CN103643987A - Gas collection, slag removal and drainage device for drill hole - Google Patents

Gas collection, slag removal and drainage device for drill hole Download PDF

Info

Publication number
CN103643987A
CN103643987A CN201310605101.7A CN201310605101A CN103643987A CN 103643987 A CN103643987 A CN 103643987A CN 201310605101 A CN201310605101 A CN 201310605101A CN 103643987 A CN103643987 A CN 103643987A
Authority
CN
China
Prior art keywords
drill hole
gas collection
gas
boring
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310605101.7A
Other languages
Chinese (zh)
Inventor
陈殿赋
黄步青
罗伙根
邬喜仓
李健威
张增辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenhua Shendong Baode Coal Mine
Original Assignee
Shenhua Shendong Baode Coal Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenhua Shendong Baode Coal Mine filed Critical Shenhua Shendong Baode Coal Mine
Priority to CN201310605101.7A priority Critical patent/CN103643987A/en
Publication of CN103643987A publication Critical patent/CN103643987A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a gas collection, slag removal and drainage device applied to a drill hole. The gas collection, slag removal and drainage device for the drill hole comprises a box body with a bracket, wherein the top part of the box body is connected to a gas drainage pipe through a gas discharge pipe, multiple drill hole interfaces connected with a drill hole pipeline are mounted on one sidewall of the box body, a waste residue discharge hole and a waste water discharge hole are formed in the lower end of one sidewall of the box body, and the waste water discharge hole is connected to a water discharger pipeline. The gas collection, slag removal and drainage device for the drill hole efficiently solves the problems of drainage pipeline stoppage and unsmooth drainage caused by a plenty of accumulated water and sediments existing in the drill hole during a drill hole drainage process, and is simple in structure, low in manufacturing cost, easy to maintain and long in service life.

Description

A kind of boring gas collection, slagging-off, dewatering installation
Technical field
The invention belongs to underground equipment field, relate in particular to a kind of gas collection, slagging-off, dewatering installation that is applied to boring.
Background technology
Gas drainage under suction is the important leverage that downhole safety is produced, but colliery is without special-purpose gas collection, slagging-off, dewatering installation now, thereby has caused the poor problem of fire damp emission effect.Concrete is mainly that there are the following problems: 1. existing tailrace waterdrainage amount is little can not discharge gas pipeline ponding in time in time, affects gas drainage under suction effect.2. present firedamp taking-out discharging drilling is without special-purpose deslagging device, be mostly after stopping drilling-draining, utilize wire by eliminating impurities in hole, this traditional deslagging method is deposited shortcoming both ways, boring can not be cleared up in time on the one hand, long-time congestion affects extraction effect, and the opposing party's boring stops after extraction, can cause at short notice tunnel gas to increase, have very big potential safety hazard.3. existing gas drilling extraction mainly adopts single hole connection to carry out extraction, weak effect, and single hole survey data is loaded down with trivial details, and time-consuming, effort, is not easy to observe gas data in groups.Existing tailrace internal control device adopts glueballs, Floater Structure more simultaneously, and long-time use is prone to damage, and maintenance cost is high.
Summary of the invention
The object of the present invention is to provide a kind of boring gas collection, slagging-off, dewatering installation, solve present down-hole do not hole gas collection, slagging-off, dewatering installation, cause the poor problem of fire damp emission effect.
For addressing the above problem, technical scheme of the present invention is: a kind of boring gas collection, slagging-off, dewatering installation, comprise and be with standoff casing, described casing top is connected with gas drainage pipeline by drawing-off gas pipe, wall box is provided with some boring interfaces, and described boring interface is connected with boring pipeline, and wall box lower end is provided with waste sludge discharge mouth and discharge of wastewater mouth, described discharge of wastewater mouth is connected with tailrace pipeline, and waste sludge discharge mouth is provided with valve.
Further, described discharge of wastewater mouth is positioned at waste sludge discharge mouth top.
Inside described wall box, middle and lower part is provided with level sensor.
Described drawing-off gas inside pipe wall is provided with pressure sensor and flow transmitter.
The present invention is by arranging a casing that can be connected with several pipelines of holing, when utilizing water that the storage boring of its space extracts out and waste residue, drawing-off gas pipe by casing top carries out separated with water with waste residue by gas, be stored in water and waste residue natural layering in cabinet space simultaneously, water is discharged by the tailrace being connected with discharge of wastewater mouth pipeline, and waste residue is discharged by waste sludge discharge mouth.
Further device of the present invention middle and lower part inside wall box is provided with level sensor, be used for checking bore flooding quantity, drawing-off gas pipe is provided with pressure sensor and flow transmitter for measuring drilling-draining negative pressure, and because a plurality of boring is connected with the present invention, can monitor at any time the water yield, drilling-draining foreign material of the large-area boring in down-hole and the situation such as extraction data in real time in groups by this device, can monitor boring real-time condition.
The present invention efficiently solves in drilling-draining process in boring and has a large amount of long-pending water and sediments, causes extraction pipeline to stop up, the problem that pump drainage is not smooth, and simple in structure, cheap, for ease of maintenaince, long service life.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
The specific embodiment
As shown in Figure 1, a kind of boring gas collection, slagging-off, dewatering installation, comprise and be with standoff casing 1, casing 1 top is connected with gas drainage pipeline by drawing-off gas pipe 2, wall box is provided with some boring interfaces 3 and is connected with boring pipeline, wall box lower end is provided with waste sludge discharge mouth 4 and discharge of wastewater mouth 5, discharge of wastewater mouth 5 is connected with tailrace pipeline, discharge of wastewater mouth 5 is between boring interface 3 and waste sludge discharge mouth 4, inside wall box, middle and lower part is provided with level sensor 6, drawing-off gas pipe 2 inwalls are provided with pressure sensor 21 and flow transmitter 22.

Claims (4)

1. a boring gas collection, slagging-off, dewatering installation, comprise and be with standoff casing, it is characterized in that: described casing top is connected with gas drainage pipeline by drawing-off gas pipe, wall box is provided with some boring interfaces and is connected with boring pipeline, described wall box lower end is provided with waste sludge discharge mouth and discharge of wastewater mouth, and described discharge of wastewater mouth is connected with tailrace pipeline.
2. boring gas collection according to claim 1, slagging-off, dewatering installation, is characterized in that: described discharge of wastewater mouth is positioned at waste sludge discharge mouth top.
3. boring gas collection according to claim 1, slagging-off, dewatering installation, is characterized in that: inside described wall box, middle and lower part is provided with level sensor.
4. boring gas collection according to claim 1, slagging-off, dewatering installation, is characterized in that: described drawing-off gas inside pipe wall is provided with pressure sensor and flow transmitter.
CN201310605101.7A 2013-11-26 2013-11-26 Gas collection, slag removal and drainage device for drill hole Pending CN103643987A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310605101.7A CN103643987A (en) 2013-11-26 2013-11-26 Gas collection, slag removal and drainage device for drill hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310605101.7A CN103643987A (en) 2013-11-26 2013-11-26 Gas collection, slag removal and drainage device for drill hole

Publications (1)

Publication Number Publication Date
CN103643987A true CN103643987A (en) 2014-03-19

Family

ID=50249258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310605101.7A Pending CN103643987A (en) 2013-11-26 2013-11-26 Gas collection, slag removal and drainage device for drill hole

Country Status (1)

Country Link
CN (1) CN103643987A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105572758A (en) * 2015-12-28 2016-05-11 郑州光力科技股份有限公司 Diagnosis method and apparatus of beam tube blocking of mining fire monitoring system
CN107585809A (en) * 2017-11-01 2018-01-16 马鞍山市新桥工业设计有限公司 For the drainage arrangement in sewage disinfection treatment
CN107789895A (en) * 2017-11-01 2018-03-13 马鞍山市新桥工业设计有限公司 For separating the sewage disposal system and method for solid-phase contaminants in sewage
CN115324510A (en) * 2022-08-23 2022-11-11 铁福来装备制造集团股份有限公司 Gas and slag-water separating device for coal mine
CN115324510B (en) * 2022-08-23 2024-04-30 铁福来装备制造集团股份有限公司 Gas and slag water separator for coal mine

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105572758A (en) * 2015-12-28 2016-05-11 郑州光力科技股份有限公司 Diagnosis method and apparatus of beam tube blocking of mining fire monitoring system
CN105572758B (en) * 2015-12-28 2018-06-05 光力科技股份有限公司 The diagnostic method and device that a kind of beam tube of mining fire monitoring system blocks
CN107585809A (en) * 2017-11-01 2018-01-16 马鞍山市新桥工业设计有限公司 For the drainage arrangement in sewage disinfection treatment
CN107789895A (en) * 2017-11-01 2018-03-13 马鞍山市新桥工业设计有限公司 For separating the sewage disposal system and method for solid-phase contaminants in sewage
CN107585809B (en) * 2017-11-01 2018-08-03 马鞍山市新桥工业设计有限公司 For the drainage arrangement in sewage disinfection treatment
CN107789895B (en) * 2017-11-01 2019-08-16 马鞍山市新桥工业设计有限公司 For separating the sewage disposal system and method for solid-phase contaminants in sewage
CN115324510A (en) * 2022-08-23 2022-11-11 铁福来装备制造集团股份有限公司 Gas and slag-water separating device for coal mine
CN115324510B (en) * 2022-08-23 2024-04-30 铁福来装备制造集团股份有限公司 Gas and slag water separator for coal mine

Similar Documents

Publication Publication Date Title
CN201297181Y (en) Water discharge device moved with pipe in coal mine gas extraction pipeline
CN201963342U (en) Device for draining water accumulated in gas drill hole under coal mine well by means of pumping
CN102787833A (en) Hydraulic fracturing surging method for bedrock well and system device thereof
CN201568076U (en) Drilling hole sealing device in highly gassy mine
CN103643987A (en) Gas collection, slag removal and drainage device for drill hole
CN203515558U (en) Deep-well water source well water level monitoring technological pipe column
CN103195470A (en) Gas discharge collecting device for drilling construction
CN105525941A (en) Method for improving stability of permanent gas extraction system of outburst mine
CN204877339U (en) Down -hole drill of effective dust fall
CN202250165U (en) Integration device for separating gas and water and discharging water and slag for drill hole in gas extraction crossheading drill site
CN202348323U (en) Coal mine gas drainage drill combination hole-main pipe hole linkage structure
CN202900322U (en) Positive-pressure automatic water discharging device
CN202391461U (en) Gas drainage tail-end system
CN203161287U (en) Out-flow gas collecting device for drilling construction
CN203640769U (en) Automatic water discharging device of mine roadway gas main pipeline
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN207212312U (en) A kind of multi-functional pressure obtaning device
CN104675411A (en) Large-diameter slurry shield high-pressure flushing device
CN202788934U (en) Underground coal mine downward hole drainage device
CN203603971U (en) Drainage device used for gas drainage pipelines
CN203891129U (en) Automatic water tower
CN201851150U (en) Drainage device of gas extraction and drainage pipe
CN202745934U (en) Downward extraction borehole drainage device
CN202882810U (en) Novel multifunctional dust falling device
CN201943750U (en) Automatic water discharge device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140319