CN103643683B - 一种堆筑子坝连续作业的方法 - Google Patents

一种堆筑子坝连续作业的方法 Download PDF

Info

Publication number
CN103643683B
CN103643683B CN201310615312.9A CN201310615312A CN103643683B CN 103643683 B CN103643683 B CN 103643683B CN 201310615312 A CN201310615312 A CN 201310615312A CN 103643683 B CN103643683 B CN 103643683B
Authority
CN
China
Prior art keywords
dam
sub
ore drawing
tailings
heap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310615312.9A
Other languages
English (en)
Other versions
CN103643683A (zh
Inventor
杨忠权
宋通泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wengfu Group Co Ltd
Original Assignee
Wengfu Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wengfu Group Co Ltd filed Critical Wengfu Group Co Ltd
Priority to CN201310615312.9A priority Critical patent/CN103643683B/zh
Publication of CN103643683A publication Critical patent/CN103643683A/zh
Application granted granted Critical
Publication of CN103643683B publication Critical patent/CN103643683B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种堆筑子坝连续作业的方法,该方法包括下列步骤:(一)、向库区里移动坝上放矿主管;(二)、取尾砂作堆筑材料,用挖机沿坝体堆筑子坝,放矿主管的放矿支管口低于堆筑子坝坝顶,分段堆筑子坝完成后,就可以开启对应段放矿支管阀门进行放矿;(三)、当放矿主管被尾矿浆淹没一半时,用挖机吊高放矿主管;(四)、在子坝体加高达到某高度时,取矿尾砂沿坝体内缘堆筑形成一道反坡,然后再向尾砂填满坝的坝顶外边缘向库区里移动移动放矿主管;一直向上堆筑到尾矿库设计的尾砂堆筑子坝高程。本方法施工移动坝上放矿管方便,筑坝子坝快捷可靠,坝体稳定性好,大大缩短施工建设周期,可操作性很强。适用于尾矿堆积坝的应用。

Description

一种堆筑子坝连续作业的方法
技术领域
本发明涉及尾矿库的堆筑施工建设,进一步来说,涉及一种堆筑子坝连续作业的方法。
背景技术
尾矿库坝体使用一段时间后,随着尾矿数量增多,需定期向上堆筑子坝,增加库容。现有技术尾矿库子坝的筑坝方法,工艺复杂,资金投入大,需用设备多,且施工难度大,尤其是放矿与筑坝工作不能连续作业。如某选矿厂尾矿库原来采用先将放矿主管分段拆卸后移走,提供可供作业的空间和平台,然后再用尾砂堆筑子坝的方法,向上堆筑到设计的高程。该方法工艺复杂,尾矿浆易流出坝外,造成环境污染;放矿主管移动难度大、选矿设备停运周期长达两周以上,按日产值500万元计算,企业直接经济损失高达7000万元;堆筑子坝坝体稳定性差、放矿与筑坝工作不能连续作业;尾矿工巡管劳动强度大、施工工程量大。
为解决这一技术难题,提出了一种新的坝上放矿主管移动方式与尾砂堆筑子坝连续生产运行方法。经检索,没有相关的报道。
发明内容
本发明的目的在于克服现有技术的缺陷,提供简单、实用、有效的一种堆筑子坝连续作业的方法,以增加库容,使施工方便快捷可靠,大大节约施工建设费用。
本发明的一种堆筑子坝连续作业的方法,该方法包括下列步骤:
(一)、从尾砂填满坝的坝顶外边缘向库区里移动坝上放矿主管,移动距离为3-12米;
(二)、在移动好的坝上放矿主管里面取浓度大的粗粒级沉矿尾砂作堆筑材料,用挖机沿坝体堆筑子坝,每期放取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,并保持坝上放矿主管的放矿支管口始终低于堆筑子坝坝顶0.1-0.2米,分段堆筑子坝完成后,就可以开启对应段放矿支管阀门进行放矿;
(三)、在放尾矿充填期间,当放矿主管被尾矿浆淹没一半时,用挖机吊高放矿主管,每次吊高放矿主管0.2-0.8米,防止放矿主管被尾矿浆淹没吊不动;在放矿充填期间,要不断地取放矿主管里的尾砂加高堆筑子坝体;
(四)、考虑尾砂沉降因素,在子坝体加高达到某高度时,还用挖机取尾砂沿坝体内缘堆筑形成一道反坡以阻止尾矿浆外泄、渗漏,造成环境污染;每期堆筑子坝完成后再从尾砂填满坝的坝顶外边缘向库区里移动放矿主管,移动距离为3-12米,在移动好的坝上放矿主管里取尾砂堆筑子坝,每期取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,一直向上堆筑到尾矿库设计的尾砂堆筑子坝高程。
本方法施工移动坝上放矿主管方便,筑坝子坝快捷可靠,坝体稳定性好,大大缩短施工建设周期,可操作性很强。
本发明方法适用于尾矿堆积坝的应用。
具体实施方式
下面结合实施例对本发明作进一步说明。
实施例:
某有限责任公司磷矿选矿厂尾矿库子坝采用本发明堆筑子坝,第一步是先从尾砂填满坝的坝顶外边缘向库区里移动坝上放矿主管,距离为3-12米;第二步是在移动好的坝上放矿主管里面取尾砂堆筑子坝,用挖机沿坝体堆筑子坝,每期取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,保持坝上放矿主管的放矿支管口始终低于堆筑子坝坝顶0.1-0.2米,分段堆筑子坝完成后,就可以开启对应段放矿支管阀门进行放矿,在取尾砂堆筑子坝期间不会影响坝上放矿主管的正常放矿;第三步是在堆筑好的子坝内放尾矿充填期间,当放矿主管被尾矿浆淹没一半时,用挖机吊高放矿主管,每次吊高放矿主管0.2-0.8米,防止放矿主管被尾矿浆淹没吊不动;在放矿充填期间,要不断地取放矿主管里的尾砂加高堆筑子坝体;第四步是在子坝体加高达到某高度时,视坝体情况,还用挖机取矿尾砂沿坝体内缘堆筑形成一道反坡以阻止尾矿浆外泄、渗漏,造成环境污染;每期堆筑子坝完成后再从尾砂填满坝的坝顶外边缘向库区里移动放矿主管,移动距离为3-12米,在移动好的坝上放矿主管里取尾砂堆筑子坝,每期取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,一直向上堆筑到尾矿库设计的尾砂堆筑子坝高程。
采用本发明后:一是尾砂堆筑子坝体高于坝上放矿支管口0.1-0.2米,杜绝了尾矿浆外流冲刷坝体;二是堆筑子坝体得到挖机不断的碾压,施工快捷可靠,提高了尾砂堆筑子坝体的稳定性;三是坝上放矿主管移动方便;四是大大缩短施工建设周期,可操作性很强;五是筑坝期间不影响正常的尾矿浆坝前放矿;六是节约了坝上放矿管拆装费用。采用了本发明方法,尾砂筑坝体稳定性好,筑坝体施工快捷可靠,坝上放矿主管移动方便,尾矿浆不会流出坝外冲坏坝体,筑坝期间不会影响坝前尾矿浆的正常放矿,生产运行及生产管理完全满足尾矿库相关规范的要求。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,任何未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (1)

1.一种堆筑子坝连续作业的方法, 该方法包括下列步骤:
(一)、从尾砂填满坝的坝顶外边缘向库区里移动坝上放矿主管,移动距离为3-12米;
(二)、在移动好的坝上放矿主管里面取浓度大的粗粒级沉矿尾砂作堆筑材料,用挖机沿坝体堆筑子坝,每期放取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,并保持坝上放矿主管的放矿支管口始终低于堆筑子坝坝顶0.1-0.2米,分段堆筑子坝完成后,就可以开启对应段放矿支管阀门进行放矿;
(三)、在放尾矿充填期间,当放矿主管被尾矿浆淹没一半时,用挖机吊高放矿主管,每次吊高放矿主管0.2-0.8米,防止放矿主管被尾矿浆淹没吊不动;在放矿充填期间,要不断地取放矿主管里的尾砂加高堆筑子坝体;
(四)、考虑尾砂沉降因素,在子坝体加高达到某高度时,还用挖机取尾砂沿坝体内缘堆筑形成一道反坡以阻止尾矿浆外泄、渗漏,造成环境污染;每期堆筑子坝完成后再从尾砂填满坝的坝顶外边缘向库区里移动放矿主管,移动距离为3-12米,在移动好的坝上放矿主管里取尾砂堆筑子坝,每期取尾砂堆筑子坝宽度为3-5米,高度为0.3-1.3米,一直向上堆筑到尾矿库设计的尾砂堆筑子坝高程。
CN201310615312.9A 2013-11-28 2013-11-28 一种堆筑子坝连续作业的方法 Active CN103643683B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310615312.9A CN103643683B (zh) 2013-11-28 2013-11-28 一种堆筑子坝连续作业的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310615312.9A CN103643683B (zh) 2013-11-28 2013-11-28 一种堆筑子坝连续作业的方法

Publications (2)

Publication Number Publication Date
CN103643683A CN103643683A (zh) 2014-03-19
CN103643683B true CN103643683B (zh) 2015-05-06

Family

ID=50248961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310615312.9A Active CN103643683B (zh) 2013-11-28 2013-11-28 一种堆筑子坝连续作业的方法

Country Status (1)

Country Link
CN (1) CN103643683B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104711990B (zh) * 2015-01-28 2016-08-17 中冶京诚(秦皇岛)工程技术有限公司 提高尾矿库库容利用率的放矿方法
CN106284373B (zh) * 2016-08-30 2018-10-09 金堆城钼业股份有限公司 一种尾矿库的建造方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1627406A1 (ru) * 1988-11-28 1991-02-15 Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу Способ складировани отходов обогащени
SU1666609A1 (ru) * 1989-07-14 1991-07-30 Всесоюзный научно-исследовательский институт гидротехники им.Б.Е.Веденеева Способ получени мелиорантов из отходов производства в процессе намыва
CN1356436A (zh) * 2001-12-24 2002-07-03 王柏纯 尾矿库固定轴线筑坝法扩容工艺
CN101660301A (zh) * 2009-09-09 2010-03-03 中国瑞林工程技术有限公司 一种阶梯式尾矿库排洪方法
CN102493399A (zh) * 2011-12-01 2012-06-13 中钢集团马鞍山矿山研究院有限公司 一种尾矿干堆工艺新方法
CN202627002U (zh) * 2012-03-29 2012-12-26 中国十九冶集团有限公司 用于截河型尾矿库涌水地段的尾矿坝

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1627406A1 (ru) * 1988-11-28 1991-02-15 Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу Способ складировани отходов обогащени
SU1666609A1 (ru) * 1989-07-14 1991-07-30 Всесоюзный научно-исследовательский институт гидротехники им.Б.Е.Веденеева Способ получени мелиорантов из отходов производства в процессе намыва
CN1356436A (zh) * 2001-12-24 2002-07-03 王柏纯 尾矿库固定轴线筑坝法扩容工艺
CN101660301A (zh) * 2009-09-09 2010-03-03 中国瑞林工程技术有限公司 一种阶梯式尾矿库排洪方法
CN102493399A (zh) * 2011-12-01 2012-06-13 中钢集团马鞍山矿山研究院有限公司 一种尾矿干堆工艺新方法
CN202627002U (zh) * 2012-03-29 2012-12-26 中国十九冶集团有限公司 用于截河型尾矿库涌水地段的尾矿坝

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
八钢尾矿库子坝的堆筑及库区环保状况评估;王维全;《新疆钢铁》;20000930(第3期);第21-22、28页 *

Also Published As

Publication number Publication date
CN103643683A (zh) 2014-03-19

Similar Documents

Publication Publication Date Title
CN203174616U (zh) 一种粘土地基降水节水系统
CN102704872B (zh) 气举反循环泥浆循环系统
CN104631475A (zh) 一种下穿河流浅埋暗挖隧道的安全快速施工方法
CN104612179B (zh) 贯穿超厚粉砂层的地下连续墙的施工方法
CN103114599A (zh) 深基坑封闭降水装置及其施工方法
CN103615042A (zh) 一种横纵竖三向网络式排渗装置
CN103643683B (zh) 一种堆筑子坝连续作业的方法
CN102912789B (zh) 喀斯特地貌下机械成孔方法
CN204676488U (zh) 一种新型的挡墙反滤排水结构
CN106759265A (zh) 一种填充混凝土的地下连续墙、其钢制结构以及其施工方法
CN204059366U (zh) 一种深基坑内侧堵漏的倾斜式高压旋喷桩
CN103290804B (zh) 导流泄水建筑物下闸后提供下游生态流量的方法及结构
CN203007961U (zh) 石笼围堰结构
CN108316259A (zh) 导流隧洞单设临时堵头联合闸门下闸封堵布置及方法
CN103790223B (zh) 一种岩溶洼地排水系统
CN105569062A (zh) 渗透弱化减排降水法
CN206512759U (zh) 一种预埋可重复注浆管的地连墙g型接头
CN203113361U (zh) 深基坑封闭降水装置
CN206279523U (zh) 一种地下连续墙及其钢制结构
CN108316236B (zh) 一种围垦工程中适用于大潮差的堤坝及其多龙口合龙方法
CN202323899U (zh) 一种用于导流洞地下闸室群的布置结构
CN204456055U (zh) 一种围堤地基加固结构设施
CN206800351U (zh) 一种尾矿库排洪涵洞
CN109610412B (zh) 一种岩溶地区地下暗河封堵结构及封堵方法
CN204715318U (zh) 一种山体内导流洞闸门井结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 550500 Guizhou Province, Qiannan Buyei and Miao Autonomous Prefecture Fuquan Racecourse town Yingbin Road No. 1 Wengfu group

Patentee after: WENGFU GROUP Co.,Ltd.

Address before: 23, 550002 floor, International Building, No. 57, South City Road, Nanming District, Guiyang, Guizhou

Patentee before: WENGFU GROUP Co.,Ltd.

CP02 Change in the address of a patent holder