CN103683500A - Substation temporary ground unlocking-locking control system - Google Patents
Substation temporary ground unlocking-locking control system Download PDFInfo
- Publication number
- CN103683500A CN103683500A CN201310623885.6A CN201310623885A CN103683500A CN 103683500 A CN103683500 A CN 103683500A CN 201310623885 A CN201310623885 A CN 201310623885A CN 103683500 A CN103683500 A CN 103683500A
- Authority
- CN
- China
- Prior art keywords
- earth connection
- temporary grounding
- control system
- ground
- temporary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a substation temporary ground unlocking-locking control system comprising a temporary ground master and ground wire locks. The temporary ground master is connected with at least one ground wire lock through a communication bus. Each ground wire lock corresponds to one ground wire. The temporary ground master is connected with a five-prevention master which is connected with a monitoring master. Each ground wire lock is provided with a code reader and a locking mechanism. The substation temporary ground unlocking-locking control system has the advantages that the ground wires can communicate with the substation five-prevention master and background, the process of mounting and demounting the ground wires during line operation is standardized by technological means, potential serious accidents caused by human factors are eliminated, and security operation of power equipment and safety of personnel are reliably guaranteed.
Description
technical field:
The present invention relates to a kind of transformer station maintenance system, particularly relate to a kind of transformer station temporary grounding open locking control system.
background technology:
Essential a kind of safety appliance when temporary ground wire is the work of electric wiring or equipment interruption maintenance, for guaranteeing operations staff's personal safety; Whether in five-prevention operation, have the regulation that prevents live connection of ground wire, prevents from closing with ground wire disconnecting link, therefore installing and removing earth connection is correctly that transformer station avoids occurring an important process in pernicious misoperation fault work.In practical operation, the action need of earth connection judges judge whether earth connection has departed from electric main equipment artificially, and mistake occurs thus hangs to tear open, leak and hang the pernicious misoperation event such as tear open, makes earth connection become great misoperation hidden danger.Micro_computer five_proof system is for avoiding artificial electric fault-operation accident to play an important role, but current five-preventing system can't solve the dismounting problem of temporary ground wire.
summary of the invention:
Technical problem to be solved by this invention is: overcome the deficiencies in the prior art, a kind of reasonable in design, precise control is provided and reduces transformer station's temporary grounding open locking control system of human accident.
Technical scheme of the present invention is: a kind of transformer station temporary grounding open locking control system, contain temporary grounding main frame and earth connection dead lock, described temporary grounding main frame interconnects by communication bus and at least one earth connection dead lock, described in each, earth connection dead lock is corresponding with an earth connection respectively, described temporary grounding main frame and five anti-main frames interconnect, and described five anti-main frames and monitoring host computer interconnect.
Described five anti-main frames and monitoring host computer interconnect by data communication network and data center respectively.Described communication bus is RS485 bus, between described five anti-main frames and temporary grounding main frame, adopts Ethernet, RS485 and RS232 communication mode to interconnect.On described earth connection dead lock, code reader and blocking mechanism are installed.Described earth connection is all fixed on corresponding ground clamp, and described temporary grounding main frame is connected with alarm.
The invention has the beneficial effects as follows:
1, the present invention is grounded the anti-machine of Xian Yu transformer station five and background communication, by technological means standard in line work, hang, the flow process of dismounting ground wire, eliminated the hidden danger that human factor causes serious accident, for safe operation and the personal security of power equipment provides reliable guarantee.
2, temporary grounding main frame of the present invention adopt microprocessor complete to the control of each earth connection dead lock and with the communicating by letter of five anti-main frames, and adopt RS485 communication mode to complete and the information interaction of each temporary ground wire dead lock of disperseing to install.Solved the problem of substation field installation requirement long haul communication, also realized the control of a main frame to a plurality of earth connection dead locks, native system has not only supplemented the function of five-prevention operation, and is convenient to maintenance management, and can effectively analyze and add up all kinds of operation informations.
3, the present invention is when ground wire is suspended in the screens of earth connection dead lock appointment, and detecting locking can identity value, thus identification ground wire can be by correct ground wire locking.After five anti-host authorizations, can be by the ground wire locking of also returning or by the ground wire release of locking, thus realize locking and the release of ground wire.
4, reasonable in design, the precise control of the present invention and reduce human accident, it is applied widely, is easy to promotion and implementation, has good economic benefit.
accompanying drawing explanation:
The circuit theory diagrams of Tu1Wei transformer station temporary grounding open locking control system.
embodiment:
Embodiment: referring to Fig. 1, in figure, 1-earth connection, 2-earth connection dead lock, 3-communication bus, 4-temporary grounding main frame, 5-data center, the anti-main frame of 6-five, 7-data communication network, 8-monitoring host computer.
Transformer station's temporary grounding open locking control system contains temporary grounding main frame 4 and earth connection dead lock 2, wherein: temporary grounding main frame 4 interconnects by communication bus 3 and at least one earth connection dead lock 2, each earth connection dead lock 2 is corresponding with an earth connection 1 respectively, temporary grounding main frame 4 and five anti-main frames 6 interconnect, and five anti-main frames 6 interconnect with monitoring host computer 8.
Five anti-main frames 6 and monitoring host computer 8 interconnect with data center 5 by data communication network 7 respectively.Communication bus 3 is RS485 bus, between five anti-main frames 6 and temporary grounding main frame 4, adopts Ethernet, RS485 and RS232 communication mode to interconnect.
Code reader and blocking mechanism are installed on earth connection dead lock 2.Earth connection is all fixed on corresponding ground clamp, and temporary grounding main frame 4 is connected with alarm.
Five anti-main frames 6 adopt the industrial computer of standard and share with five-preventing system.Earth connection 1 is all fixed on corresponding ground clamp, owing on each earth connection dead lock 2, code reader and blocking mechanism being installed, when the ground clamp of dead earth line mounts the appointment screens of earth connection dead lock 2, code reader will monitor location status, will be kept at local cache.Unified each earth connection dead lock 2 of controlling of temporary grounding main frame 4, by cyclic query state of earth wire and earth connection code value in place, judges whether earth connection is placed correctly, and by correct earth connection locking.After five anti-main frames 6 are authorized, can be by the earth connection locking of also returning or by the ground wire release of locking, thus realize locking and the unlocking function of ground wire.
Claims (5)
1.Yi Zhong transformer station temporary grounding open locking control system, contain temporary grounding main frame and earth connection dead lock, it is characterized in that: described temporary grounding main frame interconnects by communication bus and at least one earth connection dead lock, described in each, earth connection dead lock is corresponding with an earth connection respectively, described temporary grounding main frame and five anti-main frames interconnect, and described five anti-main frames and monitoring host computer interconnect.
2. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described five anti-main frames and monitoring host computer interconnect by data communication network and data center respectively.
3. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described communication bus is RS485 bus, between described five anti-main frames and temporary grounding main frame, adopts Ethernet, RS485 and RS232 communication mode to interconnect.
4. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: on described earth connection dead lock, code reader and blocking mechanism are installed.
5. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described earth connection is all fixed on corresponding ground clamp, and described temporary grounding main frame is connected with alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310623885.6A CN103683500A (en) | 2013-12-01 | 2013-12-01 | Substation temporary ground unlocking-locking control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310623885.6A CN103683500A (en) | 2013-12-01 | 2013-12-01 | Substation temporary ground unlocking-locking control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103683500A true CN103683500A (en) | 2014-03-26 |
Family
ID=50320145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310623885.6A Pending CN103683500A (en) | 2013-12-01 | 2013-12-01 | Substation temporary ground unlocking-locking control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103683500A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103986236A (en) * | 2014-05-26 | 2014-08-13 | 国家电网公司 | Ground lead management system |
CN105406590A (en) * | 2015-11-18 | 2016-03-16 | 国家电网公司 | Intelligent management system for substation ground leads |
CN107302267A (en) * | 2017-08-02 | 2017-10-27 | 广东电网有限责任公司佛山供电局 | A kind of transformer station's temporary ground wire supervising device and its operating method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201285407Y (en) * | 2008-10-11 | 2009-08-05 | 江苏省电力公司如皋市供电公司 | Test wire clip for electrical apparatus |
CN101572357A (en) * | 2009-03-06 | 2009-11-04 | 辽宁省电力有限公司盘锦供电公司 | Induction prevising grounding wire |
CN201387943Y (en) * | 2009-03-06 | 2010-01-20 | 辽宁省电力有限公司盘锦供电公司 | Prediction type sensing ground wire |
CN102130508A (en) * | 2011-03-31 | 2011-07-20 | 安徽省电力公司巢湖供电公司 | Wireless network-based substation grounding wire intelligent management system |
CN102255393A (en) * | 2011-07-29 | 2011-11-23 | 重庆大学 | Ground wire hanging anti-error blocking system and method thereof |
CN202602225U (en) * | 2012-04-19 | 2012-12-12 | 辽宁省电力有限公司铁岭供电公司 | Alarm-type grounding wire |
CN202906346U (en) * | 2012-11-17 | 2013-04-24 | 山西省电力公司长治供电分公司 | temporary grounding wire with electricity testing function |
CN203218718U (en) * | 2013-04-27 | 2013-09-25 | 杭州市电力局 | Intelligent management box of ground wires of transformer station |
CN203645405U (en) * | 2013-12-01 | 2014-06-11 | 国家电网公司 | Temporary grounding unlocking/locking control system of transformer station |
-
2013
- 2013-12-01 CN CN201310623885.6A patent/CN103683500A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201285407Y (en) * | 2008-10-11 | 2009-08-05 | 江苏省电力公司如皋市供电公司 | Test wire clip for electrical apparatus |
CN101572357A (en) * | 2009-03-06 | 2009-11-04 | 辽宁省电力有限公司盘锦供电公司 | Induction prevising grounding wire |
CN201387943Y (en) * | 2009-03-06 | 2010-01-20 | 辽宁省电力有限公司盘锦供电公司 | Prediction type sensing ground wire |
CN102130508A (en) * | 2011-03-31 | 2011-07-20 | 安徽省电力公司巢湖供电公司 | Wireless network-based substation grounding wire intelligent management system |
CN102255393A (en) * | 2011-07-29 | 2011-11-23 | 重庆大学 | Ground wire hanging anti-error blocking system and method thereof |
CN202602225U (en) * | 2012-04-19 | 2012-12-12 | 辽宁省电力有限公司铁岭供电公司 | Alarm-type grounding wire |
CN202906346U (en) * | 2012-11-17 | 2013-04-24 | 山西省电力公司长治供电分公司 | temporary grounding wire with electricity testing function |
CN203218718U (en) * | 2013-04-27 | 2013-09-25 | 杭州市电力局 | Intelligent management box of ground wires of transformer station |
CN203645405U (en) * | 2013-12-01 | 2014-06-11 | 国家电网公司 | Temporary grounding unlocking/locking control system of transformer station |
Non-Patent Citations (1)
Title |
---|
刘仁琪等: "临时接地线综合管理系统的开发和应用", 《电力系统自动化》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103986236A (en) * | 2014-05-26 | 2014-08-13 | 国家电网公司 | Ground lead management system |
CN105406590A (en) * | 2015-11-18 | 2016-03-16 | 国家电网公司 | Intelligent management system for substation ground leads |
CN107302267A (en) * | 2017-08-02 | 2017-10-27 | 广东电网有限责任公司佛山供电局 | A kind of transformer station's temporary ground wire supervising device and its operating method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203732971U (en) | System for monitoring outdoor machine rooms and outdoor equipment cabinets of electric power system | |
CN205231852U (en) | Wireless earth connection management system | |
CN111071301B (en) | Intelligent safety management system and method for unmanned area of full-automatic driving vehicle section | |
CN201421968Y (en) | Detection locking device of temporary grounding wire | |
CN102130508A (en) | Wireless network-based substation grounding wire intelligent management system | |
CN105159261A (en) | Transformer station intelligent protection screen cabinet system capable of raising maintenance efficiency | |
CN103683500A (en) | Substation temporary ground unlocking-locking control system | |
CN205178648U (en) | Substation grounding line intelligent management system | |
CN105406590A (en) | Intelligent management system for substation ground leads | |
CN106532955A (en) | Implementation method for remote measurement identification function of centralized monitoring transformer station | |
CN212134837U (en) | Subway shielded door monitoring system | |
CN201234062Y (en) | Five prevention one machine multiple station control apparatus for micro-computer | |
CN105405190B (en) | A kind of power switch cabinet electrified display interlock apparatus | |
CN112738204B (en) | Automatic arrangement system and method for security measures of secondary screen door of transformer substation | |
CN203645405U (en) | Temporary grounding unlocking/locking control system of transformer station | |
CN201975861U (en) | Wireless-network-based intelligent management system for grounding wire of transformer station | |
CN204835312U (en) | Earth connection intelligent management system | |
CN205070209U (en) | Power switch cabinet live display device | |
CN206961704U (en) | A kind of circuit of monitoring 10kV closing locking circuits | |
CN104850092A (en) | Lock state managing system for ground lead of disconnecting link of substation | |
CN202929724U (en) | Offline control system for intelligent well lock for protective well lid | |
CN105225446A (en) | Power switch cabinet intelligent anti-theft protection system | |
CN211506205U (en) | Ground wire management and control system | |
CN205681185U (en) | A kind of monitoring device monitoring power dispatching automation equipment | |
CN104407557A (en) | Novel tunnel monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140326 |