CN103618245B - 一种配电网上带电开耐张作业方法 - Google Patents
一种配电网上带电开耐张作业方法 Download PDFInfo
- Publication number
- CN103618245B CN103618245B CN201310550032.4A CN201310550032A CN103618245B CN 103618245 B CN103618245 B CN 103618245B CN 201310550032 A CN201310550032 A CN 201310550032A CN 103618245 B CN103618245 B CN 103618245B
- Authority
- CN
- China
- Prior art keywords
- strain
- distribution network
- wire
- insulation
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000009413 insulation Methods 0.000 claims abstract description 18
- 239000012211 strain insulator Substances 0.000 claims abstract description 11
- 229910052573 porcelain Inorganic materials 0.000 claims abstract description 4
- 239000012212 insulator Substances 0.000 claims abstract description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 240000007594 Oryza sativa Species 0.000 claims 1
- 235000007164 Oryza sativa Nutrition 0.000 claims 1
- 235000009566 rice Nutrition 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 5
- 238000012423 maintenance Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种配电网上带电开耐张作业方法,它是采用绝缘斗臂车为主绝缘措施,将工作人员输送到配电网电力线路的工作位置,安装临时引流线为负荷转移提供通道;它包括如下步骤:1)使用绝缘紧线器以平衡受力的方式两侧同时紧线作业,将导线在杆塔位置收紧;2)受力完全转移到绝缘紧线器后开断导线并拆除直线绝缘子,安装耐张瓷瓶串;3)将两侧导线安装到耐张线夹并搭接后引流跳线,以平衡受力的方式逐步松开绝缘紧线器使耐张绝缘子串稳定受力后拆除临时引流线及作业工具,实现杆型装置由直线变耐张;它具有作业方法简单、可靠,能满足“不间断供电”、“能带不停”的工作思路,以及提高供电可靠性,提高带电作业安全性要求等特点。
Description
技术领域
本发明涉及的是一种配电网上带电开耐张作业方法,属于配电网上电力线路的带电作业方法。
背景技术
随着社会经济的飞速发展,小康社会的建设要求直面大部分用户供电的配电网安全可靠供电,社会对配电网不间断供电的要求与配电网检修及新设备接入作业需求之间的矛盾,迫切要求配电网供电企业大力开展配网的带电作业,其中复杂带电作业项目的开展对配电网检修消缺意义重大,可显著提高配电网安全运行水平的同时确保供电区域不间断供电。
发明内容
本发明的目的在于克服现有技术存在的不足,而提供一种作业方法简单、可靠,能满足“不间断供电”、“能带不停”的工作思路,以及提高供电可靠性,提高带电作业安全性要求的配电网上带电开耐张作业方法。
本发明的目的是通过如下技术方案来完成的,所述的带电作业方法,它是采用绝缘斗臂车为主绝缘措施,将工作人员输送到配电网电力线路的工作位置,安装临时引流线为负荷转移提供通道;它包括如下步骤:1)使用绝缘紧线器以平衡受力的方式两侧同时紧线作业,将导线在杆塔位置收紧;2)受力完全转移到绝缘紧线器后开断导线并拆除直线绝缘子,安装耐张瓷瓶串;3)将两侧导线安装到耐张线夹并搭接后引流跳线,以平衡受力的方式逐步松开绝缘紧线器使耐张绝缘子串稳定受力后拆除临时引流线及作业工具,实现杆型装置由直线变耐张。
在步骤1)中所述的两侧同时紧线作业,还包括采取两侧加装绝缘定滑轮,选用两根15米长绝缘蚕丝绳作为后备保护绳,并在电杆根部加装简易固定支架,两根后备保护绳从导线卡线器引出后经绝缘滑轮引下到电杆底部,并由地面配合人员进行固定和收紧,或在导线收紧后同步由地面配合人员收紧后备保护绳。
