CN103696730B - 钻孔施工漏浆堵漏方法 - Google Patents

钻孔施工漏浆堵漏方法 Download PDF

Info

Publication number
CN103696730B
CN103696730B CN201310744662.5A CN201310744662A CN103696730B CN 103696730 B CN103696730 B CN 103696730B CN 201310744662 A CN201310744662 A CN 201310744662A CN 103696730 B CN103696730 B CN 103696730B
Authority
CN
China
Prior art keywords
sealing agent
drilling construction
lose returns
lose
blocking method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310744662.5A
Other languages
English (en)
Other versions
CN103696730A (zh
Inventor
马世旌
李德
段柏山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG CNNC TIANSHAN URANIUM INDUSTRY Co Ltd
Original Assignee
XINJIANG CNNC TIANSHAN URANIUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG CNNC TIANSHAN URANIUM INDUSTRY Co Ltd filed Critical XINJIANG CNNC TIANSHAN URANIUM INDUSTRY Co Ltd
Priority to CN201310744662.5A priority Critical patent/CN103696730B/zh
Publication of CN103696730A publication Critical patent/CN103696730A/zh
Application granted granted Critical
Publication of CN103696730B publication Critical patent/CN103696730B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Sealing Material Composition (AREA)

Abstract

本发明属于地浸生产钻孔施工技术,具体公开了一种钻孔施工漏浆堵漏方法。首先确定泥浆漏失层位置,根据漏失层位置选定堵漏剂,形成堵漏材料,利用堵漏材料堵漏之后,当无泥浆漏失现象后静置1小时~1.5小时。停止钻进后,根据泥浆面下降速率判断泥浆面位置为泥浆漏失层位置,从而根据漏失层位置和钻进位置的比较确定堵漏剂。并且根据设计的配比形成堵漏材料,因而缩短了泥浆漏失处理时间,在一定程度上保证了钻孔施工质量,减少了经济损失。

Description

钻孔施工漏浆堵漏方法
技术领域
本发明属于地浸生产钻孔施工技术,具体涉及一种钻孔施工中针对地层中泥浆严重漏失的堵漏方法。
背景技术
地浸工艺钻孔是地浸矿山生产运行所需的主要生产设施,在其施工过程中,由于复杂地层原因常出现不同程度的泥浆漏失现象,造成钻孔无法正常施工,从而影响到钻孔透水性等质量指标,甚至造成钻孔报废,给生产单位及施工单位造成无法弥补的经济损失。
原地浸出是通过工艺钻孔将溶浸液注入至矿层,经化学反应后再利用潜水泵和提升管将浸出液通过工艺钻孔从矿层提升至地表,最后进入后续处理工序的过程。
在疏干砂岩铀矿床钻孔施工过程中,由于施工区域存在断层或裂隙,致使部分钻孔在施工过程中出现了不同程度的泥浆漏失现象,耗费了大量的人力、物力,并影响了钻孔施工进度及质量。
发明内容
本发明的目的在于针对疏干砂岩铀矿床的施工区域存在断层或裂隙的泥浆漏失,提供一种钻孔施工漏浆堵漏方法。
本发明的技术方案如下:
一种钻孔施工漏浆堵漏方法,它包括如下步骤:
1)确定泥浆漏失层位置
利用水位仪测量钻孔内泥浆面位置,待泥浆面下降速率在1.0~2.0m/min时,即可确定此时的泥浆面位置为泥浆漏失层位置;
2)根据漏失层位置选定堵漏剂
a)若泥浆漏失层位置正好在钻进位置,则选择沉降性较好的堵漏剂;
b)若泥浆漏失层位置钻进位置以上,则选择具有悬浮性、高粘度特性的有机堵漏剂;
3)形成堵漏材料
选择粘稠度为35~40m2/s的泥浆,将其与堵漏剂按照比重为1.05~1.3进行配比形成的堵漏材料;
4)利用堵漏材料堵漏之后,当无泥浆漏失现象后静置1小时~1.5小时。
在上述钻孔施工漏浆堵漏方法中:在步骤1)实施之前,将钻头提升至离钻进位置20m~30m的高度悬空。
在上述钻孔施工漏浆堵漏方法中:所述步骤2)中沉降性较好的堵漏剂为速凝水泥或植物胶,所述的具有悬浮性、高粘度特性的有机堵漏剂为稻草或纤维素。
本发明的显著效果在于:停止钻进后,根据泥浆面下降速率判断泥浆面位置为泥浆漏失层位置,从而根据漏失层位置和钻进位置的比较确定堵漏剂。并且根据设计的配比形成堵漏材料,因而缩短了泥浆漏失处理时间,在一定程度上保证了钻孔施工质量,减少了经济损失。
进一步的在发现漏失现象后将钻头提升至离钻进位置20m~30m的高度悬空,防止漏失层漏失通道进一步扩大,也可以防止由于漏失层松散导致坍塌埋钻。
附图说明
图1为泥浆漏失层位置正好在钻进位置的漏失现象示意图;
图2为泥浆漏失层位置钻进位置以上的漏失现象示意图;
具体实施方式
下面结合附图及具体实施例对本发明作进一步详细说明。
1)停止钻进,将钻头提升至离钻进位置20m~30m的高度悬空,在防止漏失层漏失通道进一步扩大,也可以防止由于漏失层松散导致坍塌埋钻;
2)利用水位仪测量钻孔内泥浆面位置,待泥浆面下降速率在1.0~2.0m/min时,即可确定此时的泥浆面位置为泥浆漏失层位置;
3)根据漏失层位置选定堵漏剂
a)如图1所示,如果泥浆漏失层位置正好在钻进位置,则选择沉降性较好的堵漏剂,如速凝水泥、植物胶;
b)如图2所示,如果泥浆漏失层位置钻进位置以上,则选择具有悬浮性、高粘度特性的有机堵漏剂,如稻草、纤维素;
4)形成堵漏材料
在上述步骤a)或步骤b)的堵漏过程中,采用泥浆携带上述的堵漏剂形成堵漏材料,进入漏失层进行堵漏。在堵漏过程中,注入孔内用于堵漏的泥浆较正常条件下粘稠度较高,应具有高比重、高粘度的特点;
泥浆的粘稠度为35~40m2/s,在堵漏材料中,泥浆和堵漏剂的比重为1.05~1.3。
5)利用堵漏材料堵漏之后,无泥浆漏失现象后静置1小时~1.5小时。
待堵漏材料及堵漏剂达到其堵漏的最佳效果,然后在泥浆低速循环的条件下,采用低压慢转的钻进方式进行施工,待钻进泥浆返出并情况稳定后,方可进行正常钻进。

Claims (3)

1.一种钻孔施工漏浆堵漏方法,其特征在于,它包括如下步骤:
1)确定泥浆漏失层位置
利用水位仪测量钻孔内泥浆面位置,待泥浆面下降速率在1.0~2.0m/min时,即可确定此时的泥浆面位置为泥浆漏失层位置;
2)根据漏失层位置选定堵漏剂
a)若泥浆漏失层位置正好在钻进位置,则选择沉降性较好的堵漏剂;
b)若泥浆漏失层位置钻进位置以上,则选择具有悬浮性、高粘度特性的有机堵漏剂;
3)形成堵漏材料
选择粘稠度为35~40m2/s的泥浆,将其与堵漏剂按照比重为1.05~1.3进行配比形成的堵漏材料;
4)利用堵漏材料堵漏之后,当无泥浆漏失现象后静置1小时~1.5小时。
2.如权利要求1所述的钻孔施工漏浆堵漏方法,其特征在于:在步骤1)实施之前,将钻头提升至离钻进位置20m~30m的高度悬空。
3.如权利要求1所述的钻孔施工漏浆堵漏方法,其特征在于:所述步骤2)中沉降性较好的堵漏剂为速凝水泥或植物胶,所述的具有悬浮性、高粘度特性的有机堵漏剂为稻草或纤维素。
CN201310744662.5A 2013-12-30 2013-12-30 钻孔施工漏浆堵漏方法 Active CN103696730B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310744662.5A CN103696730B (zh) 2013-12-30 2013-12-30 钻孔施工漏浆堵漏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310744662.5A CN103696730B (zh) 2013-12-30 2013-12-30 钻孔施工漏浆堵漏方法

Publications (2)

Publication Number Publication Date
CN103696730A CN103696730A (zh) 2014-04-02
CN103696730B true CN103696730B (zh) 2016-05-18

Family

ID=50358376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310744662.5A Active CN103696730B (zh) 2013-12-30 2013-12-30 钻孔施工漏浆堵漏方法

Country Status (1)

Country Link
CN (1) CN103696730B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707338A (zh) * 2019-01-12 2019-05-03 李子杲 钻探过程中发生漏失后堵漏的方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350940B (zh) * 2015-11-19 2018-01-12 辽河石油勘探局 一种注水泥塞质量控制方法
CN106351603B (zh) * 2016-08-24 2018-11-20 中国石油集团渤海钻探工程有限公司 一种裂缝或溶洞性严重漏失堵漏方法及堵漏材料送入管串
CN113585353B (zh) * 2021-07-12 2023-01-31 中陕核工业集团二一八大队有限公司 铀超标钻孔涌水治理工艺

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770257A (en) * 1981-08-06 1988-09-13 Kabushiki Kaisha Takenaka Komuten Method of preventing loss of drilling mud during boring a hole in the ground
CA2377347A1 (en) * 2001-03-27 2002-09-27 John P. Haberman Cementing spacers for improved well cementation
CN102287162A (zh) * 2011-05-09 2011-12-21 白银有色集团股份有限公司 钻孔内小断层的堵漏方法
CN102434124A (zh) * 2010-09-29 2012-05-02 中国石油化工股份有限公司 一种钻井用逐次复合法堵漏方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63165687A (ja) * 1986-12-25 1988-07-08 株式会社竹中工務店 深層ボ−リング孔の逸水防止工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770257A (en) * 1981-08-06 1988-09-13 Kabushiki Kaisha Takenaka Komuten Method of preventing loss of drilling mud during boring a hole in the ground
CA2377347A1 (en) * 2001-03-27 2002-09-27 John P. Haberman Cementing spacers for improved well cementation
CN102434124A (zh) * 2010-09-29 2012-05-02 中国石油化工股份有限公司 一种钻井用逐次复合法堵漏方法
CN102287162A (zh) * 2011-05-09 2011-12-21 白银有色集团股份有限公司 钻孔内小断层的堵漏方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707338A (zh) * 2019-01-12 2019-05-03 李子杲 钻探过程中发生漏失后堵漏的方法

Also Published As

Publication number Publication date
CN103696730A (zh) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103967507B (zh) 一种适于富水矿山井下开采堵水用的帷幕注浆工艺
CN103696730B (zh) 钻孔施工漏浆堵漏方法
CN103277120B (zh) 一种非全深冻结立井解冻后的涌水防治方法
CN103233738B (zh) 一种急倾斜特厚煤层顶煤综合弱化方法
CN101915072B (zh) 地面钻井抽采采动稳定区煤层气的方法
CN102926770A (zh) 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN109653777B (zh) 一种高速铁路明挖隧道渗漏水及裂缝区域性整体整治方法
CN108729897A (zh) 一种二氧化碳–滑溜水间歇式混合压裂设计方法
CN103244071A (zh) 地下储气库老井封堵方法
CN103882858A (zh) 直径300mm微型桩施工方法
CN105804786B (zh) 一种松软煤层底板穿层钻孔压冲增透方法
CN105199685A (zh) 一种诱导性裂缝防漏堵漏的水基钻井液
CN110748315A (zh) 一种油水井套损治理方法
CN108456510A (zh) 一种复合承压堵漏浆、制备方法及施工方法
CN104594370B (zh) 喀斯特地区高压联合冲洗灌浆方法及其结构
CN102787606B (zh) 一种基坑开挖降水过程中对周围环境的保护方法
CN103755318A (zh) 红砂岩卵石层中的地下连续墙成槽护壁泥浆及方法
CN115012933A (zh) 一种回采断层防水煤柱的分区注浆施工方法
CN105003294B (zh) 一种基于水热耦合压裂煤体石门揭煤方法
CN103883291B (zh) 水文水井管内投砾成井设备及施工方法
CN107313743B (zh) 一种利用煤层气井对煤层底板隔水层薄弱区带修补方法
CN109026011A (zh) 巨厚富水灯影组白云岩立井井筒止水帷幕控制注浆工艺
CN103967506A (zh) 一种矿体顶板岩溶裂隙发育且强富水矿床的帷幕注浆技术
CN110566155A (zh) 一种采动区抗变形瓦斯抽采钻孔循环注浆封孔方法
CN102787611A (zh) 湿陷性黄土地区基坑开挖的降水方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant