CN103669895B - Old structural steel industrial building side column becomes the online quick transformation method of center pillar - Google Patents
Old structural steel industrial building side column becomes the online quick transformation method of center pillar Download PDFInfo
- Publication number
- CN103669895B CN103669895B CN201210355954.5A CN201210355954A CN103669895B CN 103669895 B CN103669895 B CN 103669895B CN 201210355954 A CN201210355954 A CN 201210355954A CN 103669895 B CN103669895 B CN 103669895B
- Authority
- CN
- China
- Prior art keywords
- column
- new
- steel
- frange plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000746 Structural steel Inorganic materials 0.000 title claims abstract description 17
- 238000011426 transformation method Methods 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 238000009434 installation Methods 0.000 claims abstract description 5
- 238000006073 displacement reaction Methods 0.000 claims abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 7
- 230000009466 transformation Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000003801 milling Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of old structural steel industrial building side column becomes the online quick transformation method of center pillar, it is characterized in that comprising the following steps: a column hypomere increases by a root post, increases by a root post at factory building column hypomere, to meet crane beam and track installation needs; The amendment of b epimere list steel column local, epimere list steel column side frange plate carries out cutting certain distance toward web direction, make the new frange plate (5) of local displacement and the former frange plate of new-track centre distance and opposite side with existing orbit centre apart from equal, to ensure that driving is current smoothly; Increase gusset (4), the manhole (7) be simultaneously positioned between new frange plate (5) and gusset (4) carries out shutoff with steel plate, and new frange plate (5) is connected with manhole side plate high-strength bolt (6).Old structural steel industrial building side column of the present invention become center pillar online quick transformation method have old factory rehabilitation reduced investment, speed fast, resume production early and advantage that workmanship is safe and reliable.
Description
Technical field
The present invention relates to a kind of old steel-structure factory building remodeling method, specifically, is that a kind of old structural steel industrial building side column becomes the online quick transformation method of center pillar.
Background technology
Along with unit apparatus for production line is constantly updated, production technology is updated, and production capacity constantly expands, and output increases day by day, and in old structural steel industrial building, material reservoir area capacity can not practical requirement.For two across and above old structural steel industrial building, when existence is across with time unequal across factory building length, row is stepped into shorter length factory building and extends extending capacity reformation, the old factory building column of part will become center pillar from side column, see B row in Fig. 1 112,113,114 post, ensure the installation of newly-increased crane beam and track, guarantee that old driving normally can run in prolongation factory building, also to complete these Online revamp contents with the fastest speed simultaneously, resume production as early as possible.
Summary of the invention
Object of the present invention, is to propose a kind of online quick transformation method of old structural steel industrial building side column change center pillar shorter length factory building being stepped into row prolongation extending capacity reformation.
For achieving the above object, technical solution of the present invention is:
A kind of old structural steel industrial building side column becomes the online quick transformation method of center pillar, it is characterized in that comprising the following steps:
A, column hypomere increase by a root post
Increase by a root post at factory building column hypomere, i.e. single steel column, to meet crane beam and track installation needs;
The amendment of b, epimere list steel column local
Epimere list steel column side frange plate needs to carry out cutting certain distance toward web direction, makes the new frange plate of local displacement and the former frange plate of new-track centre distance and opposite side with existing orbit centre apart from equal, to ensure that driving is current smoothly; Increase gusset, the manhole steel plate simultaneously between new frange plate and gusset carries out shutoff, new frange plate and manhole side plate high strength exploitation.
After adopting technique scheme, old structural steel industrial building side column of the present invention becomes the online quick transformation method of center pillar and has the following advantages:
1, old factory rehabilitation reduced investment, speed fast, resume production early;
2, workmanship is safe and reliable;
3, economic benefit and social benefit remarkable.
Accompanying drawing explanation
Fig. 1 is known old factory building and prolongation factory building plan-position schematic diagram;
Fig. 2 is increase by the root post schematic diagram of the embodiment of the present invention;
Fig. 3 is that schematic diagram is revised in the side column epimere list steel column local of the embodiment of the present invention;
Fig. 4 is the high strength exploitation schematic diagram of the embodiment of the present invention.
In figure: 1 pair of steel column, 2 columns, 3 single steel columns, 4 gussets, 5 new frange plates, 6 high-strength bolts, 7 manholes.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Old structural steel industrial building column generally forms by upper and lower two sections, and hypomere is two steel columns, and epimere is single steel column.Factory building side column and center pillar different in upper portion structural configuration, and hypomere part-structure arrange substantially identical.
Center pillar: L1=L2, namely epimere list steel column center is equal with the distance at the two steel column center of hypomere, is symmetrical structure.Crane beam center, both sides overlaps respectively with two steel column center.
Side column: L1 > L2, namely the distance at epimere list steel column center and hypomere double steel column center is unequal, is unsymmetric structure.Crane beam center, L1 side and double steel column center superposition, L2 side is without crane beam.
Fig. 2 is increase by the root post schematic diagram of the embodiment of the present invention.
It is increase by a root post at factory building column hypomere that old structural steel industrial building side column of the present invention becomes the online quick transformation method of center pillar, and namely single steel column 3, makes L1=L3, to meet crane beam and track installation needs.
Fig. 3 is that schematic diagram is revised in the side column epimere list steel column local of the embodiment of the present invention, and Fig. 4 is the high strength exploitation schematic diagram of the embodiment of the present invention.
The second step of old factory rehabilitation is in the amendment of side column epimere list steel column local, ensures that driving is current smoothly:
Because side column is unsymmetric structure, its upper prop side frange plate and newly-increased orbit centre distance are less than opposite side frange plate and existing orbit centre distance, and driving is by impassable.Therefore upper prop side frange plate needs to carry out cutting certain distance toward web direction, the new frange plate 5 of local displacement is made to get final product (L4=L5) with existing orbit centre apart from equal with the former frange plate of new-track centre distance and opposite side, to ensure that driving is current smoothly.
In order to ensure improved upper prop intensity, add gusset 4, the manhole 7 simultaneously between new frange plate 5 and gusset carries out shutoff with steel plate.The new edge of a wing 5 plate is connected with manhole side plate high-strength bolt 6.
Old structural steel industrial building side column of the present invention becomes the online quick transformation method of center pillar and uses in species abundance in Baosteel in Shanghai flat cold-rolled sheet factory improvement project, technological transformation that existing structural steel industrial building carries out " extending dilatation ", from shutdown, transformation completes to transformation and resumes production, altogether use 5 days and complete the online quick transformation of old structural steel industrial building side column change center pillar, Be very effective, increase reservoir area capacity, alleviate the nervous contradiction in reservoir area, be conducive to making milling train in order and connecting the total logistics cost between moving back, ensure milling train and connect the normal performance of moving back unit production capacity, also the balance of these two unit maintenance strength is beneficial to, realize utilizing the resource in existing factory building region simultaneously as far as possible, to reduce construction investment.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.
Claims (1)
1. old structural steel industrial building side column becomes the online quick transformation method of center pillar, and old structural steel industrial building column forms by upper and lower two sections, and hypomere is two steel columns (1), and epimere is single steel column (2), it is characterized in that comprising the following steps:
A, column hypomere increase by a root post
Increase by a root post at factory building column hypomere, i.e. single steel column (3), to meet crane beam and track installation needs;
The amendment of b, epimere list steel column local
Epimere list steel column side frange plate carries out cutting certain distance toward web direction, makes the new frange plate (5) of local displacement and the former frange plate of new-track centre distance and opposite side with existing orbit centre apart from equal, to ensure that driving is current smoothly; Increase gusset (4), the manhole (7) be simultaneously positioned between new frange plate (5) and gusset (4) carries out shutoff with steel plate, and new frange plate (5) is connected with manhole side plate high-strength bolt (6).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210355954.5A CN103669895B (en) | 2012-09-24 | 2012-09-24 | Old structural steel industrial building side column becomes the online quick transformation method of center pillar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210355954.5A CN103669895B (en) | 2012-09-24 | 2012-09-24 | Old structural steel industrial building side column becomes the online quick transformation method of center pillar |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103669895A CN103669895A (en) | 2014-03-26 |
| CN103669895B true CN103669895B (en) | 2016-01-20 |
Family
ID=50308604
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210355954.5A Active CN103669895B (en) | 2012-09-24 | 2012-09-24 | Old structural steel industrial building side column becomes the online quick transformation method of center pillar |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103669895B (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1705313A2 (en) * | 2004-03-24 | 2006-09-27 | Peem, spol. s.r.o. | Reinforced console column and the method of its production |
| JP2011074566A (en) * | 2009-09-29 | 2011-04-14 | Nishinippon Iron Co | Aseismatic reinforcing structure of building, and aseismatic reinforcing method of building |
| CN202249004U (en) * | 2011-09-08 | 2012-05-30 | 贵州汇通申发钢结构有限公司 | Improved steel structure plant structure |
-
2012
- 2012-09-24 CN CN201210355954.5A patent/CN103669895B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1705313A2 (en) * | 2004-03-24 | 2006-09-27 | Peem, spol. s.r.o. | Reinforced console column and the method of its production |
| JP2011074566A (en) * | 2009-09-29 | 2011-04-14 | Nishinippon Iron Co | Aseismatic reinforcing structure of building, and aseismatic reinforcing method of building |
| CN202249004U (en) * | 2011-09-08 | 2012-05-30 | 贵州汇通申发钢结构有限公司 | Improved steel structure plant structure |
Non-Patent Citations (1)
| Title |
|---|
| "对改建工程中边柱变中柱的尝试";刘晓玲等;《建设科技》;20061231(第21期);全文 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103669895A (en) | 2014-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103541300B (en) | Based on the construction method of the railway concrete continuous beam that flat stacking is implemented | |
| CN203531445U (en) | Novel steel structure workshop | |
| LU502791B1 (en) | Full hoisting construction method for assembled subway station in pile-anchor retaining structure system | |
| CN106758773A (en) | A kind of shear connector of steel reinforced concrete composite beam bridge | |
| CN103669895B (en) | Old structural steel industrial building side column becomes the online quick transformation method of center pillar | |
| CN203855899U (en) | Non-counterweight self-balance movable die carrier | |
| CN203419675U (en) | Traveling track for girder crane | |
| CN102296527A (en) | Portal pier continuous rigid frame beam | |
| CN203237934U (en) | End beam device of electric hoist crane | |
| CN203669879U (en) | Down-hole hydraulic support assembling chamber | |
| CN102900027B (en) | Dismounting method of bailey beam with upwardly strode existing lines and underneath penetrated existing bridge | |
| CN204644878U (en) | A kind of transom pier steel truss girder lifting construction device | |
| CN203640122U (en) | Node structure of elevation difference of floor carrier plates of rebar trusses | |
| CN205348214U (en) | Column formula reinforced concrete and shaped steel hybrid portal crane basis | |
| CN204173774U (en) | A kind of anti-bias driving | |
| CN103470077A (en) | Novel steel-structured plant | |
| CN206343805U (en) | Positioner for lower frame of excavator | |
| CN202830789U (en) | Beam moving work platform | |
| CN203903800U (en) | Gantry crane with electric hoist and capable of reducing total weight | |
| Wang et al. | Optimal Design and Research on Performance Parameters of Double Scissor Mechanism | |
| CN203819964U (en) | Transverse movement equipment | |
| CN204022292U (en) | The connection structure of bridging crane main beam and end carriage | |
| CN204212049U (en) | A kind of steel bridge lower edge and basic syndeton | |
| CN204097878U (en) | A kind ofly transfer suspension bracket for what transfer mobile formwork | |
| CN204000579U (en) | Steel bridge column and foundation connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |