CN103633621A - Short-time opening protection based transformer dead zone fault relay protection method - Google Patents
Short-time opening protection based transformer dead zone fault relay protection method Download PDFInfo
- Publication number
- CN103633621A CN103633621A CN201310641655.2A CN201310641655A CN103633621A CN 103633621 A CN103633621 A CN 103633621A CN 201310641655 A CN201310641655 A CN 201310641655A CN 103633621 A CN103633621 A CN 103633621A
- Authority
- CN
- China
- Prior art keywords
- transformer
- protection
- fault
- tripping
- condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention relates to a short-time opening protection based transformer dead zone fault relay protection method. The method includes in tripping control of dead zone fault on a certain side of a transformer, setting following conditions: firstly, a back-up protection tripping exit relay on the side of the transformer is in an action state or other electrical capacity protection tripping exit relays are in action states; secondly, when the first condition is satisfied, primary pulse T-time opening protection is started; thirdly, A-phase, B-phase or C-phase current on the side of the transformer reaches a starting value, or zero-sequence current or negative-sequence current reaches the starting value; when the conditions are satisfied, delaying prior to starting a transformer differential protection tripping main exit loop, and starting a circuit breaker of each side of a tripping-off transformer; when any one of the conditions is unsatisfied or after opening protection lasts for time T, returning by 0s, and disconnecting the transformer differential protection tripping main exit loop. The method is simple in action principle, high in reliability and capable of rapidly clearing dead zone faults of various voltage classes of each side of the transformer.
Description
Technical field
The invention belongs to the control technology of power transmission and distribution network, relate to a kind of based on the failure in transformer dead zone relay protecting method of open and protection in short-term.
Background technology
GB/T14285-2006 < < relaying protection and automatic safety device technical regulation > > regulation; transformer should be installed longitudinal differential protection and as main protection and reaction outside phase fault and ground short circuit, cause the electric parameters protections such as backup protection of transformer overcurrent; the backup protection of wherein reacting phase fault has composite voltage overcurrent protection, phase to phase impedance protection, and the backup protection of reaction ground short circuit has zero-sequence current protection, impedance ground protection.These backup protections are different with each side electric pressure according to the transformer of different electric pressures, install different backup protections, and generally in each side of transformer, all install the backup protection of the outside phase fault of reaction and ground short circuit.220kV and above tranformer protection configuring condition have concrete regulation in Q/GDW_175 < < transformer, high-voltage shunt reactor and bus protection and servicing unit standardized designs standard > >; The configuration of 110kV and following tranformer protection mainly in the composite voltage overcurrent protection of each side installing two-stage reaction phase fault (if 110kV neutral point is general when earth-free, configured zero-sequence current protection also generally need not, only use 110kV neutral point gap relay; If during the general ground connection of 110kV neutral point, configured zero-sequence current protection use, 110kV neutral point gap relay is stopped using).
So-called failure in transformer dead zone means the short trouble (see figure 2) occurring between the circuit breaker of a certain side of transformer and the current transformer (hereinafter to be referred as TA) of this side transformer differential protection use.Because this fault is outside transformer longitudinal linked differential protection protection range, although the backup protection of fault side or other protection (as bus protection) action, this side circuit breaker of tripping transformer, but fault still exists, only have by transformer frequency response side backup protection action or adopt the final excision of this side backup protection action connection saltus step depressor general export loop tripping transformer frequency response side circuit breaker ability fault, this kind of situation excision is generally longer fault time; If transformer is high-impedance transformer; the backup protection of transformer frequency response side may start definite value and akinesia excision fault because short circuit current reaches, till only having by the time transformer to burn to make short circuit current meet and exceed this backup protection startup value and can making transformer frequency response side backup protection action excision fault.Although proposed to join after judgement dead-zone fault the scheme of other side circuit breakers of saltus step depressor in patent of invention ZL200810201305.3 " relay protecting method of eliminating transformer dead-zone fault ", excision is still slightly long fault time, and only adapts to 110kV transformer.
Summary of the invention
Problem to be solved by this invention is; it is various electric pressure electric substation protection equipment for transformer that a kind of transmission and distribution networks that can be applied to is provided, and operating principle is simple, reliability is high, excise fast the relay protecting method of the various electric pressure dead-zone faults of each side of transformer.
Provide the technical scheme of the inventive method below.
At the do protective device of two-winding transformer, three-winding transformer, autotransformer or other transformers of various electric pressures of the power transformation of the applied transmission and distribution networks of method of the present invention, in theory, transformer has several working voltage grades to pass through breaker interval equipment (by isolating switch, circuit breaker, the equipment such as current transformer form) be connected with external circuit equipment, just there is several failure in transformer dead zone position, there are 2 working voltage grades to be connected with external circuit equipment by breaker interval equipment, as long as a certain side circuit breaker of transformer both sides only has this side of transformer to have current transformer (being called for short TA), and bus bar side does not have TA, just there is several failure in transformer dead zone position (if all there is TA circuit breaker both sides, this circuit breaker loop does not just have dead-zone fault position), there are 3 working voltage grades to be connected with external circuit equipment by breaker interval equipment, just have 3 failure in transformer dead zone positions (if 1 working voltage grade has 2 breaker interval equipment, this working voltage grade side is 2 failure in transformer dead zone positions) at least.
For sake of convenience, breaker interval equipment generation failure in transformer dead zone with one of them working voltage grade of transformer, describe quick startup and excise the method for this fault, the transformer of other electric pressure and transformer are two-winding transformer, three-winding transformer, autotransformer or other transformers, or each side of transformer is by the combination of other electric pressure, its method is similar, no longer tired stating.This breaker interval equipment is comprised of equipment such as isolating switch, circuit breaker, TA; TA has respectively several groups of secondary winding, and these several groups of secondary winding access respectively the secondary devices such as transformer differential protection (backup protection), bus differential protecting, measuring from bus bar side to transformer side.Bushing shell for transformer place has also installed sleeve pipe TA.The TA that each side backup protection of 110kV and following transformer is used separates with transformer differential protection, the TA of use be different TA(such as differential protection is used the TA of circuit breaker place, and sleeve pipe TA is used in backup protection), or the different secondary winding of TA.Its control method comprises following control procedure:
In the tripping operation of transformer side dead-zone fault is controlled, set following condition:
Condition one, exit relay is tripped in operate condition for trip protection exit relay in operate condition or other electric parameters protection (such as this side bus differential protection) in this rear flank of transformer;
Condition two, when condition one meets, starts pulsatile once T time open protection (i.e. open and protection T time; The desirable 300ms of T, lower same).
Condition three, this side of transformer A phase or B phase or C phase current Ipmax reach startup value, or zero-sequence current Io or negative-sequence current I2 reach startup value, >=setting value.
When above-mentioned condition meets, time delay t1(is as 150ms) rear starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, thereby reach this failure in transformer dead zone of quick excision; When above-mentioned arbitrary condition does not meet or after the full time T of open and protection, 0s returns, disconnect starting transformer differential protection tripping operation general export loop.
Judgement transformer this side A phase or B phase or C also have electric current mutually, can gather this side differential protection of transformer TA electric current, and this current ration can be adjusted by escaping this side maximum load current of transformer; When this side of transformer is effectively earthed system, zero-sequence current or negative-sequence current definite value can have enough sensitivity adjust (sensitivity coefficient desirable >=3) by this side bus earth fault of transformer.
When a certain side electric pressure of transformer is 35kV and following system, this system is generally isolated neutral system or compensated distribution network, and this side zero-sequence current criterion of transformer can.If resistance grounded system, this side zero-sequence current criterion of transformer can be used.
The present invention compares with the method for existing excision failure in transformer dead zone, and tool has the following advantages:
1. the do technical scheme of the two-winding transformer of various electric pressures, three-winding transformer, the isallobaric device protective device of autotransformer of the power transformation that is applicable to transmission and distribution networks.
2. just after the method judgement dead-zone fault, adopt after time delay 150ms directly starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, criterion is simple and practical, has reached the object of quick this dead-zone fault of excision;
3. owing to not adding breaker open operation position contact in criterion; for electric substation's side bus fault; bus protection action or transformer fault side backup protection action; but transformer fault side circuit breaker miss operation (breaker failure); the present invention program also can be after judgement circuit breaker tripping direct starting transformer differential protection tripping operation general export loop just after time delay 150ms; start each side circuit breaker of tripping transformer, thereby excise fast this fault.
4. increase the T time loop of short time open and protection, strengthened the fail safe of this failure in transformer dead zone protection.
Accompanying drawing explanation
Fig. 1 is the logic diagram of a certain side dead-zone fault of the transformer of the inventive method starting transformer protection general export relay;
Fig. 2 is main wiring diagram of existing 220kV electric substation's part.
In Fig. 1, symbol description is as follows:
-presentation logic or relation, initial conditions is arbitrary while meeting, and output is effectively;
-representing that initial conditions meets 150 milliseconds of time delays, initial conditions does not meet and returns for 0 second;
Embodiment
The 220kV autotransformer protection of 220kV electric substation of take is example; the method that failure in transformer dead zone starts this fault of excision is fast described; the transformer of other electric pressure and transformer are two-winding transformer, three-winding transformer, autotransformer or other transformers; or each side of transformer is by the combination of other electric pressure; its method is similar, no longer tired stating.Main wiring diagram of ,Wei 220kV electric substation part as shown in Figure 2, a 220kV autotransformer, transformer is equiped with high-pressure side circuit breaker 1QF, medium voltage side circuit breaker 2QF, low-pressure side circuit breaker 3QF; Circuit breaker 1QF place, high-pressure side, medium voltage side circuit breaker 2QF place, low-pressure side circuit breaker 3QF place are equiped with respectively one group of independently TA, and TA has respectively several groups of secondary winding, and high voltage side of transformer, medium voltage side and neutral point place have also installed sleeve pipe TA.Each side of 220kV transformer TA configuration as shown in Figure 2, wherein high voltage side of transformer (220kV) the circuit breaker TA of place secondary winding is connected to respectively first set transformer longitudinal differential and backup protection by bus bar side to transformer side, (220kV tranformer protection generally adopts main protection and backup protection unified collocation for the second cover transformer longitudinal differential and backup protection, be the public same group of TA secondary winding of each side of main protection and backup protection, secondary windings of PT, and main protection and backup protection all hardware equipment and software are in same cabinet), first set 220kV bus differential protecting, the second cover 220kV bus differential protecting (is pressed Q/GDW_175 < < transformer, the tranformer protection of high-voltage shunt reactor and bus protection and servicing unit standardized designs standard > > design does not arrange special breaker failure current circuit, by bus differential protecting, realized, otherwise have, special breaker failure current circuit is set), metering, measure, transformer medium voltage side (110kV) the circuit breaker TA of place secondary winding is connected to respectively first set transformer longitudinal differential and backup protection, the second cover transformer longitudinal differential and backup protection, 110kV bus differential protecting, metering, measurement by bus bar side to transformer side, step down side (35kV or the 10kV etc.) TA of circuit breaker place secondary winding is connected to respectively first set transformer longitudinal differential and backup protection, the second cover transformer longitudinal differential and backup protection (bus protection), failure wave-recording, metering, measurement etc. by bus bar side to transformer side.
Provide the inventive method below and be applied to the embodiment that failure in transformer dead zone excises this fault fast:
1, the quick cutting method of high voltage side of transformer dead-zone fault
(1) as the TA at the circuit breaker place, TA(Ji high-pressure side, high-pressure side that high voltage side of transformer circuit breaker lQF and transformer differential protection are used) between while there is phase fault or earth fault; fault is outside transformer longitudinal linked differential protection scope; but within first set 220kV bus differential protecting, the second cover 220kV bus differential protecting protection range, first set 220kV bus differential protecting, the second cover 220kV bus differential protecting start all switches of this fault bus of tripping (containing high voltage side of transformer circuit breaker lQF).If other side of transformer has power supply, although circuit breaker 1QF tripping, but fault is excision not, fault phase still has electric current or zero-sequence current or negative-sequence current to surpass setting value, therefore first set 220kV bus differential protecting, the second cover 220kV bus differential protecting still moves and does not return to (or high voltage side of transformer backup protection startup delay time still moves and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(2) when high voltage side of transformer circuit breaker lQF at open position, above-mentioned high voltage side of transformer dead-zone fault occurs; fault is outside transformer longitudinal linked differential protection scope; but within first set 220kV bus differential protecting, the second cover 220kV bus differential protecting protection range, first set 220kV bus differential protecting, the second cover 220kV bus differential protecting start all switches of this fault bus of tripping.If other side of transformer has power supply; although circuit breaker 1QF is at open position; but fault phase has short circuit current or zero-sequence current or negative-sequence current to surpass setting value; first set 220kV bus differential protecting, the second cover 220kV bus differential protecting action or high voltage side of transformer backup protection start delay time to action; start open and protection 300ms loop; therefore three conditions of judgement dead-zone fault meet; after time delay t1 is 150ms; starting transformer differential protection tripping operation general export loop; each side circuit breaker that starts tripping transformer, has excised this fault.
