CN203911237U - Assembling structure used for metering device of 10kV power distribution cabinet - Google Patents

Assembling structure used for metering device of 10kV power distribution cabinet Download PDF

Info

Publication number
CN203911237U
CN203911237U CN201420274498.6U CN201420274498U CN203911237U CN 203911237 U CN203911237 U CN 203911237U CN 201420274498 U CN201420274498 U CN 201420274498U CN 203911237 U CN203911237 U CN 203911237U
Authority
CN
China
Prior art keywords
storehouse
power distribution
metering device
distribution cabinet
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420274498.6U
Other languages
Chinese (zh)
Inventor
黄静达
张国民
茅雪凤
张文博
张佳杰
黄宇航
倪杏斐
姚远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201420274498.6U priority Critical patent/CN203911237U/en
Application granted granted Critical
Publication of CN203911237U publication Critical patent/CN203911237U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model provides an assembling structure used for a metering device for a 10kV power distribution cabinet. The assembling structure seals a cabin acting as an electricity metering cabinet after an electric-utility-side fuse, a voltage transformer and a current transformer are arranged in the cabin. The current transformer is arranged on one side in the cabin while the electric-utility-side fuse and the voltage transformer are arranged on the other side in the cabin. According to the utility model, wiring design of a user power distribution station is optimized; equipment quality control of a manufacturer is facilitated; risks of power utilization safety and power check are reduced; mounting environment is optimized; working efficiency is improved; and electricity-theft prevention is enhanced.

Description

The metering device attaching framework of 10kV power distribution cabinet
Technical field
The utility model relates to a kind of power equipment, particularly a kind of metering device attaching framework of 10kV power distribution cabinet.
Background technology
Metering device is as carried out a steelyard of electric weight clearing between power supply enterprise and electricity consumption client, according in Shanghai Electric Power < < Power supply business detailed rules and regulations > > by charging electric meter, electric current/voltage transformer for metering, secondary connects wire, the device definitions such as decompression calculagraph are metering device, these metering devices are significant to electric industry, and installation to user's metering device, mobile, check, remove, seal up, the work such as unpacking and the wiring of table meter are all responsible for by affiliated Utilities Electric Co., guarantee the safety of metering device, reliability service is one of groundwork of Utilities Electric Co..
Be the metering device attaching configuration diagram of existing a kind of 10kV power distribution cabinet inside as shown in Figure 1, Fig. 2 is the corresponding circuit diagram of existing power distribution cabinet shown in Fig. 1.This power distribution cabinet is a kind of HXGN-12 type ring main units.Power distribution cabinet Yi road inlet wire is by fuse 1, the rear ground connection of voltage transformer 2, another road inlet wire is by after current transformer 3, via user's side fuse 4, on-load switch 5, be connected on the one hand the leading-out terminal of power distribution cabinet, grounding switch 6 be also set on the other hand and carry out ground connection; Also be provided with in addition two groups of electrification displays, a connected node that is connected to fuse 1 and inlet wire, another is connected to the connected node of on-load switch 5 and outlet.Wherein, this existing power distribution cabinet is that incoming line cabinet and the electric cabinet of amount are united two into one, that is, current transformer 3, voltage transformer 2 have together been arranged in an inlet wire storehouse 10 with on-load switch 4.Concrete, user's side fuse 4 and voltage transformer 2 are arranged in to the side in inlet wire storehouse 10, and the operating grip of current transformer 3, on-load switch 4, on-load switch and grounding switch is arranged in to the interior relative opposite side in inlet wire storehouse 10.
The above-mentioned attaching framework of existing power distribution cabinet, although very high to the space availability ratio of position in storehouse, provide cost savings and space, depth is longer, for attaching, the inspection stream that opens a position, presses change, the maintenance of equipment that opens a position etc. all very inconvenient.Especially the fabrication junction of current transformer 3 is downward, is inconvenient to especially install.In addition, user's side fuse 4 is arranged in this same storehouse, if user's side fuse 4 breaks down, user must open the replacing of cabinet door; And for the position in storehouse that current transformer 3 is set, if cannot can provide exercisable environment to stealing by this position in storehouse of seal.
In addition, space is crowded in position in storehouse, if fuse breaks down (such as arc extinguishing is unsuccessful, fuse blast etc.), has and brings disaster to the risk of metering device around, and expansion accident scope, promotes maintenance load.And producer is cost-saving, often independently earthing bar is not set in this power distribution cabinet, but uses the earthing of casing, do not meet rules requirement.The nameplate of current transformer, voltage transformer is subject to objective impact, can only be arranged at the equipment back side, causes generaI investigation difficulty.
Therefore, although user has the right to select equipment manufacturer, even and the power distribution cabinet of same model, same electric system wiring, its inner actual attaching situation also varies; In real work, if user uses the existing power distribution cabinet of above-mentioned attaching framework, by the examination being difficult to by Utilities Electric Co., also inconvenience is rectified and improved at the scene.
Summary of the invention
The purpose of this utility model is to provide a kind of metering device attaching framework of 10kV power distribution cabinet, optimize wiring design and the installation environment of metering device, the equipment of being convenient to is installed and trouble hunting, metering device safe and reliable operation after guaranteeing to put into operation, farthest reduces the risk of carrying out stealing due to user's private opening position in storehouse.
In order to achieve the above object, the technical solution of the utility model is to provide a kind of metering device attaching framework of 10kV power distribution cabinet, in the bin level as the electric cabinet of amount, this position in storehouse is carried out to seal after electric industry side fuse, voltage transformer and current transformer are set;
Wherein, make this position in storehouse Yi road inlet wire be connected to described voltage transformer through described electric industry side fuse, and another road inlet wire of this position in storehouse is through being connected to the outlet of this position in storehouse after described current transformer.
Alternatively, described current transformer is arranged in the side in position in storehouse, and described electric industry side fuse and voltage transformer are arranged in relative opposite side in position in storehouse.
Alternatively, described current transformer and voltage transformer adopt independently grounding copper bar to carry out ground connection.
Alternatively, in the outlet of described position in storehouse, You Yi road is through user's side fuse connected load switch, and the grounding switch of separately leading up to carrys out ground connection, and the switch of described on-load switch and grounding switch is interrelated, with same operating grip, controls; The operating grip of described user's side fuse, on-load switch, grounding switch, on-load switch and grounding switch, is all arranged in an incoming line cabinet of this position in storehouse outside.
Alternatively, at described electric industry side fuse, be provided with an electrification display with the connected node place of the electric cabinet inlet wire of amount, at the connected node of described on-load switch and incoming line cabinet outlet, be provided with another electrification display.
Compared with prior art, the metering device attaching framework of the utility model 10kV power distribution cabinet, its advantage is:
1.: no user side fuse in position in storehouse of the present utility model, only deposit electric industry side fuse and stream and press that become can whole storehouse seal, reduced stealing risk.
2.: position in storehouse of the present utility model space increases, and has improved attaching environment, being convenient to open a position checks that stream presses change information, met simultaneously safe distance requirement.
3.: distance between each equipment of the present utility model is elongated, bring disaster to the risk of other equipment around after having reduced fuse fault.
4.: in the utility model, stream is pressed and become the logical board ground connection of earthing mode employing independent grounding, meets safety requirements.
Therefore, the utility model has been optimized the wiring design of user's power distribution station, is conducive to producer's equipment quality control, has reduced the risk of Electrical Safety and electricity consumption procuratorial work, has optimized installation environment, increases work efficiency, and promotes the stealing measure of taking precautions against.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the metering device attaching framework of existing a kind of 10kV power distribution cabinet;
Fig. 2 is circuit diagram corresponding to existing power distribution cabinet shown in Fig. 1;
Fig. 3 is the schematic diagram of the metering device attaching framework of 10kV power distribution cabinet described in the utility model;
Fig. 4 is the circuit diagram corresponding to metering device attaching framework of 10kV power distribution cabinet described in the utility model.
Embodiment
As shown in Figure 3, Figure 4, the 10kV power distribution cabinet that the utility model provides, is only used as the electric cabinet of amount, is only provided with electric industry side fuse 21 and voltage transformer 22, current transformer 23 in this position in storehouse 20, can carry out whole storehouse seal, has reduced stealing risk.
In the concrete application example shown in Fig. 3, current transformer 23 is arranged in to the side in position in storehouse 20, and electric industry side fuse 21 and voltage transformer 22 are arranged in to the interior relative opposite side of position in storehouse 20.Therefore, the interior space of position in storehouse 20 increases, and has improved attaching environment, is convenient to open a position check that stream presses change information (gap between current transformer 23, voltage transformer 22 is sufficient, and nameplate is convenient to observe), met simultaneously safe distance requirement.
As shown in Figure 4, described position in storehouse 20 mono-road inlet wire is connected to voltage transformer 22 through electric industry side fuse 21, and another road inlet wire is through being connected to the outlet of this position in storehouse 20 after current transformer 23.Current transformer 23 and voltage transformer 22 adopt the earthing mode of independent grounding copper bar, meet safety requirements.
In the utility model, the operating grip of on-load switch, user's side fuse, grounding switch, lightning arrester, on-load switch and grounding switch is all arranged in another incoming line cabinet on these position in storehouse 20 sides; Outlet one tunnel of aforementioned position in storehouse 20 is through user's side fuse connected load switch, and another road arranges grounding switch and carrys out ground connection, and the switch of on-load switch and grounding switch is interrelated, with same operating grip, controls.Also be provided with two groups of electrification displays, one is connected to electric industry side fuse 21 and the connected node of measuring electric cabinet inlet wire, and another is connected to the connected node of on-load switch and incoming line cabinet outlet.Distance between each equipment is elongated, and brings disaster to the risk of other equipment around after having reduced fuse fault.
In sum, the metering device attaching framework of the 10kV power distribution cabinet that the utility model provides, optimize wiring design and the installation environment of metering device, the equipment of being convenient to is installed and trouble hunting, metering device safe and reliable operation after guaranteeing to put into operation, farthest reduces the risk of carrying out stealing due to user's private opening position in storehouse.
Although content of the present utility model has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to restriction of the present utility model.Those skilled in the art, read after foregoing, for multiple modification of the present utility model with to substitute will be all apparent.Therefore, protection range of the present utility model should be limited to the appended claims.

Claims (5)

1. a metering device attaching framework for 10kV power distribution cabinet, is characterized in that,
After electric industry side fuse (21), voltage transformer (22) and current transformer (23) being set in the bin level (20) as the electric cabinet of amount, this position in storehouse (20) is carried out to seal;
Wherein, make this position in storehouse (20) Yi road inlet wire be connected to described voltage transformer (22) through described electric industry side fuse (21), and another road inlet wire of this position in storehouse (20) is connected to the outlet of this position in storehouse (20) afterwards through described current transformer (23).
2. the metering device attaching framework of 10kV power distribution cabinet as claimed in claim 1, is characterized in that,
Described current transformer (23) is arranged in the side in position in storehouse (20), and described electric industry side fuse (21) and voltage transformer (22) are arranged in relative opposite side in position in storehouse (20).
3. the metering device attaching framework of 10kV power distribution cabinet as claimed in claim 1, is characterized in that,
Described current transformer (23) and voltage transformer (22) adopt independently grounding copper bar to carry out ground connection.
4. the metering device attaching framework of 10kV power distribution cabinet as claimed in claim 1, is characterized in that,
In the outlet of described position in storehouse (20), You Yi road is through user's side fuse connected load switch, and the grounding switch of separately leading up to carrys out ground connection, and the switch of described on-load switch and grounding switch is interrelated, with same operating grip, controls; The operating grip of described user's side fuse, on-load switch, grounding switch, on-load switch and grounding switch, is all arranged in an outside incoming line cabinet of this position in storehouse (20).
5. the metering device attaching framework of 10kV power distribution cabinet as claimed in claim 4, is characterized in that,
At described electric industry side fuse (21), be provided with an electrification display with the connected node place of the electric cabinet inlet wire of amount, at the connected node of described on-load switch and incoming line cabinet outlet, be provided with another electrification display.
CN201420274498.6U 2014-05-27 2014-05-27 Assembling structure used for metering device of 10kV power distribution cabinet Withdrawn - After Issue CN203911237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420274498.6U CN203911237U (en) 2014-05-27 2014-05-27 Assembling structure used for metering device of 10kV power distribution cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420274498.6U CN203911237U (en) 2014-05-27 2014-05-27 Assembling structure used for metering device of 10kV power distribution cabinet

Publications (1)

Publication Number Publication Date
CN203911237U true CN203911237U (en) 2014-10-29

Family

ID=51785483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420274498.6U Withdrawn - After Issue CN203911237U (en) 2014-05-27 2014-05-27 Assembling structure used for metering device of 10kV power distribution cabinet

Country Status (1)

Country Link
CN (1) CN203911237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103972794A (en) * 2014-05-27 2014-08-06 国网上海市电力公司 Metering device installation framework of 10kV power distribution cabinet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103972794A (en) * 2014-05-27 2014-08-06 国网上海市电力公司 Metering device installation framework of 10kV power distribution cabinet
CN103972794B (en) * 2014-05-27 2017-03-01 国网上海市电力公司 The metering device attaching framework of 10kV power distribution cabinet

Similar Documents

Publication Publication Date Title
CN102684087B (en) Bypass operation vehicle capable of enabling users to change distribution transformer without power cutting
CN104330686A (en) System for detecting power supply circuit fault
CN202586124U (en) Bypass operation trolley capable of being used to replace distribution transformer without cutting off power
CN200997496Y (en) Movable high-voltage switching closet with shunt
CN104113002A (en) High-voltage cable cross interconnection grounding system transfer device
CN203911237U (en) Assembling structure used for metering device of 10kV power distribution cabinet
CN201383681Y (en) Mine flame-proof type direct current power supply screen
CN202535046U (en) Microcomputer monitoring and protection device for mine-used high-voltage switch
CN201570889U (en) 10kV system emergent electric supply installation
CN201584679U (en) Voltage transformer cabinet
CN103972794A (en) Metering device installation framework of 10kV power distribution cabinet
CN104659671A (en) Microcomputer protection monitoring device
CN207166138U (en) A kind of subway station distribution system
KR101338254B1 (en) Distributing panel for very high voltage
CN208272426U (en) A kind of green building distribution management device
KR100861915B1 (en) Power supplying apparatus having power receiving tank with mof installed outside
CN202434942U (en) Mining flame-proof and pressurized high-voltage power distribution device
CN104362519A (en) Medium-voltage power distribution system
CN201289967Y (en) Distribution box for base station
CN203204143U (en) Electroscope test voltage generator
CN203014208U (en) Integrated distribution box with earth leakage protection
CN105098646B (en) A kind of indoor intelligence 10kV demarcation circuit breaker switchgears with communication function
CN204633136U (en) A kind of remote-control high tension switch cabinet
CN204103336U (en) A kind of box fixed indoor ac metal closing switch gear
CN203674601U (en) Mobile bypass circuit breaker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20141029

Effective date of abandoning: 20171114