CN103639974A - Assembling tool used for rubber pipe installation on steel pipe - Google Patents

Assembling tool used for rubber pipe installation on steel pipe Download PDF

Info

Publication number
CN103639974A
CN103639974A CN201310634576.9A CN201310634576A CN103639974A CN 103639974 A CN103639974 A CN 103639974A CN 201310634576 A CN201310634576 A CN 201310634576A CN 103639974 A CN103639974 A CN 103639974A
Authority
CN
China
Prior art keywords
steel pipe
sebific duct
block
fixture block
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310634576.9A
Other languages
Chinese (zh)
Other versions
CN103639974B (en
Inventor
王彩英
滕传翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHU TONGHE AUTOMOBILE FLUID SYSTEM CO., LTD.
Original Assignee
Wuhu Tonhe Automobile Fluid System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Tonhe Automobile Fluid System Co Ltd filed Critical Wuhu Tonhe Automobile Fluid System Co Ltd
Priority to CN201310634576.9A priority Critical patent/CN103639974B/en
Publication of CN103639974A publication Critical patent/CN103639974A/en
Application granted granted Critical
Publication of CN103639974B publication Critical patent/CN103639974B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses an assembling tool used for rubber pipe installation on a steel pipe. The assembling tool used for rubber pipe installation on the steel pipe comprises a base, a rubber pipe fixing device used for fixing a rubber pipe, a steel pipe fixing device used for fixing a steel pipe, and a steel pipe pushing device used for making the steel pipe move towards the rubber pipe fixed on the rubber pipe fixing device, wherein the rubber pipe fixing device and the steel pipe pushing device are arranged on the base, and the steel pipe fixing device is arranged on the steel pipe pushing device and moves along with the steel pipe synchronously. Compared with the prior art, the assembling tool used for rubber pipe installation on the steel pipe has the advantages that the rubber pipe is fixed through the rubber pipe fixing device on the base, the steel pipe is fixed through the steel pipe fixing device, the steel pipe fixed through the steel pipe fixing device can be made to move towards the rubber pipe fixed through the rubber pipe fixing device through the steel pipe pushing device so that the steel pipe can be inserted into the rubber pipe, and then installation of the rubber pipe on the steel pipe is achieved; operation is simple, using is convenient, steel pipe and rubber pipe assembling efficiency can be improved greatly, assembling accuracy is ensured, and the inner wall of the rubber pipe can not be damaged.

Description

A kind of assembly tooling of installing for the sebific duct on steel pipe
Technical field
The present invention relates to tooling device, specifically, the present invention relates to a kind of assembly tooling of installing for the sebific duct on steel pipe.
Background technology
At present, some steel pipe using on vehicle need to be installed sebific duct in end.In prior art, the method that normally adopts man-made assembly is the end at steel by glue pipe socket, and this assembly method not only efficiency is low, and assembly precision is difficult to control, also easy infringement rubber tube inner wall.
Summary of the invention
The invention provides a kind of assembly tooling of installing for the sebific duct on steel pipe, object is to improve the efficiency of assembling of steel pipe and sebific duct.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of assembly tooling of installing for the sebific duct on steel pipe, comprise base, for the rubber pipe fixing device of fixing sebific duct, for fixedly steel tube fixing device and the steel pipe propulsion plant for steel pipe fixing sebific duct on rubber pipe fixing device is moved of steel pipe, rubber pipe fixing device and steel pipe propulsion plant are located on base, and steel tube fixing device is located on steel pipe propulsion plant and in company with steel pipe synchronizing moving.
Described steel pipe propulsion plant comprises the first bearing of being located on described base, is located at the first guide pillar on the first bearing and is set in the forward block on the first guide pillar, and described steel tube fixing device is located on forward block.
Described steel tube fixing device comprises the first cylinder and steel pipe fixture block, steel pipe fixture block comprises and is located at the first movable clip block that fixedly fixture block is connected with piston rod with the first cylinder of first on described forward block, first fixedly fixture block be provided with to match with side relative on the first movable clip block and clamp the clip slot of steel pipe.
Described first fixedly the side of fixture block be provided with the equal-sized arc clip slot of external diameter with steel tube clamping place, the side of described the first movable clip block be provided with first fixedly the arc clip slot on fixture block coordinate and form circumferentially another arc clip slot of the clip slot of sealing.
Described first fixedly the arc clip slot of fixture block towards the opening of described the first movable clip block, be open state, the first movable clip block be provided with towards first fixedly fixture block protrude can insert the first fixing projection in the arc clip slot of fixture block, the side of projection is provided with arc clip slot.
Described the first cylinder is for being horizontally disposed with.
Described forward block is provided with the push rod parallel with described the first guide pillar.
Described rubber pipe fixing device comprises the second bearing of being located on described base, is located at the second cylinder and sebific duct fixture block on the second bearing, sebific duct fixture block comprises and is located at the second movable clip block that fixedly fixture block is connected with piston rod with the second cylinder of second on the second bearing, second fixedly fixture block be provided with to match with side relative on the second movable clip block and clamp the clip slot of sebific duct.
Described second fixedly the side of fixture block be provided with and the equal-sized arc clip slot of sebific duct external diameter, the side of described the second movable clip block be provided with second fixedly the arc clip slot on fixture block coordinate another arc clip slot that forms complete circle clip slot.
Described the second cylinder is parallel with described the first cylinder, and described the second bearing is provided with the second guide pillar, and the piston rod of the second cylinder is provided with guide pad, and guide pad is connected and is set on the second guide pillar with described the second movable clip block.
The present invention adopts technique scheme, compared with prior art, this assembly tooling is fixed sebific duct by the rubber pipe fixing device on base, by steel tube fixing device, steel pipe is fixed, and can the fixing steel pipe of steel tube fixing device be moved towards the fixing sebific duct of rubber pipe fixing device by steel pipe propulsion plant, steel pipe is inserted in sebific duct, thereby complete the installation of sebific duct on steel pipe, simple to operate, easy to use, can greatly improve the efficiency of assembling of steel pipe and sebific duct, also guarantee assembly precision simultaneously, rubber tube inner wall can be not damaged yet.
Accompanying drawing explanation
Fig. 1 is the structural representation of assembly tooling of the present invention;
Fig. 2 is the first fixing structural representation of fixture block;
Fig. 3 is the structural representation of the first movable clip block;
Mark in above-mentioned figure is: 1, base; 2, sebific duct; 3, steel pipe; 4, the first bearing; 5, the first guide pillar; 6, forward block; 7, the first cylinder; 8, the first fixing fixture block; 81, U-shaped groove; 9, the first movable clip block; 91, projection; 10, push rod; 11, the second bearing; 12, the second cylinder; 13, the second fixing fixture block; 14, the second movable clip block; 15, the second guide pillar; 16, guide pad.
The specific embodiment
As shown in Figure 1, a kind of assembly tooling of installing for the sebific duct 2 on 3 of the present invention, comprise base 1, for the rubber pipe fixing device of fixing sebific duct 2, for fixing 3 steel tube fixing device and for making the 3 steel pipe propulsion plants that fixing sebific duct 2 places move on rubber pipe fixing device, rubber pipe fixing device and steel pipe propulsion plant are located on base 1, steel tube fixing device is located on steel pipe propulsion plant and in company with 3 synchronizing movings, guarantees that 3 all the time in stationary state.Therefore this assembly tooling is fixing by sebific duct 2 by the rubber pipe fixing device on base 1, fixing by 3 by steel tube fixing device, and can be by steel pipe propulsion plant by fixing 3 the moving towards the fixing sebific duct 2 of rubber pipe fixing device of steel tube fixing device, make in 3 insertion sebific ducts 2, thereby complete the installation of sebific duct 2 on 3, simple to operate, easy to use, can greatly improve 3 with the efficiency of assembling of sebific duct 2, also guaranteed assembly precision simultaneously, sebific duct 2 inwalls can be not damaged yet.
Specifically, the steel pipe propulsion plant of this assembly tooling comprises the first bearing 4 of being fixed on base 1 end face, is located at the first guide pillar 5 on the first bearing 4 and is set in the forward block 6 on the first guide pillar 5, and steel tube fixing device is located on forward block 6.The first bearing 4 is comprised of two L-type rest pads that parallel, two rest pads keep at a certain distance away, the axis of the first guide pillar 5 is parallel with 3 the axis being fixed, the first guide pillar 5 is provided with two that parallel and be located in the same horizontal plane, the two ends of the first guide pillar 5 are separately fixed on two rest pads, forward block 6 is provided with the pilot hole matching with the first guide pillar 5, by pilot hole, be enclosed within on the first guide pillar 5, forward block 6 can move along the first guide pillar 5 under external force, thereby can drive steel tube fixing device to move.
On the lateral surface of forward block 6, be provided with a push rod 10 parallel with the first guide pillar 5, push rod 10 is positioned at the centre position of two the first guide pillars 5, push rod 10 is for facilitating the gripping of staff, by 10 pairs of forward blocks 6 of push rod, apply external force, promotion forward block 6 moves towards rubber pipe fixing device place or oppositely pulls and makes forward block 6 returns.
Steel tube fixing device comprises horizontally disposed the first cylinder 7 and steel pipe fixture block, the first cylinder 7 is fixed on one end of forward block 6, steel pipe fixture block comprise be fixed on forward block 6 end faces first the first movable clip block 9, the first that fixedly fixture block 8 is connected with piston rod with the first cylinder 7 fixedly fixture block 8 be provided with to match with side relative on the first movable clip block 9 and clamp 3 clip slot.
As shown in Figures 2 and 3, first fixedly the side towards the first movable clip block 9 of fixture block 8 be provided with the equal-sized arc clip slot of external diameter with 3 clampings place, the first movable clip block 9 towards first fixedly the side of fixture block 8 be provided with another arc clip slot.Specifically, first fixedly the arc clip slot on fixture block 8 be U-shaped groove 81, the opening towards the first movable clip block 9 of this U-shaped groove 81 is taper, opening is open state, the first movable clip block 9 be provided with towards first fixedly fixture block 8 protrude can insert first fixedly the projection 91, the first in the U-shaped groove 81 of fixture block 8 fixedly the arc clip slot on fixture block 8 be provided in a side of on projection 91 towards first fixedly on the side of fixture block 8.Fixing at 3 o'clock, the first cylinder 7 drive the first movable clip blocks 9 towards first fixedly fixture block 8 places move, projection 91 on the first movable clip block 9 can insert in U-shaped groove 81, until be fixedly clamped 3, now, arc clip slot on projection 91 with first fixedly the U-shaped groove 81 on fixture block 8 match and form the circumferentially clip slot of sealing, reliable clamping, easy to operate simple.
The rubber pipe fixing device of this assembly tooling comprises the second bearing 11 of being fixed on base 1, is located at the second cylinder 12 and sebific duct fixture block on the first bearing 4.The rest pad that the second bearing 11 is paralleled by two other forms, and two rest pads keep at a certain distance away, and the second cylinder 12 is parallel with the first cylinder 7, and the second cylinder 12 is located at the side of one of them rest pad, and is positioned at the same side of base 1 with the first cylinder 7.The second bearing 11 is provided with second guide pillar 15, the second guide pillars 15 vertical with the first guide pillar 5 axis and is provided with two that parallel and be located in the same horizontal plane, and the two ends of the second guide pillar 15 are separately fixed on two rest pads.Sebific duct fixture block is between two rest pads, sebific duct fixture block comprises second the second movable clip block 14 that fixedly fixture block 13 is connected with piston rod with the second cylinder 12, second fixedly fixture block 13 be fixedly mounted on the rest pad that the second cylinder 12 is not installed on the second bearing 11, second fixedly fixture block 13 be provided with to match with side relative on the second movable clip block 14 and clamp the clip slot of sebific duct 2.The piston rod of the second cylinder 12 is through rest pad, piston rod is provided with a guide pad 16, the second movable clip block 14 is arranged on this guide pad 16, guide pad 16 is provided with the pilot hole matching with the second guide pillar 15, by pilot hole, be enclosed within on the second guide pillar 15, guide pad 16 can move along the second guide pillar 15 under the second cylinder 12 active forces, thus can drive the second movable clip block 14 towards second fixedly fixture block 13 places move or reverse mobile return.
Second fixedly the side towards the second movable clip block 14 of fixture block 13 be provided with and the equal-sized semicircle clip slot of sebific duct 2 external diameter, fixedly also being provided with and the equal-sized semicircle clip slot of sebific duct 2 external diameter on the side of fixture block 13 towards second of the second movable clip block 14, when the second movable clip block 14 with second fixedly the side of fixture block 13 contact while clamping sebific duct 2, the amalgamation of two semicircle clip slot phases forms complete circular clip slot, sebific duct 2 is tightly clamped, reliable clamping is easy to operate simple.And second fixedly the clip slot on fixture block 13 with first fixedly the clip slot on fixture block 8 want coaxial, guarantee that clamped 3 and sebific duct 2 is coaxial, thereby also just guaranteed assembly precision.
This assembly tooling is to 3 and sebific duct 2 while assembling, clamp 3 and sebific duct 2 after, can directly promote push rod 10, make 3 towards sebific duct 2 places, to move, until 3 heads insert in sebific ducts 2, installation.
By reference to the accompanying drawings the present invention is exemplarily described above; obviously specific implementation of the present invention is not subject to the restrictions described above; as long as adopted the improvement of the various unsubstantialities that method of the present invention design and technical scheme carry out; or without improving, design of the present invention and technical scheme are directly applied to other occasion, all within protection scope of the present invention.

Claims (10)

1. an assembly tooling of installing for the sebific duct on steel pipe, it is characterized in that: comprise base, for the rubber pipe fixing device of fixing sebific duct, for fixedly steel tube fixing device and the steel pipe propulsion plant for steel pipe fixing sebific duct on rubber pipe fixing device is moved of steel pipe, rubber pipe fixing device and steel pipe propulsion plant are located on base, and steel tube fixing device is located on steel pipe propulsion plant and in company with steel pipe synchronizing moving.
2. assembly tooling of installing for the sebific duct on steel pipe according to claim 1, it is characterized in that: described steel pipe propulsion plant comprises the first bearing of being located on described base, is located at the first guide pillar on the first bearing and is set in the forward block on the first guide pillar, and described steel tube fixing device is located on forward block.
3. assembly tooling of installing for the sebific duct on steel pipe according to claim 2, it is characterized in that: described steel tube fixing device comprises the first cylinder and steel pipe fixture block, steel pipe fixture block comprises and is located at the first movable clip block that fixedly fixture block is connected with piston rod with the first cylinder of first on described forward block, first fixedly fixture block be provided with to match with side relative on the first movable clip block and clamp the clip slot of steel pipe.
4. assembly tooling of installing for the sebific duct on steel pipe according to claim 3, it is characterized in that: described first fixedly the side of fixture block be provided with the equal-sized arc clip slot of external diameter with steel tube clamping place, the side of described the first movable clip block be provided with first fixedly the arc clip slot on fixture block coordinate and form circumferentially another arc clip slot of the clip slot of sealing.
5. assembly tooling of installing for the sebific duct on steel pipe according to claim 4, it is characterized in that: described first fixedly the arc clip slot of fixture block towards the opening of described the first movable clip block, be open state, the first movable clip block be provided with towards first fixedly fixture block protrude can insert the first fixing projection in the arc clip slot of fixture block, the side of projection is provided with arc clip slot.
6. assembly tooling of installing for the sebific duct on steel pipe according to claim 5, is characterized in that: described the first cylinder is for being horizontally disposed with.
7. assembly tooling of installing for the sebific duct on steel pipe according to claim 6, is characterized in that: described forward block is provided with the push rod parallel with described the first guide pillar.
8. according to the assembly tooling of installing for the sebific duct on steel pipe described in claim 3 or 4 or 5 or 6 or 7, it is characterized in that: described rubber pipe fixing device comprises the second bearing of being located on described base, is located at the second cylinder and sebific duct fixture block on the second bearing, sebific duct fixture block comprises and is located at the second movable clip block that fixedly fixture block is connected with piston rod with the second cylinder of second on the second bearing, second fixedly fixture block be provided with to match with side relative on the second movable clip block and clamp the clip slot of sebific duct.
9. assembly tooling of installing for the sebific duct on steel pipe according to claim 8, it is characterized in that: described second fixedly the side of fixture block be provided with and the equal-sized arc clip slot of sebific duct external diameter, the side of described the second movable clip block be provided with second fixedly the arc clip slot on fixture block coordinate another arc clip slot that forms complete circle clip slot.
10. assembly tooling of installing for the sebific duct on steel pipe according to claim 9, it is characterized in that: described the second cylinder is parallel with described the first cylinder, described the second bearing is provided with the second guide pillar, the piston rod of the second cylinder is provided with guide pad, and guide pad is connected and is set on the second guide pillar with described the second movable clip block.
CN201310634576.9A 2013-11-30 2013-11-30 The assembly tooling that a kind of sebific duct on steel pipe is installed Expired - Fee Related CN103639974B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310634576.9A CN103639974B (en) 2013-11-30 2013-11-30 The assembly tooling that a kind of sebific duct on steel pipe is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310634576.9A CN103639974B (en) 2013-11-30 2013-11-30 The assembly tooling that a kind of sebific duct on steel pipe is installed

Publications (2)

Publication Number Publication Date
CN103639974A true CN103639974A (en) 2014-03-19
CN103639974B CN103639974B (en) 2015-08-12

Family

ID=50245330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310634576.9A Expired - Fee Related CN103639974B (en) 2013-11-30 2013-11-30 The assembly tooling that a kind of sebific duct on steel pipe is installed

Country Status (1)

Country Link
CN (1) CN103639974B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104858589A (en) * 2015-04-09 2015-08-26 惠东县吉邦五金制品有限公司 Group welding tooling fixture
CN105364577A (en) * 2015-12-07 2016-03-02 吴中区光福华宇钣金厂 Pipe machining clamp
CN105364576A (en) * 2015-12-07 2016-03-02 吴中区光福华宇钣金厂 Pneumatic anti-clogging clamp for pipe machining
CN105935870A (en) * 2016-06-24 2016-09-14 苏州威诺尔检测设备有限公司 Newest assembly body of screwing machine
CN105945563A (en) * 2016-06-24 2016-09-21 苏州威诺尔检测设备有限公司 Most novel tightening device for assembly body of tightening machine
CN105965223A (en) * 2016-06-24 2016-09-28 苏州威诺尔检测设备有限公司 Clamping device of tightening machine latest assembly body
CN106799693A (en) * 2017-02-15 2017-06-06 胡和萍 A kind of cylinder driving-type steel-plastics composite pipe positioner
CN108098685A (en) * 2018-01-31 2018-06-01 京东方科技集团股份有限公司 Rubber hose coupling attaching/detaching apparatus
CN108527239A (en) * 2018-05-30 2018-09-14 广东科宇康科技有限公司 A kind of the installation equipment and its installation method of air pump tilting member
CN110281539A (en) * 2019-06-13 2019-09-27 广东骏驰科技股份有限公司 A kind of device of semi-automatic installation sebific duct buckle
CN110315353A (en) * 2019-05-07 2019-10-11 上海第一机床厂有限公司 A kind of processing tool and its method for processing and assembling of falling sphere pipe and shunting plug
CN110480307A (en) * 2019-09-02 2019-11-22 淄博爱科工矿机械有限公司 Rubber hose coupling automatic assembling apparatus
CN114043407A (en) * 2022-01-12 2022-02-15 宁波福士汽车部件有限公司 EGR air inlet pipeline heat insulation sheath rapid Assembly frock

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4958424A (en) * 1989-10-26 1990-09-25 Hsu Paul K H Device for fitting a hosel on a club shaft
US7665718B1 (en) * 2002-02-12 2010-02-23 Joel Kent Benson Hose fitting inserter
CN201833329U (en) * 2010-09-07 2011-05-18 北京二七轨道交通装备有限责任公司 Pneumatic mounting machine for rubber pipes
CN102513969A (en) * 2011-12-01 2012-06-27 天津鹏翎胶管股份有限公司 Pneumatic assembling fixture for rubber hose with quick connector
CN103419011A (en) * 2013-05-29 2013-12-04 宁波舜洁卫生器具有限公司 Pipe sleeving device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4958424A (en) * 1989-10-26 1990-09-25 Hsu Paul K H Device for fitting a hosel on a club shaft
US7665718B1 (en) * 2002-02-12 2010-02-23 Joel Kent Benson Hose fitting inserter
CN201833329U (en) * 2010-09-07 2011-05-18 北京二七轨道交通装备有限责任公司 Pneumatic mounting machine for rubber pipes
CN102513969A (en) * 2011-12-01 2012-06-27 天津鹏翎胶管股份有限公司 Pneumatic assembling fixture for rubber hose with quick connector
CN103419011A (en) * 2013-05-29 2013-12-04 宁波舜洁卫生器具有限公司 Pipe sleeving device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104858589B (en) * 2015-04-09 2017-02-01 惠东县吉邦五金制品有限公司 Group welding tooling fixture
CN104858589A (en) * 2015-04-09 2015-08-26 惠东县吉邦五金制品有限公司 Group welding tooling fixture
CN105364577A (en) * 2015-12-07 2016-03-02 吴中区光福华宇钣金厂 Pipe machining clamp
CN105364576A (en) * 2015-12-07 2016-03-02 吴中区光福华宇钣金厂 Pneumatic anti-clogging clamp for pipe machining
CN105935870A (en) * 2016-06-24 2016-09-14 苏州威诺尔检测设备有限公司 Newest assembly body of screwing machine
CN105965223A (en) * 2016-06-24 2016-09-28 苏州威诺尔检测设备有限公司 Clamping device of tightening machine latest assembly body
CN105945563A (en) * 2016-06-24 2016-09-21 苏州威诺尔检测设备有限公司 Most novel tightening device for assembly body of tightening machine
CN105945563B (en) * 2016-06-24 2018-05-01 宋国丰 The device for screwing up of the newest assembly of tightening machine
CN106799693A (en) * 2017-02-15 2017-06-06 胡和萍 A kind of cylinder driving-type steel-plastics composite pipe positioner
CN108098685A (en) * 2018-01-31 2018-06-01 京东方科技集团股份有限公司 Rubber hose coupling attaching/detaching apparatus
CN108527239A (en) * 2018-05-30 2018-09-14 广东科宇康科技有限公司 A kind of the installation equipment and its installation method of air pump tilting member
CN110315353A (en) * 2019-05-07 2019-10-11 上海第一机床厂有限公司 A kind of processing tool and its method for processing and assembling of falling sphere pipe and shunting plug
CN110281539A (en) * 2019-06-13 2019-09-27 广东骏驰科技股份有限公司 A kind of device of semi-automatic installation sebific duct buckle
CN110480307A (en) * 2019-09-02 2019-11-22 淄博爱科工矿机械有限公司 Rubber hose coupling automatic assembling apparatus
CN114043407A (en) * 2022-01-12 2022-02-15 宁波福士汽车部件有限公司 EGR air inlet pipeline heat insulation sheath rapid Assembly frock

Also Published As

Publication number Publication date
CN103639974B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN103639974A (en) Assembling tool used for rubber pipe installation on steel pipe
CN103770049A (en) Tool for inserting car hose into rubber sleeve
CN103537722B (en) The clamping device in machine cut by pipe
CN203843901U (en) Pipe clamping device
CN203484691U (en) Clamping device in pipe cutting machine
CN103537890A (en) Assembling tool of metal pipe connector and metal pipe
CN103639766A (en) Positioning fixture for borehole
CN203171615U (en) Marking tool of inserting lines in pipeline construction
CN202162406U (en) Thin-wall cylinder type part turning clamp
CN203459926U (en) Double-taper internal supporting clamp
CN103056837A (en) Coil spring mounting jig
CN103100903A (en) Internal clamping device
CN201720817U (en) Device special for installing oil seal
CN103639781A (en) Fixture for drilling outer circle hole
CN104296931A (en) Station switching device
CN203260683U (en) Battery core positioning mechanism
CN204524970U (en) A kind of dovetail type center positioning mechanism
CN204201346U (en) The pipeline connecting device of machine oil cooler and water pump
CN202992404U (en) Downhole double-tube cable fixer
CN103639552A (en) Linear cutting tool for cylinder inner circle
CN204075397U (en) A kind of carburetter connector burring clamper
CN202462278U (en) Pipe locating device
CN203565932U (en) High-precision drilling tool
CN203304915U (en) Elbow positioning device
CN203062291U (en) Interior clamping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: WUHU TONGHE AUTOMOBILE FLUID SYSTEM CO., LTD.

Free format text: FORMER NAME: WUHU TONGHE AUTO PIPELINE SYSTEM CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 241009 Hengshan Road economic and Technological Development Zone, Anhui, No. 26,

Patentee after: WUHU TONGHE AUTOMOBILE FLUID SYSTEM CO., LTD.

Address before: 241009 Hengshan Road economic and Technological Development Zone, Anhui, No. 26,

Patentee before: Wuhu Tonhe Automobile Fluid System Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20201130