CN103716891B - The method and system that PUCCH resource position is distributed in LTE A systems - Google Patents

The method and system that PUCCH resource position is distributed in LTE A systems Download PDF

Info

Publication number
CN103716891B
CN103716891B CN201310752947.3A CN201310752947A CN103716891B CN 103716891 B CN103716891 B CN 103716891B CN 201310752947 A CN201310752947 A CN 201310752947A CN 103716891 B CN103716891 B CN 103716891B
Authority
CN
China
Prior art keywords
pucch resource
resource position
pucch
currently processed
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310752947.3A
Other languages
Chinese (zh)
Other versions
CN103716891A (en
Inventor
李静
周陈芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201310752947.3A priority Critical patent/CN103716891B/en
Publication of CN103716891A publication Critical patent/CN103716891A/en
Application granted granted Critical
Publication of CN103716891B publication Critical patent/CN103716891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides the method and system that PUCCH resource position in a kind of LTE A systems is distributed, the LTE A systems include main plot and secondary cell, and methods described includes:User equipment (UE) is handled successively from the Subscriber Queue for waiting descending scheduling;If currently processed UE is carrier aggregation user and has downlink business in the secondary cell, available resource location is searched in the PUCCH resource position of high level configuration;The available resource location is used for currently processed UE allocation of downlink resources.Invention increases the flexibility of PUCCH resource position distribution, so as to make full use of Physical Uplink Control Channel PUCCH resource, increase up handling capacity, and the channel that can flexibly select PUCCH1B CS to use.

Description

The method and system that PUCCH resource position is distributed in lte-a system
Technical field
The present invention relates to communication technical field, the side that PUCCH resource position is distributed in more particularly to a kind of lte-a system Method, and, the system that PUCCH resource position is distributed in a kind of lte-a system.
Background technology
In LTE(Long Term Evolution, long evolving system)In system, LTE-A(LTE-Advanced is advanced Long evolving system)It is LTE evolution version, in order to meet the descending peak speed 1Gbps of LTE-A, up peak speed 500Mbps's will Ask, it is desirable to provide maximum 100MHz transmission bandwidth, but due to so big bandwidth continuous frequency spectrum it is rare, LTE-A is proposed Carrier aggregation(Carrier Aggregation, CA)Solution.So-called carrier aggregation, is by the carrier wave list of 2 or more Member(Component Carrier, CC)Condense together and be 100MHz transmission bandwidth to the maximum with support.
PUCCH(Physical Uplink Control CHannel, physical uplink control channel)Main carrying SR (Schedule Request, dispatch request), ACK/NACK(Acknowledgement, positive acknowledgment/Negative Acknowledgement, NACK)And CQI/PMI(Channel Quality Indicator, down channel quality refers to Show/Precoding Matrix Indicator, pre-coding matrix instruction), RI(Rank Indicator, stratum indicates), it is right Should be in PUCCH Format1, Format1A/1B and Format2/2A/2B form.
Format1:For UE(User Equipment, user equipment)Up transmission dispatch request, base station side only needs inspection Survey with the presence or absence of such transmission;
Format1A/1B:For the up transmission ACK/NACK of UE;
Format1 is in system L3(Layer 3)Transmitted over resources of the signal deployment to SR;Format1A/1B with descending PDCCH (Physical Downlink Control CHannel, physical downlink control channel)CCE(Control Channel Element, control channel unit)Corresponding PUCCHACK/NACK transmitted over resources;When SR and uplink ACK/NACK need together When transmitting, in transmitted over resources uplink ACK/NACK of the L3 signal deployments to SR.The money that uplink ACK takes is transmitted on PUCCH Source is by RB(Resource Block, resource block)ID, frequency domain CDM code(Frequency domain code)And time domain CDM code(When field code)It is determined that.
Format2:ACK/NACK information for sending 20 bits after up CQI feedback coding, data pass through UE- specific search space(The specific search space of user equipment)Scrambling after, carry out QPSK(Quadrature Phase Shift Keying, QPSK)Modulation;
Format2A:ACK/NACK information for sending 20 bits plus 1 bit after up CQI feedback coding, is carried out BPSK(Binary Phase Shift Keying, binary phase shift keying)Modulation;
Format2B:ACK/NACK information for sending 20 bits plus 2 bits after up CQI feedback coding, is used QPSK is modulated;
PUCCH resource maps:PUCCH is located at the both sides of system bandwidth, and two time slots of a subframe take frequency-hopping mode Obtain frequency diversity gain.
LTE-A agreements are because newly-increased carrier aggregation function introduces PUCCH1B CS forms(PUCCH Format1B with Channel Selection), for transmitting to descending ACK/NACK feedbacks.It can be fed back by using form UE The downlink reception result of different carrier waves.
PUCCH1B CS are that the PUCCH1B forms based on LTE R8/9 agreements are derived, although or only carry 2BIT feedback information, but base station passes through the content for detecting PUCCH1BCS resource location and carrying, root in each subframe According to the mapping form provided in agreement, that is, it can confirm that downlink reception results of the UE in each carrier wave.PUCCH1B CS forms are most Support lower 2 code words of 2 carrier waves in the reception condition of multiple descending sub frames, during terminal feedback reception result, workable resource Position has two kinds:A kind of is the CCE indexes used by PDCCH, and the formula provided using agreement, which is calculated, to be obtained;Another is logical High-rise signal deployment is crossed to obtain.The resource location in two kinds of sources, UE selects corresponding resource-niche according to reception condition according to agreement Put and fed back.Present problems faced is that high-level signaling is that UE at most can configure four PUCCH1B CS resource locations, base station Flexibly in four resource locations one of them can be specified to be used to UE by the field carried in PDCCH, this four resource-niches Put how the ununified standard of distributorship agreement.
In the prior art, it is PUCCH1B in order to ensure that the PUCCH1B CS resource locations used between different UE will not conflict CS individually divides one section of fixed resource and used, and the other PUCCH formats of this section of resource can not be used.This PUCCH1B CS resources The method of salary distribution wastes very much Physical Uplink Control Channel PUCCH resource, there is direct influence on up handling capacity, and The channel that PUCCH1B CS are used can not flexibly be selected by PDCCH field.
Therefore, a technical problem for needing those skilled in the art urgently to solve at present is exactly:A kind of LTE-A systems are provided The mechanism that PUCCH resource position is distributed in system, the resource to make full use of Physical Uplink Control Channel PUCCH increases up Handling capacity, and can flexibly select PUCCH1B CS use channel.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of method that PUCCH resource position is distributed in lte-a system, Accordingly, present invention also offers the system that PUCCH resource position in a kind of lte-a system is distributed.
In order to solve the above problems, the invention discloses physical uplink control channel PUCCH in a kind of lte-a system The method of resource location distribution, the lte-a system includes main plot and secondary cell, and methods described includes:
User equipment (UE) is handled successively from the Subscriber Queue for waiting descending scheduling;
If currently processed UE is carrier aggregation user and has downlink business in the secondary cell, in high level configuration Available resource location is searched in PUCCH resource position;
The available resource location is used for currently processed UE allocation of downlink resources.
Preferably, it is described high level configuration PUCCH resource position in search available resource location the step of include:
When the transmission mode of the currently processed UE supports 1 transmission block, in 4 PUCCH of the high-rise configuration In resource location, 1 PUCCH resource position is searched;
Judge whether 1 PUCCH resource position is taken by other UE;
If it is not, then judging 1 PUCCH resource position as available resource location;
Or, when the transmission mode of the currently processed UE supports 2 transmission blocks, in 4 couple of the high-rise configuration In PUCCH resource position, 1 pair of PUCCH resource position is searched;
Judge whether 1 pair of PUCCH resource position is taken by other UE;
If it is not, then judging 1 pair of PUCCH resource position as available resource location.
Preferably, methods described also includes:
It is not the current place if 1 PUCCH resource position or 1 pair of PUCCH resource position are taken by other UE The UE allocation of downlink resources of reason.
Preferably, methods described also includes:
If currently processed UE is not carrier aggregation user, or, currently processed UE is for carrier aggregation user and in institute Stating secondary cell does not have downlink business, then calculates when the secondary PUCCH resource position needed to use;
If described when the secondary PUCCH resource position needed to use is not taken by other UE, the currently processed UE is adopted Descending scheduling is carried out with the PUCCH resource position.
Preferably, methods described also includes:
It is not the currently processed UE if described when the secondary PUCCH resource position needed to use is taken by other UE Allocation of downlink resource.
Preferably, it is described to use the step of available resource location is currently processed UE allocation of downlink resource to wrap Include:
Sending physical downlink control channel PDCCH, the PDCCH to the currently processed UE includes use The available resource location that TPC is indicated.
Preferably, methods described also includes:
When the UE in the Subscriber Queue is disposed, or, when the downlink resource is assigned, terminate distribution described PUCCH resource position.
Preferably, the PUCCH for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of the high-rise configuration Resource interval range and the PUCCH resource interval range coincidence calculated by control channel unit CCE, what the high level was configured is used for Hybrid automatic repeat-request-positive acknowledgment HARQ-ACK the original position of PUCCH resource interval range is fed back by dispatch request SR resources, down channel quality indicate that CQI resources, semi-continuous scheduling SPS configuration resources are determined.
Distributed the invention also discloses physical uplink control channel PUCCH resource position in a kind of lte-a system System, the lte-a system includes main plot and secondary cell, and the system includes:
UE processing modules, for handling user equipment (UE) successively from the Subscriber Queue for waiting descending scheduling;
Available resources location lookup module, for being carrier aggregation user in currently processed UE and having in the secondary cell During downlink business, then available resource location is searched in the PUCCH resource position of high level configuration;
First descending scheduling performing module, under being carried out for the currently processed UE using the available resource location Row scheduling.
Preferably, the available resources location lookup module includes:
First searches submodule, for when the transmission mode of the currently processed UE supports 1 transmission block, described In 4 PUCCH resource positions of high level configuration, 1 PUCCH resource position is searched;
First takes judging submodule, for judging whether 1 PUCCH resource position is taken by other UE;
First decision sub-module, during for not taken in 1 PUCCH resource position by other UE, judges described 1 PUCCH resource position is available resource location;
Second searches submodule, for when the transmission mode of the currently processed UE supports 2 transmission blocks, described In 4 pairs of PUCCH resource positions of high level configuration, 1 pair of PUCCH resource position is searched;
Second takes judging submodule, for judging whether 1 pair of PUCCH resource position is taken by other UE;
Second decision sub-module, during for not taken in 1 pair of PUCCH resource position by other UE, judges described 1 pair PUCCH resource position is available resource location.
Preferably, the available resources location lookup module can also include following submodule:
First downlink resource forbids distribution sub module, in 1 PUCCH resource position or 1 pair of PUCCH resource position Put and taken by other UE, be not then the currently processed UE allocation of downlink resources.
Preferably, the system also includes:
Resource location computing module, for currently processed UE be carrier aggregation user, or, currently processed UE There is no downlink business for carrier aggregation user and in the secondary cell, then calculate when the secondary PUCCH resource position needed to use;
Second descending scheduling performing module, for working as the secondary PUCCH resource position needed to use not by other UE described During occupancy, then the currently processed UE carries out descending scheduling using the PUCCH resource position.
Preferably, the system can also include with lower module:
Second downlink resource forbids distribute module, for working as the secondary PUCCH resource position needed to use by other described It is not the currently processed UE allocation of downlink resources when UE takes.
Preferably, the first descending scheduling performing module can also include following submodule:
Resource location indicates submodule, for sending physical downlink control channel to the currently processed UE PDCCH, the PDCCH include the available resource location indicated using TPC.
Preferably, the system can also include with lower module:
Terminate distribute module, be disposed for the UE in the Subscriber Queue, or, the downlink resource is distributed Bi Shi, terminates the distribution PUCCH resource position.
Preferably, the PUCCH for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of the high-rise configuration Resource interval range and the PUCCH resource interval range coincidence calculated by control channel unit CCE, what the high level was configured is used for Hybrid automatic repeat-request-positive acknowledgment HARQ-ACK the original position of PUCCH resource interval range is fed back by dispatch request SR resources, down channel quality indicate that CQI resources, semi-continuous scheduling SPS configuration resources are determined.
Compared with prior art, the present invention includes advantages below:
The present invention is by being carrier aggregation user and when having downlink business in the secondary cell in currently processed UE, in height Available resource location is searched in the PUCCH resource position of layer configuration, descending scheduling is carried out using the available resource location, High level configuration is reduced to secondary cell configuration resource allocation PRB, thus reduces the PUCCH resource position that high-rise configuration takes, and looks into Available resource location is looked for, the flexibility of PUCCH resource position distribution is added, so as to make full use of physical uplink control Channel PUCCH resource, increases up handling capacity, and the channel that can flexibly select PUCCH1B CS to use.
The present invention is tied by the PUCCH resource position calculated when the secondary PUCCH resource position needed to use and high-rise configuration The mode of conjunction, just distributes PUCCH resource position when UE is obtained and dispatched, the waste of PUCCH resource position is reduced, with less PUCCH resource position keeps for more carrier aggregation users to access, also, the work(of the field flexible dispatching using downlink resource Can, the channel that can flexibly select PUCCH1B CS to use, so as to effectively reduce the occupancy of PUCCH resource position, Jin Erchong Divide the resource using Physical Uplink Control Channel PUCCH, increase up handling capacity.
Brief description of the drawings
Fig. 1 is shown plans schematic diagram according to a kind of PUCCH resource position of prior art;
Fig. 2 shows the method that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention The step flow chart of embodiment 1;
Fig. 3 shows a kind of PUCCH resource position planning schematic diagram according to an embodiment of the invention;
Fig. 4 shows the method that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention The step flow chart of embodiment 2;
Fig. 5 shows the system that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention The structured flowchart of embodiment.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is further detailed explanation.
For LTE-A, agreement 36.213R10 gives PUCCH1B CS application scenarios, is summarized as follows:
When UE is configured to 2 cells of carrier aggregation, ACK/NACK can be carried out to downlink business using PUCCH1B CS Feedback, feedback takes PUCCH resourceIn FDD(Frequency Division Duplexing, FDD)With TDD(Time Division Duplexing, time division duplex)Under pattern, UE is calculated, selectionMode, protocol processes Flow is different, will illustrate respectively below:
Under FDD, protocol conventions PUCCH1B CS handling process:
UE selects a PUCCH resource position in A PUCCH resource positionFed back, wherein 0≤j≤ A-1。
Subframe n-4 in main plot receives PDCCH, the PUCCH resource position used Wherein, nCCEThe first CCE numberings taken for this PDCCH,By high level configuration;When UE TM patterns(Transmission Mode, transmission mode)Support 2 TB(Transmit Block, transmission block)When,
Subframe n-4 in main plot receives the PDSCH that no PDCCH is indicated(Physical Downlink Shared Channel, physical down link sharing channel),By high level configuration, when UE TM patterns support 2 TB,
PDCCH is received in the subframe n-4 of secondary cell, indicates that UE is used by 4 of high level configuration with the field in PDCCH One or a pair in PUCCH resource, when UE TM patterns support 2 TB, field is indicated using a pair of PUCCH resources:Otherwise using a PUCCH resource
Under TDD, the calculating of PUCCH resource position, selection mode are different and different because downstream feedback set M sizes, and M is Set K element number, what set K was represented is the descending sub frame set fed back in same sub-frame of uplink under TDD.
Under TDD, M=1 or when 2, protocol conventions PUCCH1B CS handling process:
As M=1 or M=2, if in main plot subframe n-kmReceive PDCCH, wherein km∈ K, K are directed to main plot, kmIt is UE detected in set K in a value minimum in PDCCH subframe, i.e. feedback set K from feedback sub-frame of uplink point most The near descending sub frame once dispatched.Define nCCE,mThe first CCE numberings taken for this PDCCH.Now, PUCCH resourceWherein, c ∈ { 0,1,2,3 }, and need to meet bar Part For the number of PRB on downlink bandwidth Amount,Frequency amount is uploaded for a PRB frequency domain.And when M=1 and UE TM patterns support 2 TB, PUCCH resource
If subframe n-k receives the PDSCH that no PDCCH is indicated in main plot,By high level configuration.
If receiving PDCCH, wherein k ∈ K in secondary cell subframe n-k, set K is directed to secondary cell, referred to the field in PDCCH Show that, when M=1 and UE TM patterns support 2 TB, field is indicated using by one in 4 PUCCH resources of high level configuration Use a pair of PUCCH resourcesOtherwise using a PUCCH resource
Under TDD, M>When 2, protocol conventions PUCCH1B CS handling process:
Work as M>When 2, there are 4 PUCCH resource positions:0≤i≤3.Wherein,WithWith main plot PDSCH transmission or PDCCH release(PDCCH discharges)It is related;WithWith the PDSCH transmission phase of secondary cell Close.
For main plot, if receiving the PDSCH that no PDCCH is indicated in subframe n-k,By high level configuration, for subframe n- kmReceive PDSCH transmission or PDCCH release, wherein km∈ K, and the DAI in PDCCH(Downlink Assignment Index, Downlink distribution index)It is worth for 1, PUCCH resource position Otherwise, for subframe n-kmReceive PDSCH transmission or PDCCH release, wherein km∈ K, and DAI values in PDCCH are 1 Or 2, PUCCH resourceIt is 1 that i=0, which corresponds to DAI values, PDCCH, i=1 correspond to DAI values for 2 PDCCH.
For secondary cell, if in subframe n-kmReceive by the cross-carrier scheduling PDSCH, wherein k of the PDCCH instructions of main plotm∈ K, And the DAI values in PDCCH are 1 or 2, then PUCCH resource position I=2 correspond to the PDCCH that DAI values are 1, and i=3 correspond to the PDCCH that DAI values are 2.If being received in subframe n-k by secondary cell Non- cross-carrier scheduling PDSCH, wherein k ∈ K that PDCCH is indicated, then PUCCH resource positionWithPass through PDCCH In field indicate that field indicates correspondence a pair of PUCCH money using by one in 4 PUCCH resource positions of high level configuration Source:
Under summary FDD and TDD, a total of following 8 kinds of PUCCH resource position calculation formula.With bandwidth 100PRB, DSUUD sub-frame formats(D is descending sub frame, and S is special subframe, and U is sub-frame of uplink)Exemplified by, calculate PUCCH resource span As shown in table 1, wherein,The PUCCH resource position fed back for subframe n,Son during for 2 RB of transmission Another PUCCH resource position, n that frame n is fed backCCEWith nCCE,mThe first CCE numberings taken for this PDCCH resource position,By high level configuration, For the quantity of PRB on downlink bandwidth,Frequency amount is uploaded for a PRB frequency domain, in this instance, (M-m-1) × Nc+m×Nc+1+nCCE, mSpan be 0- 317。
Table 1
Therefore, the major parameter of PUCCH resource position value during influence 2 cells of carrier aggregation is:
Configured by high level by the n1PUCCH-AN in PUCCH configuration parameters, span is 0~2047.
nCCEWith nCCE,m, it is the first CCE numberings that corresponding PDCCH resource position takes, span is 0~87.
SPS is passed through by high level(Semi Persist Schedule, semi-continuous scheduling)In configuration parameter N1PUCCH-AN-PersistentList is configured, and span is 0~2047, and 4 values are can configure to a UE.
OrN1PUCCH-AN-CS- in PUCCH configuration parameters is passed through by high level R10 is configured, and span is 0~2047,4 pairs of parameters is can configure to a UE, each pair is containing 2 values.
Wherein, nCCEWith nCCE,mThe first CCE numberings taken for corresponding PDCCH, this parameter values by agreement except being limited Outside the span of system, it is impossible to limited, system call otherwise will be influenceed.Therefore, as seen from Table 1, PUCCH resource value Parameter of the scope dependent on high-rise configuration:n1PUCCH-AN、N1PUCCH-AN-PersistentList、N1PUCCH-AN-CS- r10.And PUCCH resource position is except for HARQ-ACK(Hybrid Automatic Repeat Request- Acknowledgement, hybrid automatic repeat-request-positive acknowledgment)Feedback is outer, in addition it is also necessary to which distributing to UE is used for SR and CQI Report, SR takes PUCCH resource position and configured by the sr-PUCCH-ResourceIndex in high-rise configuration parameter, and span is 0~2047;CQI takes PUCCH resource position and configured by the cqi-PUCCH-ResourceIndex in high-rise configuration parameter, takes It is 0~1185 to be worth scope.
Therefore, it is high-rise that PUCCH resource is planned before configuration resource, as shown in figure 1, in order to prevent required resource Between collide, all kinds of demands are divided successively between 0~2047, the SR resources of configuration, CQI resources, SPS configuration moneys It is separate between source, the secondary cell configuration class resource of resource 4, it is not covered with region.It is high-rise by the maximum in 4 class resources of configuration PUCCH resource value is asserted configuration parameter n1PUCCH-AN, i.e.,Understand that the maximum of PUCCH resource is with reference to table 1Span is 0~2047, i.e., high-rise configurationValue establishes all PUCCH resources The maximum occurrences of position, as long as so reducing as far as possibleValue size can reduce resource shared by PUCCH, you can have Effect expands PUSCH available resources scope, so as to improve uplink throughput.
High level configurationValue the maximum occurrences of PUCCH resource are determined, its span is 0~2047, PUCCH resource presses Format1, Format1A/1B and Format2/2A/2B forms are divided into PUCCH(1)The resource of type and PUCCH(2)The resource of type, the bandwidth of 20M down channel is equal to 100 PRB(Physical Resource Block, thing Manage resource block), whenValue 2047,36 PUCCH can be at most carried according to each PRB of protocol configuration(1)Type During resource, onlyPRB numbers can be taken and just reach 2047/36 ≈ 57.Therefore, PUCCH resource is taken less in order to try one's best Position, it is necessary to makeValue it is as far as possible small, two kinds of technical schemes commonly used in the art are as follows:
Scheme one:High level is the unique available PUCCH of each UE configurations(1)Resource;
For the N1PUCCH-AN-PersistentList configurations in SPS configuration parameters, to a UE, configurable 4 take Value.High level only configures 1 value to a UE, to reduce occupancy.
For N1PUCCH-AN-CS-r10 configurations, 4 pairs of parameters are can configure to a UE, each pair is containing 2 values.It is high-rise right One UE only configures 1 pair of value, to reduce occupancy.
Scheme two:High level is every 4 UE configuration identicals 4/to PUCCH(1)Resource;
For the N1PUCCH-AN-PersistentList configurations in SPS configuration parameters, 4 configurable to 4 UE identical Value.4 PUCCH are shared between i.e. 4 UE(1)Resource, one and its are selected by PDCCH field in 4 positions Resource location that its 3 UE does not conflict is used, and this method is also effectively reduced occupancy.
For N1PUCCH-AN-CS-r10 configurations, 4 UE can configure with 4 pairs of parameters, each pair is containing 2 values.I.e. high level is matched somebody with somebody Put shared 4 couples of PUCCH between 4 UE(1)Resource, is also that a pair and other 3 are selected in 4 pairs of positions by PDCCH field The resource that individual UE does not conflict is to use to reduce occupancy.
By above two scheme, in scheme one or scheme twoBy SR resources, CQI resources, SPS configurations Resource, secondary cell configuration resource 4 class resource are determined, are all reduced to a certain extentConfiguration Values, but with being What system was planned supports number of users to increase, and reserved number of resources increases therewith,Value is also increased.Such as planning system System can support 400 survival users, be each 3 different resource values of user configuring according to scheme one(Containing N1PUCCH-AN- PersistentList is configured to be configured with N1PUCCH-AN-CS-r10), then 3 × 400=1200 resource locations are needed.According to side Case two, every 4 users need 3 × 4=12 different resource values of configuration(Containing N1PUCCH-AN-PersistentList configuration with N1PUCCH-AN-CS-r10 is configured), then 12 × (400/4)=1200 resource location is needed.It can be seen that the two schemes point As the result matched somebody with somebody is with effect.
Therefore, there is the defect of three aspects in above two scheme.First, two schemes are all equivalent to and uniquely configured for UE One available SPS configurations and N1PUCCH-AN-CS-r10 configurations, accordingly even when the UE this there is no scheduling, this PUCCH resource position, which remains on to reserve, to be come, and causes unnecessary waste;Second, high-rise configurationValue it is larger, can Up more PRB can be taken to feed back, cause up PUSCH resource locations to reduce and influence system uplink handling capacity;Its Three, scheme one does not utilize the function of PDCCH field flexible dispatchings, though scheme two make use of the work(of PDCCH field flexible dispatchings Can, but actual effect is not introduced into obvious benefit as scheme one, also.
Reference picture 1, shows and plans schematic diagram according to a kind of PUCCH resource position of prior art, as shown in figure 1, will Upstream bandwidth is divided into sequence number according to PRB unitsPRB quantity on expression upstream bandwidth, SR resources, CQI resources, SPS configurations resource, secondary cell configuration resource determine the PUCCH resource position of high-rise configuration, in tdd mode subframe When structure is DSUUD, 36 PUCCH can at most be carried by configuring each PRB(1)The resource location of type, is SR resources, SPS Configure resource, secondary cell configuration resource respectively 2 PRB of distribution, thenThat is PUCCH(1)Type Resource location at most need to take 216+318=534 index, need 534 ÷, 36 ≈ 15 PRB to deposit PUCCH(1), and only 2 × 36=72 carrier aggregation user accesses can be carried.
Exactly inventor herein has found the seriousness of this problem, creatively proposes the core structure of the embodiment of the present invention One of think of is, proposes the method and system that PUCCH resource position is distributed in a kind of lte-a system, can distribute 4 pairs of indexes Shared to 8 UE, the distribution of downlink resource is realized using judging whether PUCCH resource position conflicts, therefore by high level configuration 'sBecome to be determined by SR resources, CQI resources, the SPS configurations class resource of resource 3, directly reduceMaximum take Value, also just reduces the occupancy of PUCCH resource position, and then reduces the occupancy to PUSCH resource locations, so as to carry More carrier aggregation user accesses, make full use of Physical Uplink Control Channel PUCCH resource, flexibly selection PUCCH1B CS The channel of use, increases up handling capacity.
Reference picture 2, shows that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention Embodiment of the method 1 step flow chart, the lte-a system includes main plot and secondary cell, can specifically include following Step:
Step 101, user equipment (UE) is handled successively from the Subscriber Queue for waiting descending scheduling;
In actual applications, user equipment (UE) sends descending scheduling request into Subscriber Queue, is arranged according to certain order Descending scheduling is waited, user equipment (UE) is handled successively from Subscriber Queue.
Step 102, if currently processed UE is carrier aggregation user and has downlink business in the secondary cell, in high level Available resource location is searched in the PUCCH resource position of configuration;
User of the carrier aggregation user for the two or more carrier units of polymerization to be transmitted.In lte-a system, UE enters Entering can be simultaneously by multiple carrier units after connected state(CC1, CC2)Communicated with source base station, base station can pass through display Configuration is that UE specifies a principal component carrier wave according to protocol conventions(Primary Component Carrier, PCC), its His carrier units are referred to as auxiliary component carrier(Secondary Component Carrier, SCC), in principal component carrier wave Serving cell is referred to as main plot(Primary Cell, Pcell), the serving cell in auxiliary component carrier is referred to as secondary cell (Secondary Cell, Scell).High level refers to LTE RRC protocol layers, and RRC protocol layers are disappeared by signaling as defined in agreement Breath, by PUCCH resource position by signal deployment to UE, while being allocated to base station, base station and UE use same PUCCH resource It can be communicated during position.In the specific implementation, the PUCCH resource position of the high-rise configuration is being used for for high-rise configuration Hybrid automatic repeat-request-positive acknowledgment HARQ-ACK PUCCH resource interval range is fed back, being used for for the high-rise configuration is anti- Present hybrid automatic repeat-request-positive acknowledgment HARQ-ACK PUCCH resource interval range can with by control channel unit CCE The PUCCH resource interval range of calculating is overlapped, that is, passes through the PUCCH resource position that will be calculated by CCE and the PUCCH of high-rise configuration Resource location overlaps reserved mode, and the PUCCH resource position calculated by CCE is distributed into terminal by high level and used Taken during PUCCH1BCS.It is further preferred that the high-rise configuration be used for feed back hybrid automatic repeat-request-positive acknowledgment The original position of HARQ-ACK PUCCH resource interval range can indicate CQI by dispatch request SR resources, down channel quality Resource, semi-continuous scheduling SPS configuration resources are determined.
When UE is carrier aggregation user and when having downlink business in the secondary cell, distributes to 8 UE due to 4 pairs of indexes and be total to With, then need high level configuration PUCCH resource position in search available resource location.
In actual applications, LTE downlink transfer pattern mainly includes following several:
1st, TM1, single antenna port transmission:It is mainly used in the occasion of single antenna transmissions;
2nd, TM2, sends diversity mode:It is suitable for that cell edge channel situation is more complicated, disturbs larger situation, sometimes The situation for being also used for high speed is waited, diversity can provide diversity gain;
3rd, TM3, big delay diversity:It is appropriate to the situation of UE high-speed mobiles;
4th, TM4, Closed-Loop Spatial Multiplexing:It is suitable for the preferable occasion of channel condition, the high data rate transmission for providing;
5th, TM5, multi-user's multiple-input and multiple-output(MU-MIMO)Transmission mode:It is mainly used to improve the capacity of cell.
6th, TM6, single current(Rank1)Transmission:It is primarily suitable for the situation of cell edge.
7th, TM7, Port5(Logic port 5)Single current Wave beam forming(Beamforming)Pattern:Main is also cell side Edge, can effectively antagonize interference.
8th, TM8, double-current Wave beam forming(Beamforming)Pattern:Can be used for cell edge can also be applied to other Scene.
9th, TM9, transmission mode 9 is a kind of transmission mode newly increased in LTE-A, can support to be up to 8 layers of transmission, Mainly for lifting message transmission rate.
10th, TM10, transmission mode 10 is also a kind of transmission mode newly increased in LTE-A, primarily to for supporting Multi-cell cooperative communication technology, improves the communication quality of Cell Edge User, the handling capacity of lifting system.
In current LTE transmission pattern, conventional TM2 and TM7 are used using the data for once sending single current, TM3 and TM8 The data of double fluid are once sent, the data of single current are exactly 1 TB, and double-current data are exactly 2 TB, are carried out to downlink business When ACK/NACK feeds back, to be fed back respectively for each TB, 1 TB of feedback needs 1 PUCCH resource position, so working as , it is necessary to 2 PUCCH resource positions during UE transmission mode support 2TB.
1 TB is supported according to UE transmission mode, high level is configured with 4 PUCCH resource positions, Cong Zhongcha accordingly for UE 1 PUCCH resource position is looked for, judges whether this 1 PUCCH resource position is taken by other UE, when not taken by other UE, Then this 1 PUCCH resource position is available resource location.
2 TB are supported according to UE transmission mode, high level is configured with 4 pairs of PUCCH resource positions, Cong Zhongcha accordingly for UE 1 pair of PUCCH resource position is looked for, judges whether this 1 pair of PUCCH resource position is taken by other UE, when not taken by other UE, Then this 1 pair of PUCCH resource position is available resource location.
According to such case, in a kind of preferred exemplary that the present invention is embodied, the step 102 can specifically include Following sub-step:
Sub-step S11, when the transmission mode of the currently processed UE supports 1 transmission block, in the high-rise configuration 4 PUCCH resource positions in, search 1 PUCCH resource position;
Sub-step S12, judges whether 1 PUCCH resource position is taken by other UE;
Sub-step S13, if it is not, then judging 1 PUCCH resource position as available resource location.
In another preferred exemplary that the present invention is embodied, the step 102 can specifically include following sub-step:
Sub-step S21, when the transmission mode of the currently processed UE supports 2 transmission blocks, in the high-rise configuration 4 pairs of PUCCH resource positions in, search 1 pair of PUCCH resource position;
Sub-step S22, judges whether 1 pair of PUCCH resource position is taken by other UE;
Sub-step S23, if it is not, then judging 1 pair of PUCCH resource position as available resource location.
Certainly, the decision method of above-mentioned available resource location is intended only as example, can when implementing the embodiment of the present invention To set the decision method of other available resource locations according to actual conditions, the embodiment of the present invention is not any limitation as to this.Separately Outside, in addition to the decision method of above-mentioned available resource location, those skilled in the art can also use it according to actual needs The decision method of its available resource location, the embodiment of the present invention is not also any limitation as to this.
Step 103, the available resource location is used for currently processed UE allocation of downlink resources.
In the specific implementation, UE is to determine uplink feedback using the available resource location progress descending scheduling Behind PUCCH resource position, then obtain downlink resource.
In a kind of preferred exemplary of the present invention, the step 103 can also include following sub-step:
Sub-step S31, sends in physical downlink control channel PDCCH, the PDCCH to the currently processed UE Including the available resource location indicated using TPC.
A kind of example implemented as the embodiment of the present invention, finds if PUCCH resource position is allocated successfully Available resource location, then 1 PUCCH resource position that the UE is indicated using the TPC fields of downlink resource, or 1 couple of PUCCH Resource location carries out descending scheduling.
Reference picture 3, shows a kind of PUCCH resource position planning schematic diagram according to an embodiment of the invention, such as Fig. 3 It is shown, by upstream bandwidth according to PRB units be divided into sequence number RB0-NRUBL-1, SR resource, CQI resources, SPS configure resource it is true The PUCCH resource position of fixed high-rise configuration, when subframe structure is DSUUD in tdd mode, configuring each PRB can at most hold Carry 36 PUCCH(1)The resource location of type, only SR resources, SPS configuration resources respectively distribute 2 PRB, then, i.e. PUCCH (1)The resource location of type at most needs to take 144+318=462 index, then needs 462 ÷, 36 ≈, 13 PRB to deposit PUCCH(1)The resource location of type, and 318*2=636 carrier aggregation user access can be carried.
Certainly, the computational methods of above-mentioned index number, PRB numbers and carrier aggregation user access number are intended only as showing Example, when implementing the embodiment of the present invention, can set other to index number, PRB numbers and carrier aggregation according to actual conditions User accesses the computational methods of number, and the embodiment of the present invention is not any limitation as to this.In addition, except above-mentioned index number, PRB are individual Outside the computational methods of number and carrier aggregation user access number, those skilled in the art can also use it according to actual needs It indexes the computational methods that number, PRB numbers and carrier aggregation user access number, and the embodiment of the present invention is not also subject to this Limitation.
The present invention is by being carrier aggregation user and when having downlink business in the secondary cell in currently processed UE, in height Available resource location is searched in the PUCCH resource position of layer configuration, descending scheduling is carried out using the available resource location, High level configuration is reduced to secondary cell configuration resource allocation PRB, thus reduces the PUCCH resource position that high-rise configuration takes, and looks into Available resource location is looked for add the flexibility of PUCCH resource position distribution, so as to make full use of physical uplink control Channel PUCCH resource, increases up handling capacity, and the channel that can flexibly select PUCCH1B CS to use.
Reference picture 4, shows that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention Embodiment of the method 2 step flow chart, the lte-a system includes main plot and secondary cell, and methods described embodiment 2 has Body may comprise steps of:
Step 201, user equipment (UE) is handled successively from the Subscriber Queue for waiting descending scheduling;
Step 202, judge whether the UE in the Subscriber Queue is disposed, or, whether the downlink resource distributes Finish, if so, step 211 is then performed, if it is not, then performing step 203;
Step 203, whether be carrier aggregation user, if so, step 204 is then performed, if it is not, then if judging currently processed UE Perform step 209 --- step 210;
Step 204, judge whether carrier aggregation user has downlink business in secondary cell, if so, then performing step 205 --- Step 206, if it is not, then performing step 209 --- step 210;
Step 205, available resource location is searched in the PUCCH resource position of high level configuration;
In a kind of preferred exemplary of the present invention, the step 205 can specifically include following sub-step:
Sub-step S41, when the transmission mode of the currently processed UE supports 1 transmission block, in the high-rise configuration 4 PUCCH resource positions in, search 1 PUCCH resource position.
In another preferred exemplary of the present invention, the step 205 can specifically include following sub-step:
Sub-step S51, when the transmission mode of the currently processed UE supports 2 transmission blocks, in the high-rise configuration 4 pairs of PUCCH resource positions in, search 1 pair of PUCCH resource position;
Step 206, judge whether the available resource location is taken by other UE;If it is not, step 207 is then performed, if It is then to perform step 208;
In a kind of preferred exemplary of the present invention, the step 206 can specifically include following sub-step:
Sub-step S61, judges whether 1 PUCCH resource position is taken by other UE;
Sub-step S62, if it is not, then judging 1 PUCCH resource position as available resource location, performs step 207, if so, then performing step 208.
In another preferred exemplary of the present invention, the step 206 can specifically include following sub-step:
Sub-step S71, judges whether 1 pair of PUCCH resource position is taken by other UE;
Sub-step S72, if it is not, 1 pair of PUCCH resource position is then judged as available resource location, if it is not, performing step Rapid 207, if so, then performing step 208.
Step 207, the available resource location is used for currently processed UE allocation of downlink resources, and return to step 202;
In a kind of preferred exemplary of the present invention, the step 207 can specifically include following sub-step:
Sub-step S81, sends in physical downlink control channel PDCCH, the PDCCH to the currently processed UE Including the available resource location indicated using TPC.
Step 208, it is not the currently processed UE allocation of downlink resources, and return to step 202;
Step 209, calculate when the secondary PUCCH resource position needed to use;
Step 210, judge described when whether the secondary PUCCH resource position needed to use is taken by other UE;If it is not, then holding Row step 207, if so, then performing step 208;
Step 211, the distribution PUCCH resource position is terminated.
In a particular application, judge whether the UE carries out carrier aggregation scheduling, should if dispatched without carrier aggregation UE is not carrier aggregation user, calculates this PUCCH resource position that need to be used according to agreement, judges the PUCCH resource position Whether taken by other UE, unoccupied, the UE can carry out descending scheduling, be not otherwise the UE allocation of downlink resources.
When the UE is carrier aggregation user and does not have downlink business in secondary cell, then calculate what this need to be used according to agreement PUCCH resource position, judges whether the PUCCH resource position is taken by other UE, unoccupied, and the UE can carry out descending Scheduling, is not otherwise the UE allocation of downlink resources.
When the UE is carrier aggregation user and has downlink business in secondary cell, then in 4 PUCCH resources position of high level configuration Put or 4 pairs of PUCCH resource positions in, search 1 PUCCH resource position or 1 pair of PUCCH resource position, judge this 1 PUCCH Whether resource location or 1 pair of PUCCH resource position are taken by other UE, unoccupied, and the UE can carry out descending scheduling, no It is not then the UE allocation of downlink resources, physical downlink control channel PDCCH is sent to the currently processed UE, it is described PDCCH includes the available resource location indicated using TPC.Circulation performs above-mentioned steps, at the UE in Subscriber Queue Reason is finished, or, the downlink resource is assigned, and terminates distribution PUCCH resource position.
It should be noted that in one preferred embodiment of the invention, the PUCCH resource position of the high-rise configuration is For the PUCCH resource interval range for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of high level configuration, high level The PUCCH resource interval range for being used to feed back HARQ-ACK of configuration and the PUCCH resource area calculated by control channel unit CCE Between scope overlap, the PUCCH resource for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of the high-rise configuration The original position of interval range indicates that CQI resources, semi-continuous scheduling SPS are configured by dispatch request SR resources, down channel quality Resource is determined.The PUCCH resource position for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of i.e. high-rise configuration With calculating when the secondary PUCCH resource position needed to use can take the PUCCH resource calculated by control channel unit CCE jointly Position, but due to 4 pairs index distribute to 8 UE share, it is therefore desirable in downlink resource allocation flow increase PUCCH resource position Put the judgement flow whether conflicted, the flexibility of increase PUCCH resource position distribution.
The present invention is tied by the PUCCH resource position calculated when the secondary PUCCH resource position needed to use and high-rise configuration The mode of conjunction, just distributes PUCCH resource position when UE is obtained and dispatched, the waste of PUCCH resource position is reduced, with less PUCCH resource position keeps for more carrier aggregation users to access, also, the work(of the field flexible dispatching using downlink resource Can, the channel that can flexibly select PUCCH1B CS to use, so as to effectively reduce the occupancy of PUCCH resource position, Jin Erchong Divide the resource using Physical Uplink Control Channel PUCCH, increase up handling capacity.
It should be noted that for embodiment of the method, in order to be briefly described, therefore it to be all expressed as to a series of action group Close, but those skilled in the art should know, the present invention is not limited by described sequence of movement, because according to this hair Bright, some steps can be carried out sequentially or simultaneously using other.Secondly, those skilled in the art should also know, specification Described in embodiment belong to preferred embodiment, necessary to the involved action not necessarily present invention.
Reference picture 5, shows that PUCCH resource position is distributed in a kind of lte-a system according to an embodiment of the invention System embodiment structured flowchart, the lte-a system includes main plot and secondary cell, can specifically include following mould Block:
UE processing modules 301, for handling user equipment (UE) successively from the Subscriber Queue for waiting descending scheduling;
Available resources location lookup module 302, for being carrier aggregation user and described auxiliary small in currently processed UE When there is downlink business in area, then available resource location is searched in the PUCCH resource position of high level configuration;
First descending scheduling performing module 303, for using the available resource location to be distributed for currently processed UE Downlink resource.
In a kind of preferred exemplary of the present invention, the available resources location lookup module 302 can include following submodule Block:
First searches submodule, for when the transmission mode of the currently processed UE supports 1 transmission block, described In 4 PUCCH resource positions of high level configuration, 1 PUCCH resource position is searched;
First takes judging submodule, for judging whether 1 PUCCH resource position is taken by other UE;
First decision sub-module, during for not taken in 1 PUCCH resource position by other UE, judges described 1 PUCCH resource position is available resource location;
Second searches submodule, for when the transmission mode of the currently processed UE supports 2 transmission blocks, described In 4 pairs of PUCCH resource positions of high level configuration, 1 pair of PUCCH resource position is searched;
Second takes judging submodule, for judging whether 1 pair of PUCCH resource position is taken by other UE;
Second decision sub-module, during for not taken in 1 pair of PUCCH resource position by other UE, judges described 1 pair PUCCH resource position is available resource location.
In a kind of preferred exemplary of the present invention, the available resources location lookup module 302 can also include following son Module:
First downlink resource forbids distribution sub module, in 1 PUCCH resource position or 1 pair of PUCCH resource position Put and taken by other UE, be not then the currently processed UE allocation of downlink resources.
In a kind of preferred exemplary of the present invention, the system can also include with lower module:
Resource location computing module, for currently processed UE be carrier aggregation user, or, currently processed UE There is no downlink business for carrier aggregation user and in the secondary cell, then calculate when the secondary PUCCH resource position needed to use;
Second descending scheduling performing module, for working as the secondary PUCCH resource position needed to use not by other UE described During occupancy, the currently processed UE carries out descending scheduling using the PUCCH resource position.
In a kind of preferred exemplary of the present invention, the system can also include with lower module:
Second downlink resource forbids distribute module, for working as the secondary PUCCH resource position needed to use by other described It is not the currently processed UE allocation of downlink resources when UE takes.
In a kind of preferred exemplary of the present invention, the first descending scheduling performing module 303 can also include following son Module:
Resource location indicates submodule, for sending physical downlink control channel to the currently processed UE PDCCH, the PDCCH include the available resource location indicated using TPC.
In a kind of preferred exemplary of the present invention, the system can also include with lower module:
Terminate distribute module, be disposed for the UE in the Subscriber Queue, or, the downlink resource is distributed Bi Shi, terminates the distribution PUCCH resource position.
In a kind of preferred exemplary of the present invention, what the high level was configured is used to feed back hybrid automatic repeat-request-affirmative The PUCCH resource interval range weight for confirming HARQ-ACK PUCCH resource interval range and being calculated by control channel unit CCE Close, the PUCCH resource interval range for being used to feed back hybrid automatic repeat-request-positive acknowledgment HARQ-ACK of the high-rise configuration Original position indicate that CQI resources, semi-continuous scheduling SPS configurations resource are determined by dispatch request SR resources, down channel quality.
For system embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, it is related Part illustrates referring to the part of embodiment of the method.
Each embodiment in this specification is described by the way of progressive, what each embodiment was stressed be with Between the difference of other embodiment, each embodiment identical similar part mutually referring to.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, device or computer program Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Finally, in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by One entity or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or operation Between there is any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant meaning Covering including for nonexcludability, so that process, method, article or equipment including a series of key elements not only include that A little key elements, but also other key elements including being not expressly set out, or also include be this process, method, article or The intrinsic key element of equipment.In the absence of more restrictions, the key element limited by sentence " including one ... ", not Also there is other identical element in the process including the key element, method, article or equipment in exclusion.
The method and system distributed above PUCCH resource position in lte-a system provided by the present invention, has been carried out in detail Thin to introduce, specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said The bright method and its core concept for being only intended to help to understand the present invention;Simultaneously for those of ordinary skill in the art, foundation The thought of the present invention, will change, in summary, this specification content is not in specific embodiments and applications It is interpreted as limitation of the present invention.

Claims (10)

1. a kind of method that physical uplink control channel PUCCH resource position is distributed in lte-a system, it is characterised in that The lte-a system includes main plot and secondary cell, and methods described includes:
User equipment (UE) is handled successively from the Subscriber Queue for waiting descending scheduling;
If currently processed UE is carrier aggregation user and has downlink business in the secondary cell, in the PUCCH of high level configuration Available resource location is searched in resource location;The number of the PUCCH resource location index of the high-rise configuration, which is less than, shares institute State the UE of the PUCCH resource location index of high-rise configuration number;
The available resource location is used for currently processed UE allocation of downlink resources;
Wherein, the PUCCH resource interval range of the high-rise configuration and the PUCCH resource area calculated by control channel unit CCE Between scope overlap, the original position of the PUCCH resource interval range of the high-rise configuration is by dispatch request SR resources, down channel Quality indicator (CQI) resource, semi-continuous scheduling SPS configuration resources are determined.
2. according to the method described in claim 1, it is characterised in that described to be searched in the PUCCH resource position of high level configuration The step of available resource location, includes:
When the transmission mode of the currently processed UE supports 1 transmission block, in 4 PUCCH resources of the high-rise configuration In position, 1 PUCCH resource position is searched;
Judge whether 1 PUCCH resource position is taken by other UE;
If it is not, then judging 1 PUCCH resource position as available resource location;
Or, when the transmission mode of the currently processed UE supports 2 transmission blocks, in 4 couples of PUCCH of the high-rise configuration In resource location, 1 pair of PUCCH resource position is searched;
Judge whether 1 pair of PUCCH resource position is taken by other UE;
If it is not, then judging 1 pair of PUCCH resource position as available resource location.
3. method according to claim 2, it is characterised in that also include:
If 1 PUCCH resource position or 1 pair of PUCCH resource position are taken by other UE, not to be described currently processed UE allocation of downlink resources.
4. according to the method described in claim 1, it is characterised in that also include:
If currently processed UE is not carrier aggregation user, or, currently processed UE is for carrier aggregation user and described auxiliary Cell does not have downlink business, then calculates when the secondary PUCCH resource position needed to use;
If described when the secondary PUCCH resource position needed to use is not taken by other UE, the currently processed UE uses institute State PUCCH resource position and carry out descending scheduling.
5. method according to claim 4, it is characterised in that also include:
It is not the currently processed UE distribution if described when the secondary PUCCH resource position needed to use is taken by other UE Downlink resource.
6. according to the method in claim 2 or 3, it is characterised in that described to use the available resource location to be current The step of UE allocation of downlink resources of processing, includes:
Include use TPC to currently processed UE transmission the physical downlink control channels PDCCH, the PDCCH to refer to The available resource location shown.
7. according to the method described in claim 1, it is characterised in that also include:
When the UE in the Subscriber Queue is disposed, or, when the downlink resource is assigned, terminate distribution described PUCCH resource position.
8. the system that physical uplink control channel PUCCH resource position is distributed in a kind of lte-a system, it is characterised in that The lte-a system includes main plot and secondary cell, and the system includes:
UE processing modules, for handling user equipment (UE) successively from the Subscriber Queue for waiting descending scheduling;
Available resources location lookup module, for being carrier aggregation user in currently processed UE and having descending in the secondary cell During business, then available resource location is searched in the PUCCH resource position of high level configuration;The PUCCH moneys of the high-rise configuration The number of source position index is less than the UE for the PUCCH resource location index for sharing high-rise configuration number;
First descending scheduling performing module, descending adjust is carried out for the currently processed UE using the available resource location Degree;
Wherein, the PUCCH resource interval range of the high-rise configuration and the PUCCH resource area calculated by control channel unit CCE Between scope overlap, the original position of the PUCCH resource interval range of the high-rise configuration is by dispatch request SR resources, down channel Quality indicator (CQI) resource, semi-continuous scheduling SPS configuration resources are determined.
9. system according to claim 8, it is characterised in that the available resources location lookup module includes:
First searches submodule, for when the transmission mode of the currently processed UE supports 1 transmission block, in the high level In 4 PUCCH resource positions of configuration, 1 PUCCH resource position is searched;
First takes judging submodule, for judging whether 1 PUCCH resource position is taken by other UE;
First decision sub-module, during for not taken in 1 PUCCH resource position by other UE, judges described 1 PUCCH resource position is available resource location;
Second searches submodule, for when the transmission mode of the currently processed UE supports 2 transmission blocks, in the high level In 4 pairs of PUCCH resource positions of configuration, 1 pair of PUCCH resource position is searched;
Second takes judging submodule, for judging whether 1 pair of PUCCH resource position is taken by other UE;
Second decision sub-module, during for not taken in 1 pair of PUCCH resource position by other UE, judges described 1 pair PUCCH resource position is available resource location.
10. system according to claim 8, it is characterised in that also include:
Resource location computing module, for not being carrier aggregation user in currently processed UE, or, currently processed UE is carries Ripple syndication users and there is no downlink business in the secondary cell, then calculate when the PUCCH resource position that time need to use;
Second descending scheduling performing module, for not taken in the PUCCH resource position that secondary ought be needed to use by other UE When, then the currently processed UE carries out descending scheduling using the PUCCH resource position.
CN201310752947.3A 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems Active CN103716891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310752947.3A CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310752947.3A CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Publications (2)

Publication Number Publication Date
CN103716891A CN103716891A (en) 2014-04-09
CN103716891B true CN103716891B (en) 2017-07-28

Family

ID=50409339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310752947.3A Active CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Country Status (1)

Country Link
CN (1) CN103716891B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104301083B (en) * 2014-09-30 2017-10-13 大唐移动通信设备有限公司 A kind of carrier polymerizing method and equipment based on TM9
CN105991209B (en) 2015-01-27 2018-04-13 上海朗帛通信技术有限公司 A kind of PUCCH method and apparatus in the CA of enhancing
CN106304347B (en) * 2015-05-18 2019-06-28 普天信息技术有限公司 PUCCH resource configuration method in a kind of LTE-A
CN106304350B (en) * 2015-05-26 2019-07-23 普天信息技术有限公司 The PUCCH channel dynamic allocation method and device of SPS business
PL3566370T3 (en) * 2017-01-05 2022-02-14 Sharp Kabushiki Kaisha Long physical uplink control channel (pucch) design for 5th generation (5g) new radio (nr)
US11166262B2 (en) 2017-01-05 2021-11-02 FG Innovation Company Limited Long physical uplink control channel (PUCCH) design for 5th generation (5G) new radio (NR)
CN108347319B (en) * 2017-01-24 2020-10-20 普天信息技术有限公司 Resource allocation method and device
CN110034865B (en) * 2018-01-12 2020-09-15 维沃移动通信有限公司 PUCCH resource determination method, PUCCH resource receiving method, terminal equipment and network side equipment
CN111713152B (en) * 2018-02-13 2023-10-20 华为技术有限公司 Communication method and device
WO2019204995A1 (en) * 2018-04-24 2019-10-31 北京小米移动软件有限公司 Scheduling request transmission method and device, and resource allocation method and device
CN108834216B (en) * 2018-05-24 2023-05-16 京信网络系统股份有限公司 Resource scheduling method and device
CN111356232B (en) * 2018-12-21 2022-08-30 中国电信股份有限公司 Parameter configuration method, device and system and computer readable storage medium
CN111385899B (en) * 2018-12-28 2023-03-14 中兴通讯股份有限公司 Resource scheduling method and device, network equipment and readable storage medium
CN111436125A (en) * 2019-01-11 2020-07-21 中国信息通信研究院 Method, equipment and signaling for sending uplink control information
CN116420368A (en) * 2020-10-15 2023-07-11 中兴通讯股份有限公司 Dynamic triggering of carriers for uplink control channels

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014505A (en) * 2009-11-03 2011-04-13 大唐移动通信设备有限公司 Method, equipment and system for resource allocation of upstream control channel
CN103068047A (en) * 2011-10-21 2013-04-24 普天信息技术研究院有限公司 Physical uplink control channel resource allocation method
CN103283166A (en) * 2011-01-07 2013-09-04 英特尔公司 Resource allocation for pucch format 1b with channel selection in an LTE- TDD system
CN103384183A (en) * 2012-05-04 2013-11-06 电信科学技术研究院 Uplink control information transmission method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014505A (en) * 2009-11-03 2011-04-13 大唐移动通信设备有限公司 Method, equipment and system for resource allocation of upstream control channel
CN103283166A (en) * 2011-01-07 2013-09-04 英特尔公司 Resource allocation for pucch format 1b with channel selection in an LTE- TDD system
CN103068047A (en) * 2011-10-21 2013-04-24 普天信息技术研究院有限公司 Physical uplink control channel resource allocation method
CN103384183A (en) * 2012-05-04 2013-11-06 电信科学技术研究院 Uplink control information transmission method and device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
3GPP.3rd Generation Partnership Project *
Evolved Universal Terrestrial Radio Access (E-UTRA) *
Physical layer procedures (Release 10).《3GPP TS 36.213 》.2013, *
Technical Specification Group Radio Access Network *

Also Published As

Publication number Publication date
CN103716891A (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN103716891B (en) The method and system that PUCCH resource position is distributed in LTE A systems
US11387953B2 (en) Method and apparatus for allocating HARQ-ACK channel resources supporting transmit diversity and channel selection
US11637659B2 (en) Method and apparatus for transmitting HARQ-ACK feedback information in an enhanced carrier aggregation system
KR102584702B1 (en) How to transmit uplink control information
US10708802B2 (en) Multi-cell periodic/SPS CSI reporting for wireless network
JP6543341B2 (en) Method and apparatus for transmitting uplink control information
US9743389B2 (en) Physical uplink control channel resource allocation for multiple channel state indicators colliding in same subframe
US20210067276A1 (en) Method and apparatus for transmitting hybrid automatic repeat and request information in a wireless communication system
CN104883243B (en) For the communication means and device of carrier aggregation system
KR101847671B1 (en) Data transmitting method and device
JP5990644B2 (en) Method and apparatus for transmitting uplink control information (UCI)
KR101749199B1 (en) Method and device for transmitting uplink control information(uci)
CN103581891B (en) The processing method and processing device of information
CN105122716B (en) Method and apparatus for transmitting channel state information in a wireless communication system
KR20140142299A (en) Downlink control signalling transmission method and device
CN104396174A (en) Hybrid automatic repeat request-acknowledge (harq-ack) codebook generation for inter-band time division duplex (tdd) carrier aggregation (ca)
CN102083223A (en) DCI (Downlink Control Information) sending method, system and device as well as uplink transmission method, system and device
CN101631374A (en) Indication method and indication device of downlink transmission mode
CN105323040B (en) Channel selection for carrier wave polymerization
CN102469599B (en) Channel resource determination method of ACK/NACK feedback information and equipment
CN103369695B (en) A kind of uplink dispatch method and device
JP2018537050A (en) Method and apparatus for transmitting uplink control information UCI
CN112615707A (en) Method for transmitting uplink control information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant