CN103711306B - Collecting well, elevator pit sunk type close inside casing section mould plate construction method - Google Patents

Collecting well, elevator pit sunk type close inside casing section mould plate construction method Download PDF

Info

Publication number
CN103711306B
CN103711306B CN201410007817.1A CN201410007817A CN103711306B CN 103711306 B CN103711306 B CN 103711306B CN 201410007817 A CN201410007817 A CN 201410007817A CN 103711306 B CN103711306 B CN 103711306B
Authority
CN
China
Prior art keywords
template
column
collecting well
elevator pit
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410007817.1A
Other languages
Chinese (zh)
Other versions
CN103711306A (en
Inventor
胡建
胡明华
吴建军
孙峰
陈建
邱训华
崔小洪
陈玉娟
沈祥
杨建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huatong Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410007817.1A priority Critical patent/CN103711306B/en
Publication of CN103711306A publication Critical patent/CN103711306A/en
Application granted granted Critical
Publication of CN103711306B publication Critical patent/CN103711306B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of collecting well, elevator pit sunk type closes inside casing section mould plate construction method, comprise the processing of template, flitch size, the making of hollow column, template bottom opening, column is installed, and secondary joist is installed, top cover form for seal, suspension ring are installed, the steps such as reinforcing template.The present invention is rational in infrastructure, arranges the double model of the column doing steam vent of hollow main joist, ensure that it has enough rigidity in template inside.Bottom adopts new-type location docking bracing means, and ensure that bottom template is smooth, concrete not easily enters in template, makes bottom template readily removable.Suspension ring are set in collecting well both sides, are convenient to lifting.

Description

Collecting well, elevator pit sunk type close inside casing section mould plate construction method
Technical field
The present invention relates to a kind of collecting well, elevator pit sunk type closes inside casing section mould plate construction method.
Background technology
In the middle of the construction in city, engineering design basement all can have collecting well and elevator pit.Walk terraced pit, staircase pit has sump, outdoor mounted valve well room, cable shaft etc. all have sump.
In the middle of practice of construction, basement collecting well, elevator pit template construction frequently occur that template is floated, even due to its rigidity mould that rises not, and work progress is once occur that construction problem is difficult to repairing and recovers, and causes unnecessary artificial, the waste of material, Machine Repairing to follow-up work.
Summary of the invention
A kind of easy construction, effective collecting well, elevator pit sunk type is the object of the present invention is to provide to close inside casing section mould plate construction method.
Technical solution of the present invention is:
A kind of collecting well, elevator pit sunk type close inside casing section mould plate construction method, comprise the processing of template, flitch size, the making of hollow column, template bottom opening, and column is installed, and secondary joist is installed, top cover form for seal, and suspension ring are installed, reinforcing template; It is characterized in that: abdicate tongue and groove when the middle rib keel between template deformation seam lay and meet concrete face slab, another side exports, and avoids the spillage problem of form joint; During the arranging of column, the inner 500-600mm of template arranges hollow column, and hollow column adopts multiple equally distributed hollow main joist, will closely be linked as entirety in length and breadth to flitch, and by top template again Seal treatment prevent from entering template during concrete placings; Bottom template during leghole process, with 30mm wide stainless steel iron sheet, clad steel silk screen is pushed down, then follow closely fix tightly with self-tapping screw, to stop concrete to be poured in column, and play scavenging action; After having built bed course, unwrapping wire has been released template steam vent distributing position and has been marked with red paint;
Bottom template when screw rod location and Template Location, before collecting well reinforcing bar binding, set positioner, highly by identifier elevation location, ensure that bottom reinforcement bars is smooth, place cement stick on then on reinforcing bar and use colligation jail; On the plate of shaft bottom according to the position of the steam vent central point identified before by with the screw rod of seal ring and baseplate reinforcing bar firm welding;
Template corner all arranges suspension ring, template is hung in collecting well or elevator pit, makes template steadily enter mould, ensures that template single step of releasing surely puts standard;
In the even placing steel tubes in template top, weld with the screw rod being arranged on column at top Φ 25 reinforcing bar; In order to ensure that template is more firm, evenly placing raft template on top, ensureing template not run-off the straight when building concrete, floating situation.
The present invention is rational in infrastructure, arranges the double model of the column doing steam vent of hollow main joist, ensure that it has enough rigidity in template inside.Bottom adopts new-type location docking bracing means, and ensure that bottom template is smooth, concrete not easily enters in template, makes bottom template readily removable.Suspension ring are set in collecting well both sides, are convenient to lifting.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
A kind of collecting well, elevator pit sunk type close inside casing section mould plate construction method, comprise the processing of template, flitch size, the making of hollow column, template bottom opening, and column is installed, and secondary joist is installed, top cover form for seal, and suspension ring are installed, reinforcing template; Middle rib keel between template deformation seam lay while abdicate tongue and groove when meeting concrete face slab, and another side exports, and avoids the spillage problem of form joint; During the arranging of column, the inner 500-600mm of template arranges hollow column, and hollow column adopts multiple equally distributed hollow main joist, will closely be linked as entirety in length and breadth to flitch, and by top template again Seal treatment prevent from entering template during concrete placings; Bottom template during leghole process, with 30mm wide stainless steel iron sheet, clad steel silk screen is pushed down, then follow closely fix tightly with self-tapping screw, to stop concrete to be poured in column, and play scavenging action; After having built bed course, unwrapping wire has been released template steam vent distributing position and has been marked with red paint;
Bottom template when screw rod location and Template Location, before collecting well reinforcing bar binding, set positioner, highly by identifier elevation location, ensure that bottom reinforcement bars is smooth, place cement stick on then on reinforcing bar and use colligation jail; On the plate of shaft bottom according to the position of the steam vent central point identified before by with the screw rod of seal ring and baseplate reinforcing bar firm welding;
Template corner all arranges suspension ring, template is hung in collecting well or elevator pit, makes template steadily enter mould, ensures that template single step of releasing surely puts standard;
In the even placing steel tubes in template top, weld with the screw rod being arranged on column at top Φ 25 reinforcing bar; In order to ensure that template is more firm, evenly placing raft template on top, ensureing template not run-off the straight when building concrete, floating situation.

