CN103696366A CN201310711396.6A CN201310711396A CN103696366A CN 103696366 A CN103696366 A CN 103696366A CN 201310711396 A CN201310711396 A CN 201310711396A CN 103696366 A CN103696366 A CN 103696366A
Authority
CN
China
Prior art keywords
layer
curing
coupling agent
resin
steel bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310711396.6A
Other languages
Chinese (zh)
Other versions
CN103696366B (en
Inventor
卢亮
闵晓阳
沈剑
沈加道
李英豪
吴梓钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Original Assignee
SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd filed Critical SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Priority to CN201310711396.6A priority Critical patent/CN103696366B/en
Publication of CN103696366A publication Critical patent/CN103696366A/en
Application granted granted Critical
Publication of CN103696366B publication Critical patent/CN103696366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a pavement structure and a pavement method of a combined steel bridge deck. The pavement structure is characterized by being formed by a four layer structure from bottom to top; the four layer structure comprises a roughness layer, an integration layer, a comprehensive waterproof system layer and a cold-mixing resin asphalt drainage concrete layer; the roughness layer is sprayed on a smooth steel plate; the integration layer is laid on the roughness layer; the comprehensive waterproof system layer is laid on the integration layer; the cold-mixing resin asphalt drainage concrete layer is laid on the comprehensive waterproof system layer. Advanced materials which are researched and developed independently are utilized, the performance of the various materials and the functions of the structural layer are maximized, and accordingly the steel plate is changed into a rough interface from a smooth interface. The self-problems of pavement of the steel bridge deck, which are difficult to solve, can be solved; the risk of a drainage functional layer of the urban elevated design is greatly reduced through the comprehensive waterproof system layer; accordingly the safety performance, the environment-friendly performance and the durability of the pavement are greatly improved.

Description

A kind of paving structure of modular steel bridge bridge floor and paving method thereof
Technical field
The present invention relates to a kind of overhead road of city paving steel bridge deck, especially relate to a kind of paving structure and paving method of modular steel bridge bridge floor.
Background technology
After 21 century, along with science and technology is constantly progressive, transport development cause has obtained development fast, steel box girder bridge due to have from heavy and light, easy construction fast, supporting capacity and the advantage such as span ability is large, application is expanding day by day, present stage urban elevated bridge in position large across footpath, that traffic impact large, service condition is relatively harsh, substantially all adopted steel box girder bridge.But, to compare cement concrete bridge condition more complicated for steel box girder bridge floor paving.
The first, it is mated formation and has relatively abundant beam-slab bracing system unlike cement concrete bridge, and steel plate thickness is all thinner, generally at 12~16mm, produces under external force whole and local flexing and is out of shape larger;
The second, large many of other earth working materials of steel plate thermal conductivity ratio, layer internal-external temperature difference of mating formation under megathermal climate is huge, and layer interior temperature of mating formation is very high, often reaches 80,90 ℃;
Three, steel plate is met water electrode and is easily got rusty, and not only between mating formation layer by layer, coheres, anti-shear ability produces significant impact, also can produce corrosion to steel case beam, affect application life;
Four, there is hogging moment in Steel Bridge Deck Pavement surface, and material bending resistance tensile stress, strain capacity are had higher requirement, and it is more outstanding that deck anti-fatigue performance, endurance quality seem;
So far, the developed country such as American-European-Japanese has carried out a series of further investigations for feature, the difficult point of paving steel bridge deck, has successively occurred take casting type asphaltic mixture that moral, English, method, Deng state the are representative scheme of mating formation; The epoxy resin asphalt that the U.S. is representative of the take double-deck modified asphalt SMA scheme that the states such as scheme and Germany, Japan adopt of mating formation, has basically formed the complete system of paving steel bridge deck that is applicable to its national feature.China is relatively late to the research of steel deck paving packing technique, until 20 end of the centurys, with Guangdong Steel deck pavement, be applied as starting point, the domestic large-span steel box girder bridge asphalt concrete pavement application period that just formally entered, but mainly take and indiscriminately imitate the complete pavement technique of Introduced From Abroad as main, applicability understanding to steel deck paving packing technique is often not enough, the severe condition shortcoming that domestic Steel Bridge Deck is used is considered, therefore, generally having there is comparatively serious earlier period damage phenomenon in the layer of mating formation, has occurred the diseases such as crack, rut and passing.
In addition, overhead road of city Steel Bridge Deck surface functional layer generally adopts traditional compact type bituminous concrete or macrovoid road structure, but these two kinds of road surface structare layers but exist many problems in actual application: 1) skid resistance of road surface rainy day, travel safety become main problem; 2) road traffic noise is having a strong impact on people's normal life; 3) flexible pavement and cement pavement have larger heat absorption rate, and city temperature is day by day climbed to a higher point, and city hot island phenomenon becomes clear day by day; 4) road surfaces layer supporting capacity is on the weak side, occurs further by the phenomenon of densification; 5) hole decay is just very obvious at short notice, and drain function is had a strong impact on; 6) it is inner that rainwater etc. infiltrates deck, and the useful life longevity of substructure layer is produced and had a strong impact on; 7) snow-melting agent or acid rain etc. produce corrosion to deck, cause road surfaces to peel off, cheat the phenomenons such as groove.
The patent No. 200910152726 and application number 201110298046.2 all disclose a kind of steel bridge deck paving structure and paving method, each functional layer mainly for Steel Bridge has been done different improvement, but the waterproofing course for the layer of mating formation, they all still adopt the coating of water proofing asphalt coating to form, therefore this single waterproof body ties up to after the long-term crimp of road surfaces, easily go to pot and produce infiltration, cause inner serious safe road to suffer from.
To sum up, for the real behavior in service of overhead road of city steel box girder bridge face, in the urgent need to developing a kind of new material, and design a kind of reliable in quality, construct convenient, comprehensive cost is relatively cheap and the life-span is longer, is applicable to paving structure and the paving method thereof of the modular steel bridge bridge floor of urban road.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of reliable in quality, easy construction, long service life, the maintenance phase is short and meet overhead road of city Steel Bridge distortion needs, thermal stability is good, paving structure and the paving method thereof of the modular steel bridge bridge floor that drain function and noise reduction effect are lasting.
To achieve these goals, technical scheme of the present invention is:
A paving structure for modular steel bridge bridge floor, is comprised of four-layer structure layer from bottom to up, is respectively: spray the roughening layer in smooth steel plate; Be laid on united layer on roughening layer; Be laid on the comprehensive waterproof system layer on united layer; And be laid on the cold mixing retinasphal draining layer of concrete in comprehensive waterproof system;
Described roughening layer, is included in smooth steel plate interface spraying reaction resin sizing material and is synchronously spread in the single Stone above described reaction resin sizing material; The particle diameter diameter of described rubble is 3~5mm, and consumption is 5~7kg/m 2; Described reaction resin sizing material coating weight 0.9~1.1kg/m 2; Described roughening layer perfection realized steel bridge interface from smooth to coarse transformation, greatly reduces the risk that slippage appears in the layer of mating formation, and can meet again the condition of mating formation of steel bridge deck harshness simultaneously;
Described united layer, comprises context layer and cold curing resin asphalt concrete layer; Described context layer adopts cold curing resin bituminous cements, and consumption is 0.3~0.5kg/m 2, play interlayer anastomosis; Described cold curing resin bituminous concrete layer thickness is 2~3cm, following raw material and percentage by weight, consists of: cold curing resin bituminous cements 6~9%, sandstone mineral aggregate 86~90%, polyester fiber 0.3~0.4%, mineral powder filling materials 2~5%; Described united layer provides integrated carrying ability, the impact of effectively resisting and disperseing vehicle overload to carry to whole paving structure layer;
Described comprehensive waterproof system layer, comprises the fixed breakstone water-proof layer of thermosetting epoxy asphalt and the close water layer of high adhered modification pitch framework compact F type grating; The fixed breakstone water-proof layer of described thermosetting epoxy asphalt adopts thermosetting epoxy asphalt consolidating agent, spraying consumption 0.6~0.8kg/m 2, the ballast grain sizes of spreading is 5~10mm, consumption is 6~8kg/m 2; The close water layer thickness of described high adhered modification pitch framework compact F type grating is 3~4cm, following raw material and percentage by weight, consists of: pitch 5.5%~6.5%, and sandstone mineral aggregate 81.5~86%, mineral powder filling materials: 8%~12%, fiber 0.3~0.4%; Described comprehensive waterproof system layer greatly reduces the risk that current infiltrate deck, destroy structural core layer;
Described cold mixing retinasphal draining coagulate layer thickness is 3~4cm, and raw material and percentage by weight consist of: retinasphal cementitious matter 5~7%, sandstone mineral aggregate 88~90%, polyester fiber 0.1~0.2%, mineral powder filling materials 3~5%; Utilize cold mixing retinasphal draining concrete as function of surface, overcome layer easy densification of mating formation, be prone to rut problems of crack, greatly improve sustainability and the durability of hole simultaneously, improve the driving safety of vehicle.
Further, reaction resin sizing material used in described roughening layer, be by epoxy resin as A component, mix to approach the mass ratio of 1:1 with B component; Described B component is comprised of following raw material and percentage by weight: curing compound 60~69%, flexibilizer 15~20%, coupling agent 5~8%, thinner 1~2%, curing accelerator 10~15%.
Described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent; Described thinner is reactive diluent, preferred alkenes class thinner; Described curing accelerator is multi-thiol.
Further, cold curing resin bituminous cements used in described united layer, is comprised of following raw material and percentage by weight: epoxy resin 20~36%, curing compound 15~30%, 70# petroleum bitumen 40~54%, bulking agent 2~4%, flexibilizer 3~8%, coupling agent 3~6%, defoamer 1~2%.
Described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent.
Modular steel bridge bridge floor of the present invention is comprised of steel bridge top board, diaphragm, midfeather, stiffening rib and bridge deck pavement; Wherein stiffening rib and vertical and horizontal diaphragm interweave mutually in the vertical direction, form netted load-bearing material structure, and are connected with top steel plate.
The invention also discloses a kind of paving method of modular steel bridge bridge floor, comprise following step:
(1) close traffic, removes the obvious foreign material of surface of steel plate, overlap, burr, grease etc., to carrying out preliminary treatment in steel plate interface;
(2) steel plate rust cleaning, makes steel plate form a fresh bright and clean interface that has certain roughness;
(3) on the steel plate interface of handling well, apply one deck reaction resin sizing material, and the synchronous mono-Stone of spreading one deck 3~5mm is curing together, forms the roughening layer with enough keying strengths;
(4) on roughening layer, lay united layer, spraying cold curing resin asphalt binding course, the cold curing resin bituminous concrete stiffness layer of making 2~3cm, makes to form between deck whole, possess high strength, high stiffness characteristics, can bear overweight load load completely;
(5) on united layer, lay comprehensive waterproof system layer, spray thermosetting epoxy resin bituminous macadam, lay the close water layer of high adhered modification pitch framework compact F type grating, form the waterproof system with enough reliabilitys;
(6) the thick cold curing resin pitch draining concrete of 3~4cm of mating formation on comprehensive waterproof system layer, obtains the paving structure of modular steel bridge bridge floor.
Roughening layer in described step (3), the reaction resin sizing material of employing be by ethylene oxidic ester based epoxy resin as A component, mix to approach the mass ratio of 1:1 with B component; Described B component is comprised of following raw material and percentage by weight: curing compound 60~69%, flexibilizer 15~20%, coupling agent 5~8%, thinner 1~2%, curing accelerator 10~15%.
