CN1036215C - Construction method of substituting deep-foundation pit engineering pile for wall pile - Google Patents

Construction method of substituting deep-foundation pit engineering pile for wall pile Download PDF

Info

Publication number
CN1036215C
CN1036215C CN93107792A CN93107792A CN1036215C CN 1036215 C CN1036215 C CN 1036215C CN 93107792 A CN93107792 A CN 93107792A CN 93107792 A CN93107792 A CN 93107792A CN 1036215 C CN1036215 C CN 1036215C
Authority
CN
China
Prior art keywords
building
pile
bracket
outer ring
cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN93107792A
Other languages
Chinese (zh)
Other versions
CN1097228A (en
Inventor
杜有亮
夏及人
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin City No1 Building Construction Co
Original Assignee
Tianjin City No1 Building Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin City No1 Building Construction Co filed Critical Tianjin City No1 Building Construction Co
Priority to CN93107792A priority Critical patent/CN1036215C/en
Publication of CN1097228A publication Critical patent/CN1097228A/en
Application granted granted Critical
Publication of CN1036215C publication Critical patent/CN1036215C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a building construction method, particularly to a construction method that a deep foundation pit engineering pile is used for replacing a wall protective pile. The present invention comprises the following steps: constructing a deep foundation pit engineering pile in a conventional method; replacing a wall protective pile by an outer ring engineering pile, and simultaneously, eliminating an overhanging bracket at the overhanging part of a floor base plate lifting the overhanging bracket in an equal height mark position of a first floor plate at the ground, etc.; lifting the upper end of the outer ring engineering pile to enable a capping beam position of the outer ring engineering pile to carry the bracket under the overhanging bracket. Compared with the existing method, the method of the present invention saves the wall protective piles and a great amount of earth, and has obvious economic benefits.

Description

Foundation structure of building
The invention belongs to a kind of foundation structure of building and job practices thereof.
To establish at present a lagging pile that encloses the temporary lining effect in the Foundation Pit Construction in the foundation ditch outer ring.Because of the building overhanging 2000mm of the body base plate bracket of encorbelmenting, generally between lagging pile and outer ring engineering piles, possess corresponding spacing.The supporting and protection structure of this kind job practices is occupied significant proportion in the Foundation Design cost.For example the foundation ditch area of plane is 100 * 70M 2, just need 340 of lagging piles, dark 8 meters of foundation ditch, then the earth volume between external and lagging pile approximately is 5440M in the building 3Therefore, if can cancel lagging pile, saving the earth volume between body of wall and lagging pile, is an important economy measure of foundation construction.
The objective of the invention is to propose a kind of lagging pile that utilizes the permanent structure engineering piles to replace temporary lining, save the foundation structure of building and the job practices of the earthwork simultaneously, to reach the purpose that reduces the basic engineering construction cost.
The content of foundation structure of building of the present invention is: it only comprises deep foundation ditch outer ring engineering piles, and the sponson of the building bottom of the building plate bracket position of encorbelmenting is positioned at first floor absolute altitude place, face of land place, and the cap position, upper end of above-mentioned outer ring engineering piles just is positioned at below the above-mentioned bracket of encorbelmenting so that support this bracket.The concrete construction sequence of its foundation structure of building is that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.
Its concrete construction sequence can be that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.The cap cross section is with 2000 * 400mm 2Be advisable.
The present invention changes the former bracket position of encorbelmenting of being located at bottom of the building plate place and is located at the negative one deck place of building body, simultaneously with outer ring engineering piles stake jacking height, utilizes this outer ring engineering piles to replace lagging pile, thereby reaches the purpose of invention.
Embodiments of the invention are as shown in drawings:
Fig. 1 is a prior art foundation structure of building schematic diagram.
Fig. 2 is a foundation structure of building schematic diagram of the present invention.
Number in the figure is represented:
1 engineering piles, 2 outer rings lengthenings engineering piles, 3 brackets of encorbelmenting, 4 lagging piles, 5 caps.
Accompanying drawing is specified foundation structure of building of the present invention and job practices thereof in conjunction with the embodiments:
The prior art foundation structure of building as shown in Figure 1, the overhanging about 2000 * 400mm in body base plate place, building 2The bracket 3 of encorbelmenting, there is a circle lagging pile 4 at about 500mm place outside it, needs during construction lagging pile inner ring pit earthwork is all got only to end skin.The inventive method rises to negative one deck floor place with bracket 3 positions.The outmost turns engineering piles is a lengthening engineering piles 2, and its cap 5 supports high-order bracket 3, and engineering piles 2 plays lagging pile simultaneously in construction, replaced lagging pile 4 of the prior art.Being provided with of engineering piles 1 is constant.Comparison diagram 1 and Fig. 2 foundation structure of building of the present invention as can be seen and job practices thereof have compared with prior art been saved lagging pile and a large amount of earthwork, have tangible economic benefit.

