CN103746314A - 10kV配电绝缘线路快速带电拆除引流线作业方法 - Google Patents

10kV配电绝缘线路快速带电拆除引流线作业方法 Download PDF

Info

Publication number
CN103746314A
CN103746314A CN201310746691.5A CN201310746691A CN103746314A CN 103746314 A CN103746314 A CN 103746314A CN 201310746691 A CN201310746691 A CN 201310746691A CN 103746314 A CN103746314 A CN 103746314A
Authority
CN
China
Prior art keywords
bar
drainage thread
line
phase
insulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310746691.5A
Other languages
English (en)
Inventor
殷洪海
蒋银国
王健
李泉根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201310746691.5A priority Critical patent/CN103746314A/zh
Publication of CN103746314A publication Critical patent/CN103746314A/zh
Pending legal-status Critical Current

Links

Abstract

本发明提供一种10kV配电绝缘线路快速带电拆除引流线作业方法,由工作负责人1人、杆上地电位作业电工1人和地面作业电工2人实施,采用地电位法作业,主要包括申请停用重合闸、做绝缘隔离、拆引流线、拆开处绝缘隔离、拆开另一边相引流线、拆开中相引流线、拆开的引流线检测和固定、绝缘装置拆除恢复该线路重合闸等作业步骤。本发明方便快捷、省时省力且可大幅提高工作效率,弥补传统绝缘斗臂车绝缘手套直接作业法的限制缺陷,增强电力供给保障的可靠性,拓展了配网带电作业项目。

Description

10kV配电绝缘线路快速带电拆除引流线作业方法
技术领域
[0001] 本发明涉及IOkV架空配电绝缘线路带电作业技术领域,具体涉及一种地电位作业快速带电拆除绝缘线路引流线的作业方法。
背景技术
[0002]目前,IOkV架空配电绝缘线路带电进行绝缘导线支接引流线的搭接和拆除抢修作业的方法,通常采用绝缘斗臂车将作业人员抬升输送到合适的工作位置,作业人员在绝缘斗臂车内采用绝缘手套直接作业,进行绝缘导线的支接引流线的搭接或拆除作业。但是,随着城市道路两旁绿化带设置的普遍以及居民小区台架、高压用户进户杆、市郊乡间小路对车辆的通行均有制约,对该类地区线路设备的抢修由于绝缘斗臂车进入受限,因而不能完全适应抢修作业需求;另外,由于城市区域内的线路通道资源愈来愈紧缺,使得架空配电线路的结构日趋复杂、紧密,如同杆高低压或同杆多回架设等十分普遍,使得线路间的间隙越来越小,如果采用绝缘斗臂车绝缘手套直接作业法,其需要作业人员直接接触导线,架空线路上复杂的线路结构之间越来越小的回转空间将会给作业人员带来较大的安全风险。然而,随着配电线路的绝缘化率的日益提高,绝缘导线的带电拆、搭引流线作业也越来越多,仅依靠目前的绝缘斗臂车绝缘手套直接作业法,难以满足生产和生活中的实际需求,因而寻求一种新的IOkV架空配电绝缘线路带电进行绝缘导线支接引流线的搭接和拆除的方法,在常用的绝缘斗臂车绝缘手套直接作业法不便实施时,能够快速进行绝缘导线支接引流线的搭接和拆除,对有效保障电力供给,显得十分必要。
发明内容
[0003] 本发明的目的是:克服现有技术的不足,提供一种采用地电位作业法、利用绝缘操作杆对IOkV配电绝缘线路进行带电作业快速拆除引流线的作业方法。
[0004] 本发明的技术方案是:本发明的IOkV配电绝缘线路快速带电拆除引流线作业方法,其特点是:采用地电位作业法,主要有以下步骤:
①申请停用重合闸:登杆作业前检查并确认待拆除线路无负荷及无相间短路和接地故障,并向电力调度部门申请停用该线路重合闸,得到确认后杆上作业电工开始登杆作业;
②做绝缘隔离:采用地电位作业的杆上电工在杆上对作业范围内引流线摆动可能造成短路或接地的设备做绝缘隔离措施;
③拆带电母线引流线:杆上作业电工分别在两边相导线上挂上绝缘锁挂杆,使用绝缘装配杆将配电线路带电母线上的地电位作业非承力接续线夹母线紧固件旋松并移开配电绝缘线路带电母线,将拆开的引流线端部挂在绝缘锁挂杆上;
④拆开处绝缘隔离:移动T形绝缘导线罩,将原搭接处的裸露导线进行绝缘隔离;
⑤拆开另一边相引流线:重复步骤③和步骤④,拆除另一边相引流线;
⑥拆开中相引流线:重复步骤③和步骤④拆开中相引流线;
⑦拆开的引流线检测和固定:杆上作业电工用高压验电器测量已拆开的引流线上确无电压后拆除三相引流线上的地电位作业非承力接续线夹,固定好三相引流线;
⑧绝缘装置拆除:杆上作业电工逐一将杆上绝缘隔离装置拆除后返回地面,恢复该线路重合闸。
[0005] 本发明具有积极的效果:(1)本发明的IOkV配电绝缘线路快速带电拆除引流线作业方法,方便快捷、省时省力且可大幅提高工作效率。(2)本发明的IOkV配电绝缘线路快速带电拆除引流线作业方法,作业地点基本不受限制,特别是在传统的绝缘斗臂车绝缘手套直接作业法的作业车辆不能到达的作业点,可由作业人员登杆在不停电的状态下直接施工,从而有效避免因停电施工带来的经济和社会不必要的损失,增强电力供给保障的可靠性。(3)本发明的IOkV配电绝缘线路快速带电拆除引流线作业方法,拓展了配网带电作业的作业项目及作业范围。
附图说明
[0006] 图1为本发明的IOkV配电绝缘线路快速带电拆除引流线作业方法的流程图。具体实施方式
[0007] 下面结合附图和具体实施方式对本发明作进一步详细的说明。
[0008](实施例1)
本实施例的IOkV配电绝缘线路快速带电拆除引流线作业方法,采用地电位作业法。
[0009] 作业前需要进行以下相应的准备工作:
一、人员组合:
作业人员包括:工作负责人I人,杆上地电位作业电工I人,地面作业电工2人。
[0010] 二、准备相关的主要作业器具:
T形导线遮蔽罩 2付;
橡胶绝缘毯 3张;
树脂绝缘毯 6张;
绝缘毯夹 6个;
地电位绝缘导线绝缘层剥除器 I套;
地电位作业非承力接续线夹 3只;
绝缘操作杆 I根;
绝缘装配杆 I根;
绝缘锁挂杆 3根;
闻压验电器 I只;
绝缘传递绳 2根。
[0011] 三、准备施工人员主要个人用具:
安全帽、脚扣、安全带。
[0012] 四、作业前的准备工作:
施工时,作业人员进入施工现场,首先由工作负责人宣读工作票,交待工作任务,讲解安全注意事项并明确分工;然后检查相关作业器具、安全防护用具的外观是否完好、用兆欧表对所述作业器具中的导线遮蔽罩、绝缘毯的沿面分别进行绝缘性能测试,绝缘电阻大于700兆欧为合格,否则予以更换;
见图1,本实施例的IOkV配电绝缘线路快速带电拆除引流线作业方法,主要有以下步
骤:
①申请停用重合闸:登杆作业前检查并确认待拆除线路无负荷及无相间短路和接地故障,并向电力调度部门申请停用该线路重合闸,得到确认后杆上作业电工开始登杆作业;
②做绝缘隔离:采用地电位作业的杆上电工在杆上对作业范围内引流线摆动可能造成短路或接地的设备做绝缘隔离措施;
③拆带电母线引流线:杆上作业电工分别在两边相导线上挂上绝缘锁挂杆,使用绝缘装配杆将配电线路带电母线上的地电位作业非承力接续线夹母线紧固件旋松并移开配电绝缘线路带电母线,将拆开的引流线端部挂在绝缘锁挂杆上;
④拆开处绝缘隔离:移动T形绝缘导线罩,将原搭接处的裸露导线进行绝缘隔离;
⑤拆开另一边相引流线:重复步骤③和步骤④,拆除另一边相引流线;
⑥拆开中相引流线:重复步骤③和步骤④拆开中相引流线;
⑦拆开的引流线检测和固定:杆上作业电工用高压验电器测量已拆开的引流线上确无电压后拆除三相引流线上的地电位作业非承力接续线夹,固定好三相引流线;
⑧绝缘装置拆除:杆上作业电工逐一将杆上绝缘隔离装置拆除后返回地面,恢复该线路重合闸。
[0013] 综上,本实施例的IOkV配电绝缘线路快速带电拆除引流线作业方法,方便快捷、省时省力且可大幅提高工作效率;作业地点基本不受限制,特别是在传统的绝缘斗臂车绝缘手套直接作业法的作业车辆不能到达的作业点,可由作业人员登杆在不停电的状态下直接施工,从而有效避免因停电施工带来的经济和社会不必要的损失,增强电力供给保障的可靠性;拓展了配网带电作业的作业项目及作业范围。
[0014] 以上实施例是对本发明的具体实施方式的说明,而非对本发明的限制,有关技术领域的技术人员在不脱离本发明的精神和范围的情况下,还可以做出各种变换和变化而得到相对应的等同的技术方案,因此所有等同的技术方案均应该归入本发明的专利保护范围。

Claims (1)

1.一种IOkV配电绝缘线路快速带电拆除引流线作业方法,其特征在于:采用地电位作业法,主要包括以下步骤: ①申请停用重合闸:登杆作业前检查并确认待拆除线路无负荷及无相间短路和接地故障,并向电力调度部门申请停用该线路重合闸,得到确认后杆上作业电工开始登杆作业; ②做绝缘隔离:采用地电位作业的杆上电工在杆上对作业范围内引流线摆动可能造成短路或接地的设备做绝缘隔离措施; ③拆带电母线引流线:杆上作业电工分别在两边相导线上挂上绝缘锁挂杆,使用绝缘装配杆将配电线路带电母线上的地电位作业非承力接续线夹母线紧固件旋松并移开配电绝缘线路带电母线,将拆开的引流线端部挂在绝缘锁挂杆上; ④拆开处绝缘隔离:移动T形绝缘导线罩,将原搭接处的裸露导线进行绝缘隔离; ⑤拆开另一边相引流线:重复步骤③和步骤④,拆除另一边相引流线; ⑥拆开中相引流线:重复步骤③和步骤④拆开中相引流线; ⑦拆开的引流线检测和固定:杆上作业电工用高压验电器测量已拆开的引流线上确无电压后拆除三相引流线上的地电位作业非承力接续线夹,固定好三相引流线; ⑧绝缘装置拆除:杆上作业电工逐一将杆上绝缘隔离装置拆除后返回地面,恢复该线路重合闸。
CN201310746691.5A 2013-12-30 2013-12-30 10kV配电绝缘线路快速带电拆除引流线作业方法 Pending CN103746314A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310746691.5A CN103746314A (zh) 2013-12-30 2013-12-30 10kV配电绝缘线路快速带电拆除引流线作业方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310746691.5A CN103746314A (zh) 2013-12-30 2013-12-30 10kV配电绝缘线路快速带电拆除引流线作业方法

Publications (1)

Publication Number Publication Date
CN103746314A true CN103746314A (zh) 2014-04-23

Family

ID=50503319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310746691.5A Pending CN103746314A (zh) 2013-12-30 2013-12-30 10kV配电绝缘线路快速带电拆除引流线作业方法

Country Status (1)

Country Link
CN (1) CN103746314A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037648A (zh) * 2014-05-14 2014-09-10 国家电网公司 35kV架空线路绝缘手套法带电断、接空载线路引线的作业方法
CN105449392A (zh) * 2015-10-23 2016-03-30 云南电网有限责任公司临沧供电局 一种10kV线路带电搭接及拆除引流线作业装置及方法
CN107681546A (zh) * 2017-10-24 2018-02-09 国网福建省电力有限公司 一种非接触拆除电力高压设备的装置及方法
CN108899801A (zh) * 2018-08-07 2018-11-27 武汉里得电力科技股份有限公司 基于配电线路维护的旁路作业方法及其配套作业装置
CN109212361A (zh) * 2018-10-24 2019-01-15 云南电网有限责任公司电力科学研究院 一种输电线相间短路试验方法及系统
CN109921335A (zh) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 塔架线路采用消弧绳地电位断、接引流线作业法
CN111355187A (zh) * 2020-04-10 2020-06-30 浙江省送变电工程有限公司 一种利用旧导线封网跨越高铁更换导地线的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640392A (zh) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 35kV配电线路带电作业断引流线的作业方法
CN102931609A (zh) * 2012-09-03 2013-02-13 辽宁省电力有限公司鞍山供电公司 带负荷更换10kV跌落式熔断器的作业方法
CN103368104A (zh) * 2013-07-26 2013-10-23 江苏省电力公司常州供电公司 地电位作业非承力接续线夹的绝缘操作杆
CN103474909A (zh) * 2013-09-25 2013-12-25 国网河南省电力公司平顶山供电公司 引流线支撑扩距带电作业更换多回路耐张绝缘子串的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640392A (zh) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 35kV配电线路带电作业断引流线的作业方法
CN102931609A (zh) * 2012-09-03 2013-02-13 辽宁省电力有限公司鞍山供电公司 带负荷更换10kV跌落式熔断器的作业方法
CN103368104A (zh) * 2013-07-26 2013-10-23 江苏省电力公司常州供电公司 地电位作业非承力接续线夹的绝缘操作杆
CN103474909A (zh) * 2013-09-25 2013-12-25 国网河南省电力公司平顶山供电公司 引流线支撑扩距带电作业更换多回路耐张绝缘子串的方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037648A (zh) * 2014-05-14 2014-09-10 国家电网公司 35kV架空线路绝缘手套法带电断、接空载线路引线的作业方法
CN105449392A (zh) * 2015-10-23 2016-03-30 云南电网有限责任公司临沧供电局 一种10kV线路带电搭接及拆除引流线作业装置及方法
CN107681546A (zh) * 2017-10-24 2018-02-09 国网福建省电力有限公司 一种非接触拆除电力高压设备的装置及方法
CN107681546B (zh) * 2017-10-24 2020-02-14 国网福建省电力有限公司 一种非接触拆除电力高压设备的装置及方法
CN108899801A (zh) * 2018-08-07 2018-11-27 武汉里得电力科技股份有限公司 基于配电线路维护的旁路作业方法及其配套作业装置
CN109212361A (zh) * 2018-10-24 2019-01-15 云南电网有限责任公司电力科学研究院 一种输电线相间短路试验方法及系统
CN109921335A (zh) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 塔架线路采用消弧绳地电位断、接引流线作业法
CN111355187A (zh) * 2020-04-10 2020-06-30 浙江省送变电工程有限公司 一种利用旧导线封网跨越高铁更换导地线的方法

Similar Documents

Publication Publication Date Title
CN103746314A (zh) 10kV配电绝缘线路快速带电拆除引流线作业方法
CN103746315A (zh) 10kV配电绝缘线路快速带电搭接引流线作业方法
CN202749782U (zh) 全过程利用倒闸操作实施的输电线路融冰系统
CN101640391B (zh) 35kV配电线路带电作业更换绝缘子的作业方法
CN103618249A (zh) ±500kV同塔双回直流输电线路带电检修工艺
CN102931609B (zh) 带负荷更换10kV跌落式熔断器的作业方法
CN103618252A (zh) 35kV架空线路带电更换耐张绝缘子的作业方法
CN103001142A (zh) 带负荷更换10kV柱上隔离开关的作业方法
CN104113002B (zh) 一种高压电缆交叉互联接地系统转接装置
CN103618245B (zh) 一种配电网上带电开耐张作业方法
CN106469892A (zh) 一种融冰线缆挂接装置
CN206640274U (zh) 一种超高压融冰优化系统
CN104037648A (zh) 35kV架空线路绝缘手套法带电断、接空载线路引线的作业方法
CN104218457A (zh) 一种配电装置及其电气主系统
CN104113007A (zh) 35kV架空配电线路带电更换耐张绝缘子的作业方法
CN103001141A (zh) 66千伏输电线路上防舞动间隔棒的带电安装方法
CN104113006A (zh) 35kV架空配电线路带电更换直线杆角钢横担作业方法
CN102780176B (zh) 一种降低交流输电线路绝缘架空地线感应电压的方法
CN103972804A (zh) 一种从环网柜临时取电的不停电作业方法
CN204464820U (zh) 一种变电站鸟窝清除装置
CN204270961U (zh) 一种带接地功能的三工位柱上隔离开关
CN103326299A (zh) 一种架空地线和复合光纤地线直流融冰系统的启动方法
CN104134967B (zh) 一种中性线断线保护装置
CN203895834U (zh) 一种高压电缆多功能接地装置
CN106786310A (zh) 一种超高压融冰优化系统及优化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140423

RJ01 Rejection of invention patent application after publication