Wherein, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent; Described thinner is reactive diluent, preferred alkenes class thinner; Described curing accelerator is multi-thiol.
United layer in described step (4), the cold curing resin bituminous cements of employing is comprised of following raw material and percentage by weight: epoxy resin 20~36%, curing compound 15~30%, 70# petroleum bitumen 40~54%, bulking agent 2~4%, flexibilizer 3~8%, coupling agent 3~6%, defoamer 1~2%.
Wherein, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent.
Compared with prior art, the technological merit that the present invention possesses is:
As a kind of new construction of overhead road of city modular steel bridge deck paving, the present invention has sufficiently and reasonably utilized the advanced material of existing and this new research and development, is that the Function of the performance of various materials and deck has been arrived ultimate attainment to a certain extent.Apply paving structure perfection of the present invention and realized the transformation of steel plate from smooth interface to rough interfaces, and can finely overcome again some more insoluble difficult problems that paving steel bridge deck self exists; Such as make it to have possessed the ability of bearing overweight load by united layer, and can effectively disperse load stress to concentrate, make stressed more even; The risk that has greatly reduced overhead road of city designing and arranging water function layer by comprehensive waterproof system layer, the possibility that bottom core structural layer is wrecked approaches " zero " substantially; Cold mixing retinasphal draining layer of concrete of the present invention is when overcoming traditional compact structure functional layer defect, especially traditional macrovoid asphalt concrete layer has been risen to a new aspect, security performance, environmental-protecting performance, the endurance quality on road surface are improved greatly.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further detail:
A paving method for modular steel bridge bridge floor, comprises following step:
1. close traffic, is used iron hammer and chemical agent to remove the obvious foreign material of surface of steel plate, overlap, burr, grease etc., and preliminary treatment is carried out in steel plate interface.
2. utilize automatic dust-free shot-blasting machine and sand-blasting machine to carry out steel plate rust cleaning, make steel plate form a fresh bright and clean interface that has certain roughness.
3. on the steel plate interface of handling well, apply one deck reaction resin sizing material, coating weight 0.9~1.1kg/m 2; And the synchronous mono-Stone of spreading one deck 3~5mm, consumption 5~7kg/m 2, solidify together, form the roughening layer with enough keying strengths.
The reaction resin sizing material here, be by epoxy resin as A component, mix to approach the mass ratio of 1:1 with B component; Described B component is comprised of following raw material and percentage by weight: curing compound 60~69%, flexibilizer 15~20%, coupling agent 5~8%, thinner 1~2%, curing accelerator 10~15%.
Wherein, epoxy resin is ethylene oxidic ester class; Curing compound is polynary amine curing agent; Flexibilizer is polysulfide rubber; Coupling agent is organo silane coupling agent; Thinner is olefines thinner; Curing accelerator is multi-thiol.
Reaction resin properties of rubber index sees the following form:
Inspection item Probe temperature Performance requirement Test method
Pull strength (MPa) 25℃ ≥10 ASTMD638
Pull strength (MPa) 70℃ ≥3 ASTMD638
Draw and cut intensity (MPa) 25℃ ≥5 ?
Draw and cut intensity (MPa) 70℃ ≥1 ?
Breaking strength (MPa) 25℃ ≥10 Actual measurement project
Elongation at break (%) 25℃ ≥10 Direct tensile test
Sizing material viscosity (Pa.S) 25℃ 1-2 Actual measurement project
Refer to the dry time (h) 25℃ 24≥t≥1 Refer to dry test
Hardening time (h) 25℃ ≤72 ASTMD638
Single Stone performance indications see the following form:
Index Unit Standard value
Apparent relative density t/m 3 ≥2.60
Firm value (> 0.3mm part) % ≥12
Sand equivalent % ≥60
Corner angle (flowing time) S ≥30
Be less than the content (WATER-WASHING METHOD) of 0.075mm % ≤1
Water absorption rate % ≤1.0
4. on roughening layer, lay united layer, spraying cold curing resin asphalt binding course, consumption is 0.3~0.5kg/m 2; And then the cold curing resin bituminous concrete stiffness layer of making 2~3cm, make to form integral body between deck, possess high strength, high stiffness characteristics, can bear overweight load load completely;
The raw material weight percentage of the cold curing resin bituminous concrete here consists of: cold curing resin bituminous cements 6~9%, sandstone mineral aggregate 86~90%, polyester fiber 0.3~0.4%, mineral powder filling materials 2~5%; Wherein, cold curing resin bituminous cements is comprised of following raw material and percentage by weight: water glyceride type epoxy resin 20~36%, polynary amine curing agent 15~30%, 70# petroleum bitumen 40~54%, bulking agent 2~4%, polysulfide rubber flexibilizer 3~8%, organo silane coupling agent 3~6%, defoamer 1~2%.
The performance indications of cold curing resin bituminous cements see the following form:
Pilot project Unit Technical requirements Test method
Refer to the dry time (25 ℃) h ≥1.0 Refer to dry method
Hardening time (25 ℃) h ≤96 ?
Elongation at break (25 ℃) % ≥10 Direct tensile test
The performance indications of cold curing resin bituminous concrete see the following form:
Pilot project Technical requirements Test method
Marshall stability KN(70 ℃) ≥30 Hit reality 50 times
Flow valuve 0.1mm 10~30 ?
Hit real porosity % 2~4 ?
Rut dynamic stability/mm(60 ℃) ≥10000 T0719
Water stability: residual Marshall stability ≥85% T0729
Freeze thawing diametral compression test retained strength ratio ≥80% T0729
Infiltration coefficient ml/min <50 T0730
Construction depth mm ≥0.5 T0731
-10 ℃ of low-temperature bending limiting strains >600×10 -6 T0728
5. on united layer, lay comprehensive waterproof system layer:
First spray thermosetting epoxy resin bituminous macadam, adopt thermosetting epoxy asphalt consolidating agent, spraying consumption 0.6~0.8kg/m 2, the ballast grain sizes of spreading is 5~10mm, consumption is 6~8kg/m 2;
Re-lay the close water layer of high adhered modification pitch framework compact F type grating, form the waterproof system with enough reliabilitys; Its thickness, at 3~4cm, is comprised of following raw material and percentage by weight: pitch 5.5%~6.5%, and sandstone mineral aggregate 81.5~86%, mineral powder filling materials: 8%~12%, fiber 0.3~0.4%.
6. the cold curing resin pitch draining concrete that the 3~4cm that mats formation on comprehensive waterproof system layer is thick, raw material and percentage by weight consist of: retinasphal cementitious matter 5~7%, sandstone mineral aggregate 88~90%, polyester fiber 0.1~0.2%, mineral powder filling materials 3~5%; Obtain the paving structure of overhead road of city modular steel bridge bridge floor.
Finally, it should be noted that, the specific embodiment described in this manual, its flow process, title that technology contents is named etc. can be different.All equivalence or simple change of doing according to described structure, feature and the principle of patent design of the present invention, are included in the protection domain of patent of the present invention.All distortion that those of ordinary skill in the art can directly derive or associate from content disclosed by the invention, all should think protection scope of the present invention.

Claims (11)

1. a paving structure for modular steel bridge bridge floor, is characterized in that, four-layer structure layer from bottom to up, consists of, and is respectively: spray the roughening layer in smooth steel plate; Be laid on united layer on roughening layer; Be laid on the comprehensive waterproof system layer on united layer; And be laid on the cold mixing retinasphal draining layer of concrete in comprehensive waterproof system;
Described roughening layer, is included in smooth steel plate interface spraying reaction resin sizing material and is synchronously spread in the single Stone above described reaction resin sizing material; The particle diameter diameter of described rubble is 3~5mm, and consumption is 5~7kg/m 2; Described reaction resin sizing material coating weight is 0.9~1.1kg/m 2;
Described united layer, comprises context layer and cold curing resin asphalt concrete layer; Described context layer adopts cold curing resin bituminous cements, and consumption is 0.3~0.5kg/m 2, play interlayer anastomosis; Described cold curing resin bituminous concrete layer thickness is 2~3cm, following raw material and percentage by weight, consists of: cold curing resin bituminous cements 6~9%, sandstone mineral aggregate 86~90%, polyester fiber 0.3~0.4%, mineral powder filling materials 2~5%;
Described comprehensive waterproof system layer, comprises the fixed breakstone water-proof layer of thermosetting epoxy asphalt and the close water layer of high adhered modification pitch framework compact F type grating; The fixed breakstone water-proof layer of described thermosetting epoxy asphalt adopts thermosetting epoxy asphalt consolidating agent, spraying consumption 0.6~0.8kg/m 2, the ballast grain sizes of spreading is 5~10mm, consumption is 6~8kg/m 2; The close water layer thickness of described high adhered modification pitch framework compact F type grating is 3~4cm, following raw material and percentage by weight, consists of: pitch 5.5%~6.5%, and sandstone mineral aggregate 81.5~86%, mineral powder filling materials: 8%~12%, fiber 0.3~0.4%;
Described cold mixing retinasphal draining coagulate layer thickness is 3~4cm, and raw material and percentage by weight consist of: retinasphal cementitious matter 5~7%, sandstone mineral aggregate 88~90%, polyester fiber 0.1~0.2%, mineral powder filling materials 3~5%.
2. the paving structure of modular steel bridge bridge floor according to claim 1, is characterized in that, reaction resin sizing material used in described roughening layer, be by epoxy resin as A component, mix to approach the mass ratio of 1:1 with B component; Described B component is comprised of following raw material and percentage by weight: curing compound 60~69%, flexibilizer 15~20%, coupling agent 5~8%, thinner 1~2%, curing accelerator 10~15%.
3. the paving structure of modular steel bridge bridge floor according to claim 2, is characterized in that, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent; Described thinner is reactive diluent, preferred alkenes class thinner; Described curing accelerator is multi-thiol.
4. the paving structure of modular steel bridge bridge floor according to claim 1, it is characterized in that, cold curing resin bituminous cements used in described united layer, by following raw material and percentage by weight, formed: epoxy resin 20~36%, curing compound 15~30%, 70# petroleum bitumen 40~54%, bulking agent 2~4%, flexibilizer 3~8%, coupling agent 3~6%, defoamer 1~2%.
5. the paving structure of modular steel bridge bridge floor according to claim 4, is characterized in that, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent.
6. the paving structure of modular steel bridge bridge floor according to claim 1, is characterized in that, described modular steel bridge bridge floor is comprised of steel bridge top board, diaphragm, midfeather, stiffening rib and bridge deck pavement; Wherein stiffening rib and vertical and horizontal diaphragm interweave mutually in the vertical direction, form netted load-bearing material structure, and are connected with top steel plate.
7. a paving method for modular steel bridge bridge floor, is characterized in that, comprises following step:
(1) close traffic, removes the obvious foreign material of surface of steel plate, overlap, burr, grease etc., to carrying out preliminary treatment in steel plate interface;
(2) steel plate rust cleaning, makes steel plate form a fresh bright and clean interface that has certain roughness;
(3) on the steel plate interface of handling well, apply one deck reaction resin sizing material, and the synchronous mono-Stone of spreading one deck 3~5mm is curing together, forms the roughening layer with enough keying strengths;
(4) on roughening layer, lay united layer, spraying cold curing resin asphalt binding course, the cold curing resin bituminous concrete stiffness layer of making 2~3cm, makes to form between deck whole, possess high strength, high stiffness characteristics, can bear overweight load load completely;
(5) on united layer, lay comprehensive waterproof system layer, spray the fixed macadam of thermosetting epoxy resin pitch, lay the close water layer of high adhered modification pitch framework compact F type grating, form the waterproof system with enough reliabilitys;
(6) the thick cold curing resin pitch draining concrete of 3~4cm of mating formation on comprehensive waterproof system layer, obtains the paving structure of modular steel bridge bridge floor.
8. the paving method of modular steel bridge bridge floor according to claim 7, it is characterized in that, roughening layer in described step (3), the reaction resin sizing material of employing be by ethylene oxidic ester based epoxy resin as A component, mix to approach the mass ratio of 1:1 with B component; Described B component is comprised of following raw material and percentage by weight: curing compound 60~69%, flexibilizer 15~20%, coupling agent 5~8%, thinner 1~2%, curing accelerator 10~15%.
9. the paving method of modular steel bridge bridge floor according to claim 8, is characterized in that, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent; Described thinner is reactive diluent, preferred alkenes class thinner; Described curing accelerator is multi-thiol.
10. the paving method of modular steel bridge bridge floor according to claim 7, it is characterized in that, united layer in described step (4), the cold curing resin bituminous cements adopting is comprised of following raw material and percentage by weight: epoxy resin 20~36%, curing compound 15~30%, 70# petroleum bitumen 40~54%, bulking agent 2~4%, flexibilizer 3~8%, coupling agent 3~6%, defoamer 1~2%.
The paving structure of 11. modular steel bridge bridge floors according to claim 10, is characterized in that, described epoxy resin is ethylene oxidic ester class; Described curing compound is polynary amine curing agent; Described flexibilizer is that chemistry is toughness reinforcing, rubber-like, preferably polysulfide rubber; Described coupling agent is organo silane coupling agent.
CN201310711396.6A 2013-12-20 2013-12-20 Pavement structure and pavement method of combined steel bridge deck Active CN103696366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310711396.6A CN103696366B (en) 2013-12-20 2013-12-20 Pavement structure and pavement method of combined steel bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310711396.6A CN103696366B (en) 2013-12-20 2013-12-20 Pavement structure and pavement method of combined steel bridge deck

Publications (2)

Publication Number Publication Date
CN103696366A true CN103696366A (en) 2014-04-02
CN103696366B CN103696366B (en) 2015-07-22

Family

ID=50358016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310711396.6A Active CN103696366B (en) 2013-12-20 2013-12-20 Pavement structure and pavement method of combined steel bridge deck

Country Status (1)

Country Link
CN (1) CN103696366B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612048A (en) * 2015-01-21 2015-05-13 朱宏伟 EAC bridge steel deck paving structure and construction method thereof
CN105088965A (en) * 2015-09-16 2015-11-25 宁波路宝科技实业集团有限公司 Steel bridge deck pavement structure and method
CN106010256A (en) * 2016-07-13 2016-10-12 袁春华 Preparing method of epoxy asphalt cement
CN108797333A (en) * 2018-06-14 2018-11-13 广州珠江黄埔大桥建设有限公司 Combined steel bridge floor paving structure
WO2023284252A1 (en) * 2021-07-14 2023-01-19 江苏中路工程技术研究院有限公司 Tunnel fiber composite resin pavement structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433345Y (en) * 2009-06-26 2010-03-31 华南理工大学 Composite pavement structure
CN101858052A (en) * 2010-06-30 2010-10-13 湖南大学 Steel and ultra-high performance concrete combined bridge deck structure
CN102392413A (en) * 2011-09-30 2012-03-28 宁波天意钢桥面铺装技术有限公司 Pavement structure of combined steel bridge deck and pavement method thereof
KR20130043746A (en) * 2011-10-21 2013-05-02 최진성 Bridge deck slab pavement method by using of sulfur polymer cement
CN203256612U (en) * 2013-02-07 2013-10-30 华南理工大学 Steel bridge deck pavement structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433345Y (en) * 2009-06-26 2010-03-31 华南理工大学 Composite pavement structure
CN101858052A (en) * 2010-06-30 2010-10-13 湖南大学 Steel and ultra-high performance concrete combined bridge deck structure
CN102392413A (en) * 2011-09-30 2012-03-28 宁波天意钢桥面铺装技术有限公司 Pavement structure of combined steel bridge deck and pavement method thereof
KR20130043746A (en) * 2011-10-21 2013-05-02 최진성 Bridge deck slab pavement method by using of sulfur polymer cement
CN203256612U (en) * 2013-02-07 2013-10-30 华南理工大学 Steel bridge deck pavement structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
黄志勇: "《钢桥铺装浇注式材料路用性能评价与研究》", 《低温建筑技术》 *
龚俊虎: "正交异性板道砟桥面钢桁梁设计", 《铁道科学与工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612048A (en) * 2015-01-21 2015-05-13 朱宏伟 EAC bridge steel deck paving structure and construction method thereof
CN105088965A (en) * 2015-09-16 2015-11-25 宁波路宝科技实业集团有限公司 Steel bridge deck pavement structure and method
CN106010256A (en) * 2016-07-13 2016-10-12 袁春华 Preparing method of epoxy asphalt cement
CN108797333A (en) * 2018-06-14 2018-11-13 广州珠江黄埔大桥建设有限公司 Combined steel bridge floor paving structure
CN108797333B (en) * 2018-06-14 2020-10-09 广州珠江黄埔大桥建设有限公司 Combined steel bridge deck pavement structure
WO2023284252A1 (en) * 2021-07-14 2023-01-19 江苏中路工程技术研究院有限公司 Tunnel fiber composite resin pavement structure

Also Published As

Publication number Publication date
CN103696366B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN1966861B (en) Composite water permeable brick
CN102392413B (en) Pavement structure of combined steel bridge deck and pavement method thereof
CN101857401B (en) Self-inflow type semi-flexible composite pavement and construction method thereof
CN102002909B (en) Pavement structure for cement concrete bridge deck and pavement method thereof
CN101660294B (en) Steel bridge deck pavement structure and pavement method thereof
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN104402339A (en) Pervious concrete and construction method thereof
CN204370308U (en) The ultra-thin composite paved Rotating fields of a kind of Steel Bridge Deck polymer
CN109594471B (en) Paving structure of steel bridge deck and construction method thereof
CN105463965A (en) Long-life water permeable plate easy to recover and keep water permeability
CN103850164A (en) Construction method of long-service-life pass-through induced drainage pavement
CN109133800A (en) Semi-flexible composite pavement prefabricated section and preparation method, the road surface using prefabricated section preparation and preparation method
CN108330774A (en) A kind of body-building green road high-strength wearable composite elastic terrace system and preparation method thereof
CN103924495A (en) Small and medium-sized steel bridge deck pavement system and implementation method
CN110952447A (en) High-toughness, durable and anti-skid steel bridge deck pavement structure and construction method thereof
CN210104563U (en) Pavement structure of steel bridge deck
CN101096837A (en) Semi-flexible composite road surface structure and building method thereof
CN205501766U (en) Easy long -life porous disk who resumes and keep ability of permeating water
CN102561143A (en) Pavement structure of concrete highway in alpine region
CN206800193U (en) A kind of durable cement concrete bridge floor composite pavement structure
CN201512749U (en) Steel bridge deck paving structure
CN112431128B (en) Steel bridge deck flexible pavement structure and construction method thereof
KR101038538B1 (en) Road paving material composition enhanced water permeability and relentivity using pva fiber and latex, road paving method using the same
CN114108412A (en) High-performance steel slag concrete road
CN209412701U (en) A kind of paving structure for Orthotropic Steel Bridge Deck reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant