CN103708349A - Split type girder moving crane - Google Patents

Split type girder moving crane Download PDF

Info

Publication number
CN103708349A
CN103708349A CN201410013605.4A CN201410013605A CN103708349A CN 103708349 A CN103708349 A CN 103708349A CN 201410013605 A CN201410013605 A CN 201410013605A CN 103708349 A CN103708349 A CN 103708349A
Authority
CN
China
Prior art keywords
crane frame
crane
split type
frame
shoulder pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410013605.4A
Other languages
Chinese (zh)
Inventor
赵建华
师韵
童国柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Original Assignee
ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGJIAN LUQIAO EQUIPMENT Co Ltd filed Critical ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Priority to CN201410013605.4A priority Critical patent/CN103708349A/en
Publication of CN103708349A publication Critical patent/CN103708349A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention relates to a split type girder moving crane. The split type girder moving crane comprises a left crane frame and a right crane frame, wherein the tops of the left crane frame and the right crane frame are provided with winding engines, each winding engine is provided with a fixed pulley group, each fixed pulley group is connected with a movable pulley group, and each movable pulley group is connected with a suspension girder shoulder pole; and the bottoms of the left crane frame and the right crane frame are provided with running mechanisms. During working, a bridge component is firstly fixed on the suspension girder shoulder pole through a hanger, then the winding engines on the left crane frame and the right crane frame are started at the same time after the bridge component is anchored so that the bridge component is raised to an appointed height, then the running mechanisms are started to drive the left crane frame and the right crane frame to move front and back along rails so that the split type girder moving crane moves to an appointed position, then the winding engines are started, and the bridge component is placed at a specific position for installation.

Description

The split type beam hoisting crane that moves
Technical field
The invention belongs to bridge weight-lifting equipment technical field, specifically relate to a kind of split type beam hoisting crane that moves that is applicable to bridge construction.
Background technology
Along with the needs of China economy suggestion, the developing rapidly of China Expressway, bridge construction is also more and more, and highway bridging machine, as the large special equipment in construction, has become indispensable key equipment in bridge on highway construction.In the process of bridge erection, need to beam slab parts be winched to assigned address by hoisting crane installs, but hoisting crane is all conjoined structure now, above hoisting crane, adopt crossbeam to connect, cause the width of hoisting crane not change according to site environment, seriously limited the lifting scope of hoisting crane.
Summary of the invention
The present invention has solved the existing above-mentioned technical matters of existing Bridge Erector, and the split type beam hoisting crane that moves is provided, and by hanging beam shoulder pole is set, has saved the middle connecting cross beam of hoisting crane, makes hoisting crane not limited by crossbeam; During lifting, only need according to bridge parts, lay the track of respective width, can realize the lifting of bridge parts, increase split type lifting scope of moving beam hoisting crane; And due to the minimizing of connecting cross beam, the split type beam hoisting crane overall weight of moving is significantly reduced, saved enterprise's productive costs.
Above-mentioned technical matters of the present invention is mainly solved by following technical proposals: the split type beam hoisting crane that moves, comprise left crane frame and right crane frame, described left crane frame and right crane frame top arrange winch, fixed pulley group is set on described winch, described fixed pulley group is connected with running block, and described running block is connected with hanging beam shoulder pole.
As preferably, described left crane frame and from right to left heavy-duty machine bottom of frame arrange traveling gear, in order to control the split type beam hoisting crane that moves, along track, seesaw.
As preferably, on described hanging beam shoulder pole, shoulder pole counterweight is set, for balance hanging beam shoulder pole.
As preferably, on described hanging beam shoulder pole, suspender is set, described suspender is in order to anchorage bridge parts.
The beneficial effect that the present invention has: by hanging beam shoulder pole is set, saved the middle connecting cross beam of hoisting crane, made hoisting crane not limited by crossbeam; During lifting, only need according to bridge parts, lay the track of respective width, can realize the lifting of bridge parts, increase split type lifting scope of moving beam hoisting crane; And due to the minimizing of connecting cross beam, the split type beam hoisting crane overall weight of moving is significantly reduced, saved enterprise's productive costs.Therefore the present invention has the features such as simple in structure, reasonable in design.
Accompanying drawing explanation
Fig. 1 is front view of the present invention.
Fig. 2 is lateral plan of the present invention.
In figure: 1, winch; 2, running block; 3, fixed pulley group; 4, hanging beam shoulder pole; 5, suspender; 6, right crane frame; 7, shoulder pole counterweight; 8, traveling gear; 9, bridge parts; 10, left crane frame; 11, track.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
Embodiment: the split type beam hoisting crane that moves, as depicted in figs. 1 and 2, comprise left crane frame and right crane frame, described left crane frame and right crane frame top arrange winch, fixed pulley group is set on described winch, described fixed pulley group is connected with running block, and described running block is connected with hanging beam shoulder pole; Described left crane frame and from right to left heavy-duty machine bottom of frame arrange traveling gear, in order to control the split type beam hoisting crane orbital motion that moves; On described hanging beam shoulder pole, shoulder pole counterweight is set, for balance hanging beam shoulder pole; On described hanging beam shoulder pole, suspender is set.
During work, bridge parts is first fixed on hanging beam shoulder pole by suspender, after bridge parts anchoring, then start the winch on left crane frame and right crane frame simultaneously, make bridge parts rise to specified altitude assignment, then start traveling gear, drive left crane frame and right crane frame to seesaw along track, make the split type beam hoisting crane that moves move to assigned address, and then start winch, bridge parts is placed on to assigned address and installs; The split type beam hoisting crane that moves has saved the middle connecting cross beam of hoisting crane, makes hoisting crane not limited by crossbeam; During lifting, only need according to bridge parts, lay the track of respective width, can realize the lifting of bridge parts, increase split type lifting scope of moving beam hoisting crane; And due to the minimizing of connecting cross beam, the split type beam hoisting crane overall weight of moving is significantly reduced, saved enterprise's productive costs.
Finally, it should be pointed out that above embodiment is only the more representational example of the present invention.Obviously, the invention is not restricted to above-described embodiment, can also have many distortion.Any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done above embodiment, all should think and belong to protection scope of the present invention.

Claims (2)

1. the split type beam hoisting crane that moves, comprise left crane frame and right crane frame, it is characterized in that described left crane frame and right crane frame top arrange winch, fixed pulley group is set on described winch, described fixed pulley group is connected with running block, described running block is connected with hanging beam shoulder pole, on described hanging beam shoulder pole, shoulder pole counterweight and suspender is set.
2. the split type beam hoisting crane that moves according to claim 1, it is characterized in that described left crane frame and from right to left heavy-duty machine bottom of frame traveling gear is set.
CN201410013605.4A 2014-01-13 2014-01-13 Split type girder moving crane Pending CN103708349A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410013605.4A CN103708349A (en) 2014-01-13 2014-01-13 Split type girder moving crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410013605.4A CN103708349A (en) 2014-01-13 2014-01-13 Split type girder moving crane

Publications (1)

Publication Number Publication Date
CN103708349A true CN103708349A (en) 2014-04-09

Family

ID=50401754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410013605.4A Pending CN103708349A (en) 2014-01-13 2014-01-13 Split type girder moving crane

Country Status (1)

Country Link
CN (1) CN103708349A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106672565A (en) * 2016-12-12 2017-05-17 西可林控制系统(上海)有限公司 Large-span beam-free rail conveyer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447318Y (en) * 2000-07-27 2001-09-12 铁道部第二工程局新线铁路运输处内昆铁路指挥部 Gantry crane
US20080302749A1 (en) * 2007-06-08 2008-12-11 Kobelco Cranes Co., Ltd. Combination crane
CN201217605Y (en) * 2008-05-29 2009-04-08 中冶天工上海十三冶建设有限公司 Lever-type sling
CN201943008U (en) * 2011-01-27 2011-08-24 邯郸市北恒工程机械有限公司 Polycarbonate (PC) rail track beam erecting equipment
CN202785391U (en) * 2012-09-11 2013-03-13 武桥重工集团股份有限公司 Three-hanging-point hoisting mechanism of overweight-type seaborne crane
CN203128084U (en) * 2013-01-30 2013-08-14 江苏武东机械有限公司 Hoisting device
CN203865857U (en) * 2014-01-13 2014-10-08 浙江中建路桥设备有限公司 Split type beam moving crane

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447318Y (en) * 2000-07-27 2001-09-12 铁道部第二工程局新线铁路运输处内昆铁路指挥部 Gantry crane
US20080302749A1 (en) * 2007-06-08 2008-12-11 Kobelco Cranes Co., Ltd. Combination crane
CN201217605Y (en) * 2008-05-29 2009-04-08 中冶天工上海十三冶建设有限公司 Lever-type sling
CN201943008U (en) * 2011-01-27 2011-08-24 邯郸市北恒工程机械有限公司 Polycarbonate (PC) rail track beam erecting equipment
CN202785391U (en) * 2012-09-11 2013-03-13 武桥重工集团股份有限公司 Three-hanging-point hoisting mechanism of overweight-type seaborne crane
CN203128084U (en) * 2013-01-30 2013-08-14 江苏武东机械有限公司 Hoisting device
CN203865857U (en) * 2014-01-13 2014-10-08 浙江中建路桥设备有限公司 Split type beam moving crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106672565A (en) * 2016-12-12 2017-05-17 西可林控制系统(上海)有限公司 Large-span beam-free rail conveyer
CN106672565B (en) * 2016-12-12 2019-08-23 西可林控制系统(上海)有限公司 A kind of large span is without beam orbit transporter and its control system

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN107044090B (en) A kind of construction method of dual deck bridge
CN104003320B (en) Hydraulic pressure changes the outfit frame and rapid-assembling method thereof
CN203922540U (en) Hydraulic pressure change the outfit frame and complete equipment thereof
CN105484168A (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN203865857U (en) Split type beam moving crane
CN205874987U (en) Simply put up bridge crane
CN103708349A (en) Split type girder moving crane
CN202542703U (en) Electric signal beam crane
CN201458544U (en) Carrying pole for mounting component
CN103410104B (en) The bearing replacement method and apparatus of overhead road of city
CN109778720A (en) Bridge construction construction method based on cradle construction
CN202644411U (en) Construction device for erecting precast beam through slipping method
CN202449757U (en) Motor-driven single-beam suspending crane
CN202465115U (en) Double main beam gantry crane
CN203667801U (en) Special beam-lifting carrying pole
CN208328717U (en) A kind of U-shaped beam bridge formation machine
CN202465098U (en) Single-beam gantry crane with V-shaped support legs
CN104532744A (en) Orbital transfer portal crane matched with movable formwork
CN208120533U (en) A kind of moveable super large precast slab hanging device
CN202358822U (en) Hoisting structure for oil field skid block
CN204282226U (en) Mobile formwork supporting change rail portal crane
CN204057304U (en) For the conveying arrangement of hydroelectric project seat ring parts
CN104085702A (en) Transportation device and method for hydropower engineering stay ring components
CN204823906U (en) Adapt to many topography hoist

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140409