CN103713622B - A kind of testing results system and method for fan master control system - Google Patents

A kind of testing results system and method for fan master control system Download PDF

Info

Publication number
CN103713622B
CN103713622B CN201310665563.8A CN201310665563A CN103713622B CN 103713622 B CN103713622 B CN 103713622B CN 201310665563 A CN201310665563 A CN 201310665563A CN 103713622 B CN103713622 B CN 103713622B
Authority
CN
China
Prior art keywords
blower fan
master control
control system
model
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310665563.8A
Other languages
Chinese (zh)
Other versions
CN103713622A (en
Inventor
王淑超
徐卫峰
赵刚
牛洪海
严伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201310665563.8A priority Critical patent/CN103713622B/en
Publication of CN103713622A publication Critical patent/CN103713622A/en
Application granted granted Critical
Publication of CN103713622B publication Critical patent/CN103713622B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the testing results system of a kind of fan master control system, this system includes: model sets up unit, language conversion unit and controller;Wherein, model is set up unit and is utilized the modeling tool of graphical function, sets up blower fan model;The blower fan model conversation of foundation is become the blower fan model program that controller can identify by language conversion unit;Controller runs the blower fan model program after converting, and carries out data with fan master control system to be tested in running and dock, it is achieved the testing results to fan master control system to be tested.The present invention discloses a kind of testing results method of fan master control system.

Description

A kind of testing results system and method for fan master control system
Technical field
The present invention relates to wind-driven generator measuring technology, particularly relate to the testing results of a kind of fan master control system System and method.
Background technology
The control system of blower fan is the important component part of blower fan, it carry fan monitoring, be automatically adjusted, Realize maximal wind-energy capture and ensure the vital tasks such as good electrical network compatibility.The control system of blower fan Mainly by monitoring system, master control system, variable blade control system and frequency conversion system (converter), driftage system A few part of uniting forms.Wherein, fan master control system is the main body of blower fan control system, is equivalent to the brain of people, Can realize automatically startup, automatic direction regulating, automatic speed regulation, auto-parallel, automatic parallel off, fault autostop, Automatically cable unwinding, maximal wind-energy catch and important control and the defencive function etc. such as automatic record and monitoring, Being the central control system of blower fan, the overall performance of blower fan is played by the technical performance of fan master control system product Critical effect.
One new wind-driven generator (abbreviation blower fan) master control system or new master control algoritic module, in exploitation Early stage, mid-term and put into the research and development later stage before on-the-spot trail run, be also required for carrying out in factory Sufficiently simulating, verifying test, to ensure R&D target and the properties of product in each stage.
At present, fan master control system is carried out before the used means of validation test mainly have several:
1, the simulation software utilizing wind-powered electricity generation field specialty is controlled the emulation of strategy.Such as, GH is utilized Blade software carries out validation test, and the method is also currently used relatively broad method, and it can be easily Amendment control strategy, verifies the effectiveness of control strategy under different operating modes.But, the master control of a blower fan System not only comprises control strategy, also includes the software and hardware system of operation control strategy and the electric of periphery Loop, the method is generally difficult to provide one complete comprehensive to test for whole wind-driven generator master control system Card means;Further, a lot of in the case of, due to the program of actual fan master control system operation with from this system The master control strategy or the algorithm routine that manually extract participation simulating, verifying are typically under two kinds of programmed environments very To being that different programming language realizes, in this case, the two property that is that there is some difference.
2, direct current or alternating current generator is utilized to simulate the matter simulating system that prime mover wind wheel is constituted.The method due to , there is not simulation modeling link in all material objects of electromotor, current transformer, can be to whole fan master control system Effectively emulate;But it is big that shortcoming is floor space, and cost is high, and not malleable difference unit capacity In the case of corresponding parameter, be limited to the speed regulation capacity of prime mover, be not easy to simulate various fast-changing wind The impact of speed.After this kind of method is applicable to producer's blower fan sizing mass production, blower fan dispatch from the factory before emulation Test.Even if so, the emulation testing major part of blower fan is to complete, equally with each subsystem local test It is difficult to the test of Global Uniformity;
3, physics programmable logic controller (PLC) (PLC, Programmable Logic Controller) is utilized to take Build analogue system.The method is exploitation blower fan simulated program in a physics PLC system, is used for simulating product Give birth to or receive the environment needed for fan master control system and electrical input signal and air-blower control command output, Exploitation blower fan simulation software with by the way of physical electrical is connected, realize signal between fan master control system Alternately.The method it is generally required to the mode utilizing manual codes to program progressively creates blower fan simulated program, this In the case of Zhong, the usual construction cycle can be the longest, and the simulated program cost of exploitation is high, and type adaptability is narrow.
In a word, existing that fan master control system carries out the used means of validation test is inefficient, motility Difference.
Summary of the invention
For solving the problems of the prior art, the embodiment of the present invention provides the operation of a kind of fan master control system to survey Test system and method.
For reaching above-mentioned purpose, the technical scheme of the embodiment of the present invention is achieved in that
The embodiment of the present invention provides the testing results system of a kind of fan master control system, and described system includes: mould Type sets up unit, language conversion unit and controller;Wherein,
Unit set up by model, for utilizing the modeling tool of graphical function, sets up blower fan model;
Language conversion unit, for the blower fan model journey that the blower fan model conversation of foundation becomes controller can identify Sequence;
Controller, the blower fan model program after running conversion, with blower fan master to be tested in running Ore-controlling Role carries out data docking, it is achieved the testing results to fan master control system to be tested.
In such scheme, described system also includes: authentication unit, for imitating the blower fan model set up True checking;
Correspondingly, language conversion unit, after simulating, verifying passes through, the blower fan model conversation set up is become control The blower fan model program that device processed can identify.
In such scheme, described system also includes: pretreatment unit, and the blower fan model set up is carried out code Conversion pretreatment;
Correspondingly, language conversion unit, for becoming to control by the blower fan model conversation after code conversion pretreatment The blower fan model program that device can identify.
In such scheme, described system also includes: output unit, for entering fan master control system to be measured During row testing results, by Simulation Interface output display relevant parameter variable and test result.
In such scheme, described system also includes: model cootrol parameter adjustment unit, at testing results During, when testing requirement changes, by Simulation Interface, adjust the associated control parameters of blower fan model, And after adjusting associated control parameters, trigger controller;
Correspondingly, controller, after the triggering receiving model cootrol parameter adjustment unit, after adjusting The associated control parameters of blower fan model, again run the blower fan model program after converting, and at running In carry out data with fan master control system to be tested and dock, it is achieved the operation to fan master control system to be tested is surveyed Examination.
In such scheme, when the controller and the operation wind that run described fan master control system correspondence program to be tested When the controller of machine model program is same controller, described in running with blower fan master control to be tested System carries out data docking, it is achieved to fan master control system testing results to be tested, including:
The control operational order assigned is transmitted directly to described by thread corresponding to described fan master control system to be measured The thread that blower fan model program is corresponding;
Operation result is transmitted directly to described blower fan to be measured master control system by the thread that described blower fan model program is corresponding The thread that system is corresponding;Or,
When the controller and the operation blower fan model program that run described fan master control system correspondence program to be tested When controller is two controllers, described in running, carry out data pair with fan master control system to be tested Connect, it is achieved to fan master control system testing results to be tested, including:
The control operational order assigned is passed through physical electrical by thread corresponding to described fan master control system to be measured I/O passage is sent to the thread that described blower fan model program is corresponding;
Operation result is sent to institute by physical electrical I/O passage by the thread that described blower fan model program is corresponding State the thread that fan master control system to be measured is corresponding.
The embodiment of the present invention also provides for a kind of testing results method of wind-driven generator master control system, including:
Utilize the modeling tool with graphical function, set up blower fan model;
The blower fan model conversation of foundation is become the blower fan model program that controller can identify;
Controller runs the blower fan model program after converting, and in running with blower fan to be tested master control system System carries out data docking, it is achieved the testing results to fan master control system to be tested.
In such scheme, the described blower fan model program becoming controller to identify the blower fan model conversation of foundation Before, described method also includes:
The blower fan model set up is carried out simulating, verifying, the blower fan model conversation that simulating, verifying will be set up after passing through Become the blower fan model program that controller can identify.
In such scheme, the described blower fan model program becoming controller to identify the blower fan model conversation of foundation Before, described method also includes:
The blower fan model set up is carried out code conversion pretreatment, by the blower fan model after code conversion pretreatment Change into the blower fan model program that controller can identify.
In such scheme, described method also includes:
During fan master control system to be measured is carried out testing results, by Simulation Interface output display phase Related parameter variable and test result.
In such scheme, described method also includes:
During testing results, when testing requirement changes, by Simulation Interface, adjust blower fan model Associated control parameters, and after adjusting associated control parameters, run the controller of blower fan model program according to tune The associated control parameters of whole rear fan model, again runs the blower fan model program after converting, and was running Journey carries out data with fan master control system to be tested dock, it is achieved the operation to fan master control system to be tested Test;During fan master control system to be measured is carried out testing results, relevant by Simulation Interface output Parametric variable and test result, by that analogy, until completing required various tests.
The testing results system and method for the fan master control system that the embodiment of the present invention provides, utilizes and has figure Change the modeling tool of function, set up blower fan model;Controller is become to identify the blower fan model conversation of foundation Blower fan model program;Controller runs the blower fan model program after converting, and with to be tested in running Fan master control system carries out data docking, it is achieved the testing results to fan master control system to be tested, so, Floor space be can effectively reduce, physical equipment dependency, raising testing efficiency and motility reduced, thus Significantly reduce testing cost.
Accompanying drawing explanation
Fig. 1 is the testing results system structure schematic diagram of the first fan master control system of the embodiment of the present invention;
Fig. 2 is the testing results system structure schematic diagram of embodiment of the present invention the second fan master control system;
Fig. 3 is the testing results system structure schematic diagram of the third fan master control system of the embodiment of the present invention;
Fig. 4 is the testing results method flow schematic diagram of a kind of fan master control system of the embodiment of the present invention;
Fig. 5 is the testing results method flow schematic diagram of embodiment of the present invention another kind fan master control system;
Fig. 6 is the testing results method schematic diagram of a kind of fan master control system of the embodiment of the present invention;
Fig. 7 is the blower fan model schematic set up in the embodiment of the present invention one;
The part signal signal that Fig. 8 is exported by blower fan model carries out in the embodiment of the present invention one simulating, verifying Figure;
Fig. 9 is to use simulation software to carry out the operation chart of code conversion in the embodiment of the present invention one;
Figure 10 is that in the embodiment of the present invention one, fan master control system program to be tested and blower fan model program are unified Integrated and they assignment interaction code fragmentary views;
Figure 11 is Simulation Interface test relevant parameter and variable schematic diagram in the embodiment of the present invention one;
Figure 12 is Simulation Interface display test fan starting grid-connected overall process schematic diagram in the embodiment of the present invention one.
Detailed description of the invention
In the following description, wind-driven generator control is referred to as blower fan;Wherein, wind-driven generator includes: Wind turbine and electromotor.
In embodiments of the present invention, utilize the modeling tool with graphical function, set up blower fan model;Will Blower fan model conversation becomes the blower fan model program that controller can identify;Described controller runs the blower fan after converting Model program, and carry out data with fan master control system to be tested and dock, it is achieved to blower fan to be tested master control system The testing results of system.
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in further detail.
The testing results system of the fan master control system that the embodiment of the present invention provides, as it is shown in figure 1, this system Including: model sets up unit 11, language conversion unit 12 and controller 13;Wherein,
Unit 11 set up by model, for utilizing the modeling tool of graphical function, sets up blower fan model;
Language conversion unit 12, for the blower fan that the blower fan model conversation of foundation becomes controller 13 can identify Model program;
Controller 13, for running the blower fan model program after conversion, and in running with wind to be tested Owner's Ore-controlling Role carries out data docking, it is achieved the testing results to fan master control system to be tested.
Here, controller 13 includes: run convert rear fan model program central processing unit (CPU) and Corresponding adjunct unit;Wherein, the concrete unit that corresponding adjunct unit is comprised is those skilled in the art Conventional techniques means, repeat no more here.
Wherein, as in figure 2 it is shown, the embodiment of the present invention provide fan master control system testing results system also May include that this system can also include: authentication unit 14, for the blower fan model set up is emulated Checking;
Correspondingly, language conversion unit 12, after simulating, verifying passes through, the blower fan model conversation set up is become The blower fan model program that controller 13 can identify.
As it is shown on figure 3, this system can also include: pretreatment unit 15, the blower fan model set up is carried out Code conversion pretreatment;
Correspondingly, language conversion unit 12, for becoming control by the blower fan model conversation after code conversion pretreatment The blower fan model program that device 13 processed can identify.
This system can also include: output unit, for fan master control system to be measured is being carried out testing results During, by Simulation Interface output display relevant parameter variable and test result.
This system can also include: model cootrol parameter adjustment unit, is used for during testing results, when When testing requirement changes, by Simulation Interface, adjust the associated control parameters of blower fan model, and adjusting phase Close after controlling parameter, trigger controller 13;
Correspondingly, controller 13, after the triggering receiving model cootrol parameter adjustment unit, according to adjustment After the associated control parameters of blower fan model, again run the blower fan model program after converting, and running Journey carries out data with fan master control system to be tested dock, it is achieved the operation to fan master control system to be tested Test.
The merit of each unit in the testing results system of embodiment of the present invention fan master control system is described below in detail Energy.
The testing results method of fan master control system that the embodiment of the present invention provides, as shown in Figure 4, including with Lower step:
Step 401: utilize the modeling tool with graphical function, set up blower fan model;
Here, the modeling tool described in graphical function refers to: each submodel is used figure Mode carries out the modeling tool shown, such as: MATLAB/SIMULINK or PSCAD etc., so, When user utilizes these modeling tools to set up phantom, can be by the figure corresponding to required submodel Utilize logic control to connect together, thus complete the foundation of model.For giving an example, it is assumed that user needs Setting up a blower fan model, required submodel includes: meteorological wind submodel, wind wheel submodel, transmission Chain submodel, logic control submodel and electromotor submodel etc., user has graphically from described The modeling tool of function finds or builds meteorological wind submodel, wind wheel submodel, driving-chain submodel and Logic control submodel each submodel graph of a correspondence, and there is described in being placed on the modeling work of graphical function In the development platform of tool, and these figures use the logic control that the figures such as arrow are corresponding link together, Thus complete the foundation of blower fan model, so, for developer, it is possible to quick, accurate and effective Set up blower fan model;Further, developer has only in the modeling tool offer with graphical function Submodel corresponding to blower fan model and control algolithm is edited on platform, and after modulating control parameter, can be complete Become the foundation of blower fan model, so need not developer possess the highest specialized capability ability.
Wherein, when utilizing the modeling tool with graphical function to set up blower fan model, that third party issues, And with the described modeling tool with graphical function have compatibility wind-powered electricity generation tool kit can be used for set up Blower fan model;Here, the wind-powered electricity generation tool kit that described third party issues refers to: the worker in wind-powered electricity generation field is free Issue, all wind-powered electricity generation tool kits that can use per capita;Described wind-powered electricity generation tool kit specifically may is that meteorology Wind submodel, wind wheel submodel, driving-chain submodel and electromotor submodel etc. are relevant to wind-power electricity generation Various functions or subsystem model.
When utilizing the modeling tool with graphical function to set up blower fan model, being correlated with according to target fan Parameter, and combine the theoretical research of wind-driven generator, analyze fan starting, variable speed, variable pitch control, The conditions such as driftage, call the submodel institute set up in the modeling tool with graphical function needed for blower fan model Graph of a correspondence, and the employing logic control of these figures is linked together, thus complete building of blower fan model Vertical.
The blower fan model that blower fan model is MW level large fan group set up.
Step 402: the blower fan model conversation of foundation is become the blower fan model program that controller can identify;
Here, before performing this step, the method can also include:
The blower fan model set up is carried out simulating, verifying, the blower fan model conversation that simulating, verifying will be set up after passing through Become the blower fan model program that controller can identify;Wherein, when the blower fan model set up is carried out simulating, verifying, Need first to set up the external interface submodel being connected with blower fan model, such as: wind speed, wind direction and system The submodels such as electrical network, after these external interface submodels are set up, can emulate the blower fan model set up Checking.What the blower fan model set up carried out simulating, verifying is implemented as those skilled in the art's conventional techniques Means, repeat no more here.
Before performing this step, the method can also include:
The blower fan model set up is carried out code conversion pretreatment, by the blower fan model after code conversion pretreatment Change into the blower fan model program that controller can identify.Wherein, described code conversion pretreatment includes: discrete Change processes, arranges simulation time step-length and arrange mode input output interface and parameter etc.;To the mould set up Type carries out the concrete processing procedure of pretreatment can use prior art.Here, when reality is applied, it is usually The blower fan model set up is carried out simulating, verifying, after simulating, verifying passes through, the blower fan model set up is carried out generation Code conversion pretreatment, becomes the blower fan mould that controller can identify by the blower fan model conversation after code conversion pretreatment Type program.
When the blower fan model program becoming controller to identify the blower fan model conversation of foundation, according to controller Type (being generally selected the hardware and software platform type corresponding with master control system controller to be measured), utilize described tool There is the language transformation function that the modeling tool of graphical function provides, become to control by the blower fan model conversation set up The high-level language programs that device is supported, such as: C/C++ LISP program LISP, IEC61131-3 LISP program LISP etc., Blower fan model program after being converted by language again is integrated into described controller corresponding integrated software automated environment In, after compiling is downloaded, blower fan model program just can the most directly run.
Described controller can be in PLC, PAC, PC (PC, Personal Computer) Virtual Controller or other CPU that can run relative program and auxiliary device etc.;Wherein, described PC In Virtual Controller refer to: there is the software Virtual Controller of PLC or PAC emulator function, this merit Can generally be provided by automated software supporting for PLC or PAC.
Step 403: controller runs the blower fan model program after converting, and with to be tested in running Fan master control system carries out data docking, it is achieved the testing results to fan master control system to be tested.
Here, when controller and the described blower fan of operation running described fan master control system correspondence program to be tested When the controller of model program is same controller, it may be assumed that run described fan master control system to be tested corresponding When cpu type is identical with running the described corresponding cpu type of blower fan model program (the most in step 402 Realize cpu type consistent), described in running, carry out data with fan master control system to be tested dock, Realize fan master control system testing results to be tested, specifically include:
The control operational order assigned is transmitted directly to described by thread corresponding to described fan master control system to be measured The thread that blower fan model program is corresponding;
Operation result is transmitted directly to described blower fan to be measured master control system by the thread that described blower fan model program is corresponding The thread that system is corresponding.
When controller and the described blower fan model journey of operation of running described fan master control system correspondence program to be tested When the controller of sequence is two controllers, it may be assumed that run CPU and the operation of described fan master control system to be tested When the CPU of described blower fan model program is two independent CPU, described in running with to be tested Fan master control system carries out data docking, it is achieved to fan master control system testing results to be tested, specifically include:
The control operational order assigned is passed through physical electrical by thread corresponding to described fan master control system to be measured I/O passage is sent to the thread that described blower fan model program is corresponding;
Operation result is sent to institute by physical electrical I/O passage by the thread that described blower fan model program is corresponding State the thread that fan master control system to be measured is corresponding.
Wherein, described physical electrical I/O passage may include that I/O board and corresponding cable connection.
Controller runs the blower fan model program after converting, and in running with blower fan to be tested master control system System carry out data docking, it may be assumed that the blower fan model program of operation by required I/O interactive mode just can with treat Test fan master control system carries out data docking, thus forms the test system of a closed loop.
At the research and development initial stage that fan master control system exploitation hardware condition is the most abundant, can be by blower fan master to be tested Controller used by Ore-controlling Role and the controller running described blower fan model program are set to same controller (can be the Virtual Controller of PC);At the middle and late stage of fan master control system exploitation, hardware condition is abundant In the case of, can be by the controller used by fan master control system to be tested and the described blower fan model program of operation Controller be separately operable in two physical controllers, so that test environment is closer to actual electricity Compression ring border.So, this flexile test mode can meet the different development of fan master control system Requirement, strong adaptability, thus significantly reduce testing cost.
The testing results method of the fan master control system that the present embodiment provides, utilizes and has building of graphical function Die worker has, and sets up blower fan model,
The testing results method of the fan master control system that the embodiment of the present invention provides, as it is shown in figure 5, the method Can also include:
Step 404: during fan master control system to be measured is carried out testing results, pass through Simulation Interface Output display relevant parameter variable and test result.
Here, the relevant parameter variable of output display may include that mean wind speed, mean wind direction, wind speed are disturbed Reason, wind direction Discontinuous Factors, tip speed ratio, current efficiency, generator power, loss power, change oar Angle desired value, the vane angle real output value that becomes, change oar speed real output value, generator speed etc..
The test result of output display may include that fan operation state, generator power, transducer power, Pitch position and yaw position etc..
Wherein, in the actual used time, user can select to need relevant parameter variable or the test result of output Particular content.
The method can also include: during testing results, when testing requirement change adjusts, by imitative True interface, adjusts the associated control parameters of blower fan model, and after adjusting associated control parameters, runs blower fan The controller of model program, according to the associated control parameters of adjustment rear fan model, runs the wind after converting again Machine model program, and in running, carry out data with fan master control system to be tested dock, it is achieved treat The testing results of test fan master control system;During fan master control system to be measured is carried out testing results, By Simulation Interface output relevant parameter variable and test result, by that analogy, until completing required various Test;So, can reach to optimize the checking logic control of fan master control system, algorithm and the mesh of relevant parameter 's.
Wherein, the change of described test condition demand refers to: tester wishes changing test condition (if not With meteorological wind parameter or type, different network load and failure conditions etc.) under observe and verify blower fan master to be tested The behavior of Ore-controlling Role;Here, change test condition is implemented as those skilled in the art's conventional techniques hands Section, repeats no more.
Described associated control parameters includes: wind model, mean wind speed 1, mean wind speed 2, wind speed Discontinuous Factors, Mathematics models, wind direction Discontinuous Factors, yaw angle encoder resolution, yawing velocity, yaw system are used Property time constant, generator rotation inertia, converter response inertia time constant, power generator electrode logarithm etc.. Wherein, two wind speed instruments that mean wind speed 1 and the corresponding blower fan of mean wind speed 2 are commonly used, two redundancy wind speed Instrument can improve reliability and the accuracy gathering wind speed numerical value.
By above description it is known that the operation of the fan master control system provided by the embodiment of the present invention Method of testing, can obtain a flow chart as shown in Figure 6, specifically, utilize and have graphical function Modeling tool, set up blower fan model;According to the type of controller, described in utilization, there is graphical function The language transformation function that modeling tool provides, becomes controller correspondence software and hardware to put down the blower fan model conversation of foundation The high-level language programs that platform is supported, such as: C/C++ LISP program LISP, IEC61131-3 LISP program LISP etc., Blower fan model integrated after again language being converted in described controller corresponding integrated software automated environment, After compiling is downloaded, blower fan model program just can the most directly run;Described controller is transported Blower fan model program after row conversion, now can run the controller of blower fan model program and attached list thereof Unit is referred to as blower fan analogue system, and carries out data with fan master control system to be tested in running and dock, Realize the testing results to fan master control system to be tested, so, can effectively reduce floor space, reduce Testing cost, improves testing efficiency.
Below in conjunction with specific embodiment, the present invention is described in further detail again.
The present embodiment one
It is straight that the present embodiment uses MATLAB/SIMULINK simulation software auxiliary to set up a 2.5MW permanent magnetism The testing results system of drive blower master control system;Wherein, it is C/C++ language that blower fan model code converts language, The major parameter of this permanent magnet direct-drive blower fan is as follows: rated power is 2500kw, and rotor diameter is 92m, specified Wind speed is 11m/s, and incision wind speed is 3m/s, and cut-out wind speed is 25m/s, and rotor rated speed is 16RPM, Rated voltage is 700V, and rated current is 2060A, and electromotor rated frequency is 16Hz, generating Machine number of pole-pairs is 60P.Controller used can be each producer PLC or PAC meeting functional requirement, or Person is that other can meet the controller of functional requirement;Certainly, target fan can also be double-fed or other type The blower fan of each capacitance grade.
The flow process of the testing results system that the present embodiment sets up fan master control system includes:
Step one: use MATLAB/SIMULINK simulation software to set up blower fan model;
The blower fan model set up specifically includes that change blade wind turbine and driving-chain submodel, permanent-magnet synchronous generating Loom model, fan condition switching control submodel, change oar and direct torque submodel, current transformer submodel And system electrical network submodel etc..Wherein, when setting up blower fan model, for each submodel, remove In the Simulink Library that MATLAB/SIMULINK simulation software carries, emulation tool bag can be direct Outside using, it is also possible to use the emulation tool bag that numerous third party develops, as such, it is possible to be greatly improved model The efficiency set up and speed.
Submodule is set up below with wind wheel and drive system, magneto alternator and fan condition switching control As a example by type, blower fan model is set up process and simply introduces.
1, blade wind turbine and the foundation of driving-chain submodel are become
In the correlator model kit resource of MATLAB/SIMULINK simulation software, more existing specialties Wind wheel and drive system submodel.In the present embodiment, for example with third party exploitation wind-powered electricity generation simulation package- Feather blower fan wind wheel model (Wind in wind-driven generator tool kit (Wind Turbine Blockset) Turbine Rotor Variable Pitch) and second-order model driving-chain (Drive-Train(Two-mass model)) Respectively as wind wheel waveform and drive system submodel, as shown in Figure 7.Wherein, wind wheel parameter arranges and includes: Wind wheel radius (Blade radius) is 46m, and atmospheric density (Air density) is 1.25kg/m3, incision Wind speed (Cut in speed) is 3m/sec, and cut-out wind speed (Cut out speed) is 25m/sec, thus complete Become to become blade wind turbine and the foundation of driving-chain submodel.
2, the foundation of magneto alternator submodel
SimPowerSystems under Simulink Library in MATLAB/SIMULINK simulation software Tool kit contains permanent-magnet synchronous wind turbine power generation loom model, therefore, has the most directly used Existing permanent-magnet synchronous wind turbine power generation loom model in MATLAB/SIMULINK simulation software, such as Fig. 7 Shown in, and according to the relevant parameter of target fan, configuration relevant parameter can complete magneto alternator The foundation of model.
3, the foundation of fan condition switching control submodel
The fan condition set up controls submodel needs the function realized to include: according to wind speed and wind direction to blower fan Control accordingly;Under stable hydraulic pressure or electrical control, become oar and driftage;Simultaneously monitor electromotor fortune The temperature of row and the oil pressure of hydraulic system etc., report to the police when having exception, make fan parking if desired; Mainly according to the different operating conditions of wind-driven generator, it is achieved the different basic status of blower fan are run and triggered and turn The work such as change.Wherein, it is achieved the basic status of blower fan include: shut down, start, generate electricity by way of merging two or more grid systems, become oar And driftage, fault brake, the fan condition of foundation controls submodel as shown in Figure 7.
Step 2: modelling verification and code convert
After blower fan model has been set up, can run in MATLAB/SIMULINK simulation software (Run) the blower fan model set up, in order to the blower fan model set up is carried out simulating, verifying.
During carrying out simulating, verifying, with Scope oscillograph, the signal of required observation is exported, in order to Whether the model that checking is set up meets the expected requirements, and Fig. 8 is that the blower fan model set up is carried out simulation run institute The part signal of output, is followed successively by: wind speed, yaw angle, rotating speed, change vane angle, electromotor from top to bottom Output.
After blower fan model is by checking, utilize MATLAB/SIMULINK simulation software, blower fan model Carry out pretreatment, including: sliding-model control, simulation time step-length is set and mode input output is set connects Mouth and parameter etc., further according to the type of controller, configure corresponding parameter, and select the controller soft of correspondence Part platforms etc., would generally select the controller CPU used with fan master control system to be measured to put down in actual application Output that platform type is identical is (such as good fortune, Ingeborg Bachmann PLC correspondence 3S CoDeSys platform, Bei Jialai PLC again Corresponding B&R platform), as it is shown in figure 9, the control that generated blower fan model program is corresponding thus can be made Device cpu type processed is identical with the type of the controller CPU that fan master control system to be measured is used, after this is Continuous selection integrated (two programs synthesis run in same controller) or separately independent test provide more Many motilities.Finally, utilize MATLAB/SIMULINK simulation software, blower fan model conversation is become C/C++ The blower fan model program of language (during actual application, it is also possible to be other language);It addition, according to blower fan master Ore-controlling Role program actual interrupt frequency, arranges program interrupt corresponding to blower fan model and performs step-length (Step), as It is set to 0.01s, thus completion code conversion process.
The program code corresponding when fan master control system to be tested is integrated in same with the program code of blower fan model After in the integrated automation platform of individual controller, program that fan master control system to be tested is corresponding and blower fan mould Can carry out various forms of data interaction between the program that type is corresponding, wherein, simplest is also the most direct Interactive mode be exactly that the code assignment of cross-thread is mutual, in other words, it is simply that by journey corresponding for blower fan model The input variable of the program that the output variable of sequence is corresponding with test fan master control system carries out assignment docking, and will The order that the order output of the program that test fan master control system is corresponding is assigned to program corresponding to blower fan model is defeated Enter, as shown in Figure 10.Here, it should be understood that for realize fan master control system to be tested corresponding Between program and program corresponding to blower fan model, mutual language is not limited by the used language of blower fan model conversation System, can be any one programming language of being supported of controller platform, in such as IEC61131-3 language Struct Text(ST) language etc., as shown in Figure 10.
Meanwhile, some man machine interfaces developed by the engineering automated software platform that controller is corresponding, it may be assumed that imitative Some important variablees of fan master control system or parameter i.e. associated control parameters are carried out interface display by true interface, And as shown in figure 11, thus can be realized wind to be tested by operation these associated control parameters of interface modification The start-stop of the testing results of owner's Ore-controlling Role triggers and controls, and adjusts model parameter by Simulation Interface and check Simulation result, to observe blower fan operation feedback of system under different operating modes, as shown in figure 12.Generally, The basic controlling logic of blower fan and flow process and major part control algolithm all can be tested in aforementioned manners.
When running the controller of fan master control system correspondence program to be tested and the control running blower fan model program When device is two independent controls, can be that fan master control system to be tested offer one is applied more really Environment, coordinates with input and output I/O board and corresponding cable connection, forms semi-matter simulating system, from And complete artificial site physical electrical connection, so, emulation testing can be made more life-like and complete. In a word, each for blower fan master control development project of this flexible, master control test system that hsrdware requirements are little Function debugging is to be suitable for very much with easily.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or meter Calculation machine program product.Therefore, the present invention can use hardware embodiment, software implementation or combine software and The form of the embodiment of hardware aspect.And, the present invention can use and wherein include calculating one or more The computer-usable storage medium of machine usable program code (includes but not limited to disk memory and optical storage Device etc.) form of the upper computer program implemented.
The present invention is with reference to method, equipment (system) and computer program according to embodiments of the present invention Flow chart and/or block diagram describe.It should be understood that can be by computer program instructions flowchart and/or side Flow process in each flow process in block diagram and/or square frame and flow chart and/or block diagram and/or the knot of square frame Close.Can provide these computer program instructions to general purpose computer, special-purpose computer, Embedded Processor or The processor of other programmable data processing device is to produce a machine so that by computer or other can The instruction that the processor of programming data processing equipment performs produces for realizing in one flow process or multiple of flow chart The device of the function specified in flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions may be alternatively stored in and can guide computer or other programmable data processing device In the computer-readable memory worked in a specific way so that be stored in this computer-readable memory Instruction produces the manufacture including command device, and this command device realizes at one flow process of flow chart or multiple stream The function specified in journey and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, makes Sequence of operations step must be performed to produce computer implemented place on computer or other programmable devices Reason, thus the instruction performed on computer or other programmable devices provides for realizing flow chart one The step of the function specified in flow process or multiple flow process and/or one square frame of block diagram or multiple square frame.
The above, only presently preferred embodiments of the present invention, it is not intended to limit the protection model of the present invention Enclose.

Claims (12)

1. the testing results system of a fan master control system, it is characterised in that described system includes: model Set up unit, language conversion unit and controller;Wherein,
Unit set up by model, for utilizing the modeling tool of graphical function, sets up blower fan model;
Language conversion unit, for the blower fan model journey that the blower fan model conversation of foundation becomes controller can identify Sequence;
Controller, the blower fan model program after running conversion, with blower fan master to be tested in running Ore-controlling Role carries out data docking, it is achieved the testing results to fan master control system to be tested;
The described modeling tool with graphical function refers to: each submodel of blower fan model is used figure The mode of shape carries out the modeling tool shown.
System the most according to claim 1, it is characterised in that described system also includes: authentication unit, For the blower fan model set up is carried out simulating, verifying;
Correspondingly, language conversion unit, after simulating, verifying passes through, the blower fan model conversation set up is become control The blower fan model program that device processed can identify.
System the most according to claim 1, it is characterised in that described system also includes: pretreatment list Unit, carries out code conversion pretreatment to the blower fan model set up;
Correspondingly, language conversion unit, for becoming to control by the blower fan model conversation after code conversion pretreatment The blower fan model program that device can identify.
4. according to the system described in any one of claims 1 to 3, it is characterised in that described system also includes: Output unit, for during fan master control system to be measured is carried out testing results, passes through Simulation Interface Output display relevant parameter variable and test result.
System the most according to claim 4, it is characterised in that described system also includes: model cootrol Parameter adjustment unit, for during testing results, when testing requirement changes, by Simulation Interface, Adjust the associated control parameters of blower fan model, and after adjusting associated control parameters, trigger controller;
Correspondingly, controller, after the triggering receiving model cootrol parameter adjustment unit, after adjusting The associated control parameters of blower fan model, again run the blower fan model program after converting, and at running In carry out data with fan master control system to be tested and dock, it is achieved the operation to fan master control system to be tested is surveyed Examination.
6. according to the system described in any one of claims 1 to 3, it is characterised in that described to be measured when running The controller of examination fan master control system correspondence program is same control with the controller of operation blower fan model program During device, described in running, carry out data with fan master control system to be tested dock, it is achieved to be tested Fan master control system testing results, including:
The control operational order assigned is transmitted directly to described by thread corresponding to described fan master control system to be measured The thread that blower fan model program is corresponding;
Operation result is transmitted directly to described blower fan to be measured master control system by the thread that described blower fan model program is corresponding The thread that system is corresponding;Or,
When the controller and the operation blower fan model program that run described fan master control system correspondence program to be tested When controller is two controllers, described in running, carry out data pair with fan master control system to be tested Connect, it is achieved to fan master control system testing results to be tested, including:
The control operational order assigned is passed through physical electrical by thread corresponding to described fan master control system to be measured I/O passage is sent to the thread that described blower fan model program is corresponding;
Operation result is sent to institute by physical electrical I/O passage by the thread that described blower fan model program is corresponding State the thread that fan master control system to be measured is corresponding.
7. the testing results method of a wind-driven generator master control system, it is characterised in that described method includes:
Utilize the modeling tool with graphical function, set up blower fan model;
The blower fan model conversation of foundation is become the blower fan model program that controller can identify;
Controller runs the blower fan model program after converting, and in running with blower fan to be tested master control system System carries out data docking, it is achieved the testing results to fan master control system to be tested;
The described modeling tool with graphical function refers to: each submodel of blower fan model is used figure The mode of shape carries out the modeling tool shown.
Method the most according to claim 7, it is characterised in that the described blower fan model conversation that will set up Before becoming the blower fan model program that controller can identify, described method also includes:
The blower fan model set up is carried out simulating, verifying, the blower fan model conversation that simulating, verifying will be set up after passing through Become the blower fan model program that controller can identify.
Method the most according to claim 7, it is characterised in that the described blower fan model conversation that will set up Before becoming the blower fan model program that controller can identify, described method also includes:
The blower fan model set up is carried out code conversion pretreatment, by the blower fan model after code conversion pretreatment Change into the blower fan model program that controller can identify.
Method the most according to claim 7, it is characterised in that when running described blower fan master to be tested When the controller of the controller of Ore-controlling Role correspondence program and operation blower fan model program is same controller, institute State and in running, carry out data with fan master control system to be tested dock, it is achieved to blower fan master control to be tested System testing results, including:
The control operational order assigned is transmitted directly to described by thread corresponding to described fan master control system to be measured The thread that blower fan model program is corresponding;
Operation result is transmitted directly to described blower fan to be measured master control system by the thread that described blower fan model program is corresponding The thread that system is corresponding;Or,
When the controller and the operation blower fan model program that run described fan master control system correspondence program to be tested When controller is two controllers, described in running, carry out data pair with fan master control system to be tested Connect, it is achieved to fan master control system testing results to be tested, including:
The control operational order assigned is passed through physical electrical by thread corresponding to described fan master control system to be measured I/O passage is sent to the thread that described blower fan model program is corresponding;
Operation result is sent to institute by physical electrical I/O passage by the thread that described blower fan model program is corresponding State the thread that fan master control system to be measured is corresponding.
11. according to the method described in any one of claim 7 to 10, it is characterised in that described method is also wrapped Include:
During fan master control system to be measured is carried out testing results, by Simulation Interface output display phase Related parameter variable and test result.
12. methods according to claim 11, it is characterised in that described method also includes:
During testing results, when testing requirement changes, by Simulation Interface, adjust blower fan model Associated control parameters, and after adjusting associated control parameters, run the controller of blower fan model program according to tune The associated control parameters of whole rear fan model, again runs the blower fan model program after converting, and was running Journey carries out data with fan master control system to be tested dock, it is achieved the operation to fan master control system to be tested Test;During fan master control system to be measured is carried out testing results, relevant by Simulation Interface output Parametric variable and test result, by that analogy, until completing required various tests.
CN201310665563.8A 2013-12-09 2013-12-09 A kind of testing results system and method for fan master control system Expired - Fee Related CN103713622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310665563.8A CN103713622B (en) 2013-12-09 2013-12-09 A kind of testing results system and method for fan master control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310665563.8A CN103713622B (en) 2013-12-09 2013-12-09 A kind of testing results system and method for fan master control system

Publications (2)

Publication Number Publication Date
CN103713622A CN103713622A (en) 2014-04-09
CN103713622B true CN103713622B (en) 2016-08-17

Family

ID=50406673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310665563.8A Expired - Fee Related CN103713622B (en) 2013-12-09 2013-12-09 A kind of testing results system and method for fan master control system

Country Status (1)

Country Link
CN (1) CN103713622B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103969578B (en) * 2014-03-18 2017-02-01 电子科技大学 Device and method for testing power grid adaptability of wind power generating unit
CN109343448B (en) * 2018-09-18 2020-09-08 国电联合动力技术有限公司 Programming system and programming method for fan integrated control system
CN109782626A (en) * 2019-01-17 2019-05-21 中国东方电气集团有限公司 A kind of wind power master control real-time simulation test macro based on RT-LAB
CN110262454B (en) * 2019-06-25 2020-10-13 三一重能有限公司 Test system, method and device for fan control system
CN112014715B (en) * 2020-07-24 2023-06-27 杭州微光电子股份有限公司 EC fan control panel detection device
CN113238491B (en) * 2021-04-12 2023-05-05 湖南三一智能控制设备有限公司 Simulation test method and device of execution mechanism, intelligent arm support and engineering vehicle
CN116339291B (en) * 2023-05-31 2023-07-28 三峡智控科技有限公司 Test system for multi-platform PLC wind turbine generator system main control system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799688A (en) * 2010-04-12 2010-08-11 东南大学 Wind power generation semi-physical simulation test platform
CN102385377A (en) * 2011-09-16 2012-03-21 上海卡鲁自动化科技有限公司 Hardware in the loop experiment system used for wind power generator master control system test and method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799688A (en) * 2010-04-12 2010-08-11 东南大学 Wind power generation semi-physical simulation test platform
CN102385377A (en) * 2011-09-16 2012-03-21 上海卡鲁自动化科技有限公司 Hardware in the loop experiment system used for wind power generator master control system test and method thereof

Also Published As

Publication number Publication date
CN103713622A (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN103713622B (en) A kind of testing results system and method for fan master control system
Munteanu et al. Hardware-in-the-loop-based simulator for a class of variable-speed wind energy conversion systems: Design and performance assessment
CN106650072B (en) Semi-physical simulation-based virtual grid-connected detection system and method for same generator
Ellis et al. Description and technical specifications for generic WTG models—A status report
KR100930956B1 (en) Real time simulator of wind power system
Ovando et al. Emulation of a low power wind turbine with a DC motor in Matlab/Simulink
CN105404720A (en) Hardware-in-loop simulation based wind power unit modeling method
CN203324019U (en) Semi-physical real-time simulation platform of wind turbine generator system
EP2157488A2 (en) Systems and methods for simulating plant operations
CN102819221B (en) LVRT Capability of Wind Turbine Generator characteristic associative simulation model and joint simulation method thereof
CN103760809B (en) Simulation method and device for simulating operation of wind turbine generator and PLC system
CN102722107A (en) Intelligent integrated development and test system for high-voltage frequency converter and establishment method thereof
CN109782626A (en) A kind of wind power master control real-time simulation test macro based on RT-LAB
CN101799688A (en) Wind power generation semi-physical simulation test platform
CN102879199A (en) Full-condition wind turbine simulator
CN103064412B (en) Online simulation test and control system of wind generating set control device and test method thereof
CN104597765A (en) Semi-physical real-time simulation platform of wind generating set
CN108508360A (en) Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system
Moness et al. A real-time heterogeneous emulator of a high-fidelity utility-scale variable-speed variable-pitch wind turbine
JP2004133650A (en) Method of simulating and verifying control logic and personal computer for simulation and verification
CN109800455A (en) A kind of idle characteristic Simulation method and apparatus of double-fed fan motor unit transient state
CN109066768A (en) The double-fed fan motor unit combined simulation system and method for multiple-variable flow device parallel connection
CN103324801B (en) Wind energy conversion system digital simulation method based on RTDS
Neshati et al. Hardware-in-the-loop testing of wind turbine nacelles for electrical certification on a dynamometer test rig
CN110427642A (en) A kind of Wind turbines electromagnetical transient emulation method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20201209

CF01 Termination of patent right due to non-payment of annual fee