Claims (1)

1. collecting well, elevator pit sunk type close an inside casing section mould plate construction method, comprise the processing of template, flitch size, the making of hollow column, template bottom opening, and column is installed, and secondary joist is installed, top cover form for seal, and suspension ring are installed, reinforcing template; It is characterized in that: abdicate tongue and groove when the middle rib keel between template deformation seam lay and meet concrete face slab, another side exports, and avoids the spillage problem of form joint; During the arranging of column, the inner 500-600mm of template arranges hollow column, and hollow column adopts multiple equally distributed hollow main joist, will closely be linked as entirety in length and breadth to flitch, and by top template again Seal treatment prevent from entering template during concrete placings; Bottom template during leghole process, with 30mm wide stainless steel iron sheet, clad steel silk screen is pushed down, then follow closely fix tightly with self-tapping screw, to stop concrete to be poured in column, and play scavenging action; After having built bed course, unwrapping wire has been released template steam vent distributing position and has been marked with red paint;
Bottom template when screw rod location and Template Location, before collecting well reinforcing bar binding, set positioner, highly by identifier elevation location, guarantee bottom reinforcement bars is smooth, then on reinforcing bar, places cement stick and colligation is firm; On the plate of shaft bottom according to the position of the steam vent central point identified before by with the screw rod of seal ring and baseplate reinforcing bar firm welding;
Template corner all arranges suspension ring, template is hung in collecting well or elevator pit, makes template steadily enter mould, ensures that template single step of releasing surely puts standard;
In the even placing steel tubes in template top, weld with the screw rod being arranged on column at top Φ 25 reinforcing bar; In order to ensure that template is more firm, evenly placing raft template on top, ensureing template not run-off the straight when building concrete, floating situation.
CN201410007817.1A 2014-01-08 2014-01-08 Collecting well, elevator pit sunk type close inside casing section mould plate construction method Expired - Fee Related CN103711306B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007817.1A CN103711306B (en) 2014-01-08 2014-01-08 Collecting well, elevator pit sunk type close inside casing section mould plate construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007817.1A CN103711306B (en) 2014-01-08 2014-01-08 Collecting well, elevator pit sunk type close inside casing section mould plate construction method

Publications (2)

Publication Number Publication Date
CN103711306A CN103711306A (en) 2014-04-09
CN103711306B true CN103711306B (en) 2015-12-30

Family

ID=50404619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007817.1A Expired - Fee Related CN103711306B (en) 2014-01-08 2014-01-08 Collecting well, elevator pit sunk type close inside casing section mould plate construction method

Country Status (1)

Country Link
CN (1) CN103711306B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822061A (en) * 2016-04-06 2016-08-03 中国十七冶集团有限公司 Formwork mounting and support reinforcing system for collector well, elevator shaft and the like
CN106930523A (en) * 2017-03-14 2017-07-07 中国十七冶集团有限公司 A kind of concrete structure catch pit detachable template reinforcement technique

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228634A (en) * 1996-02-26 1997-09-02 Hiromichi Kimura Constructing method of slab on pit and water tank in pit
CN202430997U (en) * 2011-12-27 2012-09-12 中建七局第四建筑有限公司 Reinforcing device for template of sump or elevator shaft
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump template

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228634A (en) * 1996-02-26 1997-09-02 Hiromichi Kimura Constructing method of slab on pit and water tank in pit
CN202430997U (en) * 2011-12-27 2012-09-12 中建七局第四建筑有限公司 Reinforcing device for template of sump or elevator shaft
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump template

Also Published As

Publication number Publication date
CN103711306A (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN104895318A (en) Aluminum alloy template system and construction method of same
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN206625428U (en) Floor closed system is poured after a kind of pipe well
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN103711306B (en) Collecting well, elevator pit sunk type close inside casing section mould plate construction method
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN106958313A (en) Floor closed system and its construction method are poured after a kind of pipe well
CN206873945U (en) A kind of constructing device for lifting concrete floorslab thickness qualities
CN206352388U (en) A kind of special scaffold of dual operation platform elevator
CN104831832B (en) Assembly of shear wall structure and its installation method
CN109025275A (en) A kind of shear wall side regularization stair punching block and installation method
CN106284653A (en) The construction method that a kind of balcony construct capital interspaces in advance
CN205804949U (en) A kind of sealing reversed beam model sheetinstallat fixing device
CN104499706A (en) Elevator well template platform and construction method thereof
CN203808281U (en) Shock isolation structure for shaft bottom-hung conversion brackets
CN207647169U (en) A kind of climbing type flue formwork system
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN206337643U (en) Pre-fabricated one
CN204059555U (en) Building finishing tap
CN107780655A (en) A kind of climbing type flue formwork system and its construction method
CN107761759A (en) A kind of L-type concrete guard wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Hu Jian

Inventor after: Yang Jianzhong

Inventor after: Hu Minghua

Inventor after: Wu Jianjun

Inventor after: Sun Feng

Inventor after: Chen Jian

Inventor after: Qiu Xunhua

Inventor after: Cui Xiaohong

Inventor after: Chen Yujuan

Inventor after: Shen Xiang

Inventor before: Cheng Jun

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151030

Address after: 226002 No. 8, Yongxing Road, Nantong, Jiangsu

Applicant after: Nantong Huatong Construction Group Co.,Ltd.

Address before: Tongzhou District Xingyuan road Jiangsu city of Nantong province sunshine mansion 226300 Building No. 63 room 2208

Applicant before: Cheng Jun

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20220108

CF01 Termination of patent right due to non-payment of annual fee