(3) if 220kV busbar fault, although two cover 220kV bus differential protecting actions, two cover 220kV bus differential protectings start other all switches of this fault bus of tripping, but high voltage side of transformer circuit breaker lQF miss operation, if other side of transformer has power supply, not excision of fault, fault phase still has electric current or zero-sequence current or negative-sequence current to surpass setting value, therefore first set 220kV bus differential protecting, the second cover 220kV bus differential protecting still moves and does not return to (or high voltage side of transformer backup protection startup delay time still moves and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(4) if this other side of electric substation's transformer does not have power supply; transformer fault side does not have fault current to flow through; therefore two conditions of judgement dead-zone fault do not meet, just can not start each side circuit breaker of starting transformer differential protection tripping operation general export loop saltus step depressor.If 220kV bus differential protecting or high voltage side of transformer backup protection one direct acting do not return, locking transformer dead zone protection after 300ms, concurrent alarm signal.
2, the quick cutting method of transformer medium voltage side dead-zone fault
(1) when the medium voltage side TA(that transformer medium voltage side circuit breaker 2QF and transformer differential protection are used is the TA at medium voltage side circuit breaker place) between press while there is phase fault or earth fault between side circuit breaker 2QF and pressure side circuit breaker TA when transformer, fault is outside transformer longitudinal linked differential protection scope, but within the protection range of 110kV bus differential protecting, 110kV bus differential protecting starts all switches of this fault bus of tripping (containing transformer medium voltage side circuit breaker 2QF), although circuit breaker 2QF tripping, but fault is excision not, fault phase still has electric current or zero-sequence current or negative-sequence current to surpass setting value, therefore 110kV bus differential protecting still moves and does not return to (or high voltage side of transformer backup protection startup delay time still moves and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, or medium voltage side circuit breaker 2QF is at open position, after time delay t2 is 120ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(2) when transformer medium voltage side circuit breaker 2QF at open position, above-mentioned transformer medium voltage side dead-zone fault occurs; fault is outside transformer longitudinal linked differential protection scope; but within 110kV bus differential protecting protection range, 110kV bus differential protecting starts all switches of this fault bus of tripping.Although circuit breaker 2QF is at open position; but fault phase has short circuit current or zero-sequence current or negative-sequence current to surpass setting value; the action of 110kV bus differential protecting or high voltage side of transformer backup protection start delay time to action; therefore two conditions of judgement dead-zone fault meet; after time delay 150ms; starting transformer differential protection tripping operation general export loop, each side circuit breaker of startup tripping transformer, has excised this fault.
(3) if 110kV busbar fault, although 110kV bus differential protecting action, 110kV bus differential protecting starts other all switches of this fault bus of tripping, but transformer medium voltage side circuit breaker 2QF tripping, but fault is excision not, fault phase still has electric current or zero-sequence current or negative-sequence current to surpass setting value, therefore 110kV bus differential protecting still moves and does not return to (or transformer medium voltage side backup protection startup delay time still moves and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(4) if 110kV bus differential protecting or high voltage side of transformer backup protection one direct acting do not return, locking transformer dead zone protection after 300ms, concurrent alarm signal.
3, the quick cutting method of step down side dead-zone fault
(1) step down side electric pressure is generally 35kV and following system; this system is generally isolated neutral system or compensated distribution network or grounded system via resistance; generally do not install special bus differential protecting, by a set of step down side backup protection wherein, as bus, protected.When low-pressure side TA(that step down side circuit breaker 3QF and transformer differential protection are used is the TA at low-pressure side circuit breaker place) between while there is phase fault or earth fault (during grounded system via resistance); fault is outside transformer longitudinal linked differential protection scope; but within the protection range of step down side backup protection, step down side backup protection starts tripping step down side circuit breaker 3QF.Although circuit breaker 3QF tripping, but fault is excision not, fault phase still has electric current or negative-sequence current or zero-sequence current to surpass setting value (during grounded system via resistance), therefore low-voltage bus bar differential protection still moves and does not return to that (or step down side backup protection is not (when there is no bus protection, by a set of low-pressure side backup protection wherein as bus protection) start delay time and still move and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(2) when step down side circuit breaker 3QF is when above-mentioned low-pressure side dead-zone fault occurs open position, fault is outside transformer longitudinal linked differential protection scope, but within the protection range of step down side backup protection, step down side backup protection starts, although circuit breaker 3QF is at open position, but fault phase still has electric current or negative-sequence current or zero-sequence current to surpass setting value (during grounded system via resistance), when low-voltage bus bar differential protection action or step down side backup protection be not (when there is no bus protection, by a set of low-pressure side backup protection wherein as bus protection) start delay time action, start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(3) if low-voltage bus bar fault, although step down side backup protection action, but step down side circuit breaker 2QF tripping, so fault is excision not, fault phase still has electric current or negative-sequence current to surpass setting value, low-voltage bus bar differential protection still moves and does not return to (or step down side backup protection startup delay time still moves and do not return to backup protection), start open and protection 300ms loop, therefore three conditions of judgement dead-zone fault meet, after time delay t1 is 150ms, starting transformer differential protection tripping operation general export loop, start each side circuit breaker of tripping transformer, excised this fault.
(4) if step down side backup protection one direct acting does not return, locking transformer dead zone protection after 300ms, concurrent alarm signal.
4, the quick cutting method of other failure in transformer dead zone
When a certain side electric pressure of transformer is 35kV and following system, this system is generally isolated neutral system or compensated distribution network or grounded system via resistance, and the quick cutting method of this side dead-zone fault of transformer can be with reference to the quick cutting method of 220kV step down side dead-zone fault.
When a certain side electric pressure of transformer is 110kV or 220kV and above system, this system is generally effectively earthed system, and the quick cutting method of this side dead-zone fault of transformer can be with reference to 220kV high voltage side of transformer or the quick cutting method of medium voltage side dead-zone fault.
When transformer is two-winding transformer, be equivalent to above-mentioned three-winding transformer and lacked a side, only need to consider that dead-zone fault quick cutting method in transformer both sides is just passable.
Claims (1)
1. based on a failure in transformer dead zone relay protecting method for open and protection in short-term, it is characterized in that: its control method comprises following control procedure,
In the tripping operation of transformer side dead-zone fault is controlled, set following condition:
Condition one, this rear flank of transformer for trip protection exit relay in operate condition or other electric parameters trip protection exit relays in operate condition;
Condition two, when condition one meets, starts the protection of pulsatile once T time open;
Condition three, this side of transformer A phase or B phase or C phase current Ipmax reach startup value, or zero-sequence current Io or negative-sequence current I
2reach startup value,>=setting value;
When above-mentioned condition meets, starting transformer differential protection tripping operation general export loop after time delay t1, each side circuit breaker of startup tripping transformer; When above-mentioned arbitrary condition does not meet or after the full time T of open and protection, 0s returns, disconnect starting transformer differential protection tripping operation general export loop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310641655.2A CN103633621B (en) | 2013-12-03 | 2013-12-03 | Short-time opening protection based transformer dead zone fault relay protection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310641655.2A CN103633621B (en) | 2013-12-03 | 2013-12-03 | Short-time opening protection based transformer dead zone fault relay protection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103633621A true CN103633621A (en) | 2014-03-12 |
CN103633621B CN103633621B (en) | 2017-05-10 |
Family
ID=50214368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310641655.2A Active CN103633621B (en) | 2013-12-03 | 2013-12-03 | Short-time opening protection based transformer dead zone fault relay protection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103633621B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111668816A (en) * | 2020-05-14 | 2020-09-15 | 许昌许继软件技术有限公司 | Electronic transformer-based breaker dead zone fault processing method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0260412A (en) * | 1988-08-23 | 1990-02-28 | Mitsubishi Electric Corp | Protective relay |
CN101557101A (en) * | 2008-10-14 | 2009-10-14 | 吴宏斌 | Relay protection method for eliminating failure in transformer dead zone |
CN103001195A (en) * | 2012-11-13 | 2013-03-27 | 江苏省电力公司镇江供电公司 | Relay protection method capable of quickly removing dead zone fault of transformer |
CN103001196A (en) * | 2012-11-13 | 2013-03-27 | 江苏省电力公司镇江供电公司 | Relay production method for cutting transformer dead zone faults |
CN103280782A (en) * | 2013-05-08 | 2013-09-04 | 国家电网公司 | Relay protection method for clearing dead zone fault of transformer |
-
2013
- 2013-12-03 CN CN201310641655.2A patent/CN103633621B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0260412A (en) * | 1988-08-23 | 1990-02-28 | Mitsubishi Electric Corp | Protective relay |
CN101557101A (en) * | 2008-10-14 | 2009-10-14 | 吴宏斌 | Relay protection method for eliminating failure in transformer dead zone |
CN103001195A (en) * | 2012-11-13 | 2013-03-27 | 江苏省电力公司镇江供电公司 | Relay protection method capable of quickly removing dead zone fault of transformer |
CN103001196A (en) * | 2012-11-13 | 2013-03-27 | 江苏省电力公司镇江供电公司 | Relay production method for cutting transformer dead zone faults |
CN103280782A (en) * | 2013-05-08 | 2013-09-04 | 国家电网公司 | Relay protection method for clearing dead zone fault of transformer |
Non-Patent Citations (1)
Title |
---|
赵雪燕: "《500kV变电运行实训指导书》", 31 July 2013, 北京:中国电力出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111668816A (en) * | 2020-05-14 | 2020-09-15 | 许昌许继软件技术有限公司 | Electronic transformer-based breaker dead zone fault processing method |
CN111668816B (en) * | 2020-05-14 | 2022-07-12 | 许昌许继软件技术有限公司 | Breaker dead zone fault processing method based on electronic transformer |
Also Published As
Publication number | Publication date |
---|---|
CN103633621B (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103001195B (en) | The relay protecting method of failure in transformer dead zone and the circuit breaker tripping of fault side | |
CN103280782B (en) | The relay protecting method of failure in transformer dead zone excision | |
CN103001196B (en) | The relay protecting method of excision failure in transformer dead zone | |
CN103208788B (en) | Intelligent Dynamic power network neutral point earthing method and the complete sets of equipment | |
CN103762551A (en) | Relay protection method for accelerated removal and TA sealing of dead zone faults of transformer based on open positions of circuit breakers | |
CN206533136U (en) | 220kV transformer stations arc suppression coil parallel low resistance earthed system | |
CN104836330B (en) | Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method | |
CN101183788A (en) | Power network controlled reactance and small resistor combination type earthing device | |
CN108879645A (en) | A kind of arc suppression coil and pro-active intervention arc-extinction device paired running device and method | |
CN107317308A (en) | The adaptive locking prepared auto restart guard method of sectionalized single busbar connection 110kV bus differential protections | |
CN103346534B (en) | The relay protecting method that failure in transformer dead zone excises fast | |
CN103618290B (en) | Based on open and protection in short-term and the transformer dead-zone fault relay protection method of envelope TA | |
CN103762553A (en) | Relay protection method for accelerated removal of dead zone faults of transformer based on open positions of circuit breakers | |
CN103618291A (en) | Transformer dead-zone fault relay protection method based on rapid removal and sealed TAs | |
CN105529685B (en) | A kind of interim IT grounded system switching method of frequency conversion load with TT grounded systems low-pressure system under leak current fault | |
CN103683200A (en) | Relay protection method for dead-zone faults of voltage transformers on basis of starting at switching positions and sealed current transformers TA | |
CN103606890B (en) | Relay protection method fast removing transformer dead zone fault | |
CN102694419A (en) | Management system for integrated test and control | |
CN103633621A (en) | Short-time opening protection based transformer dead zone fault relay protection method | |
CN204947582U (en) | Loop is distributed in the jumping of 220kV failure protection connection rationally | |
CN213754084U (en) | Dual-power supply system adopting power supplies with different grounding modes | |
CN104734117B (en) | A kind of breaker fail protection method of substation | |
Rezaei et al. | A Novel Differential-based Protection Scheme for Intertie Zone of Large-Scale Centralized DFIG Wind Farms | |
CN103683199A (en) | Relay protection method for dead-zone faults of voltage transformers on basis of starting at switching positions | |
Wang et al. | The application of equipment overheating and arcing fault warning and protection systems of switchgear in power systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |