CN103679346A - Self-development prepared solution generating, executing and evaluating improvement method and improvement system - Google Patents

Self-development prepared solution generating, executing and evaluating improvement method and improvement system Download PDF

Info

Publication number
CN103679346A
CN103679346A CN201310610146.3A CN201310610146A CN103679346A CN 103679346 A CN103679346 A CN 103679346A CN 201310610146 A CN201310610146 A CN 201310610146A CN 103679346 A CN103679346 A CN 103679346A
Authority
CN
China
Prior art keywords
prediction scheme
scheme
module
resource
prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310610146.3A
Other languages
Chinese (zh)
Inventor
陶瑞岩
张伟
孙建宏
樊平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing E Hualu Information Technology Co Ltd
Original Assignee
Beijing E Hualu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing E Hualu Information Technology Co Ltd filed Critical Beijing E Hualu Information Technology Co Ltd
Priority to CN201310610146.3A priority Critical patent/CN103679346A/en
Publication of CN103679346A publication Critical patent/CN103679346A/en
Pending legal-status Critical Current

Links

Images

Abstract

Disclosed are self-development prepared solution generating, executing and evaluating improvement method and improvement system. By the improvement method and the improvement system, standardized management is performed to handling process of major significant emergency events, communication and police resources are commanded and dispatched effectively rapidly by scientific and technical means, handling time is shortened, and personal loss and financial loss due to handling error and time delay caused by poor experience and poor capability of people are avoided.

Description

Improving method and system are carried out and evaluated to a kind of Grow Your Own type scheme forming
Technical field
The present invention relates to a kind of Grow Your Own type scheme forming and carry out and evaluate improving method and system, belong to intelligent command system field.
Background technology
Current accident in all parts of the country takes place frequently, more and more important to the emergency processing of Emergent Public Events.
According to the generating process of Emergent Public Events, character and mechanism, Emergent Public Events is mainly divided into following four classes:
(1) disaster.Mainly comprise bloods and droughts, meteorological disaster, earthquake disaster, geologic hazard, Oceanic disasters, biological epidemics and Forset and glassland fire etc.
(2) accident.All kinds of security incidents that mainly comprise the enterprises such as industrial and mineral commerce and trade, transportation incident, communal facility and equipment breakdown, environmental pollution and ecological disruption event etc.
(3) public health event.Mainly comprise epidemic, group Unknown disease, food security and occupational hazards, animal epidemics, and other have a strong impact on the event of public health and life security.
(4) social security events.Mainly comprise the attack of terrorism, economic security event and accident concerning foreign affairs etc.
All kinds of Emergent Public Events, according to factors such as its character, the order of severity, controllability and coverages, are generally divided into level Four: I level (great especially), II level (great), III level (larger) and IV level (generally).
The commanding dispatching system of Emergent Public Events is that government emergency mechanism (as Police Command Center) provides command, control, communications, and information guarantee, by in addition integrated to the information network of all departments and communication system, various emergency service resources are unified among the prediction scheme of a set of complete Intelligentized Information and communication.Joint emergency response system can realize to be unified to receive a crime report, unifies to deal with emergencies and dangerous situations, and under the support of wireless colony dispatching communication platform and integrated data information, unified command relevant departments carry out joint action.
Command dispatching system is divided into normality commander and emergency command, for normality, command, because alert is relatively little, relatively not strong, the associated face relative narrower of urgency, can rely on command scheduling personnel's personal experience, simple and easy workflow to be disposed, and for particularly serious emergency event, for fear of the commander who occurs mistake or poor efficiency, need to set up prediction scheme back-up system, command scheduling is carried out to normalized management.
Prediction scheme (Prepared Solution), it is preset solution, not just simple plan, it is a whole set of scheme of dealing with problems, not only there is the arrangement in operation flow, also to there is technical support, solution with informationalized means arms, be integrated with wireless telecommunications command scheduling, integrated location application, and by the decision support technique Establishing process of computing machine, digitized prediction scheme, closely integrated with the process of emergency command scheduling, set up and take the novel emergency command scheduling business system that procedure prediction scheme is core.
There is following problem in current emergency commading system:
(1) all kinds of major events frequently occur, and there is no for a long time scientific unified command;
Face major event, command system cannot very cover correlated crowd;
(2) control and command mode falls behind, and cannot intuitively present field conditions, and commanding lacks scene
Foundation;
(3) resource mobilization not in time, inefficiency, poor controllability;
(4) along with the foundation of city various information technological system, monitoring, communication facilities constantly increase,
All kinds of emergency commading systems and the prediction scheme set up are also a lot, but lack the unified management of prediction scheme system and the interlock between system, and the United Dispatching being deficient in resources and management are difficult to give play to effect under battle conditions.
For above problem, Chinese patent CN103136611A provides a kind of numeral of emergency preplan
Change generation method, according to emergency preplan document, extract commander's organizational information, mission bit stream, writing information, the start-up parameter information relating in prediction scheme and import commander's organization tree and set up call relation.But, also there is the problem that Police Command Center emergency disposal is indifferent, disposal efficiency is not high, emergency disposal flow process is lack of standardization, Grow Your Own system is poor, revision is loaded down with trivial details.
Summary of the invention
For this reason, technical matters to be solved by this invention is that the prediction scheme of emergency commading system lacks corresponding assessment and evaluation, lacks subsequent feedback process, thereby propose a kind of Grow Your Own type scheme forming, carries out and evaluate improving method and system.
For solving the problems of the technologies described above, the invention provides a kind of Grow Your Own type scheme forming and carry out and evaluate improving method, comprise the following steps:
(1) generate prediction scheme, and carry out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
(2) prediction scheme is carried out, once there is emergent accident, will start certain class emergency preplan according to the degree of pushing comes to shove and type;
(3) prediction scheme evaluation, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
(4) prediction scheme is from growing up, and the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, establishes, and as the prediction scheme of calling next time after person in charge or expert discuss again, and new all kinds of resources of building, movingly screen and add and improve to prediction scheme.
Generation emergency preplan comprises:
(1) transfer prediction scheme text message, prediction scheme is that all kinds of emergency command prediction schemes of formulating are presided over by government bodies, relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
(2) transfer personnel's address list resource information: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
(3) transfer goods and materials facility and facility information: the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, and all embodies a concentrated reflection of in the middle of digital emergency planning, becomes the organic component of procedure digital emergency planning;
(4) transfer video monitoring resource: the video resource of the traffic monitoring in city, security monitoring, building monitoring is the important channel of realizing visual command scheduling, and it is the important component part of emergency command that the monitor video of spot is linked.
The implementation of prediction scheme is mainly worked as follows:
Voice scheduling: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduling: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlock: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
Described prediction scheme evaluation procedure comprises:
Resources reserve matching degree is analyzed, and forms decision analysis data;
The capable degree of all departments' cannibalization, examines each associated department with this;
The contrast of prediction scheme text and physical record, proposes to revise the suggestion of prediction scheme.
Certainly the growth step of described prediction scheme comprises:
All kinds of resource adjustment of prediction scheme implementation are all carried out by a prediction scheme, count in new prediction scheme, realize adjustment and the optimization of former prediction scheme;
Prediction scheme after adjustment retains former prediction scheme from growing module, can realize the switching of the two, in order to consulting.
Correspondingly, the present invention also provides a kind of Grow Your Own type scheme forming to carry out and evaluate and has improved system
System, comprising:
(1) scheme forming module, it generates prediction scheme and carries out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, and prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
(2) prediction scheme execution module, once there is emergent accident, starts corresponding emergency preplan according to the degree of pushing comes to shove and type;
(3) prediction scheme evaluation module, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
(4) prediction scheme is from growing module, the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, after discussing again, person in charge or expert establish, and as the prediction scheme of calling next time, new all kinds of resources of building, move and screen and add and improve to prediction scheme.
Scheme forming module comprises:
(1) prediction scheme text module, comprises all kinds of emergency command prediction schemes that government bodies' hosting is formulated, and relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
(2) personnel's address list resource module: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
(3) goods and materials facility and EM equipment module: comprise that the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, all embody a concentrated reflection of in the middle of digital emergency planning, become the organic component of procedure digital emergency planning;
(4) video monitoring resource module: comprising traffic monitoring, the security monitoring in city, the video resource of building monitoring, is the important channel of realizing visual command scheduling, and it is the important component part of emergency command that the monitor video of spot is linked.
The execution module of prediction scheme comprises:
Voice scheduling module: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduler module: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource module: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlocking module: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
The evaluation module of prediction scheme comprises:
Resources reserve matching degree is analyzed, and forms decision analysis data
The capable degree of all departments' cannibalization, examines each associated department with this
The contrast of prediction scheme text and physical record, proposes to revise the suggestion of prediction scheme
Comprising from growing module of prediction scheme:
Prediction scheme adjusting module, all kinds of resources of prediction scheme implementation are adjusted all kinds of resource adjustment of prediction scheme implementation and all by a prediction scheme, are carried out, and count in new prediction scheme, realize adjustment and the optimization of former prediction scheme;
Prediction scheme handover module, the prediction scheme after adjustment retains former prediction scheme from growing module, can realize the switching of the two, in order to consulting.
Technique scheme of the present invention has the following advantages compared to existing technology: improve each large, medium and small city emergency commading center emergency disposal ability, disposal efficiency, standard emergency disposal flow process.Solved in current emergency command prediction scheme at different levels ubiquitous text type in the majority, but feasibility is poor, Grow Your Own is poor, the problem that revision is loaded down with trivial details; Just protect making full use of of emergency resources simultaneously, avoided wasting of resources phenomenon.
Accompanying drawing explanation
For content of the present invention is more likely to be clearly understood, below according to a particular embodiment of the invention and by reference to the accompanying drawings, the present invention is further detailed explanation, wherein
Fig. 1 is the flow chart of steps that improving method was carried out and evaluated to a kind of Grow Your Own type scheme forming of one embodiment of the invention.
Fig. 2 is the modular structure figure that sophisticated systems was carried out and evaluated to a kind of Grow Your Own type scheme forming of one embodiment of the invention.
Embodiment
According to one embodiment of present invention, a kind of Grow Your Own type scheme forming is as shown in Figure 1 carried out and is evaluated improving method, comprises the following steps:
(1) generate prediction scheme, and carry out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
(2) prediction scheme is carried out, once there is emergent accident, will start certain class emergency preplan according to the degree of pushing comes to shove and type;
(3) prediction scheme evaluation, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
(4) prediction scheme is from growing up, and the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, establishes, and as the prediction scheme of calling next time after person in charge or expert discuss again, and new all kinds of resources of building, movingly screen and add and improve to prediction scheme.
Generation emergency preplan comprises:
(1) prediction scheme text, is that all kinds of emergency command prediction schemes of formulating are presided over by government bodies, relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
(2) personnel's address list resource: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
(3) goods and materials facility and equipment: the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, and all embodies a concentrated reflection of in the middle of digital emergency planning, becomes the organic component of procedure digital emergency planning;
(4) video monitoring resource: the video resource of the traffic monitoring in city, security monitoring, building monitoring is the important channel of realizing visual command scheduling, and it is the important component part of emergency command that the monitor video of spot is linked.
The implementation of prediction scheme is mainly carried out following steps:
Voice scheduling: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduling: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlock: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
According to provided by the invention as another embodiment of Fig. 2, a kind of Grow Your Own type scheme forming carry out and
Evaluate sophisticated systems, comprising:
(1) scheme forming module, it generates prediction scheme and carries out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, and prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
(2) prediction scheme execution module, once there is emergent accident, starts corresponding emergency preplan according to the degree of pushing comes to shove and type;
(3) prediction scheme evaluation module, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
(4) prediction scheme is from growing module, the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, after discussing again, person in charge or expert establish, and as the prediction scheme of calling next time, new all kinds of resources of building, move and screen and add and improve to prediction scheme.
Scheme forming module comprises:
(1) prediction scheme text module, comprises all kinds of emergency command prediction schemes that government bodies' hosting is formulated, and relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
(2) personnel's address list resource module: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
(3) goods and materials facility and EM equipment module: comprise that the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, all embody a concentrated reflection of in the middle of digital emergency planning, become the organic component of procedure digital emergency planning;
(4) video monitoring resource module: comprising traffic monitoring, the security monitoring in city, the video resource of building monitoring, is the important channel of realizing visual command scheduling, and it is the important component part of emergency command that the monitor video of spot is linked.
The execution module of prediction scheme comprises:
Voice scheduling module: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduler module: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource module: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlocking module: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
The object of the invention is to improve each large, medium and small city emergency commading center emergency disposal ability, disposal efficiency, standard emergency disposal flow process.What bring thus is that the safety of people's lives and properties has obtained more guarantee, has improved government image, has strengthened government function.In the majority to ubiquitous text type in current emergency command prediction schemes at different levels, but feasibility is poor, and Grow Your Own is poor, the problem that revision is loaded down with trivial details.The foundation of system and enforcement be Improving Government department he be not each service unit emergency disposal ability of incident command system and government work ability, improve and evaluate the strong mode of self work.Just protect making full use of of emergency resources simultaneously, avoided wasting of resources phenomenon.
Obviously, above-described embodiment is only for example is clearly described, and the not restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without also giving all embodiments.And the apparent variation of being extended out thus or change are still among the protection domain in the invention.

Claims (10)

1. Grow Your Own type scheme forming is carried out and is evaluated an improving method, it is characterized in that comprising the following steps:
S1. generate prediction scheme, and carry out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
S2. prediction scheme is carried out, once there is emergent accident, will start certain class emergency preplan according to the degree of pushing comes to shove and type;
S3. prediction scheme evaluation, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
S4. prediction scheme is from growing up, and the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, after discussing again, person in charge or expert establish, and as the prediction scheme of calling next time, new all kinds of resources of building, automatic screening is also added and is improved to prediction scheme.
2. a kind of Grow Your Own type scheme forming according to claim 1 is carried out and is evaluated improving method, it is characterized in that: generate emergency preplan and comprise:
Prediction scheme text, is that all kinds of emergency command prediction schemes of formulating are presided over by government bodies, relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
Personnel's address list resource: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
Goods and materials facility and equipment: the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, and all embodies a concentrated reflection of in the middle of digital emergency planning, becomes the organic component of procedure digital emergency planning;
Video monitoring resource: the video resource of the traffic monitoring in city, security monitoring, building monitoring is the important channel of realizing visual command scheduling, and it is the important component part of emergency command that the monitor video of spot is linked.
3. a kind of Grow Your Own type scheme forming according to claim 1 and 2 is carried out and is evaluated improving method, it is characterized in that: the implementation of prediction scheme is mainly worked as follows:
Voice scheduling: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduling: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlock: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
4. according to the arbitrary described a kind of Grow Your Own type scheme forming of claim 1-3, carry out and evaluate improving method, it is characterized in that: described prediction scheme evaluation procedure comprises:
Resources reserve matching degree is analyzed, and forms decision analysis data;
The capable degree of all departments' cannibalization, examines each associated department with this;
The contrast of prediction scheme text and physical record, proposes to revise the suggestion of prediction scheme.
5. according to the arbitrary described a kind of Grow Your Own type scheme forming of claim 1-4, carry out and evaluate improving method, it is characterized in that: the growth step certainly of described prediction scheme comprises:
All kinds of resource adjustment of prediction scheme implementation are all carried out by a prediction scheme, count in new prediction scheme, realize adjustment and the optimization of former prediction scheme;
Prediction scheme after adjustment retains former prediction scheme from growing module, can realize the switching of the two, in order to consulting.
6. Grow Your Own type scheme forming is carried out and is evaluated a sophisticated systems, it is characterized in that comprising with lower module:
Scheme forming module, it generates prediction scheme and carries out classification and classification according to the object of prediction scheme, the scope of application, organization, operating mechanism, and prediction scheme is stored in commanding dispatching system according to rank, kind unification after creating;
Prediction scheme execution module, once there is emergent accident, starts corresponding emergency preplan according to the degree of pushing comes to shove and type;
Prediction scheme evaluation module, after prediction scheme is finished, during reality is carried out, in goods and materials, personnel, equipment, video interlink resource utilization and prediction scheme, fixed utilization rate is mated contrast, evaluates the goodness of fit of prediction scheme, sums up statistical conclusions and experience;
Prediction scheme is from growing module, and the resource that prediction scheme increases in carrying out counts in the perfected version of prediction scheme automatically, after discussing again, person in charge or expert establish, and as the prediction scheme of calling next time, new all kinds of resources of building, automatic screening is also added and is improved to prediction scheme.
7. a kind of Grow Your Own type scheme forming according to claim 6 is carried out and is evaluated sophisticated systems, it is characterized in that: scheme forming module comprises:
Prediction scheme text module, comprises all kinds of emergency command prediction schemes that government bodies' hosting is formulated, and relates to object, classification and classification, the scope of application, work principle, organizational framework, operating mechanism, emergency guarantee and supervision and management;
Personnel's address list resource module: comprise public security, fire-fighting, health, medical aid troop, the specialty of relevant department and enterprises and institutions is emergent, rescue troop, and army, People's Armed Police and people's militia, department of the governments of higher levels and community's self and mutual medical aid tissue and the emergent troop of volunteer, expert team;
Goods and materials facility and EM equipment module: comprise that the resource that each responsibility department grasps oneself comprises vehicle, equipment, equipment, facility, communicates by letter, all embody a concentrated reflection of in the middle of digital emergency planning, become the organic component of procedure digital emergency planning;
Video monitoring resource module: comprise traffic monitoring, the security monitoring in city, the video resource of building monitoring, it is the important channel of realizing visual command scheduling, it is the important component part of emergency command that the monitor video of spot is linked, system, by generalized information system, realizes resource and dynamic corresponding and storage administration spot, associated department.
8. according to a kind of Grow Your Own type scheme forming described in claim 6 or 7, carry out and evaluate sophisticated systems, it is characterized in that: the execution module of prediction scheme comprises:
Voice scheduling module: according to personnel's address list resource in the prediction scheme of set execution, a key is called out shareholder, carries out voice scheduling, once push comes to shove, Ke Yijian superior government or the report of the emergent office of the supervisor of State Council, make a request for help;
Note scheduler module: by emergency command note dispatching platform, carry out computing machine short message editing, the shareholder in prediction scheme sends note;
Scheduling of resource module: the materials and equipment resources title relating in prediction scheme, geographic position, quantity, allot the time, custodian's information can show, carries out on-line scheduling;
Video resource interlocking module: along with the startup of prediction scheme, the video image of spot association can be play in large-size screen monitors cocycle automatically, realizes visual command scheduling.
9. according to the arbitrary described a kind of Grow Your Own type scheme forming of claim 6-8, carry out and evaluate sophisticated systems, it is characterized in that: the evaluation module of prediction scheme comprises:
Resource matched analysis module, resources reserve matching degree is analyzed, and forms decision analysis data;
Department's evaluation module, the capable degree of all departments' cannibalization, examines each associated department with this;
Prediction scheme contrast module, the contrast of prediction scheme text and physical record, proposes to revise the suggestion of prediction scheme.
10. according to the arbitrary described a kind of Grow Your Own type scheme forming of claim 6-10, carry out and evaluate sophisticated systems, it is characterized in that: the comprising from growing module of prediction scheme:
Prediction scheme adjusting module, all kinds of resources of prediction scheme implementation are adjusted all kinds of resource adjustment of prediction scheme implementation and all by a prediction scheme, are carried out, and count in new prediction scheme, realize adjustment and the optimization of former prediction scheme;
Prediction scheme handover module, the prediction scheme after adjustment retains former prediction scheme from growing module, can realize the switching of the two, in order to consulting.
CN201310610146.3A 2013-11-27 2013-11-27 Self-development prepared solution generating, executing and evaluating improvement method and improvement system Pending CN103679346A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310610146.3A CN103679346A (en) 2013-11-27 2013-11-27 Self-development prepared solution generating, executing and evaluating improvement method and improvement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310610146.3A CN103679346A (en) 2013-11-27 2013-11-27 Self-development prepared solution generating, executing and evaluating improvement method and improvement system

Publications (1)

Publication Number Publication Date
CN103679346A true CN103679346A (en) 2014-03-26

Family

ID=50316823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310610146.3A Pending CN103679346A (en) 2013-11-27 2013-11-27 Self-development prepared solution generating, executing and evaluating improvement method and improvement system

Country Status (1)

Country Link
CN (1) CN103679346A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778534A (en) * 2014-11-13 2015-07-15 安徽四创电子股份有限公司 Dynamically-adjustable government emergency process method and system
CN107154007A (en) * 2017-05-11 2017-09-12 长威信息科技发展股份有限公司 A kind of emergency complete period processing method and system
CN107357912A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 Job scheduling method based on visual presentation
CN107977762A (en) * 2016-10-24 2018-05-01 大连天虹网络有限公司 Emergency command dispatching method and commanding dispatching system
CN108874078A (en) * 2018-09-04 2018-11-23 江苏警官学院 A kind of intelligent emergency program management system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102346886A (en) * 2011-09-30 2012-02-08 北京国正信安系统控制技术有限公司 Railway emergency commanding system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102346886A (en) * 2011-09-30 2012-02-08 北京国正信安系统控制技术有限公司 Railway emergency commanding system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778534A (en) * 2014-11-13 2015-07-15 安徽四创电子股份有限公司 Dynamically-adjustable government emergency process method and system
CN107977762A (en) * 2016-10-24 2018-05-01 大连天虹网络有限公司 Emergency command dispatching method and commanding dispatching system
CN107154007A (en) * 2017-05-11 2017-09-12 长威信息科技发展股份有限公司 A kind of emergency complete period processing method and system
CN107357912A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 Job scheduling method based on visual presentation
CN108874078A (en) * 2018-09-04 2018-11-23 江苏警官学院 A kind of intelligent emergency program management system

Similar Documents

Publication Publication Date Title
Yuan et al. Intelligent mobile crisis response systems
CN105190721A (en) Personnel crisis communications management system
CN103679346A (en) Self-development prepared solution generating, executing and evaluating improvement method and improvement system
CN204204022U (en) A kind of live supervisory system based on operation of power networks state
CN104484754A (en) Command and dispatching system for earthquake emergency response team
CN106296043A (en) Unmanned plane dispatching patcher
Parry-Jones et al. Crisis management for biobanks
CN114943428A (en) Emergency comprehensive management system for safety production of hazardous chemical substances
Chehade et al. Handling effective communication to support awareness in rescue operations
CN208188895U (en) emergency management system
Jennex Managing Crises and Disasters with Emerging Technologies: Advancements: Advancements
Way et al. Transitioning from dynamic decision support to context-aware multi-party coordination: A case for emergency response
Tovey et al. Communication in a crisis in UK ambulance services: What is needed to improve incident communication?
Zhang et al. Incident Command System in C hina: Development and Dilemmas Evidence from Comparison of Two Cases
Batard et al. Integrating citizen initiatives in a technological platform for collaborative crisis management
Cinque et al. SECTOR: secure Common Information Space for the interoperability of first responders
Mantzana et al. Airports’ Crisis Management Processes and Stakeholders Involved
CN114418262A (en) Evacuation management method and system for evacuation site
Faulhaber Solving the interoperability problem: Are we on the same channel-an essay of the problems and prospects for public safety radio
Comfort Inter-organizational design for disaster management: Cognition, communication, coordination, and control
CN202524422U (en) Disaster prevention and mitigation service platform for urban public buildings
Maidin et al. Issues and challenges in managing enablers for the Fire and Rescue Department Malaysia in search and rescue missions
Simola et al. How a real-time video solution can affect to the level of preparedness in situation centers
Barth et al. Design of a multi-hazard collaborative system for scenario-based response planning
Wang et al. Functional requirements analysis of militia emergency communication equipment based on soa architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326