本发明具有作业方法简单、可靠,能满足“不间断供电”、“能带不停”的工作思路,以及提高供电可靠性,提高带电作业安全性要求等特点。
附图说明
图1是本发明所述直线杆受力分布示意图。
图2是本发明所述紧线过程受力分布示意图。
图3是本发明所述作业完成后耐张杆受力分布示意图。
图4是本发明所述引流线分流等值电路图。
具体实施方式
下面将结合附图对本发明做详细的介绍:本发明所述的配电网上带电开耐张作业方法,它是采用绝缘斗臂车为主绝缘措施,将工作人员输送到配电网电力线路的工作位置,安装临时引流线为负荷转移提供通道;它包括如下步骤:1)使用绝缘紧线器以平衡受力的方式两侧同时紧线作业,将导线在杆塔位置收紧,见图1所示的直线杆受力示意情况;2)受力完全转移到绝缘紧线器后开断导线并拆除直线绝缘子,安装耐张瓷瓶串;3)将两侧导线安装到耐张线夹并搭接后引流跳线,以平衡受力的方式逐步松开绝缘紧线器使耐张绝缘子串稳定受力后拆除临时引流线及作业工具,实现杆型装置由直线变耐张,见图2、3所示;另图4所示为引流线分流等值电路图。
在步骤1)中所述的两侧同时紧线作业,还包括采取两侧加装绝缘定滑轮,选用两根15米长绝缘蚕丝绳作为后备保护绳,并在电杆根部加装简易固定支架,两根后备保护绳从导线卡线器引出后经绝缘滑轮引下到电杆底部,并由地面配合人员进行固定和收紧,或在导线收紧后同步由地面配合人员收紧后备保护绳。
Claims (1)
1.一种配电网上带电开耐张作业方法,其特征在于:它是采用绝缘斗臂车为主绝缘措施,将工作人员输送到配电网电力线路的工作位置,安装临时引流线为负荷转移提供通道;它包括如下步骤:
1)使用绝缘紧线器以平衡受力的方式两侧同时紧线作业,将导线在杆塔位置收紧;
2)受力完全转移到绝缘紧线器后开断导线并拆除直线绝缘子,安装耐张瓷瓶串;
3)将两侧导线安装到耐张线夹并搭接后引流跳线,以平衡受力的方式逐步松开绝缘紧线器使耐张绝缘子串稳定受力后拆除临时引流线及作业工具,实现杆型装置由直线变耐张;
在步骤1)中所述的两侧同时紧线作业,还包括采取两侧加装绝缘定滑轮,选用两根15米长绝缘蚕丝绳作为后备保护绳,并在电杆根部加装简易固定支架,两根后备保护绳从导线卡线器引出后经绝缘滑轮引下到电杆底部,并由地面配合人员进行固定和收紧,或在导线收紧后同步由地面配合人员收紧后备保护绳。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310550032.4A CN103618245B (zh) | 2013-11-08 | 2013-11-08 | 一种配电网上带电开耐张作业方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310550032.4A CN103618245B (zh) | 2013-11-08 | 2013-11-08 | 一种配电网上带电开耐张作业方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103618245A CN103618245A (zh) | 2014-03-05 |
CN103618245B true CN103618245B (zh) | 2017-04-12 |
Family
ID=50168948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310550032.4A Active CN103618245B (zh) | 2013-11-08 | 2013-11-08 | 一种配电网上带电开耐张作业方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103618245B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108899801B (zh) * | 2018-08-07 | 2020-10-30 | 武汉里得电力科技股份有限公司 | 基于配电线路维护的旁路作业方法及其配套作业装置 |
CN112510572B (zh) * | 2020-09-29 | 2022-09-09 | 浙江大有实业有限公司带电作业分公司 | 基于不停电需求的辐射状结构架空线路迁改方法 |
CN112636251B (zh) * | 2020-12-31 | 2022-07-19 | 上海东捷建设(集团)有限公司第五分公司 | 10kV直线杆带电改分段杆作业方法 |
CN114362041B (zh) * | 2021-12-14 | 2024-03-01 | 云南电网有限责任公司昆明供电局 | 直线杆改耐张杆的方法及直线杆改耐张杆金具 |
CN114614399B (zh) * | 2022-03-04 | 2023-10-20 | 国网浙江省电力有限公司金华供电公司 | 一种带负荷迁移耐张杆的作业方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102545094A (zh) * | 2010-12-16 | 2012-07-04 | 上海市电力公司 | 带电调换10kV供电线路的耐张绝缘子的方法 |
CN103001142A (zh) * | 2012-09-03 | 2013-03-27 | 辽宁省电力有限公司鞍山供电公司 | 带负荷更换10kV柱上隔离开关的作业方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100407547B1 (ko) * | 2001-06-02 | 2003-12-06 | 대원전기 주식회사 | 엘피애자용 전선 연선롤러 및 이를 이용한 전선 배선공법 |
-
2013
- 2013-11-08 CN CN201310550032.4A patent/CN103618245B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102545094A (zh) * | 2010-12-16 | 2012-07-04 | 上海市电力公司 | 带电调换10kV供电线路的耐张绝缘子的方法 |
CN103001142A (zh) * | 2012-09-03 | 2013-03-27 | 辽宁省电力有限公司鞍山供电公司 | 带负荷更换10kV柱上隔离开关的作业方法 |
Non-Patent Citations (1)
Title |
---|
带电更换10kV线路耐张绝缘子的方法;张仕民等;《四川电力技术》;20030628(第3期);第29-30页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103618245A (zh) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103618245B (zh) | 一种配电网上带电开耐张作业方法 | |
WO2015078279A1 (zh) | ±800kV特高压直流输电线路带电检修工艺 | |
CN101174761B (zh) | 高压输电线路耐张绝缘子串上旋带电更换方法 | |
WO2012088987A1 (zh) | 用于直流输电线路绝缘子的检修工具 | |
CN102545094A (zh) | 带电调换10kV供电线路的耐张绝缘子的方法 | |
CN103746315A (zh) | 10kV配电绝缘线路快速带电搭接引流线作业方法 | |
CN103618249A (zh) | ±500kV同塔双回直流输电线路带电检修工艺 | |
CN103606854A (zh) | 超、特高压直流线路带电更换耐张绝缘子的作业方法 | |
CN102136693B (zh) | 一种实现绞磨吊篮导轨远方进出等电位方法及其装置 | |
WO2016023141A1 (zh) | ±800kV特高压直流线路带电更换耐张硬管母跳线绝缘子工艺 | |
CN103746314A (zh) | 10kV配电绝缘线路快速带电拆除引流线作业方法 | |
CN106410662A (zh) | 一种停电更换220kv线路双串耐张绝缘子串的方法 | |
CN103001141A (zh) | 66千伏输电线路上防舞动间隔棒的带电安装方法 | |
CN205985893U (zh) | 10kV线路绝缘杆间接旁路带电更换柱上开关专用设备 | |
CN203289006U (zh) | 一种绝缘可调节联板 | |
CN206685794U (zh) | 一种10kV线路地电位带电更换耐张杆绝缘子的装置 | |
CN201440584U (zh) | 地电位更换输电线路耐张塔绝缘子及附件的装置 | |
CN104113007A (zh) | 35kV架空配电线路带电更换耐张绝缘子的作业方法 | |
CN201466574U (zh) | 用于等电位更换输电线路铁塔绝缘子及附件的装置 | |
CN102738732A (zh) | 500kV线路跨越高密度高压有电线路的施工方法 | |
CN205882560U (zh) | 配电带电作业地电位专用循环绳架装置 | |
CN109253057A (zh) | 永磁直驱风力发电机组的防雷系统的安装方法 | |
CN102290738B (zh) | 一种更换35kV线路耐张杆横担的施工方法 | |
CN104037648A (zh) | 35kV架空线路绝缘手套法带电断、接空载线路引线的作业方法 | |
CN203760925U (zh) | 更换输电线路耐张单联绝缘子卡具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |