CN1037184A CN 88105897 CN88105897A CN1037184A CN 1037184 A CN1037184 A CN 1037184A CN 88105897 CN88105897 CN 88105897 CN 88105897 A CN88105897 A CN 88105897A CN 1037184 A CN1037184 A CN 1037184A
Authority
CN
China
Prior art keywords
punching block
template
hoisting frame
big
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 88105897
Other languages
Chinese (zh)
Inventor
吕琼茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 88105897 priority Critical patent/CN1037184A/en
Publication of CN1037184A publication Critical patent/CN1037184A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Whole installed or removed steel shutter construction is number upright in basic storehouse, and self-contained big punching block on the form removal work plane, and reserving longitudinal joint between big punching block is provided with simple and easy hoisting frame in longitudinal joint institute on to concrete.Upright in lifting, during form removal, at first use pull bar grappling shelf; again the hand cucurbit on the hoisting frame upper cantilever suspension ring is tangled punching block lower end suspension hook, spur the hand cucurbit synchronously, make the up sliding liter of punching block by two people; punching block is slided when rising, and is limited between the front and back crosspiece mould cross bar set on the hoisting frame.When punching block was in place, its lower floor enclosed purlin crack and the contraposition of former concreting upper sleeve bolt hole, wears tight sleeve bolt formboard fastening.

Description

Whole installed or removed steel shutter
The invention belongs to water and build the large formwork construction scheme of high dam body of engineering dam and high large-scale concrete engineering.Especially relate to a kind of self-contained whole tearing open from the constructure scheme that promotes punching block.
At the high large-scale formwork erection of the high dam body of water conservancy construction dam, in the template construction of form removal work plane, mainly contain two kinds of formwork construction technology schemes.
The first is upright in the large, medium and small type concrete of the high dam body of dam multilayer storehouse number, outside the form removal work plane, progressively set up high-rise peripheral scaffold from the bottom up, takes fritter template splicing method and dismounting method by upright, form removal personnel, successively stands from the bottom up, form removal.Taking this job practices, mainly is that scaffold all must be taken, be torn open to each template construction, upright, form removal four procedures.In upright, form removal, take that to tear scaffold work amount open big, consumable material is many, and work efficiency is low, and is long in time limit, and working security is poor.
It two is in the craneman does the footprint.On number upright with crane under the formwork erection personnel cooperate, the form removal work plane, carry out large form installing/dismounting (Here it is, and usually said point is installed, torn open) one by one layer by layer from the bottom up in the multilayer storehouse.The major defect of this method is: 1. the peace of large form, tear open with concrete building and all need crane, thereby it is very outstanding to strive the contradiction of crane in construction mutually, influences programming widely.2. can only tear open with this crane peace that large form is one by one carried out in number beginning from a certain storehouse on upright, the form removal work plane in a plurality of storehouses in the craneman does the footprint number, and carry out the large form peace on can not be simultaneously upright on a plurality of storehouses of its footprint number, the form removal work plane, tear open (face peace, tear open).So work efficiency is low, long in time limit, programming is slow.3. the large form beyond the craneman does the footprint is pacified, is just torn open and can't carry out, so bad adaptability, is subjected to the restriction of a lot of conditions in the construction.Car is had bad luck, and formwork rigidity requires big, makes manyly with material, is fabricated into complete lifting appliance vehicle from special factory and has bad luck the scene, carries out big punching block with on-the-spot crane again and pacifies, tears open and need expend a large amount of manpowers, material resources and machine power.
In the construction of other existing templates, the sliding shuttering technology of employing in body of wall is built arranged, but all be lifting appliance to be set or to be anchored on respectively to build on the body of wall on little thickness body of wall usually with tower slip cage body.The job practices of these types is just like body of wall rising template (be used in thickness of wall body is below the 1 meter more) job practices of EP108697 report, though institute's template that adopts can be in the equal altitudes that the connects lifting that make progress on whole active length.But must provide supporting by a template, and on this piece template, lifting appliance is set, make it produce ascending motion face die plate.If thickness of wall body strengthens, the lifting appliance structure complicates, and dimensional weight all strengthens, and installation is all difficult, even this construction method will become impossible when certain thickness.And in the dam template construction, most concrete storehouse number all is thickness is very big in the horizontal direction storehouse number, and quite a lot of storehouses are number upright, form removal work plane opposite does not all have template can provide the supporting lifting appliance.Therefore, this class template construction method can't be applied in the high dam concrete template construction of dam.
The disclosed jumping formwork of Deutsches Reichs-Patent (DE2760022) also belongs to the body of wall jumping formwork.This template is by upright, the form removal of finishing each template with the tower winding frame of slip cage body and lifting appliance and lifting work.During climbing shuttering, pylon and slip cage body adopt the separate type anchor device, directly fix with the body of wall of pouring, and when pylon rose, slip cage body was fixed.Pylon was fixed when the cage body rose, and stood, when tearing climbing shuttering open, and template is unclamped the back from crab-bolt up climbs template by the lifting appliance on the pylon.This hoisting frame and lifting appliance complex structure weight with the cage body is big, installs, the dismounting trouble, can not arbitrarily make things convenient for immediately as special tool, constructs on several bodies of wall storehouse number simultaneously.Therefore, tower winding frame and lifting appliance with the cage body all must be installed on each body of wall storehouse number.In construction, this climbing device requires to make many inevitably.And it highly also must be higher than the required hoisting depth of template.Therefore, the size of shelf and weight are all bigger, and this is for large tracts of land, and the hydraulic engineering construction of big height is impossible basically.
Purpose of the present invention, be in order to shorten water conservancy project dam, high dam body or high large-scale concrete engineering template construction duration, speed up the work, simplifying working procedure saves material for the template construction of high large-scale concrete engineering provides a kind of, the man power and material, easy to operate construction formwork and hoisting frame thereof.Large, medium and small delaminated cabins all on working face is number upright, the form removal work plane diminishes piece splicing method and dismounting method is that large form promotes peace, tears method open in the hope of solving; The peace of solution large form in construction, tear the contradiction of striving crane with concreting open; Become the large form point of crane on work plane and be installed as the face installation.
The present invention finishes like this, reserve longitudinal joint between the self-contained good big punching block on, the form removal work plane upright in concrete storehouse number, longitudinal joint simple and easy hoisting frame is set on the right former concreting, the lower cantalever that hoisting frame is provided with back shelves mould cross bar is clipped between the two big punching blocks.When promoting upright, form removal, at first use temporary rod grappling shelf, again the hand cucurbit on the hoisting frame upper cantilever suspension ring is tangled an end of steel cable, the other end of steel cable hitches the suspension hook of big punching block bottom, what does not spur the hand cucurbit on the hoisting frame of both sides  the first day of the lunar month synchronously, makes that the big punching block that is provided with scaffold is up sliding to be risen.During template sliding lifting, template is limited between the front and back crosspiece mould cross bar set on the upper and lower cantilever of hoisting frame and slides.
The big punching block in hoisting frame both sides is mentioned required formwork erection height, the upper and lower cantilever of shelf all is clipped between the two big punching blocks, to reduce the height of hoisting frame, reduce rack design size and weight, be convenient to can remove easily at any time, everywhere and move on to other local upright form removal as special tool.
In the present invention, self-contained big punching block lower floor enclose the purlin crack and do not have the steel form face locating, being convenient to big punching block promotes when in place, it (is that lower floor builds the storehouse when number building that its lower floor encloses purlin crack and pouring concrete upper sleeve bolt hole (28), the grappling draw rod positions of template, take off the sleeve bolt on the pull bar during form removal, promptly staying bolt hole on the concreting.) contraposition wears tight sleeve bolt with the formboard fastening effect, and can weld one deck pull bar less.
Below in conjunction with embodiment the present invention is described further:
Accompanying drawing 1 is the original state of template when not promoting; Accompanying drawing 2 is that template promotes state in place; Accompanying drawing 3 is template anchoring signals; Accompanying drawing 4 is the sleeve bolts that are connected with steel bar rod with anchoring on template.(24)。
1。Steel form face 2.Upright band square steel 3.Enclose the purlin square steel
4。Back shelves mould cross bar 5.Preceding shelves mould cross bar 6.Upper cantilever
7。Lower cantalever 8.Hand cucurbit 9.Hoisting frame
10。Regulating sleeve nut 11.Crotch screw rod 12.L12.5×8
Angle steel 13.L7.5 * 7.5 angle steel 14.The steel form face supports (lumps of wood)
15。φ 14 connecting bolts 16.φ 12 steel cables
17。φ 45 * 2.5 sliding formwork steel pipes 18.Promote suspension hook
19。Pre-embedded bolt 20.The pad mould lumps of wood 21.Tapered connecting pin
22。Enclose purlin crack 23.Pre-buried fastening drag hook 24.Fastening sleeve nut
Big punching block construction method stands dam, the contour large-scale concrete engineering of high dam body high large-scale with promoting, stand on the form removal work plane, when tearing big punching block open, at first with storehouse, interim plate lumps of wood levelling basis number upright, form removal work plane footing, adopt artificial fritter splicing method at the big punching block (form of structure as shown in drawings) of self-contained required specification on the footing and between two big punching blocks, reserve the longitudinal joint of 20~30cm, between big punching block in edge and interface, storehouse, stay 30~40cm interval longitudinal joint.Basis storehouse template self-contained good after, on longitudinal joint, fill out joint filling board (also available little punching block replaces) and fixing with the wood band, through reinforcing, proofread and correct, after basic storehouse number following two floor pull bar are welded, just finished the formwork erection work in basic storehouse number, can build after the cleaning.The storehouse, basis number is built and to be received when mixing, immediately between the two big punching blocks between reservation longitudinal joint and big punching block in edge and interface, storehouse the prepared separation longitudinal joint concrete surface is pressed pre-embedded bolt (19), the rod anchor hook (23) of the pre-buried anchoring hoisting frame of accompanying drawing (9).And make the pre-embedded bolt (19) that is buried after hoisting frame (9) installs, and can make upper and lower cantilever (6), (7) are by the longitudinal joint center line, and shelf is upright, steady, no big inclination.If concrete matcoveredn reinforcing bar will be noted regulating self-contained position of template and pre-embedded bolt position or strengthen the longitudinal joint width, make two cantilevers (6), (7) can be passed between the longitudinal reinforcement.
After number water in the storehouse, basis, generally to up found, tear open big punching block at normal temperatures through available hoisting way more than 48 hours.If weather is cold excessively, the upright time of tearing big punching block open suitably lengthens, to guarantee the required minimum concrete strength of form removal.
Up promote when founding, tearing open big punching block, between the two big punching blocks between the big punching block of longitudinal joint and edge and the interface, storehouse longitudinal joint load onto hoisting frame (9) on the pre-embedded bolt (19) also with interim hook (hooked) bolt (11) pull bar grasp (23) regulating sleeve nut (10) anchoring to locating.After hoisting frame (9) installs, its lower cantalever (7) is clipped between the two big punching blocks, back shelves mould cross bars (4) shelves on the lower cantalever (7) live template in case during form removal template topple over backward, then, the joint filling board wood of dismantling is with and joint filling board, hand cucurbit (8) on upper cantilever (6) suspension ring of hoisting frame (9) is tangled an end of steel cable (16), the other end of steel cable (16) hitches template mouth lower end suspension hook (18), up lay down all sleeve bolts on the big punching block again, tear the north straight swan  prize of what  of margin 0 river which rises in the northeastern part of Anhui Province S Rong  special bags of willow branches, framed by bamboo, for building dykes of giving repeated exhortations open) on hand cucurbit (8) make that the big punching block both sides that are provided with scaffold are up sliding synchronously to rise.Just be limited in during template sliding lifting on the hoisting frame (9), lower cantalever (6), (7), set front and back crosspiece mould cross bar (5) slides between (4).And owing to be provided with two sliding formwork steel pipes at the back side of template, this has just guaranteed that the smooth sliding of template when promoting promotes, and after big punching block rises to required formwork erection height, makes big punching block lower floor enclose the sleeve bolt hole contraposition on purlin crack (22) and former pouring concrete top, and wear tight sleeve bolt, fastening, calibration template, welding lower floor pull bar, it is upright just to have finished first big punching block, form removal work, it is upright that operation continues to utilize former hoisting frame 9 liftings as method, tears the second, the three open ... big punching block.
After new storehouse, upper strata number all big punching blocks stood well, the shelf of dismantling was filled out all joint filling boards, and reinforced with the wood band, had just finished the formwork erection work of new storehouse.Continue later on to stand on, the form removal work plane number upright toward the storehouse, upper strata, when tearing climbing shuttering open, just continue to adopt this to promote and stand, the form removal construction method up promote upright, tear big punching block open.
Stand, tear open in the big punching block construction in lifting, if required formwork erection height is above 3 meters, available long-chain hand cucurbit or midway big punching block is temporarily fixed on the concrete surface with two sleeve bolts, build up steel cable (16) bifilar, one end hitches punching block suspension hook (18), the other end hitches hand cucurbit (8) chain hook, treats to continue up to promote after hand cucurbit (8) returns chain.
When the big punching block in hoisting frame (9) both sides promote in place after, remove immediately that hoisting frame (9) moves on to that other is upright, the form removal work plane continues to promote and found, tear open big punching block, and hoisting frame is fully used as special tool.
In the house civil engineering, for the large-scale concreting face of height, also can adopt this lifting slding form operation to improve work efficiency, lower consumption.
Pass sleeve bolt that template is connected with anchoring rod and adopt the form of accompanying drawing 4, after anchoring rod (25) is attached thereto, regulate the optimum position that nut (26) and bolt (27) can make template be in to build easily respectively.
If when on upright, the form removal work plane keyway template being arranged, just require the keyway template and promote big punching block strong bonded, tear lifting open in order to realize that big punching block and keyway template can be put in order simultaneously, subsides one deck sheet iron or plastic sheeting on keyway plate face.In addition, the grout pipe horn mouth is fixed with stove bolt.Horn mouth does not have the steel form face to locating, dismounting stove bolt after being convenient to.
Adopt large formwork construction method provided by the invention, it is except the template construction that can effectively finish tall and big concrete works requires, also solved in the large-sized concrete construction, standing of template, tear open and build the contradiction of striving crane, it is so that the template construction operation is simplified reduction of erection time, and saved widely raw-material consumption. In addition, use construction method of the present invention, employing be to promote with the supporting of simple and easy hoisting frame, with the transmission of hand cucurbit, it is convenient to install, remove, and appearance and size and the weight of shelf are all littler, be convenient to as specific purpose tool at any time easily, form removal working face vertical at high and low sky move, install. And do not need each large form specialized designs hoisting mechanism, make whole form work engineering reduce widely design, the making of hoisting mechanism.
Calculate according to ration standard and practical construction experience, with the big punching block construction method of the present invention, big punching block is risen to eventually upper position (2~6 meters of hoisting depths) required time 5~15 minutes with initial position at every turn, (comprised correction, reinforcing, welding bottom pull bar in about 30~60 minutes by big punching block of the every installation of two people, benefit is filled out joint filling board), carry out template construction than common artificial employing fritter template splicing method and improve 5~10 times of work efficiency (promoting more than 5 times in whole active length). Big punching block raising work efficiency is about more than 2 times than standing, tear open with crane, (promoting more than 5 times in whole active length). And on the whole active length on same large-scale vertical, the form removal working face, it is more many to promote number of times, and hoisting depth is more high, and the area that at every turn promotes punching block is more big, and work efficiency is just more high, and benefit is just more big.

Claims (4)

1, water is built in the large formwork construction of the contour large-scale concrete engineering of engineering dam, the peace of its large form, tears open and adopts elevating mechanism upwards to promote by self-contained good large form in special-purpose factory.Back in place weldering is with the steel bar rod anchoring.It is characterized in that in construction, simple and easy hoisting frame (9) is set replaces elevating mechanism.Large form employing scene is spliced into and hoisting frame relative bottom hook template.After the template lifting is in place, passes the template place and use the sleeve bolt cylinder lever connecting rod its anchoring.
2, hoisting frame according to claim 1 is characterized in that its upper and lower two cantilevers (6), (7) are provided with a grade mould cross bar (4), (5).In the construction, the upper and lower cantilever (6) of hoisting frame (9), (7) are clipped between the two big punching blocks, make punching block slide between shelves mould cross bar (4) (5).The lifting of punching block promotes with the hand cucurbit (8) that hangs on the upper cantilever (6), and the chain hook of hand cucurbit tangles the bottom of punching block.
3, big punching block according to claim 1 is characterized in that there are two sliding formwork steel pipes (17) at the back side of punching block.
4, big punching block according to claim 1, the bottom that it is characterized in that punching block encloses the purlin crack does not have the template face to cover, so that when punching block is in place, the fastening sleeve bolt in upright position can be aimed at the sleeve bolt hole (28) on the former LIFT easily, and each layer of template pull bar adopts sleeve bolt (24) fastening passing the template place.
CN 88105897 1988-04-29 1988-04-29 Whole installed or removed steel shutter Pending CN1037184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 88105897 CN1037184A (en) 1988-04-29 1988-04-29 Whole installed or removed steel shutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 88105897 CN1037184A (en) 1988-04-29 1988-04-29 Whole installed or removed steel shutter

Publications (1)

Publication Number Publication Date
CN1037184A true CN1037184A (en) 1989-11-15

Family

ID=4834019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 88105897 Pending CN1037184A (en) 1988-04-29 1988-04-29 Whole installed or removed steel shutter

Country Status (1)

Country Link
CN (1) CN1037184A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677890A (en) * 2012-04-23 2012-09-19 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
US8673189B2 (en) 2008-03-25 2014-03-18 Peri Gmbh Method for implementing a rail-guided self-climbing formwork system with climbing rail extension pieces
CN107513984A (en) * 2017-09-15 2017-12-26 中国水利水电第十三工程局有限公司 Gravity dam panel is poured with without support punching block mounting structure and installation method
CN111295490A (en) * 2017-10-02 2020-06-16 Tgr建设公司 Concrete forming system
CN112709194A (en) * 2020-12-28 2021-04-27 云南建投第二水利水电建设有限公司 Hydraulic sliding formwork construction complete equipment for gate pier and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8673189B2 (en) 2008-03-25 2014-03-18 Peri Gmbh Method for implementing a rail-guided self-climbing formwork system with climbing rail extension pieces
CN102677890A (en) * 2012-04-23 2012-09-19 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
CN102677890B (en) * 2012-04-23 2014-05-21 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
CN107513984A (en) * 2017-09-15 2017-12-26 中国水利水电第十三工程局有限公司 Gravity dam panel is poured with without support punching block mounting structure and installation method
CN107513984B (en) * 2017-09-15 2023-09-29 中国电建市政建设集团有限公司 Mounting structure and mounting method of unsupported steel die for gravity dam panel pouring
CN111295490A (en) * 2017-10-02 2020-06-16 Tgr建设公司 Concrete forming system
CN111295490B (en) * 2017-10-02 2021-11-02 Tgr建设公司 Concrete forming system
CN112709194A (en) * 2020-12-28 2021-04-27 云南建投第二水利水电建设有限公司 Hydraulic sliding formwork construction complete equipment for gate pier and construction method

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN104631333B (en) Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN106351242A (en) Deepwater high-flow-rate exposed high-strength steep rock sea area steel trestle and construction method thereof
CN109706939B (en) Deep foundation pit prestress combined steel support and construction method
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN107059920B (en) Loess formation piping lane construction technology
CN104746435A (en) Wide-angle Y-shaped pier column construction method
CN110331668A (en) A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method
CN106522101B (en) A kind of construction method of cable-stayed bridge overlength cordless beam section
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN104563119A (en) Rotating type floating pile driving guide frame
CN1718938A (en) Concrete core cement soil stirring pile machine and its construction technological method
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN207160585U (en) Superelevation outer wall of basement Bailey bracket single side formwork architecture
CN208309593U (en) A kind of steel pipe structure with oblique member
CN113106833A (en) Special-shaped pedestrian landscape bridge structure and construction method thereof
CN1037184A (en) Whole installed or removed steel shutter
CN112627484A (en) Two-point type triangular hanging rack platform and construction method
CN204510221U (en) Rotary marine piling saddle
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN111622126B (en) Construction method of high-altitude vertical manned channel in high mountain rock area
CN110029653A (en) A kind of jackstone seabed foundations steel pipe pile foundation processing method
CN211735477U (en) A tower crane foundation structure for bridge tower construction
CN112412154B (en) Ultra-high voltage transmission line construction process with floating type overwater platform as operation surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
AD01 Patent right deemed abandoned
C20 Patent right or utility model deemed to be abandoned or is abandoned