CN103701202A CN201310754540.4A CN201310754540A CN103701202A CN 103701202 A CN103701202 A CN 103701202A CN 201310754540 A CN201310754540 A CN 201310754540A CN 103701202 A CN103701202 A CN 103701202A
Authority
CN
China
Prior art keywords
substation
subsystem
fault
adjusting
delay time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310754540.4A
Other languages
Chinese (zh)
Other versions
CN103701202B (en
Inventor
陈兴华
陈锦昌
杨文佳
吴国炳
李力
林少华
李新超
魏宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201310754540.4A priority Critical patent/CN103701202B/en
Publication of CN103701202A publication Critical patent/CN103701202A/en
Application granted granted Critical
Publication of CN103701202B publication Critical patent/CN103701202B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method and a system for the automatic switching power supplying of a serial substation standby power. The method comprises the steps of detecting the operation mode of a substation sub station, judging whether the substation sub station is an open-loop operation substation or a non-open-loop operation substation, respectively processing according to the operation modes of the substation sub station, starting the function of judging the accelerating action of closing a switch at a fault within a preset time, determining the set delay time of the substation sub station when the accelerating action condition is met, and cutting the switch of a main powering line subjected to fixed value setting to isolate the fault after the set delay time, wherein a automatic switch device arranged on the substation is closer to the fault point, the delay time of the accelerating action is shorter, the fault is isolated with the minimum range to the greatest content, and the aim of recovering the power supplying for users of the substation is restored with the largest range. By the method for realizing the automatic switching power supplying of the serial substation standby power through fault isolation, the power supply for the substation without voltage by the standby power supply can be restored with the largest range during the main power supply fault of a serial power supplying grid and the method and system have good economic benefits.

Description

The method and system of statements based on collusion transformer station automatic closing power supply
Technical field
The present invention relates to electric power network technical field, particularly relate to the method and system of statements based on collusion transformer station automatic closing power supply.
Background technology
Automatic switching device of standby power supply is exactly after working power is because of fault tripping, can be rapidly automatically by in-put of spare power supply work or user is switched on stand-by power supply, thereby make a kind of device of the unlikely long-time power failure of user, be called for short backup auto-activating device.By traditional application, the transformer station of each open loop operation installs a set of backup auto-activating device, after first cutting former supply line switch when the substation power loss, drops into the power supply that extension wire switch recovers our station again.
For the act in collusion to make each other's confessions mode of a plurality of substation operations of You Yi road power supply, the equal decompression of a plurality of transformer stations when power end line failure, that transformer station that traditional backup auto-activating device can only recover open loop operation powers by stand-by power supply, and the remaining transformer station meeting long period cannot be to customer power supply.
For addressing this problem, in engineering application, have by using optical-fibre channel that the backup auto-activating device of statements based on collusion transformer station installing is coupled together to the scheme of a system of forming, for different statements based on collusion transformer station quantity, the different standby standby system logic of throwing of Demand Design of throwing.By the spare power automatic switching system of this conceptual design, the one, need to increase and join optical-fiber communication channel and the logic control main website installing between station, increased investment, the 2nd, various statements based on collusion power network wiring mode need be formulated respectively the policy logic of standby throwing system, has increased the workload of design and check.
Summary of the invention
Based on this, be necessary method complexity, the high problem of implementation cost for the automatic closing power supply of existing issue statements based on collusion transformer station, provide a kind of simple, the method and system of the statements based on collusion transformer station automatic closing power supply that implementation cost is cheap.
The method that the transformer station's automatic closing of acting in collusion to make each other's confessions is powered, comprises step:
Detect subsystem in substation operational mode, judge whether subsystem in substation is open loop operation transformer station;
When subsystem in substation is open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
When subsystem in substation is that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
The system that the transformer station's automatic closing of acting in collusion to make each other's confessions is powered, comprising:
Operational mode detection module, for detection of subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station;
Open loop processing module, for when subsystem in substation being open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
Non-open loop processing module, for working as subsystem in substation, be that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
The act in collusion to make each other's confessions method and system of transformer station automatic closing power supply of the present invention, detect subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station, according to the operational mode of subsystem in substation, (open loop and non-open loop) processed respectively respectively, open Preset Time judgement is closed in the function of fault accelerated motion, and when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting, the delay time of wherein adjusting be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point, the time delay of backup auto-activating device accelerated motion of transformer station installing that so more approaches fault point is shorter, realize minimum zone ground isolated fault as far as possible, reach maximum magnitude and recover the object of transformer station's customer power supply.The act in collusion to make each other's confessions method and system of transformer station automatic closing power supply of the present invention is realized the method for statements based on collusion transformer station automatic closing power supply by isolated fault step by step, can realize statements based on collusion electrical network and when main power supply fault, recover decompression transformer station maximum magnitude and power by stand-by power supply, there is good economic benefit.
Accompanying drawing explanation
Fig. 1 is the act in collusion to make each other's confessions schematic flow sheet of first embodiment of method of transformer station automatic closing power supply of the present invention;
Fig. 2 is the act in collusion to make each other's confessions schematic flow sheet of second embodiment of method of transformer station automatic closing power supply of the present invention;
Fig. 3 is act in collusion to make each other's confessions one of them specific embodiment application example schematic diagram of method of transformer station automatic closing power supply of the present invention;
Fig. 4 is the act in collusion to make each other's confessions structural representation of first embodiment of system of transformer station automatic closing power supply of the present invention;
Fig. 5 is the act in collusion to make each other's confessions structural representation of second embodiment of system of transformer station automatic closing power supply of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below with reference to the accompanying drawings and embodiment, the present invention is further elaborated.Should be appreciated that concrete enforcement described herein, only in order to explain the present invention, does not limit the present invention.
As shown in Figure 1, a kind of method of the transformer station's automatic closing power supply of acting in collusion to make each other's confessions, comprises step:
S200: detect subsystem in substation operational mode, judge whether subsystem in substation is open loop operation transformer station;
S400: when subsystem in substation is open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
S600: when subsystem in substation is that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
It is generally to select to be set as 10S judgement to close in the function of fault accelerated motion that Preset Time judgement is closed in the function of fault accelerated motion.
The act in collusion to make each other's confessions method of transformer station automatic closing power supply of the present invention, detect subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station, according to the operational mode of subsystem in substation, (open loop and non-open loop) processed respectively respectively, open Preset Time judgement is closed in the function of fault accelerated motion, and when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting, the delay time of wherein adjusting be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point, the time delay of backup auto-activating device accelerated motion of transformer station installing that so more approaches fault point is shorter, realize minimum zone ground isolated fault as far as possible, reach maximum magnitude and recover the object of transformer station's customer power supply.The act in collusion to make each other's confessions method of transformer station automatic closing power supply of the present invention realizes the method for statements based on collusion transformer station automatic closing power supply by isolated fault step by step, can realize statements based on collusion electrical network and when main power supply fault, recover decompression transformer station maximum magnitude and power by stand-by power supply, there is good economic benefit.
As shown in Figure 2, in an embodiment, described S400 specifically comprises step therein:
S420: when subsystem in substation is open loop operation transformer station, the backup auto-activating device of subsystem in substation installing is charged;
S440: when subsystem in substation power supply main line breaks down, whether detect subsystem in substation bus meets without stream condition with no pressure, when subsystem in substation bus meets without stream condition with no pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion;
S460: when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, excise former main for line switching, isolated fault after the described delay time of adjusting.
As shown in Figure 2, in an embodiment, described step S600 specifically comprises step therein:
S620: when subsystem in substation is non-open loop operation transformer station, the backup auto-activating device of subsystem in substation installing does not charge;
S640: when subsystem in substation power supply main line breaks down, detect substation, power station bus and whether from no pressure becoming, have pressure, when subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of the backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion;
S660: when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting after the described delay time of adjusting.
As shown in Figure 2, therein in an embodiment, before described step S200 also in steps:
S100: all subsystem in substations in traversal power transformation net, arrange respectively and close a floodgate in fault accelerated motion electric current threshold definite value and action delay definite value the backup auto-activating device of each subsystem in substation.
Backup auto-activating device is preferably the backup auto-activating device of standardization logical design, whether the transformer station that the backup auto-activating device of standardization logical design can be automatically differentiated place according to the position of the line switching of access device and bus connection switch is the transformer station of open loop operation, and the judgement in the backup auto-activating device of standardization logical design is closed a floodgate can be by user adjust operating current threshold definite value and action delay definite value in fault accelerated motion function, device accelerated motion time delay fixed value adjusting the closer to power supply point in application must be less, in order to realize isolated fault step by step.
In order further to explain in detail the act in collusion to make each other's confessions method of transformer station automatic closing power supply of the present invention, to adopt a plurality of specific embodiments and Fig. 3 below, explain in detail the act in collusion to make each other's confessions method difference with the prior art of transformer station's automatic closing power supply of the present invention, with and the beneficial effect that brings.
Be illustrated in figure 3 A, B, C3Ge 110kV transformer station 520 by two 220kV stations 510 by the act in collusion to make each other's confessions modes of operation of double-circuit line, figure comprises that the circuit breaker 550 of co-bit state is, the circuit breaker 540 of a minute state and on the spot type backup auto-activating device 530.In this specific embodiment, to have the mode of connection that 2 or 2 above transformer stations act in collusion to make each other's confessions by same power supply all applicable to similar for the method that realizes the automatic closing power supply of statements based on collusion transformer station.
As shown in Figure 3, by traditional prepared auto restart action logic, when fault point 1 is the circuit generation permanent fault between 220kV station 510 and 110kV A station, 110kV A, B, C San Ge transformer station all become with no pressure, the transformer station of now open loop operation is that the main line switching that supplies of the backup auto-activating device action tripping at 110kV C station is this side switch of circuit between 110kV B station and 110kV C station, and the available line switching that closes is that this side switch of circuit between 110kV C station and 110kV D station is with the power supply at recovery 110kV C station.Because of 110kV C station side switch first tripping before backup auto-activating device drops into Backup Power Switch of circuit between 110kV B station and 110kV C station, after prepared auto restart action, 110kV A station and 110kV B station cannot restore electricity.
By 3 110kV transformer stations 520 of above-mentioned example, by 220kV station 510, by the double-circuit line mode of moving of act in collusion to make each other's confessions, applied, can be by following consideration on definite value arranges: the 110kV A 220kV station 510 of adjusting at station is main for circuit with the circuit between 110kV A station, closing a floodgate in the fault delayed setting that accelerates motion is 0.3s; The circuit that 110kV B adjusts at station between 110kV A station and 110kV B station is main for circuit, and closing a floodgate in fault accelerated motion delayed setting is 0.6s; The circuit that 110kV C adjusts at station between 110kV B station and 110kV C station is main for circuit, and closing a floodgate in fault accelerated motion delayed setting is 0.9s.By the backup auto-activating device action logic of standardization logical design, the backup auto-activating device at 110kV C station according to 110kV B station and line switching between 110kV C station be co-bit and 110kV C station with 110kV D station between line switching for dividing, automatically be identified as open loop operating point, while meeting prepared auto restart charging modes, complete prepared auto restart charging.The backup auto-activating device at 110kV A station, 110kV B station is identified as non-open loop operating point according to accessed line switching in co-bit, does not carry out the charging of prepared auto restart mode.
By above-mentioned example, as shown in Figure 3 during the 1 place's circuit generation permanent fault of fault point, if the line configuring between 220kV station 510 and 110kV A station in full line range, can move rapidly the protection of excising faulty line both sides switch during any point fault, as conventional optical fiber differential protective, after the backup auto-activating device action of described standardization logical design, all transformer station restores electricity, by the backup auto-activating device action logic of standardization logical design, the backup auto-activating device action behavior of each transformer station is as follows: after fault point 1 place's fault occurs, the both sides switch of route protection action excision 220kV station 510 and 110kV A intersite line is with isolated fault, while 110kV A, B, C San Ge transformer station all becomes with no pressure.The backup auto-activating device at 110kV C station automatically identifies that our station bus is with no pressure, circuit is without stream, the condition that meets " with no pressure without stream " starts, after the action delay of adjusting, the action extension wire that closes is the line switching between standing with 110kV D in 110kV C station, and open 10s judgement is closed a floodgate in the function of fault accelerated motion, but because excising fault point, do not meet the condition of closing a floodgate in fault accelerated motion, without closing a floodgate, in fault, accelerate motion.When the backup auto-activating device at 110kV A station, 110kV B station closes line switching between standing of 110kV C station and 110kV D at 110kV C station, voltage has pressure from no pressure becoming, meeting " change with no pressure has pressure " condition starts, and open 10s judgement is closed a floodgate in the function of fault accelerated motion, but because excising fault point, do not meet the condition of closing a floodgate in fault accelerated motion, without closing a floodgate, in fault, accelerate motion.After above-mentioned backup auto-activating device has moved, 110kV A, B, C San Ge transformer station all transfer to by 110kV C station by 220kV 510 powered operations of standing.
By above-mentioned example, as shown in Figure 3 during the 1 place's circuit generation permanent fault of fault point, if 220kV station 510 and circuit between 110kV A station can move rapidly the protection of excising faulty line both sides switch while not configuring in full line range any point fault, the switch that while being fault point 1 place's circuit generation permanent fault, faulty line 220kV station 510 these sides are only excised in protection action is with isolated fault, by the backup auto-activating device action logic of standardization logical design of the present invention, the backup auto-activating device action behavior of each transformer station is as follows: after fault point 1 place's fault occurs, the mains side switch of route protection action excision 220kV station 510 and 110kV A intersite line is with excision fault, while 110kV A, B, C San Ge transformer station all becomes with no pressure.The backup auto-activating device at 110kV C station automatically identifies that our station bus is with no pressure, circuit is without stream, the condition that meets " with no pressure without stream " starts, after the action delay of adjusting action close extension wire be 110kV C station with 110kV D station between line switching, and the open 10s judgement function of closing a floodgate and accelerating motion in fault.When the backup auto-activating device at 110kV A station, 110kV B station closes line switching between standing of 110kV C station and 110kV D at 110kV C station, voltage has pressure from no pressure becoming, meet " change with no pressure has pressure " condition and start, and open 10s judgement is closed a floodgate in the function of fault accelerated motion.Because 220kV station 510 and the switch of 110kV A intersite line by 110kV A station side do not disconnect, the prepared auto restart action at the 110kV C station fault current after extension wire switch that closes is stood by 110kV D by 220kV station 510, C station, B station, A station flows to 1 place, fault point, 110kV A station, 110kV B station, the backup auto-activating device at 110kV C station closes a floodgate and all meets in the criterion of fault accelerated motion simultaneously, but adjust as 0.3s in fault accelerated motion time delay 110kV A station owing to closing a floodgate, 110kV B adjusts at station as 0.6s, 110kV C adjusts at station as 0.9s, the backup auto-activating device that after 0.3s, 110kV A stands closes a floodgate and excises in fault accelerated motion adjust main is the switch of 220kV station 510 and 110kV A intersite line for line switching, after switch trip, fault point isolates, 110kV B station, the backup auto-activating device at 110kV C station meets to close a floodgate and returns in the condition of fault accelerated motion before action delay arrives.Therefore,, after above-mentioned backup auto-activating device has moved, 110kV A, B, C San Ge transformer station equally all can transfer to by 110kV C station by 220kV 510 powered operations of standing.
By above-mentioned example, as shown in Figure 3 during the 2 place's circuit generation permanent fault of fault point, the backup auto-activating device action behavior at 110kV B station, 110kV C station and the above-mentioned prepared auto restart action behavior that 110kV A stands, 110kV C stands are similar, as shown in Figure 3 during the 3 place's circuit generation permanent fault of fault point, the prepared auto restart action behavior that the backup auto-activating device action behavior at 110kV C station and above-mentioned 110kV C stand is similar, does not repeat them here.
By above scheme, can be found out, the act in collusion to make each other's confessions method of transformer station automatic closing power supply of the present invention, by taking backup auto-activating device when action directly to close extension wire switch, whether open combined floodgate closes a floodgate in fault in fault accelerated motion Function detection again, the backup auto-activating device of each transformer station's installing closes a floodgate in the time delay of fault accelerated motion function by differential fiting tuning, device the closer to power supply point closes a floodgate shorter in fault accelerated motion time delay fixed value adjusting, to reach the object of isolated fault step by step, realized statements based on collusion transformer station and by prepared auto restart, realized the demand that maximum magnitude restores electricity when former power supply fault.The act in collusion to make each other's confessions method of transformer station automatic closing power supply of the present invention, go for 2 or 2 modes of connection that above transformer station acts in collusion to make each other's confessions by same power supply, for concrete operational mode, each device arranged to suitable main confession line switching and close a floodgate in fault accelerated motion time delay definite value, can realize statements based on collusion electrical network moves by prepared auto restart the transformer station that will be correlated with and is converted to by stand-by power supply and powers when power failure, the reliability that has improved fail safe and the power supply of electrical network, has good economic benefit.
As shown in Figure 4, a kind of system of the transformer station's automatic closing power supply of acting in collusion to make each other's confessions, comprising:
Operational mode detection module 100, for detection of subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station;
Open loop processing module 200, for when subsystem in substation being open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
Non-open loop processing module 300, for working as subsystem in substation, be that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
The act in collusion to make each other's confessions system of transformer station automatic closing power supply of the present invention, operational mode detection module 100 detects subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station, open loop processing module 200 and non-open loop processing module 300 respectively according to the operational mode of subsystem in substation (open loop and non-open loop) process respectively, open Preset Time judgement is closed in the function of fault accelerated motion, and when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting, wherein, the delay time of adjusting be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point, the time delay of backup auto-activating device accelerated motion of transformer station installing that so more approaches fault point is shorter, realize minimum zone ground isolated fault as far as possible, reach maximum magnitude and recover the object of transformer station's customer power supply.The act in collusion to make each other's confessions system of transformer station automatic closing power supply of the present invention realizes the system of statements based on collusion transformer station automatic closing power supply by isolated fault step by step, can realize statements based on collusion electrical network and when main power supply fault, recover decompression transformer station maximum magnitude and power by stand-by power supply, there is good economic benefit.
As shown in Figure 5, in an embodiment, described open loop processing module 200 specifically comprises therein:
The first charging control unit 220, when when subsystem in substation being open loop operation transformer station, charges to the backup auto-activating device of subsystem in substation installing;
Open loop processing unit 240, for when subsystem in substation power supply main line breaks down, detect subsystem in substation bus and whether meet logistics without stream condition with no pressure, when subsystem in substation bus meets logistics without stream condition with no pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion;
The Fisrt fault excision unit 260 of adjusting, for when meet accelerated motion condition, determines the power transformation substation delay time of adjusting, and excises former main confession line switching, isolated fault after the described delay time of adjusting.
As shown in Figure 5, in an embodiment, described non-open loop processing module 300 specifically comprises therein:
The second charging control unit 320, when when subsystem in substation being non-open loop operation transformer station, the backup auto-activating device of subsystem in substation installing does not charge;
Non-open loop processing unit 340, for when subsystem in substation power supply main line breaks down, detect substation, power station bus and whether from no pressure becoming, have pressure, when subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of the backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion;
The second fault excision unit 360 of adjusting, for when meet accelerated motion condition, determines the power transformation substation delay time of adjusting, and excises the main confession line switching isolated fault of fixed value adjusting after the described delay time of adjusting.
As shown in Figure 5, in an embodiment, described system of acting in collusion to make each other's confessions transformer station's automatic closing power supply also comprises therein:
Module 400 is set, for traveling through all subsystem in substations of power transformation net, the backup auto-activating device of each subsystem in substation is arranged respectively and closed a floodgate in fault accelerated motion electric current threshold definite value and action delay definite value.
The above embodiment has only expressed several execution mode of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (8)

1. the method that the transformer station's automatic closing of acting in collusion to make each other's confessions is powered, is characterized in that, comprises step:
Detect subsystem in substation operational mode, judge whether subsystem in substation is open loop operation transformer station;
When subsystem in substation is open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
When subsystem in substation is that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
2. the method that the transformer station's automatic closing of acting in collusion to make each other's confessions according to claim 1 is powered, it is characterized in that, the described subsystem in substation of working as is open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault, specifically comprise step:
When subsystem in substation is open loop operation transformer station, the backup auto-activating device of subsystem in substation installing is charged;
When subsystem in substation power supply main line breaks down, detect subsystem in substation bus and whether meet logistics without stream condition with no pressure, when subsystem in substation bus meets logistics without stream condition with no pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion;
When meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault.
3. method of acting in collusion to make each other's confessions transformer station's automatic closing power supply according to claim 1 and 2 is characterized in that, the described subsystem in substation of working as is that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the subsystem in substation delay time of adjusting, after the described delay time of adjusting, excise the main of fixed value adjusting and specifically comprise step for line switching isolated fault:
When subsystem in substation is non-open loop operation transformer station, the backup auto-activating device of subsystem in substation installing does not charge;
When subsystem in substation power supply main line breaks down, detect substation, power station bus and whether from no pressure becoming, have pressure, when subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of the backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion;
When meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting.
4. the method for the transformer station's automatic closing power supply of acting in collusion to make each other's confessions according to claim 1 and 2, is characterized in that, described detection subsystem in substation operational mode judges whether subsystem in substation is that open loop moves transformer station before also in steps:
All subsystem in substations in traversal power transformation net, arrange respectively and close a floodgate in fault accelerated motion electric current threshold definite value and action delay definite value the backup auto-activating device of each subsystem in substation.
5. the system that the transformer station's automatic closing of acting in collusion to make each other's confessions is powered, is characterized in that, comprising:
Operational mode detection module, for detection of subsystem in substation operational mode, judgement subsystem in substation is open loop operation transformer station or is that non-open loop moves transformer station;
Open loop processing module, for when subsystem in substation being open loop operation transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus loss of pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise former main for line switching, isolated fault;
Non-open loop processing module, for working as subsystem in substation, be that non-open loop moves transformer station, and when subsystem in substation power supply main line breaks down, subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion, when meeting accelerated motion condition, determine the power transformation substation delay time of adjusting, after the described delay time of adjusting, excise the main for line switching isolated fault of fixed value adjusting;
Wherein, described in adjust delay time be default unit of unit adjust delay time N+1 doubly, described N is the subsystem in substation number of being separated by between subsystem in substation and fault point.
6. the system of the transformer station's automatic closing power supply of acting in collusion to make each other's confessions according to claim 5, is characterized in that, described open loop processing module specifically comprises:
The first charging control unit, when when subsystem in substation being open loop operation transformer station, charges to the backup auto-activating device of subsystem in substation installing;
Open loop processing unit, for when subsystem in substation power supply main line breaks down, whether detect subsystem in substation bus meets without stream condition with no pressure, when subsystem in substation bus meets without stream condition with no pressure, it is former main for line switching closure state that the backup auto-activating device of subsystem in substation installing keeps, engage extension wire switch, and open Preset Time judgement is closed in the function of fault accelerated motion;
The Fisrt fault excision unit of adjusting, for when meeting accelerated motion condition, determines the power transformation substation delay time of adjusting, and excises former main for line switching, isolated fault after the described delay time of adjusting.
7. according to the system of the statements based on collusion transformer station automatic closing power supply described in claim 5 or 6, it is characterized in that, described non-open loop processing module specifically comprises:
The second charging control unit, when when subsystem in substation being non-open loop operation transformer station, the backup auto-activating device of subsystem in substation installing does not charge;
Non-open loop processing unit, for when subsystem in substation power supply main line breaks down, detect substation, power station bus and whether from no pressure becoming, have pressure, when subsystem in substation bus has pressure from no pressure becoming, the open Preset Time judgement of the backup auto-activating device of subsystem in substation installing is closed a floodgate in the function of fault accelerated motion;
The second fault excision unit of adjusting, for when meeting accelerated motion condition, determines the power transformation substation delay time of adjusting, and excises the main for line switching isolated fault of fixed value adjusting after the described delay time of adjusting.
8. the system of the statements based on collusion transformer station automatic closing power supply of stating according to claim 5 or 6, is characterized in that, also comprises:
Module is set, for traveling through all subsystem in substations of power transformation net, the backup auto-activating device of each subsystem in substation is arranged respectively and closed a floodgate in fault accelerated motion electric current threshold definite value and action delay definite value.
CN201310754540.4A 2013-12-31 2013-12-31 The method and system that statements based on collusion transformer station automatic closing is powered Active CN103701202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310754540.4A CN103701202B (en) 2013-12-31 2013-12-31 The method and system that statements based on collusion transformer station automatic closing is powered

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310754540.4A CN103701202B (en) 2013-12-31 2013-12-31 The method and system that statements based on collusion transformer station automatic closing is powered

Publications (2)

Publication Number Publication Date
CN103701202A true CN103701202A (en) 2014-04-02
CN103701202B CN103701202B (en) 2015-11-18

Family

ID=50362647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310754540.4A Active CN103701202B (en) 2013-12-31 2013-12-31 The method and system that statements based on collusion transformer station automatic closing is powered

Country Status (1)

Country Link
CN (1) CN103701202B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682547A (en) * 2015-01-30 2015-06-03 广东电网有限责任公司梅州供电局 Method and system for judging whether action of spare power automatic switching is successful or not by remote automatic bus transfer device
CN104821655A (en) * 2015-05-14 2015-08-05 南京南瑞继保电气有限公司 Fault positioning method for regional spare power automatic switching
CN107276087A (en) * 2017-08-08 2017-10-20 国网上海市电力公司 It is a kind of to accelerate the standby method thrown of network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5343079A (en) * 1991-02-25 1994-08-30 Regents Of The University Of Minnesota Standby power supply with load-current harmonics neutralizer
WO2010063326A1 (en) * 2008-12-05 2010-06-10 Areva T&D Uk Ltd Electricity substation standby power supply system
KR20110013885A (en) * 2009-08-04 2011-02-10 한국전력공사 Overhead loop power distribution system
CN102075005A (en) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5343079A (en) * 1991-02-25 1994-08-30 Regents Of The University Of Minnesota Standby power supply with load-current harmonics neutralizer
WO2010063326A1 (en) * 2008-12-05 2010-06-10 Areva T&D Uk Ltd Electricity substation standby power supply system
KR20110013885A (en) * 2009-08-04 2011-02-10 한국전력공사 Overhead loop power distribution system
CN102075005A (en) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周伊琳,孙建伟,陈炯聪: "区域网络备自投及其测试关键技术", 《电力系统自动化》, vol. 36, no. 23, 10 December 2012 (2012-12-10), pages 1 - 3 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682547A (en) * 2015-01-30 2015-06-03 广东电网有限责任公司梅州供电局 Method and system for judging whether action of spare power automatic switching is successful or not by remote automatic bus transfer device
CN104682547B (en) * 2015-01-30 2017-01-25 广东电网有限责任公司梅州供电局 Method and system for judging whether action of spare power automatic switching is successful or not by remote automatic bus transfer device
CN104821655A (en) * 2015-05-14 2015-08-05 南京南瑞继保电气有限公司 Fault positioning method for regional spare power automatic switching
CN107276087A (en) * 2017-08-08 2017-10-20 国网上海市电力公司 It is a kind of to accelerate the standby method thrown of network
CN107276087B (en) * 2017-08-08 2020-09-08 国网上海市电力公司 Method for accelerating network backup switch

Also Published As

Publication number Publication date
CN103701202B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN102882197B (en) DG (distributed generation)-containing power distribution network distributed protection and control method
CN108988305B (en) Protection method of direct current power distribution network system
CN102684175B (en) A kind of implementation method of micro-capacitance sensor protection
CN105024361A (en) On-site feeder automatic protection method and application thereof
CN102270835A (en) Distributed over-current protection and interphase fault isolation method for distribution network
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN103762715B (en) Parallel operation and load switching control method of 10kV generator set
CN103607038B (en) Method for implementing serial power supplying of multistage spare power automatic switching devices in power grid
CN103378583A (en) Feeder automation technical scheme based on intelligent rapid vacuum circuit breaker
CN102624088B (en) Method for controlling fault self-recovery of power distribution switching station
CN204928105U (en) Power distribution terminal device with trip protections function of preventing bypassing immediate leadership
CN105425110A (en) Quick override trip fault positioning method based on power line carrier technology
CN103701202B (en) The method and system that statements based on collusion transformer station automatic closing is powered
CN106134498B (en) A kind of satellite load line under-voltage protection control circuit
CN202127283U (en) Circuit backup power automatic switching protection device
CN104682544A (en) Spare power automatic switching method and device
CN104485732A (en) In-put control method for standby powers of transformer substations
CN204156594U (en) A kind of region backup auto-activating device
CN203225578U (en) A power transmission line induction energy acquiring power supply apparatus with a high redundancy feature
CN103384062B (en) Isolation control system of grid power distribution fault detection
CN211377605U (en) Uninterrupted parallel operation grid-connected system of medium-voltage power supply vehicle
CN104092193A (en) 10kV power distribution network mixed line fault processing method
CN102222886A (en) Protection device and method for high-voltage vacuum power distribution equipment for mining
CN105471036B (en) A kind of intelligent charge control method based on electric car
CN110098599B (en) Fault processing method and system for overhead line-cable hybrid line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant