CN203161287U - Out-flow gas collecting device for drilling construction - Google Patents

Out-flow gas collecting device for drilling construction Download PDF

Info

Publication number
CN203161287U
CN203161287U CN 201320185938 CN201320185938U CN203161287U CN 203161287 U CN203161287 U CN 203161287U CN 201320185938 CN201320185938 CN 201320185938 CN 201320185938 U CN201320185938 U CN 201320185938U CN 203161287 U CN203161287 U CN 203161287U
Authority
CN
China
Prior art keywords
gas
pipe
drilling
seal
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320185938
Other languages
Chinese (zh)
Inventor
蔡明�
李秀山
韩枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuangyashan City Jichang Machinery Manufacturing Co Ltd
Original Assignee
Shuangyashan City Jichang Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuangyashan City Jichang Machinery Manufacturing Co Ltd filed Critical Shuangyashan City Jichang Machinery Manufacturing Co Ltd
Priority to CN 201320185938 priority Critical patent/CN203161287U/en
Application granted granted Critical
Publication of CN203161287U publication Critical patent/CN203161287U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

An out-flow gas collecting device for drilling construction comprises a sealed drilling sleeve, a gas, water and slag discharge component, a follow-up sealing component, a gas collecting component and a connecting pipe. The sealed drilling sleeve and the follow-up sealing component are fixedly matched with two ends of the gas, water and slag discharge component, and the connecting pipe is arranged between the gas, water and slag discharge component and the gas collecting component. By the aid of the out-flow gas collecting device for drilling construction, high-pressure gas or water is not needed to be injected during drilling by a drilling machine, and the drilling machine can operate continuously at normal pressure state, the follow-up sealing component can rotationally seal along with a drill rod, gas, water and slag discharged from drilled holes can be ensured to be in a closed cavity, the gas can be extracted by negative pressure of a coal mine gas extraction system, and the slag and water can flow out under the action of gravity. Drilling is safe and reliable, safety potential hazards are eliminated, drilling construction can be continuously performed and average drilling speed is greatly increased.

Description

The drilling construction gas gathering-device of gushing out
Technical field
The utility model relates to the coal mining technical field, especially a kind of drilling construction gas gathering-device of gushing out.
Background technology
In mine coal mining engineering, for ensuring safety in production, must drill in advance before the tunnelling construction, verify front geological, the hydrology, gas situation.In mine producing, gas tax amount in the coal seam is deposited overproof, must draw out methane earlier, just allow exploitation then.Boring is a large amount of, basic, basic engineering measure.
Implement drilling construction, generally the equipment of Shi Yonging is underground drill rig.Drilling construction process when this device is used for the underground drill rig drilling construction, the time have gas from the boring of creeping into, to gush out, local space formation gas density exceeds standard near boring, run into gas sharply diffusion naturally of ejection suddenly from boring sometimes, form gas concentration over-standard in a certain spatial dimension.The gas no-console condition spreads naturally very easily to form and has the interval of gas explosion concentration, thereby brings major safety risks to production.Therefore, in case gas is gushed out, underground drill rig must be shut down wait, treats that ventilation system drops to gas density could continue below the safety standard to creep into.At present the gas that utilizes the tunnel exhaust system that the occurs gathering-device of gushing out adopts and injects gases at high pressure or water under high pressure Expansion sealing body or capsule shutoff boring, owing to must inject the technical requirements that gases at high pressure or water under high pressure could be realized shutoff boring, make that its device volume is big, complex structure, capsule shutoff boring does not reach the plugging effect of later stage requirement of engineering.
Summary of the invention
In order to overcome the deficiency that prior art exists, the utility model provides a kind of drilling construction gas gathering-device of gushing out, this device not only can gather up the gas of gushing out from boring, gas sharply ejection suddenly in the buffering boring, gas by mine is taken out, exhaust system is discharged gas, slag, the water that can get rid of drilling construction, and rig is continuous operation under atmospheric pressure state.
The utility model has solved the technical scheme that the deficiencies in the prior art take, comprising boring seal nested, exhaust grain slag assembly, the Follow-up seal assembly, the gas collection assembly, gas collection assembly seat, tube connector, it is characterized in that: cooperate the fixing boring that has to seal nested and the Follow-up seal assembly with exhaust grain slag assembly two ends, between exhaust grain slag assembly and gas collection assembly tube connector is arranged, the gas collection assembly cooperates fixing with gas collection assembly seat, described exhaust grain slag assembly comprises the drilling rod guide thimble, draining slag pipe, the methane gas delivery line, wherein, drilling rod guide thimble one end has flange, the other end is bigger diameter end, flange is arranged on the bigger diameter end, methane gas delivery line and deslagging water pipe cooperate solid welding with the drilling rod guide thimble respectively, and communicate with drilling rod guide pin bushing internal diameter, on the methane gas delivery line flange is arranged, described Follow-up seal assembly comprises seal, bearing and sealing ring, gland, wherein, there is bearing cup at the seal two ends, what cooperate with bearing cup has a bearing, the sealing ring external diameter cooperates with bearing inner ring, internal diameter of the seal ring and drilling rod fitted seal, with seal, bearing and sealing ring cooperate the fixing gland that has, the seal external diameter has flange, described gas collection assembly comprises jar, the flexible pipe pipe connects, the sediment discharge pipe, float valve, the gas-water separation dividing plate, pump drainage methane pipe connects, observation port, wherein, constitute Device in Gas body cavity and grain slag precipitation chamber with cooperating the fixing gas-water separation dividing plate that has in the tank inner chamber, there is a pump drainage methane pipe to connect in the Device in Gas body cavity, pump drainage methane pipe has connected flange, one observation port is arranged on the tank body, float valve comprises leading truck, ball float and sealed tube, leading truck cooperates fixing with bottom, grain slag precipitation chamber, ball float and sealed tube are one, the sealed tube lower end is hemispherical end, and ball float and leading truck are slidingly matched, there is the flexible pipe pipe to connect on the tank body, cooperating with grain slag precipitation chamber fixing have the sediment discharge pipe and communicates with tank inner chamber, the big face of gas-water separation dividing plate in the described tank body has an air inlet port, it is a steel pipe that described boring is sealed nested, one end has flange, described tube connector is a flexible pipe, it comprises two tube connector joints, and wherein two tube connector joint one ends have flange.
The beneficial effects of the utility model are: this drilling construction gas gathering-device of gushing out, when holing, rig need not inject gases at high pressure or water under high pressure, rig continuous operation under atmospheric pressure state, the Follow-up seal assembly is with the drilling rod rotary seal, guarantee that the interior methane gas of discharging of boring and water, slag are in airtight cavity, gas is extracted out by mine pump drainage gas train negative pressure, and slag, water flow out under the gravity effect.Bore operation safety, reliable has been removed potential safety hazard, has guaranteed that the drilling construction operation normally carries out continuously, increases substantially the boring average advance.
Description of drawings:
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is the utility model structure chart;
Fig. 2 is the utility model exhaust grain slag assembly assumption diagram;
Fig. 3 is the utility model Follow-up seal assembly assumption diagram;
Fig. 4 is the utility model exhaust grain slag assembly assumption diagram;
Fig. 5 is the utility model gas-water separation diaphragm structure figure.
The specific embodiment
The specific embodiment of the present utility model is, with reference to Fig. 1, comprising holes seals nested 2, exhaust grain slag assembly 4, Follow-up seal assembly 24, gas collection assembly 12, gas collection assembly seat 18, tube connector 7, wherein, cooperating with exhaust grain slag assembly 4 two ends fixing has boring to seal nested 2 and Follow-up seal assembly 24,12 of exhaust grain slag assembly 4 and gas collection assemblies have tube connector 7, gas collection assembly 12 cooperates fixing with gas collection assembly seat 18, with reference to Fig. 2, described exhaust grain slag assembly 4 comprises drilling rod guide thimble 26, draining slag pipe 31, methane gas delivery line 27, wherein, drilling rod guide thimble 26 1 ends have flange 25, the other end is bigger diameter end 29, flange 30 is arranged on the bigger diameter end 29, methane gas delivery line 27 and deslagging water pipe 31 cooperate solid welding with drilling rod guide thimble 26 respectively, and communicate with drilling rod guide pin bushing 26 internal diameters, flange 28 is arranged on the methane gas delivery line 27, with reference to Fig. 3, described Follow-up seal assembly 24 comprises seal 36, bearing 33,37 and sealing ring 34,39, gland 32,38, wherein there is bearing cup at seal 36 two ends, what cooperate with bearing cup has a bearing 33,37, sealing ring 34,39 external diameters and bearing 33, ring cooperates in 37, sealing ring 34,39 internal diameters and drilling rod 23 fitted seal, with seal 36, bearing 33,37 and sealing ring 34,39 cooperate the fixing gland 32 that has, 38, seal 35 external diameters have flange 35, with reference to Fig. 1, Fig. 4, described gas collection assembly 12 comprises jar 40, the flexible pipe pipe connects 11, sediment discharge pipe 43, float valve, gas-water separation dividing plate 14, pump drainage methane pipe connects 16, observation port 13, wherein, constitute Device in Gas body cavity 17 and grain slag precipitation chamber 21 with cooperating the fixing gas-water separation dividing plate 14 that has in tank body 40 inner chambers, have a pump drainage methane pipe to connect 16 in the Device in Gas body cavity 17, pump drainage methane pipe connects flange 15 on 16, one observation port 13 is arranged on the tank body 40, float valve comprises leading truck 41, ball float 19 and sealed tube 42, leading truck 41 cooperates fixing with grain slag precipitation 21 bottoms, chamber, and ball float 19 and sealed tube 42 are one, sealed tube 42 lower ends are hemispherical end 43, and ball float 19 is slidingly matched with leading truck 41, has the flexible pipe pipe to connect 11 on the tank body 40, and cooperating with grain slag precipitation chamber 21 fixing have sediment discharge pipe 20 and communicate with tank body 40 inner chambers, with reference to Fig. 5, gas-water separation dividing plate 14 big faces in the described tank body 40 have an air inlet port 44, and with reference to Fig. 1, it is a steel pipe that described boring seals nested 2, one end has flange 3, with reference to Fig. 1, described tube connector 7 is a flexible pipe, and it comprises two tube connector joints 5,9, two tube connector joints 5 wherein, 9 one ends have flange 6,10, the described drilling construction gas gathering-device of gushing out is achieved in that with reference to Fig. 1 and at first gets out one section greater than the counterbore of normal bore diameter in rib 1 drill hole, boring is sealed nested 2 embed sealing and fixing in the counterbores, with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, drilling rod guide pin bushing 26 in the exhaust grain slag assembly 4 seals embedding with boring, 2 flange 3,25 cooperations are fixing, and Follow-up seal assembly 24 external diameters cooperate flange 30 with drilling rod guide pin bushing 26 bigger diameter ends 29 internal diameters, 35 cooperations are fixing, and the sealing ring 34 in the drilling rod on the rig 22 23 and the Follow-up seal assembly, 39 internal diameters, drilling rod guide pin bushing 26 internal diameters, boring is sealed nested 2 internal diameters and is cooperated, tube connector joint 5 on tube connector 7 two ends, flange 6 on 9,10 respectively with exhaust grain slag assembly 4 in gas delivery line 27 on flange 28 and the flange 11 that connects of the flexible pipe pipe in the gas collection assembly 12 cooperate fixing, pump drainage methane pipe in the gas collection assembly 12 connects 16 and is connected with mine gas exhaust system interface, and drilling rod 23 cooperates fixing with dop 8 on the rig, install this device after, in normal bore operation, with reference to Fig. 1, the sealing ring 34 of Fig. 2 in Follow-up seal assembly 24, under the effect of 39 internal diameters and drilling rod 23 fitted seal, sealing ring 34,39 along with drilling rod 23 rotates, and its anti-water that goes out seals nested 2 internal diameters and drilling rod guide pin bushing 26 internal diameters with slag by boring, discharge through draining slag pipe 31, in a single day when gushing out methane gas in the boring, under system's negative pressure sucking-off effect, methane gas seals nested 2 internal diameters and drilling rod guide pin bushing 26 internal diameters with grain slag going along with by boring, gas delivery line 27 in exhaust grain slag assembly 4, in the tank body 40 that tube connector 7 imports in the gas collection assembly 12, at this moment methane gas enters the Device in Gas body cavity 17 in the tank body 40, and grain slag enters grain slag precipitation chamber 21, and methane gas connects 16 through pump drainage methane pipe and discharged by the mine gas exhaust system, ball float 19 when the water in the grain slag precipitation chamber 17 reaches predetermined water level in the float valve and sealed tube 42 are prolonging leading truck 41 and are upwards floating, grain slag is discharged through sediment discharge pipe 20, finishes ball float 19 and sealed tube 42 whereabouts when racking up along with water level decline grain slag, and at this moment the hemispherical end 43 of sealed tube 42 lower ends cooperates shutoff to close float valve with sediment discharge pipe 20.

Claims (7)

1. drilling construction gas gathering-device of gushing out, comprising that boring seals nested, exhaust grain slag assembly, Follow-up seal assembly, gas collection assembly, gas collection assembly seat, tube connector, it is characterized in that: cooperate the fixing boring that has to seal nested and the Follow-up seal assembly with exhaust grain slag assembly two ends, between exhaust grain slag assembly and gas collection assembly tube connector is arranged, the gas collection assembly cooperates fixing with gas collection assembly seat.
2. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: described exhaust grain slag assembly comprises drilling rod guide thimble, draining slag pipe, methane gas delivery line, wherein, drilling rod guide thimble one end has flange, the other end is bigger diameter end, and flange is arranged on the bigger diameter end, and methane gas delivery line and deslagging water pipe cooperate solid welding with the drilling rod guide thimble respectively, and communicate with drilling rod guide pin bushing internal diameter, on the methane gas delivery line flange is arranged.
3. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: described Follow-up seal assembly comprises seal, bearing and sealing ring, gland, wherein, there is bearing cup at the seal two ends, what cooperate with bearing cup has a bearing, and the sealing ring external diameter cooperates with bearing inner ring, internal diameter of the seal ring and drilling rod fitted seal, cooperate the fixing gland that has with seal, bearing and sealing ring, the seal external diameter has flange.
4. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: described gas collection assembly comprises jar, the flexible pipe pipe connects, the sediment discharge pipe, float valve, the gas-water separation dividing plate, pump drainage methane pipe connects, observation port, wherein, constitute Device in Gas body cavity and grain slag precipitation chamber with cooperating the fixing gas-water separation dividing plate that has in the tank inner chamber, there is a pump drainage methane pipe to connect in the Device in Gas body cavity, pump drainage methane pipe has connected flange, one observation port is arranged on the tank body, float valve comprises leading truck, ball float and sealed tube, leading truck cooperates fixing with bottom, grain slag precipitation chamber, ball float and sealed tube are one, the sealed tube lower end is hemispherical end, and ball float and leading truck are slidingly matched, and have the flexible pipe pipe to connect on the tank body, and cooperating with grain slag precipitation chamber fixing have the sediment discharge pipe and communicate with tank inner chamber.
5. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: the big face of gas-water separation dividing plate in the described tank body has an air inlet port.
6. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: it is a steel pipe that described boring is sealed nested, and an end has flange.
7. a kind of drilling construction gas according to claim 1 gathering-device of gushing out, it is characterized in that: described tube connector is a flexible pipe, and it comprises two tube connector joints, and wherein two tube connector joint one ends have flange.
CN 201320185938 2013-04-15 2013-04-15 Out-flow gas collecting device for drilling construction Expired - Fee Related CN203161287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320185938 CN203161287U (en) 2013-04-15 2013-04-15 Out-flow gas collecting device for drilling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320185938 CN203161287U (en) 2013-04-15 2013-04-15 Out-flow gas collecting device for drilling construction

Publications (1)

Publication Number Publication Date
CN203161287U true CN203161287U (en) 2013-08-28

Family

ID=49022479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320185938 Expired - Fee Related CN203161287U (en) 2013-04-15 2013-04-15 Out-flow gas collecting device for drilling construction

Country Status (1)

Country Link
CN (1) CN203161287U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195470A (en) * 2013-04-15 2013-07-10 双鸭山市吉昌机械制造有限公司 Gas discharge collecting device for drilling construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195470A (en) * 2013-04-15 2013-07-10 双鸭山市吉昌机械制造有限公司 Gas discharge collecting device for drilling construction
CN103195470B (en) * 2013-04-15 2015-12-09 双鸭山市吉昌机械制造有限公司 Drilling construction Gas gathering-device

Similar Documents

Publication Publication Date Title
CN103306657B (en) A kind of coal seam cutting release is anti-reflection and slot holding device and method
CN103195470B (en) Drilling construction Gas gathering-device
CN103277129B (en) One prevents Top Corner Gas on Coal Face to transfinite technology
CN101915086B (en) Coal mine underground gas borehole fracturing method
CN101775975A (en) Method for exploiting coal bed gas by hydraulic drilling and pressure relieving
CN106761584A (en) Abandoned mine goaf coal bed gas ground discharge and mining method under a kind of aqueous conditions
CN106703871A (en) Method of using high-pressure water injection to prevent and treat gas coal dust
CN105507940A (en) Slotting, plugging and fracturing integrated type intensified marsh gas extraction device and method
CN205047207U (en) Colliery binary channels segmentation in pit hydraulic fracturing device
CN104696006B (en) Ground drilling penetrates the method for abandoned coal pillar extraction multilamellar old dead zone remnants coal bed gas
CN105697053A (en) Pumping and pressing hybrid gas extraction downward drilling and water draining device
CN104295263A (en) Radial hole sealing device for drill holes for exhausting coal bed gas
CN210269442U (en) Triaxial coal petrography multi-field multiphase coupling fracturing experimental apparatus
CN204754895U (en) Device is adopted to colliery slot of pulse water conservancy in pit - anti -reflection taking out of fracturing integration
CN106930746A (en) The alternative expression coal seam anti-reflection method that drilling acetone invasion and attack are combined with hydraulic fracturing
CN103912304A (en) Method for locally extracting gas of soft coal seams
CN102787833A (en) Hydraulic fracturing surging method for bedrock well and system device thereof
CN104612748A (en) Coal-mass gas extraction method and device
CN203161287U (en) Out-flow gas collecting device for drilling construction
CN102865104A (en) Downward extraction drilling drainage device
CN102966376B (en) Vacuum negative pressure quick unwatering method for ore body
CN202851052U (en) A delay self-expanding capsule and paste body combination hole sealing device for drilled holes of gas extraction
CN203685288U (en) Underground coal mine water exploration drilling water control device
CN204040999U (en) A kind of hole diameter for coal-bed gas pump drainage is to hole packer
CN201696048U (en) Coal seam gob fracture zone water-injection observation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20160415