas pipeline | |
CN105672373B (en) | Immersed tube tunnel watertight door leakage detection apparatus | |
KR20160008327A (en) | A device for preventing a leakage of water without suspension of water supply | |
CN108131506A (en) | The construction method that a kind of steel pipe is connect with FRP sand tube | |
CN204783060U (en) | Shield constructs hole circle stagnant water system in machine stage of starting | |
CN203784513U (en) | Connection device of grouting pipe and sleeve | |
CN204420158U (en) | A kind of gate sealing configuration | |
CN203131320U (en) | Grouting and glue injecting three-way sealing clamp | |
CN104213848A (en) | Arc-shaped sealing device for opening hole of pipeline or drill rod with pressure and using method | |
CN206112393U (en) | Adaptation environmental protection ha fujie's seal cover | |
JP6128088B2 (en) | Pipe penetration construction method and pipe penetration construction member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140416 |
|
WD01 | Invention patent application deemed withdrawn after publication |