CN103643680A - Emulsified asphalt grouting process - Google Patents
Emulsified asphalt grouting process Download PDFInfo
- Publication number
- CN103643680A CN103643680A CN201310667524.1A CN201310667524A CN103643680A CN 103643680 A CN103643680 A CN 103643680A CN 201310667524 A CN201310667524 A CN 201310667524A CN 103643680 A CN103643680 A CN 103643680A
- Authority
- CN
- China
- Prior art keywords
- grouting
- mulseal
- pressure
- injected
- cement paste
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Provided is an emulsified asphalt grouting process. The grouting process includes the following steps that (1) grouting holes are dug in an object region; (2) emulsified asphalt and demulsifying agents are injected into the object region through the grouting holes via a double-liquid grouting pump, grouting pressure of the double-liquid grouting pump should be controlled to be 1.2-1.5 times that of stratum water pressure, the mass ratio of the emulsified asphalt to the demulsifying agents is 1: (0.6-1.2), and the demulsifying agents are sodium carbonate solutions; (3) after demulsification is completed, cement paste is reinjected, wherein the cement paste is injected into the object region through the grouting pump via the grouting holes, reinjected grouting pressure should be controlled to be 1.5-2.0 times that of the stratum water pressure, and final pressure should be maintained by more than 30 minutes. According to the emulsified asphalt grouting process, good anti-permeability and water blocking effects are achieved, and meanwhile, cost is reduced.
Description
Technical field
The present invention relates to underground construction antiseepage water-plugging technique field, especially a kind of grouting process.
Background technology
Slurry injection technique is, by grouting pump, injecting paste material is injected to target area, reaches a comprehensive engineering of various engineering objectives such as strengthening target area engineering performance, antiseepage water blockoff.According to the difference of the equipment such as injecting paste material, slip casting target area and grouting pump, can derive a plurality of subitems.This invention mainly for adopting mulseal as main injecting paste material, reach underground construction antiseepage, new technology of water blockoff object.
In current engineering, also conventional common slurry injection technique reaches object impervious, water blockoff, conventional injecting paste material is cement paste merit cement-sodium silicate two liquid slurries, this grouting water blocking method can produce good initial stage effect, but due to the shrinkage character of cement paste and the hydrolysis properties of water glass, inevitably can make the anaphase effect variation of slip casting, in engineering, have to adopt the method for repeated multiple times slip casting, to reach impervious and water blockoff long-term effect preferably.
In engineering, also useful pitch grouting method solves the impervious of engineering and water blockoff problem, due to the good impervious and water plugging effect of bituminous material, tends to obtain good engineering effort.But due to bituminous material thermal plastic property, this slurry injection technique need special grouting pump, pipe and special heat, heat-insulation system, make whole activities become very complicated, and the required economic input of engineering is larger, therefore, this method is in the less employing of engineering.
Summary of the invention
In order to overcome the deficiency that can not take into account cost and impervious and water plugging effect of existing grouting method, the invention provides a kind of when thering is good impervious and water plugging effect, the mulseal grouting process reducing costs.
The technical solution adopted for the present invention to solve the technical problems is:
A mulseal grouting process, described grouting process comprises the following steps:
(1) in target area, beat injected hole;
(2) pass through Double-liquid mud-injection pump, mulseal and demulsifier are injected to target area by injected hole, the grouting pressure of described Double-liquid mud-injection pump should be controlled 1.2~1.5 times of stratum hydraulic pressure, and the mass ratio of described mulseal and demulsifier is 1:(0.6~1.2), described demulsifier is soda ash solution;
(3), after breakdown of emulsion completes, carry out the multiple note of cement paste: by grouting pump, cement paste is injected to target area by injected hole, the grouting pressure of multiple note should be controlled at 1.5~2.0 times of stratum hydraulic pressure, and should keep final pressure more than 30 minutes.
Further, in described step (2), the breakdown of emulsion time is 5~15 minutes.
Further, in described step (3), cement paste notes again with the time interval of Double-liquid mud-injection pump slip casting and can be 5 minutes~and 8 hours.
Further again, the mass percent of described soda ash solution is 0.5~20%, for example, can adopt 0.5% soda ash solution, 1% soda ash solution, 5% soda ash solution, 12% soda ash solution or 20% soda ash solution, and concentration is higher, and demulsification is better.
Technical conceive of the present invention is: the invention of this project still adopts plant equipment and the facility of light water mud slurry injection technique, adopt mulseal to replace protobitumen as main injecting paste material, in slip casting process, adopt the reduction technique of pitch, make mulseal when arriving target slip casting region, substantially complete reduction, by round-about way, realize protobitumen slip casting, to reach good grouting for water blocking effect.
Mulseal be a kind of by after protobitumen emulsification (adding emulsifier to produce by High Rotation Speed) for the material of road construction in winter, it can simplify the techniques such as protobitumen heating and thermal insulation, by cal rolling and natural photosynthesis, make it be reduced to protobitumen, mulseal is a kind of material that existing market can conveniently be purchased, and because processing technology is easier, price is not high yet.Main material using mulseal as slip casting, coming part to replace cement paste or cement-sodium silicate slurry is because mulseal has the good property noted, can directly utilize Double-liquid mud-injection pump that mulseal is injected to target area together with demulsifier (alkali), within the control time, make mulseal reduction.
Beneficial effect of the present invention is mainly manifested in: when having good impervious and water plugging effect, reduce costs.
Accompanying drawing explanation
Fig. 1 is the flow chart of mulseal grouting process process.
Fig. 2 is the schematic diagram of mulseal slip casting.
The specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
See figures.1.and.2, a kind of mulseal grouting process, described grouting process comprises the following steps:
(1) 6 dozens of injected holes in target area;
(2) by Double-liquid mud-injection pump 1, mulseal 3 and demulsifier 4 are injected to target area 6 by injected hole, the grouting pressure of described Double-liquid mud-injection pump 1 should be controlled 1.2~1.5 times of stratum hydraulic pressure, the mass ratio of described mulseal 3 and demulsifier 4 is 1:(0.6~1.2), described demulsifier 4 is soda ash solution;
(3) after breakdown of emulsion completes, be that mulseal 3 is reduced into after pitch 7, carry out the multiple note of cement paste 5: by grouting pump 2, cement paste 5 is injected to target area 6 by injected hole, the grouting pressure of multiple note should be controlled at 1.5~2.0 times of stratum hydraulic pressure, and should keep final pressure more than 30 minutes.
Further, in described step (2), the breakdown of emulsion time is 5~15 minutes.
Further, in described step (3), cement paste notes again with the time interval of Double-liquid mud-injection pump slip casting and can be 5 minutes~and 8 hours.
Further again, the mass percent of described soda ash solution is 0.5~20%, for example, can adopt 0.5% soda ash solution, 1% soda ash solution, 5% soda ash solution, 12% soda ash solution or 20% soda ash solution, and concentration is higher, and demulsification is better.
In the present embodiment, found out a kind of controlled breakdown of emulsion liquid, made mulseal can realize the reduction reaction of pitch when reaching slip casting target area.Through repetition test, find: aqueous slkali has demulsification, and can control by controlling the concentration of aqueous slkali the breakdown of emulsion process of mulseal, the i.e. time of mulseal reduction reaction.After mulseal mixes with soda ash solution, within 5~15 seconds, can realize basic reduction, this time can meet slurries in common engineering completely and from grouting pump, arrive the time of slip casting target area.The concentration of demulsifier is higher, the breakdown of emulsion time is shorter, the biliquid slurry grouting pressure of mulseal+demulsifier (generally can consider the proportioning of 1:1) should be controlled 1.2~1.5 times of stratum hydraulic pressure, the filling of biliquid slurry can utilize Double-liquid mud-injection pump conventional on market to realize, concrete grouting process is consistent with general two fluid grouting technique, just changes injecting paste material into mulseal and demulsifier.
In the present embodiment, after mulseal mixes with soda ash solution, within 5~15 seconds, pitch reduces substantially; The multiple note technique of filled with water mud after above-mentioned mulseal and breakdown of emulsion liquid two fluid grouting.The multiple note technique of filled with water mud can realize with common grouting pump conventional on market.Multiple cement injection has three effects, and the one, cement itself is basic matterial, can further reduce the pitch of mulseal; Another effect is that the relative mulseal denseness of cement paste is larger, can utilize cement and as-reduced pitch acting in conjunction, stops up larger water stream channel, further improves the effect of water blockoff; Also have one to be exactly to utilize higher cement paste grouting pressure, extrude the moisture that mulseal reduction reaction produces, and pitch and cement paste are clamp-oned to penetrating passage in the lump.The time of filled with water mud is controlled less demanding, can need to plant to a few hours somewhat with the last mulseal slip casting time interval according to concrete engineering.The grouting pressure of multiple note should be controlled at 1.5~2.0 times of stratum hydraulic pressure, and should keep final pressure more than 30 minutes.
Claims (4)
1. a mulseal grouting process, is characterized in that: described grouting process comprises the following steps:
(1) in target area, beat injected hole;
(2) pass through Double-liquid mud-injection pump, mulseal and demulsifier are injected to target area by injected hole, the grouting pressure of described Double-liquid mud-injection pump should be controlled 1.2~1.5 times of stratum hydraulic pressure, and the mass ratio of described mulseal and demulsifier is 1:(0.6~1.2), described demulsifier is soda ash solution;
(3), after breakdown of emulsion completes, carry out the multiple note of cement paste: by grouting pump, cement paste is injected to target area by injected hole, the grouting pressure of multiple note should be controlled at 1.5~2.0 times of stratum hydraulic pressure, and should keep final pressure more than 30 minutes.
2. a kind of mulseal grouting process as claimed in claim 1, is characterized in that: in described step (2), the breakdown of emulsion time is 5~15 minutes.
3. a kind of mulseal grouting process as claimed in claim 1, is characterized in that: in described step (3), it is 5 minutes~8 hours that cement paste is noted with the time interval of Double-liquid mud-injection pump slip casting again.
4. as a kind of mulseal grouting process of one of claim 1~3, it is characterized in that: the mass percent of described soda ash solution is 0.5~20%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310667524.1A CN103643680A (en) | 2013-12-10 | 2013-12-10 | Emulsified asphalt grouting process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310667524.1A CN103643680A (en) | 2013-12-10 | 2013-12-10 | Emulsified asphalt grouting process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103643680A true CN103643680A (en) | 2014-03-19 |
Family
ID=50248958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310667524.1A Pending CN103643680A (en) | 2013-12-10 | 2013-12-10 | Emulsified asphalt grouting process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103643680A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3252290A (en) * | 1961-10-27 | 1966-05-24 | Phillips Petroleum Co | Grouting of underwater formations |
CN1078759A (en) * | 1992-05-11 | 1993-11-24 | 水利部交通部能源部南京水利科学研究院 | Caulking technology with tarring |
JPH08296247A (en) * | 1995-04-26 | 1996-11-12 | Nisshin Kogyo Kk | Construction method for waterproofing of underground outer wall |
JP2002147198A (en) * | 2000-11-15 | 2002-05-22 | Sementetsukusu Corp:Kk | Leakage preventing method for tunnel |
CN102912795A (en) * | 2012-11-06 | 2013-02-06 | 中国水利水电科学研究院 | Device and method for stopping leakage by grouting low-heat asphalt |
CN102942338A (en) * | 2012-09-13 | 2013-02-27 | 中国水利水电科学研究院 | Low-heat asphalt for grouting plugging of large leakage quantity and high flow velocity karst and preparation method thereof |
-
2013
- 2013-12-10 CN CN201310667524.1A patent/CN103643680A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3252290A (en) * | 1961-10-27 | 1966-05-24 | Phillips Petroleum Co | Grouting of underwater formations |
CN1078759A (en) * | 1992-05-11 | 1993-11-24 | 水利部交通部能源部南京水利科学研究院 | Caulking technology with tarring |
JPH08296247A (en) * | 1995-04-26 | 1996-11-12 | Nisshin Kogyo Kk | Construction method for waterproofing of underground outer wall |
JP2002147198A (en) * | 2000-11-15 | 2002-05-22 | Sementetsukusu Corp:Kk | Leakage preventing method for tunnel |
CN102942338A (en) * | 2012-09-13 | 2013-02-27 | 中国水利水电科学研究院 | Low-heat asphalt for grouting plugging of large leakage quantity and high flow velocity karst and preparation method thereof |
CN102912795A (en) * | 2012-11-06 | 2013-02-06 | 中国水利水电科学研究院 | Device and method for stopping leakage by grouting low-heat asphalt |
Non-Patent Citations (2)
Title |
---|
刘靖宇等: "冻结滑动井壁壁间乳化沥青注浆技术", 《煤炭科学技术》 * |
闻庆权等: "乳化沥青在新型井壁夹层注浆中的应用", 《建井技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108729897B (en) | A kind of carbon dioxide-slippery water batch-mixed fracturing design method | |
CN102562012B (en) | Method for improving recovery ratio of water-flooding developed common heavy oil reservoir | |
CN106703752B (en) | A kind of system enclosure method for oil shale underground in situ exploitation | |
CN105626006A (en) | CO2 drive technological limit well spacing determination method for low-permeability oil reservoir | |
CN102504777B (en) | Delaying cross-linking polymer hard-gel in-depth profile controlling agent and preparation method thereof | |
CN105422068A (en) | Method for developing heavy oil reservoir by combining staged volume fracturing and fracturing filling of horizontal well | |
CN202560157U (en) | Grouting device | |
CN103114835B (en) | A kind of nitrogen assists viscous crude stratum reducing viscosity by emulsifying exploitation method | |
CN103410486B (en) | A kind of three-in-one compound displacement technique for oil field deep transfer drive | |
CN104176976B (en) | Antifriction mud and preparation method and grouting construction method that large Cross-Section Rectangular push pipe is used | |
CN102619492A (en) | Polymer flooding alternate injection method for heterogeneous reservoir | |
CN103541705A (en) | High-temperature blocking and adjusting device and method for super-heavy oil reservoir steam flooding | |
CN102733821A (en) | Secondary double-liquid slurry re-grouting method capable of effectively controlling surface deformation | |
CN101139920A (en) | Dibasic composite horizontal well bottom water plugging technique | |
CN102926701B (en) | Continuous mixed type water plugging process method | |
CN102392626A (en) | Method for exploiting thick-layer heavy oil reservoir by in situ combustion assisted gravity drainage | |
CN104870744A (en) | Process for producing oil | |
Cao et al. | Effect and mechanism of combined operation of profile modification and water shutoff with in-depth displacement in high-heterogeneity oil reservoirs | |
CN104099074A (en) | Volume fracturing reconstruction crack plugging agent and water plugging construction method | |
CN103628846A (en) | Method for improving CO2 displacement efficiency of low-permeability reservoir | |
CN109723423A (en) | It is a kind of to utilize the up-front compound acid fracturing method of phase-change material supporting crack | |
CN104399740B (en) | A kind of horizontal sealing Rotating fields and its method for contaminated soil remediation | |
CN110318725B (en) | Method for improving geothermal reservoir | |
CN102020982B (en) | Multiple-effect viscosity depressant for exploiting thickened oil | |
CN103422842A (en) | Oil well plugging, adjusting and washing process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140319 |