CN103683500A - Substation temporary ground unlocking-locking control system - Google Patents

Substation temporary ground unlocking-locking control system Download PDF

Info

Publication number
CN103683500A
CN103683500A CN201310623885.6A CN201310623885A CN103683500A CN 103683500 A CN103683500 A CN 103683500A CN 201310623885 A CN201310623885 A CN 201310623885A CN 103683500 A CN103683500 A CN 103683500A
Authority
CN
China
Prior art keywords
earth connection
temporary grounding
control system
ground
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310623885.6A
Other languages
Chinese (zh)
Inventor
许利
刘彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310623885.6A priority Critical patent/CN103683500A/en
Publication of CN103683500A publication Critical patent/CN103683500A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a substation temporary ground unlocking-locking control system comprising a temporary ground master and ground wire locks. The temporary ground master is connected with at least one ground wire lock through a communication bus. Each ground wire lock corresponds to one ground wire. The temporary ground master is connected with a five-prevention master which is connected with a monitoring master. Each ground wire lock is provided with a code reader and a locking mechanism. The substation temporary ground unlocking-locking control system has the advantages that the ground wires can communicate with the substation five-prevention master and background, the process of mounting and demounting the ground wires during line operation is standardized by technological means, potential serious accidents caused by human factors are eliminated, and security operation of power equipment and safety of personnel are reliably guaranteed.

Description

Transformer station's temporary grounding open locking control system
 
technical field:
The present invention relates to a kind of transformer station maintenance system, particularly relate to a kind of transformer station temporary grounding open locking control system.
background technology:
Essential a kind of safety appliance when temporary ground wire is the work of electric wiring or equipment interruption maintenance, for guaranteeing operations staff's personal safety; Whether in five-prevention operation, have the regulation that prevents live connection of ground wire, prevents from closing with ground wire disconnecting link, therefore installing and removing earth connection is correctly that transformer station avoids occurring an important process in pernicious misoperation fault work.In practical operation, the action need of earth connection judges judge whether earth connection has departed from electric main equipment artificially, and mistake occurs thus hangs to tear open, leak and hang the pernicious misoperation event such as tear open, makes earth connection become great misoperation hidden danger.Micro_computer five_proof system is for avoiding artificial electric fault-operation accident to play an important role, but current five-preventing system can't solve the dismounting problem of temporary ground wire.
summary of the invention:
Technical problem to be solved by this invention is: overcome the deficiencies in the prior art, a kind of reasonable in design, precise control is provided and reduces transformer station's temporary grounding open locking control system of human accident.
Technical scheme of the present invention is: a kind of transformer station temporary grounding open locking control system, contain temporary grounding main frame and earth connection dead lock, described temporary grounding main frame interconnects by communication bus and at least one earth connection dead lock, described in each, earth connection dead lock is corresponding with an earth connection respectively, described temporary grounding main frame and five anti-main frames interconnect, and described five anti-main frames and monitoring host computer interconnect.
Described five anti-main frames and monitoring host computer interconnect by data communication network and data center respectively.Described communication bus is RS485 bus, between described five anti-main frames and temporary grounding main frame, adopts Ethernet, RS485 and RS232 communication mode to interconnect.On described earth connection dead lock, code reader and blocking mechanism are installed.Described earth connection is all fixed on corresponding ground clamp, and described temporary grounding main frame is connected with alarm.
The invention has the beneficial effects as follows:
1, the present invention is grounded the anti-machine of Xian Yu transformer station five and background communication, by technological means standard in line work, hang, the flow process of dismounting ground wire, eliminated the hidden danger that human factor causes serious accident, for safe operation and the personal security of power equipment provides reliable guarantee.
2, temporary grounding main frame of the present invention adopt microprocessor complete to the control of each earth connection dead lock and with the communicating by letter of five anti-main frames, and adopt RS485 communication mode to complete and the information interaction of each temporary ground wire dead lock of disperseing to install.Solved the problem of substation field installation requirement long haul communication, also realized the control of a main frame to a plurality of earth connection dead locks, native system has not only supplemented the function of five-prevention operation, and is convenient to maintenance management, and can effectively analyze and add up all kinds of operation informations.
3, the present invention is when ground wire is suspended in the screens of earth connection dead lock appointment, and detecting locking can identity value, thus identification ground wire can be by correct ground wire locking.After five anti-host authorizations, can be by the ground wire locking of also returning or by the ground wire release of locking, thus realize locking and the release of ground wire.
4, reasonable in design, the precise control of the present invention and reduce human accident, it is applied widely, is easy to promotion and implementation, has good economic benefit.
accompanying drawing explanation:
The circuit theory diagrams of Tu1Wei transformer station temporary grounding open locking control system.
embodiment:
Embodiment: referring to Fig. 1, in figure, 1-earth connection, 2-earth connection dead lock, 3-communication bus, 4-temporary grounding main frame, 5-data center, the anti-main frame of 6-five, 7-data communication network, 8-monitoring host computer.
Transformer station's temporary grounding open locking control system contains temporary grounding main frame 4 and earth connection dead lock 2, wherein: temporary grounding main frame 4 interconnects by communication bus 3 and at least one earth connection dead lock 2, each earth connection dead lock 2 is corresponding with an earth connection 1 respectively, temporary grounding main frame 4 and five anti-main frames 6 interconnect, and five anti-main frames 6 interconnect with monitoring host computer 8.
Five anti-main frames 6 and monitoring host computer 8 interconnect with data center 5 by data communication network 7 respectively.Communication bus 3 is RS485 bus, between five anti-main frames 6 and temporary grounding main frame 4, adopts Ethernet, RS485 and RS232 communication mode to interconnect.
Code reader and blocking mechanism are installed on earth connection dead lock 2.Earth connection is all fixed on corresponding ground clamp, and temporary grounding main frame 4 is connected with alarm.
Five anti-main frames 6 adopt the industrial computer of standard and share with five-preventing system.Earth connection 1 is all fixed on corresponding ground clamp, owing on each earth connection dead lock 2, code reader and blocking mechanism being installed, when the ground clamp of dead earth line mounts the appointment screens of earth connection dead lock 2, code reader will monitor location status, will be kept at local cache.Unified each earth connection dead lock 2 of controlling of temporary grounding main frame 4, by cyclic query state of earth wire and earth connection code value in place, judges whether earth connection is placed correctly, and by correct earth connection locking.After five anti-main frames 6 are authorized, can be by the earth connection locking of also returning or by the ground wire release of locking, thus realize locking and the unlocking function of ground wire.

Claims (5)

1.Yi Zhong transformer station temporary grounding open locking control system, contain temporary grounding main frame and earth connection dead lock, it is characterized in that: described temporary grounding main frame interconnects by communication bus and at least one earth connection dead lock, described in each, earth connection dead lock is corresponding with an earth connection respectively, described temporary grounding main frame and five anti-main frames interconnect, and described five anti-main frames and monitoring host computer interconnect.
2. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described five anti-main frames and monitoring host computer interconnect by data communication network and data center respectively.
3. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described communication bus is RS485 bus, between described five anti-main frames and temporary grounding main frame, adopts Ethernet, RS485 and RS232 communication mode to interconnect.
4. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: on described earth connection dead lock, code reader and blocking mechanism are installed.
5. transformer station according to claim 1 temporary grounding open locking control system, is characterized in that: described earth connection is all fixed on corresponding ground clamp, and described temporary grounding main frame is connected with alarm.
CN201310623885.6A 2013-12-01 2013-12-01 Substation temporary ground unlocking-locking control system Pending CN103683500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310623885.6A CN103683500A (en) 2013-12-01 2013-12-01 Substation temporary ground unlocking-locking control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310623885.6A CN103683500A (en) 2013-12-01 2013-12-01 Substation temporary ground unlocking-locking control system

Publications (1)

Publication Number Publication Date
CN103683500A true CN103683500A (en) 2014-03-26

Family

ID=50320145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310623885.6A Pending CN103683500A (en) 2013-12-01 2013-12-01 Substation temporary ground unlocking-locking control system

Country Status (1)

Country Link
CN (1) CN103683500A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103986236A (en) * 2014-05-26 2014-08-13 国家电网公司 Ground lead management system
CN105406590A (en) * 2015-11-18 2016-03-16 国家电网公司 Intelligent management system for substation ground leads
CN107302267A (en) * 2017-08-02 2017-10-27 广东电网有限责任公司佛山供电局 A kind of transformer station's temporary ground wire supervising device and its operating method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201285407Y (en) * 2008-10-11 2009-08-05 江苏省电力公司如皋市供电公司 Test wire clip for electrical apparatus
CN101572357A (en) * 2009-03-06 2009-11-04 辽宁省电力有限公司盘锦供电公司 Induction prevising grounding wire
CN201387943Y (en) * 2009-03-06 2010-01-20 辽宁省电力有限公司盘锦供电公司 Prediction type sensing ground wire
CN102130508A (en) * 2011-03-31 2011-07-20 安徽省电力公司巢湖供电公司 Wireless network-based substation grounding wire intelligent management system
CN102255393A (en) * 2011-07-29 2011-11-23 重庆大学 Ground wire hanging anti-error blocking system and method thereof
CN202602225U (en) * 2012-04-19 2012-12-12 辽宁省电力有限公司铁岭供电公司 Alarm-type grounding wire
CN202906346U (en) * 2012-11-17 2013-04-24 山西省电力公司长治供电分公司 temporary grounding wire with electricity testing function
CN203218718U (en) * 2013-04-27 2013-09-25 杭州市电力局 Intelligent management box of ground wires of transformer station
CN203645405U (en) * 2013-12-01 2014-06-11 国家电网公司 Temporary grounding unlocking/locking control system of transformer station

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201285407Y (en) * 2008-10-11 2009-08-05 江苏省电力公司如皋市供电公司 Test wire clip for electrical apparatus
CN101572357A (en) * 2009-03-06 2009-11-04 辽宁省电力有限公司盘锦供电公司 Induction prevising grounding wire
CN201387943Y (en) * 2009-03-06 2010-01-20 辽宁省电力有限公司盘锦供电公司 Prediction type sensing ground wire
CN102130508A (en) * 2011-03-31 2011-07-20 安徽省电力公司巢湖供电公司 Wireless network-based substation grounding wire intelligent management system
CN102255393A (en) * 2011-07-29 2011-11-23 重庆大学 Ground wire hanging anti-error blocking system and method thereof
CN202602225U (en) * 2012-04-19 2012-12-12 辽宁省电力有限公司铁岭供电公司 Alarm-type grounding wire
CN202906346U (en) * 2012-11-17 2013-04-24 山西省电力公司长治供电分公司 temporary grounding wire with electricity testing function
CN203218718U (en) * 2013-04-27 2013-09-25 杭州市电力局 Intelligent management box of ground wires of transformer station
CN203645405U (en) * 2013-12-01 2014-06-11 国家电网公司 Temporary grounding unlocking/locking control system of transformer station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘仁琪等: "临时接地线综合管理系统的开发和应用", 《电力系统自动化》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103986236A (en) * 2014-05-26 2014-08-13 国家电网公司 Ground lead management system
CN105406590A (en) * 2015-11-18 2016-03-16 国家电网公司 Intelligent management system for substation ground leads
CN107302267A (en) * 2017-08-02 2017-10-27 广东电网有限责任公司佛山供电局 A kind of transformer station's temporary ground wire supervising device and its operating method

Similar Documents

Publication Publication Date Title
CN203732971U (en) System for monitoring outdoor machine rooms and outdoor equipment cabinets of electric power system
CN205231852U (en) Wireless earth connection management system
CN111071301B (en) Intelligent safety management system and method for unmanned area of full-automatic driving vehicle section
CN201421968Y (en) Detection locking device of temporary grounding wire
CN102130508A (en) Wireless network-based substation grounding wire intelligent management system
CN105159261A (en) Transformer station intelligent protection screen cabinet system capable of raising maintenance efficiency
CN103683500A (en) Substation temporary ground unlocking-locking control system
CN205178648U (en) Substation grounding line intelligent management system
CN105406590A (en) Intelligent management system for substation ground leads
CN106532955A (en) Implementation method for remote measurement identification function of centralized monitoring transformer station
CN212134837U (en) Subway shielded door monitoring system
CN201234062Y (en) Five prevention one machine multiple station control apparatus for micro-computer
CN105405190B (en) A kind of power switch cabinet electrified display interlock apparatus
CN112738204B (en) Automatic arrangement system and method for security measures of secondary screen door of transformer substation
CN203645405U (en) Temporary grounding unlocking/locking control system of transformer station
CN201975861U (en) Wireless-network-based intelligent management system for grounding wire of transformer station
CN204835312U (en) Earth connection intelligent management system
CN205070209U (en) Power switch cabinet live display device
CN206961704U (en) A kind of circuit of monitoring 10kV closing locking circuits
CN104850092A (en) Lock state managing system for ground lead of disconnecting link of substation
CN202929724U (en) Offline control system for intelligent well lock for protective well lid
CN105225446A (en) Power switch cabinet intelligent anti-theft protection system
CN211506205U (en) Ground wire management and control system
CN205681185U (en) A kind of monitoring device monitoring power dispatching automation equipment
CN104407557A (en) Novel tunnel monitoring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326