CN103701243A - 大功率双馈风力发电机的双叠式绕组的并头套 - Google Patents
大功率双馈风力发电机的双叠式绕组的并头套 Download PDFInfo
- Publication number
- CN103701243A CN103701243A CN201310682504.1A CN201310682504A CN103701243A CN 103701243 A CN103701243 A CN 103701243A CN 201310682504 A CN201310682504 A CN 201310682504A CN 103701243 A CN103701243 A CN 103701243A
- Authority
- CN
- China
- Prior art keywords
- lead binding
- double
- headgear
- driven generator
- wind driven
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
大功率双馈风力发电机的双叠式绕组的并头套,包括:并头套;所述的并头套为“十”字型,且中间连接部位略微凸出;并头套与线排之间用焊料填缝。所述的并头套材质为铜T2;所述的焊料采用25%的银铜;本发明保证了并头套的结构强度,同时导电面积合理,增加了转子运行的可靠性。
Description
技术领域
本发明涉及一种并头套,尤其涉及一种大功率双馈风力发电机的双叠式绕组的并头套。
背景技术
在风力发电中,由于风速变幻莫测,使对其的利用存在一定的困难。所以改善风力发电技术,提高风力发电机组的效率,最充分地利用风能资源,有着十分重要的意义。任何一个风力发电机组都包括作为原动机的风力机和将机械能转变为电能的发电机。其中,作为原动机的风力机,其效率在很大程度上决定了整个风力发电机组的效率,而风力机的效率又在很大程度上取决于其负荷是否处于最佳状态。不管一个风力机是如何精细地设计和施工建造,若它处于过载或久载的状态下,都会损失其效率。风力发电机的转速随风速及负荷的变化应及时作出相应的调整,依靠转子动能的变化,吸收或释放功率,减少对电网的扰动。通过变频器控制器对逆变电路中功率器件的控制。可以改变双馈发电机转子励磁电流的幅值、频率及相位角,达到调节其转速、有功功率和无功功率的目的,既提高了机组的效率,又对电网起到稳频、稳压的作用。
3MW及以上大功率双馈风力发电机转子存在转速高,电流大,惯性强等特点;造成发电机绕组断路、短路接地的可能原因有:绕组机械性拉断、损伤,极间连接线焊接不良,包括:虚焊、假焊。
发明内容
本发明提供了一种大功率双馈风力发电机的双叠式绕组的并头套,保证了结构强度,同时导电面积合理,增加了转子运行的可靠性。
为了实现上述目的,本发明的技术方案具体如下:
大功率双馈风力发电机的双叠式绕组的并头套,包括:并头套;所述的并头套为“十”字型,且中间连接部位略微凸出;并头套与线排之间用焊料填缝。
所述的并头套材质为铜T2;
所述的焊料采用25%的银铜;
本发明的有益效果在于:由于大功率双馈风力发电机转子线排为每槽4根,且嵌线后较为发散,故需设计并头套成“十”字型,同时中间连接部位略微凸出,包住4根线排使其固定便于感应焊接。
本发明满足转子线排焊接强度、保证了通电面积合理,同时便于焊接过后端部绝缘材料的包扎,增加了转子运行的可靠性。
附图说明
本发明共有附图3幅。
图1为本发明的并头套剖视图和左视图;
图2为线排端部焊接剖视图;
图3为线排端部焊接侧视图说明。
图中序号说明:1、并头套,2、线排,3、焊料。
具体实施方式
下面结合具体实施方式和附图对本发明进一步说明:
大功率双馈风力发电机的双叠式绕组的并头套,包括:并头套1;所述的并头套1为“十”字型,且中间连接部位略微凸出;并头套1与线排2之间用焊料3填缝。
所述的并头套1材质为铜T2;
所述的焊料3采用25%的银铜。
Claims (3)
1.大功率双馈风力发电机的双叠式绕组的并头套,其特征在于包括:并头套(1);所述的并头套(1)为“十”字型,且中间连接部位略微凸出;并头套(1)与线排(2)之间用焊料(3)填缝。
2.根据权利要求1所述的大功率双馈风力发电机的双叠式绕组的并头套,其特征在于:所述的并头套(1)材质为铜T2。
3.根据权利要求1所述的大功率双馈风力发电机的双叠式绕组的并头套,其特征在于:所述的焊料(3)采用25%的银铜。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310682504.1A CN103701243A (zh) | 2013-12-12 | 2013-12-12 | 大功率双馈风力发电机的双叠式绕组的并头套 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310682504.1A CN103701243A (zh) | 2013-12-12 | 2013-12-12 | 大功率双馈风力发电机的双叠式绕组的并头套 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103701243A true CN103701243A (zh) | 2014-04-02 |
Family
ID=50362687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310682504.1A Pending CN103701243A (zh) | 2013-12-12 | 2013-12-12 | 大功率双馈风力发电机的双叠式绕组的并头套 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103701243A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104702015A (zh) * | 2015-03-31 | 2015-06-10 | 永济新时速电机电器有限责任公司 | 在高空对兆瓦级双馈风力发电机的转子引出线固定的方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201418014Y (zh) * | 2009-05-27 | 2010-03-03 | 大连天元电机有限公司 | 发电机转子线圈端部用h型并头套 |
CN201699502U (zh) * | 2010-07-01 | 2011-01-05 | 湘潭电机股份有限公司 | 电机转子线圈端部并头固定装置 |
CN202282701U (zh) * | 2011-11-04 | 2012-06-20 | 江阴博风特种电机有限公司 | 3mw永磁同步风力发电机定子线圈装配用工字型并头套 |
-
2013
- 2013-12-12 CN CN201310682504.1A patent/CN103701243A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201418014Y (zh) * | 2009-05-27 | 2010-03-03 | 大连天元电机有限公司 | 发电机转子线圈端部用h型并头套 |
CN201699502U (zh) * | 2010-07-01 | 2011-01-05 | 湘潭电机股份有限公司 | 电机转子线圈端部并头固定装置 |
CN202282701U (zh) * | 2011-11-04 | 2012-06-20 | 江阴博风特种电机有限公司 | 3mw永磁同步风力发电机定子线圈装配用工字型并头套 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104702015A (zh) * | 2015-03-31 | 2015-06-10 | 永济新时速电机电器有限责任公司 | 在高空对兆瓦级双馈风力发电机的转子引出线固定的方法 |
CN104702015B (zh) * | 2015-03-31 | 2017-05-10 | 永济新时速电机电器有限责任公司 | 在高空对兆瓦级双馈风力发电机的转子引出线固定的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Datta et al. | Variable-speed wind power generation using doubly fed wound rotor induction machine-a comparison with alternative schemes | |
Cao et al. | Wind turbine generator technologies | |
CN101871433B (zh) | 具有储能装置的变速恒频风力发电装置 | |
CN205141698U (zh) | 双馈风力发电系统 | |
CN102157958A (zh) | 一种采用多套绕组发电机的风力发电机组 | |
Camara et al. | Permanent magnet synchronous generators for offshore wind energy system linked to grid-modeling and control strategies | |
Camara et al. | Permanent magnet synchronous generator for offshore wind energy system connected to grid and battery-modeling and control strategies | |
CN102044924A (zh) | 内双馈风力发电机 | |
Fang et al. | Improvement of low-voltage ride-through capability for wave energy conversion system | |
CN102185336A (zh) | 风力发电设备 | |
CN103701243A (zh) | 大功率双馈风力发电机的双叠式绕组的并头套 | |
CN201528280U (zh) | 全功率直驱式风电机组柔性并网变流器 | |
Li et al. | Optimal direct-drive permanent magnet wind generator systems for different rated wind speeds | |
CN207743703U (zh) | 一种风电机组与储能装置一体化系统 | |
CN201332277Y (zh) | 大型风力发电机组的变频器冗余系统 | |
CN208272641U (zh) | 含变阻值撬棒保护的双馈风电系统 | |
CN102638134B (zh) | 独立集电器的内馈发电机 | |
CN205779476U (zh) | 一种双馈风力发电装置 | |
CN203707796U (zh) | 一种新型风力发电双馈机主电路 | |
CN201868971U (zh) | 内双馈风力发电机 | |
CN103094917A (zh) | 全功率高速永磁同步风机的低电压穿越控制方法 | |
CN201928150U (zh) | 一种双馈风力发电机滑环接地系统 | |
KR101059126B1 (ko) | 다단 발전기 풍력 발전 시스템 | |
CN202488288U (zh) | 独立集电器的内馈发电机 | |
CN108258731A (zh) | 一种带有超导磁储能的新式无刷双馈风力发电系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140402 |