Claims (3)

1, a kind of foundation structure of building, it is characterized in that it only comprises deep foundation ditch outer ring engineering piles, and the sponson of the building bottom of the building plate bracket position of encorbelmenting is positioned at first floor absolute altitude place, face of land place, and the cap position, upper end of above-mentioned outer ring engineering piles just is positioned at below the above-mentioned bracket of encorbelmenting so that support this bracket.
2, the job practices of the described foundation structure of building of a kind of claim 1, it is characterized in that concrete construction sequence is that outmost turns engineering piles stake top mark height is fixed on negative one deck underfloor, and reserve the space, cross section of cap, digging the first step earthwork to outer ring engineering piles again pushes up, beat engineering piles steel bar concrete cap, and then dig the earthwork of second step to the foundation ditch hypodermis, when the building body construction is extremely born one deck floor place, on cap, beat the bracket of encorbelmenting.
3, foundation structure of building job practices according to claim 2 is characterized in that the cap cross section is 2000 * 400mm 2
CN93107792A 1993-07-08 1993-07-08 Construction method of substituting deep-foundation pit engineering pile for wall pile Expired - Fee Related CN1036215C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN93107792A CN1036215C (en) 1993-07-08 1993-07-08 Construction method of substituting deep-foundation pit engineering pile for wall pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN93107792A CN1036215C (en) 1993-07-08 1993-07-08 Construction method of substituting deep-foundation pit engineering pile for wall pile

Publications (2)

Publication Number Publication Date
CN1097228A CN1097228A (en) 1995-01-11
CN1036215C true CN1036215C (en) 1997-10-22

Family

ID=4986855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN93107792A Expired - Fee Related CN1036215C (en) 1993-07-08 1993-07-08 Construction method of substituting deep-foundation pit engineering pile for wall pile

Country Status (1)

Country Link
CN (1) CN1036215C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851155B (en) * 2006-04-28 2010-12-29 上海市政工程设计研究总院 Airport taxi-track down connection channel, and its construction method
CN104695460A (en) * 2014-11-27 2015-06-10 中铁三局集团有限公司 Construction method for arranging asymmetric support system in cross section direction of small-radius curve cast-in-place beam

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU702116A1 (en) * 1977-04-18 1979-12-05 Shishkin Leonid G Foundation
SU844692A1 (en) * 1979-01-04 1981-07-07 Трест Организации И Технологии Сельскогостроительства "Молдоргтехсельстрой" Foundation constructing method
SU1021717A1 (en) * 1981-12-23 1983-06-07 Ростовский инженерно-строительный институт Foundation base

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU702116A1 (en) * 1977-04-18 1979-12-05 Shishkin Leonid G Foundation
SU844692A1 (en) * 1979-01-04 1981-07-07 Трест Организации И Технологии Сельскогостроительства "Молдоргтехсельстрой" Foundation constructing method
SU1021717A1 (en) * 1981-12-23 1983-06-07 Ростовский инженерно-строительный институт Foundation base

Also Published As

Publication number Publication date
CN1097228A (en) 1995-01-11

Similar Documents

Publication Publication Date Title
US4425743A (en) Inground fluid storage tank and method of erection thereof
CN201581409U (en) Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN102425171A (en) Forward-backward constructing method for central island of deep and large foundation pit
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN108086344A (en) A kind of lattice tower-crane foundation structure and construction method
CN1036215C (en) Construction method of substituting deep-foundation pit engineering pile for wall pile
WO2007070897B1 (en) Method for erecting a radio telescope
CN110644501A (en) Foundation pit supporting and underpinning bearing platform combined construction method with zero distance from original building
CN214993737U (en) Slip casting composite foundation that building reinforcement was rectified
CN105155573A (en) Offshore wind turbine barrel-in-barrel foundation
CN215105472U (en) Backfill soft foundation temporary construction foundation construction device
CN201598644U (en) Ring beam inner support pile-and-beam combined structure for circular foundation pit
CN110700315A (en) Integrated station structure and construction method of middle cover excavation method
CN215715451U (en) Pile foundation underpinning structure for newly-built tunnel below bridge
CN216552051U (en) Column-barrel combined bearing type fan foundation
CN217629971U (en) Foundation pit excavation supporting structure
JP2001246346A (en) Landfill stock equipment for waste
CN217421240U (en) Subway tunnel reinforcing equipment
CN215829426U (en) Foundation ditch construction supports optimization device
CN218953309U (en) Supporting structure of pipe-jacking working well
CN212298354U (en) Novel observation pier formwork erection device
US4487526A (en) Method of and structure for erecting an artificial island
CN217267517U (en) Foundation pit support structure
CN219547810U (en) Multistage echelon arrangement foundation pit supporting structure system
CN217438691U (en) Step type bridge abutment suitable for steep slope terrain

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee