CN1036215C - Construction method of substituting deep-foundation pit engineering pile for wall pile - Google Patents
Construction method of substituting deep-foundation pit engineering pile for wall pile Download PDFInfo
- Publication number
- CN1036215C CN1036215C CN93107792A CN93107792A CN1036215C CN 1036215 C CN1036215 C CN 1036215C CN 93107792 A CN93107792 A CN 93107792A CN 93107792 A CN93107792 A CN 93107792A CN 1036215 C CN1036215 C CN 1036215C
- Authority
- CN
- China
- Prior art keywords
- building
- pile
- bracket
- outer ring
- cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
The present invention relates to a building construction method, particularly to a construction method that a deep foundation pit engineering pile is used for replacing a wall protective pile. The present invention comprises the following steps: constructing a deep foundation pit engineering pile in a conventional method; replacing a wall protective pile by an outer ring engineering pile, and simultaneously, eliminating an overhanging bracket at the overhanging part of a floor base plate lifting the overhanging bracket in an equal height mark position of a first floor plate at the ground, etc.; lifting the upper end of the outer ring engineering pile to enable a capping beam position of the outer ring engineering pile to carry the bracket under the overhanging bracket. Compared with the existing method, the method of the present invention saves the wall protective piles and a great amount of earth, and has obvious economic benefits.
Description
The invention belongs to a kind of foundation structure of building and job practices thereof.
To establish at present a lagging pile that encloses the temporary lining effect in the Foundation Pit Construction in the foundation ditch outer ring.Because of the building overhanging 2000mm of the body base plate bracket of encorbelmenting, generally between lagging pile and outer ring engineering piles, possess corresponding spacing.The supporting and protection structure of this kind job practices is occupied significant proportion in the Foundation Design cost.For example the foundation ditch area of plane is 100 * 70M
2, just need 340 of lagging piles, dark 8 meters of foundation ditch, then the earth volume between external and lagging pile approximately is 5440M in the building
3Therefore, if can cancel lagging pile, saving the earth volume between body of wall and lagging pile, is an important economy measure of foundation construction.
The objective of the invention is to propose a kind of lagging pile that utilizes the permanent structure engineering piles to replace temporary lining, save the foundation structure of building and the job practices of the earthwork simultaneously, to reach the purpose that reduces the basic engineering construction cost.
The content of foundation structure of building of the present invention is: it only comprises deep foundation ditch outer ring engineering piles, and the sponson of the building bottom of the building plate bracket position of encorbelmenting is positioned at first floor absolute altitude place, face of land place, and the cap position, upper end of above-mentioned outer ring engineering piles just is positioned at below the above-mentioned bracket of encorbelmenting so that support this bracket.The concrete construction sequence of its foundation structure of building is that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.
Its concrete construction sequence can be that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.The cap cross section is with 2000 * 400mm
2Be advisable.
The present invention changes the former bracket position of encorbelmenting of being located at bottom of the building plate place and is located at the negative one deck place of building body, simultaneously with outer ring engineering piles stake jacking height, utilizes this outer ring engineering piles to replace lagging pile, thereby reaches the purpose of invention.
Embodiments of the invention are as shown in drawings:
Fig. 1 is a prior art foundation structure of building schematic diagram.
Fig. 2 is a foundation structure of building schematic diagram of the present invention.
Number in the figure is represented:
1 engineering piles, 2 outer rings lengthenings engineering piles, 3 brackets of encorbelmenting, 4 lagging piles, 5 caps.
Accompanying drawing is specified foundation structure of building of the present invention and job practices thereof in conjunction with the embodiments:
The prior art foundation structure of building as shown in Figure 1, the overhanging about 2000 * 400mm in body base plate place, building
2The bracket 3 of encorbelmenting, there is a circle lagging pile 4 at about 500mm place outside it, needs during construction lagging pile inner ring pit earthwork is all got only to end skin.The inventive method rises to negative one deck floor place with bracket 3 positions.The outmost turns engineering piles is a lengthening engineering piles 2, and its cap 5 supports high-order bracket 3, and engineering piles 2 plays lagging pile simultaneously in construction, replaced lagging pile 4 of the prior art.Being provided with of engineering piles 1 is constant.Comparison diagram 1 and Fig. 2 foundation structure of building of the present invention as can be seen and job practices thereof have compared with prior art been saved lagging pile and a large amount of earthwork, have tangible economic benefit.
Claims (3)
1, a kind of foundation structure of building, it is characterized in that it only comprises deep foundation ditch outer ring engineering piles, and the sponson of the building bottom of the building plate bracket position of encorbelmenting is positioned at first floor absolute altitude place, face of land place, and the cap position, upper end of above-mentioned outer ring engineering piles just is positioned at below the above-mentioned bracket of encorbelmenting so that support this bracket.
2, the job practices of the described foundation structure of building of a kind of claim 1, it is characterized in that concrete construction sequence is that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.
3, foundation structure of building job practices according to claim 2 is characterized in that the cap cross section is 2000 * 400mm
2
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN93107792A CN1036215C (en) | 1993-07-08 | 1993-07-08 | Construction method of substituting deep-foundation pit engineering pile for wall pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN93107792A CN1036215C (en) | 1993-07-08 | 1993-07-08 | Construction method of substituting deep-foundation pit engineering pile for wall pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1097228A CN1097228A (en) | 1995-01-11 |
CN1036215C true CN1036215C (en) | 1997-10-22 |
Family
ID=4986855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN93107792A Expired - Fee Related CN1036215C (en) | 1993-07-08 | 1993-07-08 | Construction method of substituting deep-foundation pit engineering pile for wall pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1036215C (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1851155B (en) * | 2006-04-28 | 2010-12-29 | 上海市政工程设计研究总院 | Airport taxi-track down connection channel, and its construction method |
CN104695460A (en) * | 2014-11-27 | 2015-06-10 | 中铁三局集团有限公司 | Construction method for arranging asymmetric support system in cross section direction of small-radius curve cast-in-place beam |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU702116A1 (en) * | 1977-04-18 | 1979-12-05 | Shishkin Leonid G | Foundation |
SU844692A1 (en) * | 1979-01-04 | 1981-07-07 | Трест Организации И Технологии Сельскогостроительства "Молдоргтехсельстрой" | Foundation constructing method |
SU1021717A1 (en) * | 1981-12-23 | 1983-06-07 | Ростовский инженерно-строительный институт | Foundation base |
-
1993
- 1993-07-08 CN CN93107792A patent/CN1036215C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU702116A1 (en) * | 1977-04-18 | 1979-12-05 | Shishkin Leonid G | Foundation |
SU844692A1 (en) * | 1979-01-04 | 1981-07-07 | Трест Организации И Технологии Сельскогостроительства "Молдоргтехсельстрой" | Foundation constructing method |
SU1021717A1 (en) * | 1981-12-23 | 1983-06-07 | Ростовский инженерно-строительный институт | Foundation base |
Also Published As
Publication number | Publication date |
---|---|
CN1097228A (en) | 1995-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4425743A (en) | Inground fluid storage tank and method of erection thereof | |
CN201581409U (en) | Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit | |
CN102425171A (en) | Forward-backward constructing method for central island of deep and large foundation pit | |
CN103103988A (en) | Foundation ditch construction method of horizontal bracing structure of central island floor slaps | |
CN108086344A (en) | A kind of lattice tower-crane foundation structure and construction method | |
CN1036215C (en) | Construction method of substituting deep-foundation pit engineering pile for wall pile | |
WO2007070897B1 (en) | Method for erecting a radio telescope | |
CN110644501A (en) | Foundation pit supporting and underpinning bearing platform combined construction method with zero distance from original building | |
CN214993737U (en) | Slip casting composite foundation that building reinforcement was rectified | |
CN105155573A (en) | Offshore wind turbine barrel-in-barrel foundation | |
CN215105472U (en) | Backfill soft foundation temporary construction foundation construction device | |
CN201598644U (en) | Ring beam inner support pile-and-beam combined structure for circular foundation pit | |
CN110700315A (en) | Integrated station structure and construction method of middle cover excavation method | |
CN215715451U (en) | Pile foundation underpinning structure for newly-built tunnel below bridge | |
CN216552051U (en) | Column-barrel combined bearing type fan foundation | |
CN217629971U (en) | Foundation pit excavation supporting structure | |
JP2001246346A (en) | Landfill stock equipment for waste | |
CN217421240U (en) | Subway tunnel reinforcing equipment | |
CN215829426U (en) | Foundation ditch construction supports optimization device | |
CN218953309U (en) | Supporting structure of pipe-jacking working well | |
CN212298354U (en) | Novel observation pier formwork erection device | |
US4487526A (en) | Method of and structure for erecting an artificial island | |
CN217267517U (en) | Foundation pit support structure | |
CN219547810U (en) | Multistage echelon arrangement foundation pit supporting structure system | |
CN217438691U (en) | Step type bridge abutment suitable for steep slope terrain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |