CN103647348A - Novel mine power supply monitoring system - Google Patents

Novel mine power supply monitoring system Download PDF

Info

Publication number
CN103647348A
CN103647348A CN201310636952.8A CN201310636952A CN103647348A CN 103647348 A CN103647348 A CN 103647348A CN 201310636952 A CN201310636952 A CN 201310636952A CN 103647348 A CN103647348 A CN 103647348A
Authority
CN
China
Prior art keywords
intelligent integrated
power monitoring
integrated protector
monitoring substation
switch intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310636952.8A
Other languages
Chinese (zh)
Inventor
刘振翮
张淳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN CHANG'AN ELECTROMECHANICAL EQUIPMENT CO Ltd
Original Assignee
HUNAN CHANG'AN ELECTROMECHANICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN CHANG'AN ELECTROMECHANICAL EQUIPMENT CO Ltd filed Critical HUNAN CHANG'AN ELECTROMECHANICAL EQUIPMENT CO Ltd
Priority to CN201310636952.8A priority Critical patent/CN103647348A/en
Publication of CN103647348A publication Critical patent/CN103647348A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a novel mine power supply monitoring system which is composed of a substation, a monitoring center and a power monitoring sub-station system, wherein the substation and the monitoring center are arranged on the ground, and the power monitoring sub-station system is disposed underground. The monitoring center is connected with power monitoring sub-stations through an industrial Ethernet switch. The monitoring center comprises a first workstation, a second workstation, a data server host machine, a data server backup machine and an industrial Ethernet switch, wherein the first workstation, the second workstation, the data server host machine and the data server backup machine are respectively connected with the industrial Ethernet switch. The novel mine power supply monitoring system is reasonable in design, all the power monitoring sub-stations adopt explosion-proof switch intelligent integrated protectors, and safety and reliability are achieved; and meanwhile, the invention provides a comprehensive network communication solution for digital coal mine substations, thus guaranteeing reliable and continuous power supply to coal mines.

Description

A kind of New Mine power supply monitoring system
Technical field
The invention belongs to power supply technique field, be specifically related to a kind of New Mine power supply monitoring system.
Background technology
At present, the mechanical power energy meter that coal industry is used in down-hole is affected by environment larger, temperature, humidity, inclination all affect the normal use of measuring equipment, fast development along with electronic information technology, the production management electric equipment security monitoring management work in colliery also needs electronization, automation, informationization, and existing Electric Energy Metering Technology can not meet Production requirement.Existing colliery underground power supply system adopts isolated neutral mode, and its advantage is to greatly reduce electrical network earth current and capacitance current, has improved the fail safe of personal electric shock fail safe and power supply unit.Supply power mode, with unanimous on the whole, mainly adopts central substation to be provided with main transformer abroad, and total feeding switch is to each branch switch feeding classification.Electric power system is complicated; circuit is short; there are 3 end lines; route protection current ration is difficult to adjust;, can not, by the differential cooperation of adjusting that realizes route protections at different levels of increase time, during line fault, very easily there is overstep tripping in the situation that especially has the cascade of multistage exploiting field transformer station under coal mine; cause large-area power-cuts, affects safety production.
Summary of the invention
Technical problem to be solved by this invention is: a kind of New Mine power supply monitoring system that meets electronization, automation and e-manufacturing demand is provided.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
A New Mine power supply monitoring system, comprises the electric substation and the Surveillance center that are arranged on ground, and is positioned at that the power monitoring substation system of down-hole forms, and described Surveillance center connects power monitoring substation by industrial ethernet switch, described Surveillance center comprises the first work station, the second work station, data server main frame, data server standby host and industrial ethernet switch, and the first work station, the second work station, data server main frame and data server standby host are connected with industrial ethernet switch respectively, described power monitoring substation comprises the first power monitoring substation and the second power monitoring substation, the 3rd power monitoring substation, the 4th power monitoring substation, the first high voltage flameproof switch Intelligent integrated protector, the first low-voltage explosion-proof switch Intelligent integrated protector, the second high voltage flameproof switch Intelligent integrated protector, the second low-voltage explosion-proof switch Intelligent integrated protector, third high is pressed flame-proof switch Intelligent integrated protector, the 3rd low-voltage explosion-proof switch Intelligent integrated protector, the 4th high voltage flameproof switch Intelligent integrated protector, the 4th low-voltage explosion-proof switch Intelligent integrated protector, the first power monitoring substation, the second power monitoring substation, between the 3rd power monitoring substation and the 4th power monitoring substation, by optical fiber, carry out cascade, form optical fiber ring network, the first power monitoring substation connects the first high voltage flameproof switch Intelligent integrated protector and the first low-voltage explosion-proof switch Intelligent integrated protector by Ethernet, the second power monitoring substation connects the second high voltage flameproof switch Intelligent integrated protector and the second low-voltage explosion-proof switch Intelligent integrated protector by Ethernet, the 3rd power monitoring substation connects third high by Ethernet and presses flame-proof switch Intelligent integrated protector and the 3rd low-voltage explosion-proof switch Intelligent integrated protector, the 4th power monitoring substation connects the 4th high voltage flameproof switch Intelligent integrated protector and the 4th low-voltage explosion-proof switch Intelligent integrated protector by Ethernet.
Compared with prior art, the beneficial effect that the present invention has is:
The present invention is reasonable in design, and the equal Bian of each power monitoring substation flame-proof switch Intelligent integrated protector is safe and reliable; Simultaneously, the invention provides the comprehensive network service solution of digitlization colliery transformer station, build the intelligent electric power system in colliery, utilize intelligent power supply system self-healing, strong characteristic, the generation of prevention colliery burst electric power accident, can guarantee that colliery is reliable, continued power.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of New Mine power supply monitoring system of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1, a kind of New Mine power supply monitoring system, comprises the electric substation and the Surveillance center that are arranged on ground, and is positioned at that the power monitoring substation system of down-hole forms, and described Surveillance center connects power monitoring substation by industrial ethernet switch, described Surveillance center comprises that the first work station 1, the second work station 2, data server main frame 3, data server standby host 4 and industrial ethernet switch 5, the first work stations 1, the second work station 2, data server main frame 3 are connected with industrial ethernet switch 5 respectively with data server standby host 4, described power monitoring substation comprises the first power monitoring substation 6 and the second power monitoring substation 7, the 3rd power monitoring substation 12, the 4th power monitoring substation 13, the first high voltage flameproof switch Intelligent integrated protector 8, the first low-voltage explosion-proof switch Intelligent integrated protector 9, the second high voltage flameproof switch Intelligent integrated protector 10, the second low-voltage explosion-proof switch Intelligent integrated protector 11, third high is pressed flame-proof switch Intelligent integrated protector 14, the 3rd low-voltage explosion-proof switch Intelligent integrated protector 15, the 4th high voltage flameproof switch Intelligent integrated protector 16, the 4th low-voltage explosion-proof switch Intelligent integrated protector 17, the first power monitoring substation 6, the second power monitoring substation 7, between the 3rd power monitoring substation 12 and the 4th power monitoring substation 13, by optical fiber, carry out cascade, form optical fiber ring network, the first power monitoring substation 6 connects the first high voltage flameproof switch Intelligent integrated protector 8 and the first low-voltage explosion-proof switch Intelligent integrated protector 9 by Ethernet, the second power monitoring substation 7 connects the second high voltage flameproof switch Intelligent integrated protector 10 and the second low-voltage explosion-proof switch Intelligent integrated protector 11 by Ethernet, the 3rd power monitoring substation 12 connects third high by Ethernet and presses flame-proof switch Intelligent integrated protector 14 and the 3rd low-voltage explosion-proof switch Intelligent integrated protector 15, the 4th power monitoring substation 13 connects the 4th high voltage flameproof switch Intelligent integrated protector 16 and the 4th low-voltage explosion-proof switch Intelligent integrated protector 17 by Ethernet.
Those of ordinary skill in the art will be appreciated that, above embodiment is only for the present invention is described, and be not used as limitation of the invention, as long as within the scope of connotation of the present invention, to the variation of the above embodiment, modification, all will drop within the scope of claim of the present invention.

Claims (1)

1. a New Mine power supply monitoring system, comprise the electric substation and the Surveillance center that are arranged on ground, and the power monitoring substation system that is positioned at down-hole forms, it is characterized in that: described Surveillance center connects power monitoring substation by industrial ethernet switch, described Surveillance center comprises the first work station (1), the second work station (2), data server main frame (3), data server standby host (4) and industrial ethernet switch (5), and the first work station (1), the second work station (2), data server main frame (3) and data server standby host (4) are connected with industrial ethernet switch (5) respectively, described power monitoring substation comprises the first power monitoring substation (6) and the second power monitoring substation (7), the 3rd power monitoring substation (12), the 4th power monitoring substation (13), the first high voltage flameproof switch Intelligent integrated protector (8), the first low-voltage explosion-proof switch Intelligent integrated protector (9), the second high voltage flameproof switch Intelligent integrated protector (10), the second low-voltage explosion-proof switch Intelligent integrated protector (11), third high is pressed flame-proof switch Intelligent integrated protector (14), the 3rd low-voltage explosion-proof switch Intelligent integrated protector (15), the 4th high voltage flameproof switch Intelligent integrated protector (16), the 4th low-voltage explosion-proof switch Intelligent integrated protector (17), the first power monitoring substation (6), the second power monitoring substation (7), between the 3rd power monitoring substation (12) and the 4th power monitoring substation (13), by optical fiber, carry out cascade, form optical fiber ring network, the first power monitoring substation (6) connects the first high voltage flameproof switch Intelligent integrated protector (8) and the first low-voltage explosion-proof switch Intelligent integrated protector (9) by Ethernet, the second power monitoring substation (7) connects the second high voltage flameproof switch Intelligent integrated protector (10) and the second low-voltage explosion-proof switch Intelligent integrated protector (11) by Ethernet, the 3rd power monitoring substation (12) connects third high by Ethernet and presses flame-proof switch Intelligent integrated protector (14) and the 3rd low-voltage explosion-proof switch Intelligent integrated protector (15), the 4th power monitoring substation (13) connects the 4th high voltage flameproof switch Intelligent integrated protector (16) and the 4th low-voltage explosion-proof switch Intelligent integrated protector (17) by Ethernet.
CN201310636952.8A 2013-12-02 2013-12-02 Novel mine power supply monitoring system Pending CN103647348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310636952.8A CN103647348A (en) 2013-12-02 2013-12-02 Novel mine power supply monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310636952.8A CN103647348A (en) 2013-12-02 2013-12-02 Novel mine power supply monitoring system

Publications (1)

Publication Number Publication Date
CN103647348A true CN103647348A (en) 2014-03-19

Family

ID=50252529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310636952.8A Pending CN103647348A (en) 2013-12-02 2013-12-02 Novel mine power supply monitoring system

Country Status (1)

Country Link
CN (1) CN103647348A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106681259A (en) * 2015-11-05 2017-05-17 广东罗尔科技有限公司 Coal mine power supply monitoring system and method applicable to various protocol comprehensive protectors
CN106849361A (en) * 2017-03-09 2017-06-13 辽宁工程技术大学 A kind of mine electric power monitoring system and method
CN109120066A (en) * 2018-08-24 2019-01-01 淮北矿业股份有限公司 A kind of coal mine electric power monitoring system transmission device
CN114400779A (en) * 2022-01-18 2022-04-26 上海山源电子科技股份有限公司 Rapid networking system and rapid networking method for underground unattended substation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201975860U (en) * 2011-03-29 2011-09-14 哈尔滨国力电气有限公司 Power supply monitoring system used in coal mine
CN202533787U (en) * 2012-02-29 2012-11-14 山东科技大学 New type mine power supply monitoring system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201975860U (en) * 2011-03-29 2011-09-14 哈尔滨国力电气有限公司 Power supply monitoring system used in coal mine
CN202533787U (en) * 2012-02-29 2012-11-14 山东科技大学 New type mine power supply monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王霞: "煤矿电网监测监控系统设计", 《科技信息》, no. 23, 31 December 2012 (2012-12-31), pages 382 - 383 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106681259A (en) * 2015-11-05 2017-05-17 广东罗尔科技有限公司 Coal mine power supply monitoring system and method applicable to various protocol comprehensive protectors
CN106849361A (en) * 2017-03-09 2017-06-13 辽宁工程技术大学 A kind of mine electric power monitoring system and method
CN109120066A (en) * 2018-08-24 2019-01-01 淮北矿业股份有限公司 A kind of coal mine electric power monitoring system transmission device
CN114400779A (en) * 2022-01-18 2022-04-26 上海山源电子科技股份有限公司 Rapid networking system and rapid networking method for underground unattended substation

Similar Documents

Publication Publication Date Title
CN203312781U (en) Integrated anti-islanding protection system for distributed power generation
CN201975860U (en) Power supply monitoring system used in coal mine
CN202309201U (en) Communication power system
CN103390887A (en) Method for isolating faults of power distribution system with micro-grid
CN103647348A (en) Novel mine power supply monitoring system
CN206559134U (en) Stand-by power supply discharge control device
CN103078301A (en) Override trip protection system and method for coal mine power network
CN203350349U (en) Transformer substation bus phase voltage off-limit alarm system
CN203081508U (en) Safety monitoring system for coal mine
CN104242258A (en) Underground coal mine override trip prevention system and method based on EtherCAT
CN202455054U (en) Override trip protection system for coal mine power grid
CN205543911U (en) On -vehicle prepackage type solid insulation switching station
CN203071654U (en) Mine high-low voltage power grid leakage selection Ethernet ring network monitoring combined device
CN203940883U (en) A kind of transformer fault diagnosis system
CN208835841U (en) A kind of mobile substation stacked switch address self-reacting device
CN204144977U (en) A kind of novel mine high-power UPS
CN202474857U (en) Intelligent distribution network with failure automatic isolation and self-clearing functions
CN202651750U (en) Coal mine motive power center protection control circuit
CN202034694U (en) Dual power supply 10kV power distribution device
CN104362519A (en) Medium-voltage power distribution system
CN204835526U (en) High pressure length multinode chain power supply system
CN202651753U (en) Coal mine power center protective circuit
CN203911237U (en) Assembling structure used for metering device of 10kV power distribution cabinet
CN202978242U (en) Photoelectric type arc light protection device
CN203734697U (en) Remote transmission gigabit switch based on single-mode fiber channel for intelligent substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140319