CN103674777B - 一种测量土壤充分淋滤后沉降量的试验方法 - Google Patents
一种测量土壤充分淋滤后沉降量的试验方法 Download PDFInfo
- Publication number
- CN103674777B CN103674777B CN201310719634.8A CN201310719634A CN103674777B CN 103674777 B CN103674777 B CN 103674777B CN 201310719634 A CN201310719634 A CN 201310719634A CN 103674777 B CN103674777 B CN 103674777B
- Authority
- CN
- China
- Prior art keywords
- sample
- soil
- trickle
- test
- settling amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Sampling And Sample Adjustment (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明属于土木工程中土工试验领域,具体涉及一种测量土壤充分淋滤后沉降量的试验方法,包括以下步骤:⑴试样的采集与制备;⑵测定试样的风干含水率和最大干密度;⑶装样;⑷淋水;⑸测定试样土层的沉降量并计算干密度;⑹试验终止。试验仪器为专用土壤淋滤试验仪,由玻璃圆桶、钢尺定位板、钢尺组成,玻璃圆桶的桶壁上至少有2条以上的刻度线,靠近底部的桶壁上至少有2个以上的出水口,钢尺定位板中间开有定位孔。测定试样土层沉降量s时,将钢尺定位板搁置于玻璃圆桶口处,将钢尺插入定位孔读数。本发明通过模拟方式对室外回填土在淋水条件下的沉降量进行测定试验,且方法简单易行,可以为提高室外回填土施工质量提供技术支持。
Description
技术领域
本发明属于土木工程中土工试验领域,具体涉及一种测量土壤充分淋滤后沉降量的试验方法。
背景技术
在工业与民用建筑施工过程中,室外回填土施工质量问题一直难以解决。由于坑(槽)深浅不一,回填面积大小不同,回填土方量有很大的差异。当室外回填土范围狭窄时,压实机具难以到位,填土压实不充分;当室外回填土方量很大时,一些施工单位往往采用推土机或铲运机一次回填到位,然后大致整平的方法,这样做违背了规范中分层回填、分层夯实的要求,将直接影响回填土的质量,给建筑物特别是基础部分带来严重的安全隐患。
发明内容
本发明的目的是要解决现有技术中存在的问题。本发明提供了一种通过模拟方式对室外回填土在淋水条件下的沉降量进行测定试验的方法,该方法简单易行,为提高室外回填土施工质量提供技术支持。
本发明的目的是这样实现的,一种测量土壤充分淋滤后沉降量的试验方法,该方法按照以下步骤进行:
步骤1、试样的采集与制备
采集足量的室外回填土,置于通风处晾干后碾散,过孔径为0.5mm的筛子制备成试样;
步骤2、测定试样的风干含水率w0和最大干密度ρmax
对试样进行风干含水率w0及最大干密度ρmax的测定,并记录测定数据;所述最大干密度ρmax的单位为g/cm3;
步骤3、装样并测定试样土层的沉降观测初始值h0
取足量试样均匀装入专用土壤淋滤试验仪内,静置至少1个小时后,测定淋滤试验仪内试样土层的沉降观测初始值h0;所述沉降观测初始值h0的单位为mm;
所述的专用土壤淋滤试验仪由玻璃圆桶、钢尺定位板、钢尺组成,所述玻璃圆桶用于盛放试样,玻璃圆桶的桶壁上至少有2条以上的刻度线,靠近底部的桶壁上至少有2个以上的出水口;所述钢尺定位板中间开有定位孔;测定试样土层的沉降量s时,将钢尺定位板搁置于玻璃圆桶口处,并使所述定位孔处于玻璃圆桶口的内部,将钢尺插入定位孔读数;所述的2条以上的刻度线和2个以上的出水口在玻璃圆桶上呈环向均匀分布;所述淋滤试验仪的底面积s0即为玻璃圆桶的横截面面积。
步骤4、淋水
关闭专用土壤淋滤试验仪的出水口,对试样土层进行均匀淋水至过饱和状态并记录用水量;
步骤5、测定试样土层的沉降量并计算干密度
打开专用土壤淋滤试验仪的出水口将试样土层中的水排出,测定试样土层的沉降量s并计算淋水后试样的干密度ρd,第一次淋水初期加密观测,之后每隔1天测定一次,每隔N天对试样土层再次均匀淋水至过饱和状态;
试样土层的沉降量s按下式计算:
s=st-h0
式中:st为淋水后试样土层沉降观测读数,单位为mm;
淋水后试样的干密度按下式计算:
式中:ρd为淋水后试样的干密度,单位为g/cm3;
ms为试样土层的质量,单位为g;
m0为试样的质量,单位为g;
w0为试样的风干含水率,其为百分率;
Vt为淋水后试样土层的体积,单位为cm3;
s0为淋滤试验仪的底面积,单位为cm2;
ht为淋水后试样土层的高度,单位为cm;
步骤6、试验的终止
检验是否达到设定的试验终止条件,如果满足终止条件,试验结束;如果不满足终止条件,则返回步骤4,并重复步骤4-6,直至满足试验终止条件。
所述的试验终止条件为某次淋水后连续三次读数之差小于0.1mm,或者是某次淋水后试样的干密度ρd已大于试样最大干密度ρmax的90%。
所述的室外回填土为粒径不大于0.5mm的粘性土或粉土。
本发明提供的技术方案可以通过模拟方式掌握室外回填土沉降量及干密度的变化规律,且试验方法简单,数据可靠。
附图说明
图1是本发明一种测量土壤充分淋滤后沉降量的试验方法的流程示意图;
图2是本发明中实施例中所使用的专用土壤淋滤试验仪正视图;
图3是本发明中实施例中所使用的专用土壤淋滤试验仪俯视图。
其中:1.出水口;2.玻璃圆桶刻度线;3.玻璃圆桶;4.定位孔;5.钢尺;6.钢尺定位板。
具体实施方式:
下面结合实施例及附图对本发明做进一步说明,但本发明的实施例不限于此。
附图1为本发明一种测量土壤充分淋滤后沉降量的试验方法的流程示意图。由该图所示,本实施例中的试验方法包括以下步骤:
步骤1、试样的采集与制备
根据试验项目要求,取足量的室外回填土,回填土主要为粘性土或粉土,粒径不大于0.5mm;
将上述室外回填土置于通风处晾干,并将风干的土样放在橡皮板上用木碾碾散;
将碾散后的土样过孔径为0.5mm的筛子,充分拌匀后制备成为试样。
步骤2、测定试样的风干含水率w0和最大干密度ρmax
根据《土工试验方法标准》(GB50123-1999)的规定,测定试样的风干含水率w0和最大干密度ρmax,并记录测定数据。
步骤3、装样并测定试样土层的沉降观测初始值h0
(1)选择专用土壤淋滤试验仪
本发明中的试验装置采用专用的土壤淋滤试验仪。如附图2、3所示,本实施例中该试验仪由玻璃圆桶3、钢尺定位板6、钢尺5组成。玻璃圆桶用于盛放试样,下述公式中淋滤试验仪的底面积s0即为玻璃圆桶的横截面面积。桶壁上有4条刻度线2,靠近底部的桶壁上有4个出水口1,4条刻度线和4个出水口在玻璃圆桶3上呈环向均匀分布;钢尺定位板6中间开有定位孔4。测量土体中部区域沉降时,将钢尺定位板6搁置于玻璃圆桶3口,钢尺5插入定位孔读数。
(2)装样
按附图2装好专用土壤淋滤试验仪,将出水口置于关闭位置;
在试验仪底部放入两块Ф49.8*10mm的透水石,并在其上覆盖一张直径为50cm的圆形滤纸;
移开钢尺5和定位板6,取足量风干后的试样,称量后分层摊铺在试验仪内,每层20cm,共摊铺5层。摊铺时土样要用刮刀轻轻放入仪器内,每层土表面要用刮刀整平;
摊铺完成后,在试样土层表面铺一层20mm厚的中细砂并整平,然后在砂层表面均匀覆盖一层土工布。
(3)测定试样土层的沉降观测初始值h0
静置仪器1~2小时,待试样土层稳定后,将钢尺定位板搁置于玻璃圆桶口,钢尺沿定位孔轻放至试样表面,读出一组读数(其中试样中心点读一次,两侧各读一次),若三次读数中最大值与最小值之差的绝对值小于0.1mm时,则取该组数据的平均值作为初始值;否则应对试样表面进行整平,直至三次读数中最大值与最小值之差的绝对值小于0.1mm,然后取三次读数的平均值作为初始值。
步骤4、淋水
关闭专用土壤淋滤试验仪的出水口,用花洒壶对试样均匀淋水至过饱和状态,此时试样充分浸湿,每次淋水均要记录用水量。
步骤5、测定试样土层的沉降量并计算干密度
打开出水阀,将试样土层中的水排出,按照步骤3(3)测定试样土层初始高度的方式测定一次试样土层的沉降量s并计算淋水后试样的干密度ρd,第一次淋水后间隔0.5小时、0.5小时、1小时、1小时、2小时、2小时观测一次,之后每隔1天测定一次,考虑到粘性土的固结沉降需要较长时间,每隔7天对试样土层再次淋水至过饱和状态。
试样土层的沉降量s按下式计算:
s=st-h0
式中:st为淋水后试样土层沉降观测读数,单位为mm;
淋水后试样的干密度ρd应按下式计算:
式中:ρd为淋水后试样土的干密度(g/cm3);
ms为试样土层的质量(g);
m0为试样的质量(g);
w0为试样的风干含水率(%);
Vt为淋水后试样土层的体积(cm3);
s0为淋滤试验仪的底面积(cm2);
ht为淋水后试样土层的高度,单位为cm;
6、试验的终止
检验是否达到设定的试验终止条件,如果满足终止条件,试验结束;如果不满足终止条件,则返回步骤4,并重复步骤4-6,直至满足试验终止条件。所述的试验终止条件为某次淋水后连续三次读数之差小于0.1mm或者试样的干密度ρd已大于试样最大干密度ρmax的90%。
本实施例某次淋水后,第一次读数为26.4mm,第二次读数为26.5mm,第三次读数为26.5mm,第四次读数为26.5mm,此时试验终止。
试验终止后,进行试验数据整理与分析,并绘制出试样沉降量和干密度随时间变化的s-t,ρd-t曲线。
Claims (4)
1.一种测量土壤充分淋滤后沉降量的试验方法,其特征在于:包括以下步骤:
步骤1、试样的采集与制备
采集足量的室外回填土,置于通风处晾干后碾散,过孔径为0.5mm的筛子制备成试样;
步骤2、测定试样的风干含水率w0和最大干密度ρmax
对试样进行风干含水率w0及最大干密度ρmax的测定,并记录测定数据;所述最大干密度ρmax的单位为g/cm3;
步骤3、装样并测定试样土层沉降观测初始值h0
取足量试样均匀装入专用土壤淋滤试验仪内,静置1个小时后,测定专用土壤淋滤试验仪内试样土层沉降观测初始值h0;所述沉降观测初始值h0的单位为mm;
步骤4、淋水
关闭专用土壤淋滤试验仪的出水口,对试样土层进行均匀淋水至过饱和状态并记录用水量;
步骤5、测定试样土层的沉降量并计算淋水后试样的干密度
打开专用土壤淋滤试验仪的出水口将试样土层中的水排出,测定试样土层的沉降量s并计算淋水后试样的干密度ρd,第一次淋水初期加密观测,之后每隔1天测定一次,每隔N天对试样土层再次均匀淋水至过饱和状态;
试样土层的沉降量s按下式计算:
s=st-h0
式中:st为淋水后试样土层沉降观测读数,单位为mm;
淋水后试样的干密度ρd按下式计算:
式中:ρd为淋水后试样的干密度,单位为g/cm3;
ms为试样土颗粒的质量,单位为g;
m0为试样的质量,单位为g;
w0为试样的风干含水率,其为百分率;
Vt为淋水后试样土层的体积,单位为cm3;
s0为淋滤试验仪的底面积,单位为cm2;
ht为淋水后试样土层的高度,单位为cm;
步骤6、试验的终止
检验是否达到设定的试验终止条件,如果满足终止条件,试验结束;如果不满足终止条件,则返回步骤4,并重复步骤4~6,直至满足试验终止条件;
步骤3所述的专用土壤淋滤试验仪由玻璃圆桶、钢尺定位板、钢尺组成,所述玻璃圆桶用于盛放试样,玻璃圆桶的桶壁上至少有2条刻度线,靠近底部的桶壁上至少有2个出水口;所述钢尺定位板中间开有定位孔;测定试样土层的沉降量s时,将钢尺定位板搁置于玻璃圆桶口处,并使所述定位孔处于玻璃圆桶口的内部,将钢尺插入定位孔读数;所述的刻度线和出水口在玻璃圆桶上呈环向均匀分布;所述淋滤试验仪的底面积s0即为玻璃圆桶的横截面面积。
2.根据权利要求1所述的一种测量土壤充分淋滤后沉降量的试验方法,其特征在于:步骤6所述的试验终止条件为某次淋水后连续三次读数之差小于0.1mm。
3.根据权利要求1所述的一种测量土壤充分淋滤后沉降量的试验方法,其特征在于:步骤6所述的试验终止条件为某次淋水后试样的干密度ρd已大于试样最大干密度ρmax的90%。
4.根据权利要求1所述的一种测量土壤充分淋滤后沉降量的试验方法,其特征在于:步骤1所述的室外回填土为粒径不大于0.5mm的粘性土或粉土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310719634.8A CN103674777B (zh) | 2013-12-23 | 2013-12-23 | 一种测量土壤充分淋滤后沉降量的试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310719634.8A CN103674777B (zh) | 2013-12-23 | 2013-12-23 | 一种测量土壤充分淋滤后沉降量的试验方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103674777A CN103674777A (zh) | 2014-03-26 |
CN103674777B true CN103674777B (zh) | 2016-03-02 |
Family
ID=50312995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310719634.8A Expired - Fee Related CN103674777B (zh) | 2013-12-23 | 2013-12-23 | 一种测量土壤充分淋滤后沉降量的试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103674777B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110031400B (zh) * | 2019-05-05 | 2024-01-02 | 中交疏浚技术装备国家工程研究中心有限公司 | 用于疏浚刀齿与黏土粘附力测定及刀齿优化的多功能装置 |
CN111896717B (zh) * | 2020-09-22 | 2021-04-30 | 兰州理工大学 | 一种土体渗流-沉降的测试方法 |
CN112345325B (zh) * | 2020-11-06 | 2024-03-26 | 湖北瑞鹏恒信检测有限公司 | 用于土壤干密度测试的振动台法实验装置及其实验方法 |
CN113418501A (zh) * | 2021-07-19 | 2021-09-21 | 安徽建大交通科技有限公司 | 一种改进的测量土壤充分淋滤后沉降量的试验方法 |
CN114964154B (zh) * | 2022-07-28 | 2022-10-21 | 北京新桥技术发展有限公司 | 一种灌注桩浇筑过程监控系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101111069B1 (ko) * | 2011-11-18 | 2012-02-15 | 주식회사 공간정보 | 지형의 3차원 측지측량을 통한 지표면의 수준정보 측량확인시스템 |
CN102735212A (zh) * | 2012-06-18 | 2012-10-17 | 电子科技大学 | 路基沉降的监测方法及其装置 |
CN202947731U (zh) * | 2011-12-23 | 2013-05-22 | 同方威视技术股份有限公司 | 沉降信息采集系统 |
CN103175508A (zh) * | 2011-12-23 | 2013-06-26 | 同方威视技术股份有限公司 | 铁路路基沉降监测 |
JP2013145225A (ja) * | 2012-11-30 | 2013-07-25 | Hitachi Zosen Corp | 土砂量測定方法 |
-
2013
- 2013-12-23 CN CN201310719634.8A patent/CN103674777B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101111069B1 (ko) * | 2011-11-18 | 2012-02-15 | 주식회사 공간정보 | 지형의 3차원 측지측량을 통한 지표면의 수준정보 측량확인시스템 |
CN202947731U (zh) * | 2011-12-23 | 2013-05-22 | 同方威视技术股份有限公司 | 沉降信息采集系统 |
CN103175508A (zh) * | 2011-12-23 | 2013-06-26 | 同方威视技术股份有限公司 | 铁路路基沉降监测 |
CN102735212A (zh) * | 2012-06-18 | 2012-10-17 | 电子科技大学 | 路基沉降的监测方法及其装置 |
JP2013145225A (ja) * | 2012-11-30 | 2013-07-25 | Hitachi Zosen Corp | 土砂量測定方法 |
Non-Patent Citations (4)
Title |
---|
Settlement patterns of soft soil foundations under embankments;Limin Zhang;《Canadian Geotechnical Journal》;19991231;第36卷(第4期);第774~781页 * |
剖面沉降测试仪提高测试精度方法研究;马天鸽等;《国防交通工程与技术》;20121231(第6期);第77~79页 * |
基坑降水引起周围土体沉降性状分析;金小荣等;《岩土力学》;20051031;第26卷(第10期);第1575~1578页 * |
铁路软土地基沉降测试分析;王祥等;《岩石力学与工程学报》;20050331;第24卷(第5期);第905~910页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103674777A (zh) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103674777B (zh) | 一种测量土壤充分淋滤后沉降量的试验方法 | |
CN106768840B (zh) | 一种模拟渗流-振动作用下的动水携砂实验装置及方法 | |
CN108088982B (zh) | 模拟深部含水层砂土内部细颗粒渗流侵蚀的室内试验方法 | |
CN103236209B (zh) | 一种河道横断面二维地下渗流水力学实验装置 | |
CN106338457A (zh) | 一种模拟不同填充物裂隙的动水注浆试验装置 | |
CN206114469U (zh) | 一种模拟不同填充物裂隙的动水注浆试验装置 | |
CN102519811B (zh) | 强度衰减路基变形和应力变化规律试验模型及试验方法 | |
CN102636630A (zh) | 大型包气带土壤非饱和渗流物理模拟装置 | |
CN105735375B (zh) | 一种黄土隧道隧底稳定性监测方法、系统及施工方法 | |
CN110041039A (zh) | 一种磷石膏用于路堤改良的施工方法 | |
CN102312449A (zh) | 一种模拟长板-短桩工法离心模型及其试验装置和方法 | |
CN102854300A (zh) | 研究坡面径流和地下孔裂隙流产流产沙规律的测量方法 | |
CN203811515U (zh) | 一种散体材料的现场渗透实验装置 | |
CN102331282B (zh) | 土壤深层水量渗漏测试记录仪 | |
CN108593505B (zh) | 一种喀斯特地区土壤地下漏失的分析方法 | |
CN106908349B (zh) | 确定筑坝原级配砂砾料最大干密度的方法 | |
CN108118725B (zh) | 相似材料模拟承压含水层中基坑降水的试验装置及方法 | |
CN103091471B (zh) | 一种加速冲填土固结的模型及其试验方法 | |
CN113338358A (zh) | 一种欠固结土中测量桩基负摩阻力模型装置及制备方法和试验方法 | |
Menzies | The mechanics of drumlin formation with particular reference to the change in pore-water content of the till | |
CN201859104U (zh) | 一种用于研究坡面径流和地下孔裂隙流的模拟试验装置 | |
CN106702999B (zh) | 道路复合地基静载荷试验预判工后沉降的方法 | |
CN202372418U (zh) | 强度衰减路基变形和应力变化规律试验模型 | |
CN103149139B (zh) | 一种全尾砂胶结充填料浆渗透特性的测试方法 | |
Sun et al. | Experimental study on hydraulic erosion characteristics of ecological slope of tailings reservoir under rainfall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180720 Address after: 230051 20 Shenyang Road, Baohe Industrial Zone, Hefei, Anhui Patentee after: Anhui Jian Da Traffic Technology Co., Ltd. Address before: 230051 20 Shenyang Road, Baohe Industrial Zone, Hefei, Anhui Patentee before: ANHUI GOLDENLAND ARCHITECTURAL DESIGN LTD. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160302 Termination date: 20191223 |
|
CF01 | Termination of patent right due to non-payment of annual fee |