A kind of uplink dispatch method and device
Technical field
The present invention relates to communication technical field, more particularly to a kind of uplink dispatch method and device.
Background technology
When ascending-descending subframes number is asymmetric, scheduling subframe, transmission subframe and feedback subframe cannot form one-to-one corresponding and close
System.For example, when sub-frame of uplink number is more than descending sub frame number (include special time slot), the corresponding dispatch of multiple sub-frame of uplink
Need to transmit in same descending sub frame.In this case, up instruction (UL grant) is needed comprising up instruction (UL
Index) domain, for indicating the numbering of corresponding sub-frame of uplink.When sub-frame of uplink number less than descending sub frame number (include it is special when
Gap) when, corresponding confirmation (ACK)/non-acknowledgement (NACK) information of multiple descending sub frames is transmitted in same sub-frame of uplink.This feelings
Under condition, need to indicate (DAI) domain comprising descending distribution in UL grant, for indicating in current uplink ACK/NACK feedback windows
Need the dynamic physical downlink sharied signal channel (Physical Downlink Shared Channel, PDSCH) of feedback
The summation of number and descending semi-continuous scheduling (Semi-Persistent Scheduling, SPS) release signaling number, is used for
Judge in uplink ACK/NACK feedback windows whether packet loss.
Therefore, UL index, are served only for scheduled time division duplex (Time Division Duplex, TDD) uplink-downlink configuration 0
Physical uplink link shared channels (PUSCH), for indicating the numbering of corresponding sub-frame of uplink.And DAI, it is current for indicating
The number and the summation of descending SPS release signalings number of the dynamic PDSCH of the needs feedback in uplink ACK/NACK feedback windows,
For judging in uplink ACK/NACK feedback windows whether packet loss.
In existing TDD system, UL index domains are present only in uplink-downlink configuration 0, and DAI domains are only in up-downgoing
Exist during configuration 1-6.Therefore, always only comprising one of domain in UL grant (DCI 0 and 4) information.
But with the development of technology, the promotion of particularly following three kinds of technologies, the corresponding dispatch of multiple sub-frame of uplink
In same descending sub frame, transmission and the corresponding ACK/NACK information of multiple descending sub frames are transmitted in same sub-frame of uplink
Situation may be simultaneously present, and current downlink control information (Downlink Control Inion, DCI) design cannot support this
The situation of kind.
First, dynamic TDD.
It is as the tdd mode of one of two big basic duplex systems, ever-increasing to bandwidth demand in wide-band mobile communication
It is under background, of increased attention.Uplink and downlink transmission in TDD system uses identical frequency resource, in difference
Time slot on transmit uplink/downlink signals.In common TDD system, including the time division synchronous of the third generation (3G) communication system
CDMA accesses (Time Division Synchronized Code Division Multiple Access, TD-
SCDMA) time-division Long Term Evolution (the Time Division-Long Term of system and forth generation (4G) communication system
Evolvement, TD-LTE) system, the division of uplink and downlink time slot is static or semi-static, it is common practice in net
Determine unified uplink and downlink timeslot ratio and keep constant according to business proportion substantially in network planning process.This is big in macrocell
It is relatively simple way under the background of covering, and it is also more effective.And as technology develops, increasing Microcell
The low power base stations such as (Pico cell), Home eNodeB (Home NodeB) are deployed for providing the little covering of local.One side
Face, the main type of service of this kind of cell (for example, data service) are different with macrocell (for example, speech business), therefore, up and down
The proportioning demand difference of row time slot is larger.On the other hand, the number of users of this kind of cell is less, and customer service changes in demand compared with
Greatly, thus cell up-downgoing business proportion demand exist dynamic change situation.Based on this, up-downgoing is more dynamically configured
Time slot ratio receives more concerns and studies.
2nd, (inter-band) TDD in frequency band.
In advanced Long Term Evolution (LTE Advanced, LTE-A) system, the peak rate of system has huge than LTE
Raising, it is desirable to reach descending 1Gbps, up 500Mbps.If a use of maximum bandwidth being only nothing for the carrier wave of 20MHz
Method reaches peak-rate requirements.Therefore, lte-a system needs the bandwidth that terminal extension can be used, and thus introduces carrier wave
Polymerization (Carrier Aggregation, CA) technology, multiple continuous or discrete load that will be under same eNB (base station)
Ripple condenses together, while service for UE, with the speed needed for providing.These carrier waves for condensing together are also called member carrier
(component carrier, abbreviation CC).Each cell can be a member carrier, the cell (member under different eNB
Carrier wave) can not be polymerized.In order to the UE for ensureing LTE can work under each carrier wave being polymerized, each carrier wave maximum is less than
20MHz.The CA technologies of LTE-A are as shown in figure 1, have 4 carrier waves that can be polymerized, base station can simultaneously 4 under the base station of LTE-A
Carry out data transmission with UE on individual carrier wave, to improve throughput of system.
In LTE versions 11 (Rel-11) or the later system of version, in order to avoid the interference to other TDD systems, it is located at
The LTE cells of different frequency bands (Band) may use different TDD uplink/downlink sub-frame configurations, as shown in Fig. 2 wherein 1 He of carrier wave
Carrier wave 2 is located at Band A, and carrier wave 3 is located at Band B, and cell 1, cell 2 and cell 3 are on carrier wave 1, carrier wave 2 and carrier wave 3 respectively
Cell.Cell 1 is identical with the TDD uplink-downlink configurations of cell 2, is configuration 1, the TDD uplink/downlink sub-frame configuration of cell 3 with
Cell 1 and cell 2 are different, are configuration 2.If terminal is desirable with these three cells and carries out carrier aggregation, then just occur
The different situation of the TDD uplink-downlink configurations of all aggregation cells of terminal.
3rd, FDD (FDD) is polymerized with TDD.
TDD carrier waves and descending (DL) carrier aggregations of FDD may be supported in the follow-up evolution systems of LTE.
In sum, DCI of the prior art cannot support the corresponding dispatch of multiple sub-frame of uplink same simultaneously
The situation that transmission and the corresponding ACK/NACK information of multiple descending sub frames are transmitted in same sub-frame of uplink in individual descending sub frame.
The content of the invention
A kind of uplink dispatch method and device are embodiments provided, to support multiple sub-frame of uplink correspondences simultaneously
Dispatch transmit in same descending sub frame and the corresponding ACK/NACK information of multiple descending sub frames in same up son
Situation about transmitting in frame.
A kind of uplink dispatch method provided in an embodiment of the present invention includes:
When needing to carry out uplink scheduling, it is determined that for the Downlink Control Information DCI of uplink scheduling, wherein in the DCI
At least include that up instruction UL index domains and descending distribution indicate DAI domains;
Send the DCI.
A kind of acquisition methods of uplink scheduling information provided in an embodiment of the present invention, including:
The Downlink Control Information DCI that network side sends is received, wherein, at least include up instruction UL in the DCI
Index domains and descending distribution indicate DAI domains;
Uplink scheduling information of the network side to user equipment (UE) is determined according to the DCI.
A kind of uplink scheduling device provided in an embodiment of the present invention includes:
DCI determining units, for when needing to carry out uplink scheduling, it is determined that for the Downlink Control Information of uplink scheduling
DCI, wherein at least including in the DCI that up instruction UL index domains and descending distribution indicate DAI domains;
Transmitting element, for sending the DCI.
A kind of acquisition device of uplink scheduling information provided in an embodiment of the present invention includes:
DCI receiving units, for receiving the Downlink Control Information DCI of network side transmission, wherein, at least wrap in the DCI
Include up instruction UL index domains and descending distribution indicates DAI domains;
Information determination unit, for determining uplink scheduling information of the network side to user equipment (UE) according to the DCI.
The embodiment of the present invention, when needing to carry out uplink scheduling, it is determined that for the Downlink Control Information DCI of uplink scheduling,
At least include in wherein described DCI that up instruction UL index domains and descending distribution indicate DAI domains;The DCI is sent, so as to same
When support the corresponding dispatch of multiple sub-frame of uplink transmit in same descending sub frame and multiple descending sub frames it is corresponding
The situation that ACK/NACK information is transmitted in same sub-frame of uplink.
Description of the drawings
Fig. 1 is the schematic diagram for having 4 polymerization carrier waves under LTE-A base stations using CA;
Fig. 2 is aggregated in different band for LTE-A CA terminals, using the schematic diagram of different TDD uplink/downlink sub-frame configurations;
Fig. 3 is a kind of schematic flow sheet of uplink dispatch method provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic flow sheet of the acquisition methods of uplink scheduling information provided in an embodiment of the present invention;
Fig. 5 is a kind of structural representation of uplink scheduling device provided in an embodiment of the present invention;
Fig. 6 is a kind of structural representation of the acquisition device of uplink scheduling information provided in an embodiment of the present invention.
Specific embodiment
A kind of uplink dispatch method and device are embodiments provided, to support multiple sub-frame of uplink correspondences simultaneously
Dispatch transmit in same descending sub frame and the corresponding ACK/NACK information of multiple descending sub frames in same up son
Situation about transmitting in frame.
The embodiment of the present invention provides a kind of DCI for uplink scheduling, for supporting in a carrier wave, may or always
While existing, the corresponding dispatch of multiple sub-frame of uplink is transmitted in same descending sub frame and multiple descending sub frames are corresponding
The scene that ACK/NACK information is transmitted in same sub-frame of uplink.
Transmit in same descending sub frame in the corresponding dispatch of multiple sub-frame of uplink corresponding with multiple descending sub frames
ACK/NACK information transmit in same sub-frame of uplink on simultaneous carrier wave, at least same in the DCI of uplink scheduling
When include UL index domains and DAI domains, it is and all effective.
Wherein, UL index domains, for indicating corresponding sub-frame of uplink;
DAI domains, it is real in the multiple descending sub frames using same sub-frame of uplink transmission ACK/NACK feedback informations for indicating
The number of the PDSCH of border transmission, the summation with the number of the PDCCH for the release of indicating downlink SPS resources, for judging whether
There is downlink data to lose.
When the corresponding dispatch of multiple sub-frame of uplink being only existed on carrier wave needing to transmit in same descending sub frame,
Effectively, the DAI domains are invalid in the UL index domains;
When the corresponding feedback information of multiple descending sub frames being only existed on carrier wave needing to transmit in same sub-frame of uplink, institute
State DAI domains effectively, the UL index domains are invalid.
Therefore, in network side, referring to Fig. 3, a kind of uplink dispatch method provided in an embodiment of the present invention, including:
S101, when needing to carry out uplink scheduling, it is determined that for the Downlink Control Information DCI of uplink scheduling, wherein described
At least include in DCI that up instruction UL index domains and descending distribution indicate DAI domains;
S102, the transmission DCI.
It is preferred that in the UL index domains and the DAI domains, at least one domain is effective.
Need in same descending sub frame it is preferred that work as simultaneously
When middle transmission and the corresponding feedback information of multiple descending sub frames need to transmit in same sub-frame of uplink, the UL index domains and
The DAI domains effectively simultaneously;
It is preferred that needing in same descending sub frame when the corresponding dispatch of multiple sub-frame of uplink is only existed on carrier wave
During transmission, effectively, the DAI domains are invalid in the UL index domains;
It is preferred that needing to pass in same sub-frame of uplink when the corresponding feedback information of multiple descending sub frames is only existed on carrier wave
When defeated, effectively, the UL index domains are invalid in the DAI domains.
It is preferred that the length in the UL index domains, is according to while the number of the sub-frame of uplink dispatched determines;
For example:When the sub-frame of uplink number that can be dispatched simultaneously is 2, UL index length of fields are 2;
It is preferred that the length in the DAI domains, is the number according to the descending sub frame in same sub-frame of uplink transmitting feedback information
What mesh determined;
For example:When the number of the descending sub frame of same sub-frame of uplink transmitting feedback information is less than or equal to 4, DAI domains
Length is 2.
The length in UL index domains is predetermined, or according to the uplink-downlink configuration situation dynamic configuration on carrier wave
's.
Usually, UL index length is relevant with the sub-frame of uplink number that can be dispatched simultaneously, and can dispatch simultaneously
Number of subframes is not limited to 2.DAI length is relevant with the descending sub frame number in same sub-frame of uplink feeding back ACK/NACK, and
The descending sub frame unlimited number of same sub-frame of uplink feeding back ACK/NACK can be further expanded in current techniques.
It is preferred that the UL index domains are indicated by the way of bit table bitmap.
For example, when the sub-frame of uplink number that can be dispatched simultaneously is 2, UL index length of fields are 2, wherein, a bit
One subframe of correspondence.
It is preferred that the feedback information, is ACK/NACK information.
The explanation of two embodiments is given below.
Embodiment one:It is static/to be semi-statically configured up-downgoing mixed automatic retransfer (HARQ, Hybrid-ARQ) sequential.
It is static/to be semi-statically configured PDSCH HARQ sequential relationships on carrier wave, and PUSCH scheduling or HARQ sequential relationships, example
Such as secondary cell (Scell) a kind of PDSCH HARQ sequential relationships of correspondence in inter-band CA systems and a kind of PUSCH scheduling or
HARQ sequential relationships, wherein, described these sequential relationships can be semi-statically configured by base station, it is also possible to true according to making an appointment
Fixed, in the PUSCH scheduling or HARQ sequential relationships, the corresponding dispatch of multiple sub-frame of uplink is in same descending sub frame
Transmission, in the PDSCH HARQ sequential relationships, the corresponding ACK/NACK information of multiple descending sub frames is passed in same sub-frame of uplink
It is defeated.
In this scene, UL index domains and DAI domains are constantly present and all effective.
Embodiment two:Dynamic configuration up-downgoing HARQ sequential.
(carrier wave) scene of PDSCH HARQ sequential relationships and PUSCH scheduling or HARQ sequential relationships on dynamic configuration carrier wave
In.Also, alternative PUSCH scheduling or HARQ sequential relationships include the corresponding dispatch of multiple sub-frame of uplink same
Situation about transmitting in descending sub frame, includes the corresponding ACK/NACK of multiple descending sub frames in alternative PDSCHHARQ sequential relationships
In this scene, UL index and DAI domains are constantly present the situation that information is transmitted in same sub-frame of uplink.Dynamic configuration
PUSCH dispatch or HARQ sequential relationships in the corresponding dispatch of multiple sub-frame of uplink transmit in same descending sub frame, and
In the PDSCH HARQ sequential relationships of dynamic configuration, the corresponding ACK/NACK information of multiple descending sub frames is in same sub-frame of uplink
Transmission, both of these case simultaneously in the presence of, UL index and DAI domains are all effective.
When the corresponding dispatch of multiple sub-frame of uplink in the PUSCH scheduling or HARQ sequential relationships for only existing dynamic configuration
When transmitting in same descending sub frame, UL index are present and effectively, DAI domains are present but invalid.
When the corresponding ACK/NACK information of multiple descending sub frames in the PDSCH HARQ sequential relationships for only exist dynamic configuration
When transmitting in same sub-frame of uplink, DAI domains are present and effectively, UL Index domains are present but invalid.
Correspondingly, in UE sides, referring to Fig. 4, a kind of acquisition methods of uplink scheduling information provided in an embodiment of the present invention, bag
Include:
S201, the Downlink Control Information DCI for receiving network side transmission, wherein, at least include up instruction UL in the DCI
Index domains and descending distribution indicate DAI domains;
S202, uplink scheduling information of the network side to user equipment (UE) is determined according to the DCI.
It is preferred that in the UL index domains and the DAI domains, at least one domain is effective.
It is preferred that uplink scheduling information of the network side to user equipment (UE) is determined according to the DCI, including:
Transmit in same descending sub frame and many when there is the corresponding dispatch of multiple sub-frame of uplink on carrier wave simultaneously
When the corresponding feedback information of individual descending sub frame is transmitted in same sub-frame of uplink, to the DCI in the UL index domains and
The DAI domains are all parsed.
It is preferred that uplink scheduling information of the network side to user equipment (UE) is determined according to the DCI, including:
Need to transmit in same descending sub frame when the corresponding dispatch of multiple sub-frame of uplink is only existed on carrier wave, extremely
It is few that UL index domains in the DCI are parsed.
It is preferred that uplink scheduling information of the network side to user equipment (UE) is determined according to the DCI, including:
When the corresponding feedback information of multiple descending sub frames being only existed on carrier wave needing to transmit in same sub-frame of uplink, extremely
It is few that DAI domains in the DCI are parsed.
In network side, referring to Fig. 5, a kind of uplink scheduling device provided in an embodiment of the present invention, including:
DCI determining units 11, for when needing to carry out uplink scheduling, it is determined that for the Downlink Control Information of uplink scheduling
DCI, wherein at least including in the DCI that up instruction UL index domains and descending distribution indicate DAI domains;
Transmitting element 12, for sending the DCI.
It is preferred that in the UL index domains and the DAI domains, at least one domain is effective.
Pass in same descending sub frame it is preferred that work as and there is the corresponding dispatch of multiple sub-frame of uplink on carrier wave simultaneously
When the corresponding feedback information of defeated and multiple descending sub frame is transmitted in same sub-frame of uplink, the UL index domains and the DAI
Domain effectively simultaneously.
It is preferred that needing to transmit in same descending sub frame when the corresponding dispatch of multiple sub-frame of uplink is only existed
When, effectively, the DAI domains are invalid in the UL index domains;
It is preferred that when only existing the corresponding feedback information of multiple descending sub frames and needing to transmit in same sub-frame of uplink,
Effectively, the UL index domains are invalid in the DAI domains.
It is preferred that the DCI determining units determine the UL index domains according to the number of the sub-frame of uplink of scheduling simultaneously
Length;
It is preferred that number of the DCI determining units according to the descending sub frame in same sub-frame of uplink transmitting feedback information
Determine the length in the DAI domains.
It is preferred that the DCI determining units indicate the UL index domains by the way of bit table bitmap.
It is preferred that the feedback information, is to confirm ACK information or non-acknowledgement nack message.
It is preferred that the uplink scheduling device is base station.
Correspondingly, in UE sides, referring to Fig. 6, a kind of acquisition device of uplink scheduling information provided in an embodiment of the present invention, bag
Include:
DCI receiving units 21, for receiving the Downlink Control Information DCI of network side transmission, wherein, in the DCI at least
DAI domains are indicated including up instruction UL index domains and descending distribution;
Information determination unit 22, for determining uplink scheduling information of the network side to user equipment (UE) according to the DCI.
It is preferred that in the UL index domains and the DAI domains, at least one domain is effective.
It is preferred that described information determining unit 22, specifically for:
Transmit in same descending sub frame and many when there is the corresponding dispatch of multiple sub-frame of uplink on carrier wave simultaneously
When the corresponding feedback information of individual descending sub frame is transmitted in same sub-frame of uplink, to the DCI in the UL index domains and
The DAI domains are all parsed.
It is preferred that described information determining unit 22, specifically for:
Need to transmit in same descending sub frame when the corresponding dispatch of multiple sub-frame of uplink is only existed on carrier wave, extremely
It is few that UL index domains in the DCI are parsed.
It is preferred that described information determining unit 22, specifically for:
When the corresponding feedback information of multiple descending sub frames being only existed on carrier wave needing to transmit in same sub-frame of uplink, extremely
It is few that DAI domains in the DCI are parsed.
It is preferred that the acquisition device of the uplink scheduling information, is UE.
In sum, the embodiment of the present invention, when the corresponding dispatch of multiple sub-frame of uplink is in same descending sub frame
Transmit, and the corresponding ACK/NACK information of multiple descending sub frames is transmitted in same sub-frame of uplink, on simultaneous carrier wave, use
UL index domain and DAI domain are included in the DCI of uplink scheduling at least while, wherein, UL index domains are used for the up of instruction
Subframe;DAI domains are actually passed in being used to indicate multiple descending sub frames that ACK/NACK feedback informations are transmitted using same sub-frame of uplink
The number of defeated PDSCH, the summation with the number of the PDCCH of indicating downlink SPS resources release, for determining whether lower line number
According to loss.Therefore, the embodiment of the present invention provides a kind of DCI for uplink scheduling, for supporting to deposit on a carrier wave simultaneously
Transmit in same descending sub frame and the corresponding ACK/ of multiple descending sub frames in the corresponding dispatch of multiple sub-frame of uplink
The scene that nack message is transmitted in same sub-frame of uplink.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or computer program
Product.Therefore, the present invention can adopt complete hardware embodiment, complete software embodiment or with reference to the reality in terms of software and hardware
Apply the form of example.And, the present invention can be using the computer for wherein including computer usable program code at one or more
The shape of the computer program implemented in usable storage medium (including but not limited to disk memory and optical memory etc.)
Formula.
The present invention be with reference to method according to embodiments of the present invention, equipment (system), and computer program flow process
Figure and/or block diagram are describing.It should be understood that can be by computer program instructions flowchart and/or each stream in block diagram
The combination of journey and/or square frame and flow chart and/or flow process and/or square frame in block diagram.These computer programs can be provided
The processor of general purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce
A raw machine so that produced for reality by the instruction of computer or the computing device of other programmable data processing devices
The device of the function of specifying in present one flow process of flow chart or one square frame of multiple flow processs and/or block diagram or multiple square frames.
These computer program instructions may be alternatively stored in and can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory is produced to be included referring to
Make the manufacture of device, the command device realize in one flow process of flow chart or one square frame of multiple flow processs and/or block diagram or
The function of specifying in multiple square frames.
These computer program instructions can be also loaded in computer or other programmable data processing devices so that in meter
Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented process, so as in computer or
The instruction performed on other programmable devices is provided for realizing in one flow process of flow chart or multiple flow processs and/or block diagram one
The step of function of specifying in individual square frame or multiple square frames.
Obviously, those skilled in the art can carry out the essence of various changes and modification without deviating from the present invention to the present invention
God and scope.So, if these modifications of the present invention and modification belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising these changes and modification.