CN103617816B - 反应堆堆芯功率分布的测量方法 - Google Patents
反应堆堆芯功率分布的测量方法 Download PDFInfo
- Publication number
- CN103617816B CN103617816B CN201310521939.8A CN201310521939A CN103617816B CN 103617816 B CN103617816 B CN 103617816B CN 201310521939 A CN201310521939 A CN 201310521939A CN 103617816 B CN103617816 B CN 103617816B
- Authority
- CN
- China
- Prior art keywords
- neutron
- reactor core
- meas
- power
- pred
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310521939.8A CN103617816B (zh) | 2013-10-29 | 2013-10-29 | 反应堆堆芯功率分布的测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310521939.8A CN103617816B (zh) | 2013-10-29 | 2013-10-29 | 反应堆堆芯功率分布的测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103617816A CN103617816A (zh) | 2014-03-05 |
CN103617816B true CN103617816B (zh) | 2016-06-08 |
Family
ID=50168519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310521939.8A Active CN103617816B (zh) | 2013-10-29 | 2013-10-29 | 反应堆堆芯功率分布的测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103617816B (zh) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104240779B (zh) * | 2014-09-22 | 2017-04-19 | 中国广核集团有限公司 | 核电站堆芯功率象限倾斜的监督方法和装置 |
CN104347126B (zh) * | 2014-09-22 | 2017-04-19 | 中国广核集团有限公司 | 核电站堆芯功率象限倾斜因子的显示方法和装置 |
CN105006262B (zh) * | 2015-06-15 | 2017-12-08 | 中广核研究院有限公司 | 一种标定核反应堆堆外探测器的方法 |
CN106782707B (zh) * | 2015-11-20 | 2023-11-21 | 国核(北京)科学技术研究院有限公司 | 装载177盒燃料组件的堆芯的探测器布置方法及其堆芯 |
CN106126925B (zh) * | 2016-06-24 | 2019-01-29 | 西安交通大学 | 一种改进反应堆堆芯三维中子通量密度精细分布的方法 |
CN106448766B (zh) * | 2016-10-21 | 2018-03-16 | 福建福清核电有限公司 | 一种堆芯象限功率倾斜比的测量方法 |
CN107492399B (zh) * | 2017-09-28 | 2019-04-02 | 上海核星核电科技有限公司 | 一种利用单次堆内通量测量完成堆外探测器刻度的方法 |
CN108447574B (zh) * | 2018-03-28 | 2020-08-11 | 中广核工程有限公司 | 一种核电站堆外探测器中子计数率计算方法及其系统 |
CN109273119B (zh) * | 2018-09-13 | 2022-02-11 | 中国核动力研究设计院 | 在临界装置上测量大反应性时优化中子探测器位置的方法 |
CN109887625B (zh) * | 2019-03-07 | 2022-04-22 | 中国核动力研究设计院 | 用于堆芯在线监测的探测器失效应对方法及电流恢复方法 |
CN110765618B (zh) * | 2019-10-28 | 2021-04-13 | 西安交通大学 | 一种压水堆堆内自给能中子探测器的响应电流计算方法 |
CN111797509B (zh) * | 2020-06-15 | 2022-05-24 | 中山大学 | 一种基于探测器测量值的堆芯中子通量预测方法 |
CN114694862A (zh) * | 2022-04-02 | 2022-07-01 | 中广核工程有限公司 | 核电厂功率分布测量方法、装置及系统 |
CN114974630B (zh) * | 2022-05-26 | 2024-05-10 | 中国科学院上海应用物理研究所 | 一种熔盐堆功率测量方法及系统 |
CN116110630A (zh) * | 2023-02-07 | 2023-05-12 | 中广核研究院有限公司 | Dcs系统中反应堆堆芯热功率测量方法与装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1153573A (zh) * | 1994-07-21 | 1997-07-02 | 西屋电气公司 | 根据堆芯外检测器电流来准确计算pwr功率的方法和系统 |
CN101669176A (zh) * | 2007-03-19 | 2010-03-10 | 阿海珐核能公司 | 确定核反应堆堆芯三维功率分布的方法 |
CN101946253A (zh) * | 2008-02-11 | 2011-01-12 | 西屋电气有限责任公司 | 模拟核反应堆堆芯内的燃料棒功率分布的方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05134079A (ja) * | 1991-11-13 | 1993-05-28 | Toshiba Corp | 原子炉出力分布監視装置 |
-
2013
- 2013-10-29 CN CN201310521939.8A patent/CN103617816B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1153573A (zh) * | 1994-07-21 | 1997-07-02 | 西屋电气公司 | 根据堆芯外检测器电流来准确计算pwr功率的方法和系统 |
CN101669176A (zh) * | 2007-03-19 | 2010-03-10 | 阿海珐核能公司 | 确定核反应堆堆芯三维功率分布的方法 |
CN101946253A (zh) * | 2008-02-11 | 2011-01-12 | 西屋电气有限责任公司 | 模拟核反应堆堆芯内的燃料棒功率分布的方法 |
Non-Patent Citations (6)
Title |
---|
Advanced PWR Core Calculation Based on Multi-group Nodal-transport Method in Three-dimensional Pin-by-Pin Geometry;Masahiro TATSUMI .et al;《Journal of Nuclear Science and Technology》;20030630;第40卷(第6期);第376~387页 * |
Extension of Askew"s Coarse Method to Few-Group Problems for Calculation Two-Dimensional Power Distribution in Fast Breeder Reactors;Toshikazu TAKEDA .et al;《Journal of Nuclear Science and Technology》;19780731;第15卷(第7期);第523~532页 * |
Two-level Coarse Mesh Finit Difference Formulation with Multigroup Source Expansion Nodal Kernels;Joo II YOON .et al;《Journal of Nuclear Science and Technology》;20081231;第45卷(第7期);第668~682页 * |
大亚湾核电站堆芯功率分布测量及其处理;张洪;《核科学与工程》;19970331;第17卷(第1期);第1~11页 * |
快堆组件内精细功率分布的改进方法与程序;王侃等;《核动力工程》;19970228;第18卷(第1期);第29~33页 * |
船用反应堆堆芯精细功率重构计算;黎浩峰等;《原子能科学技术》;20100930;第44卷;第307~311页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103617816A (zh) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103617816B (zh) | 反应堆堆芯功率分布的测量方法 | |
Liu et al. | Data-driven power flow linearization: A regression approach | |
CN106055888B (zh) | 基于误差预测修正的变压器顶层油温预测方法和装置 | |
Moura et al. | Adaptive partial differential equation observer for battery state-of-charge/state-of-health estimation via an electrochemical model | |
Keck et al. | Two improvements to the dynamic wake meandering model: including the effects of atmospheric shear on wake turbulence and incorporating turbulence build‐up in a row of wind turbines | |
CN102377180B (zh) | 基于电能质量监测系统的电力系统负荷建模方法 | |
Li et al. | An innovative software tool suite for power plant model validation and parameter calibration using PMU measurements | |
Wang et al. | Transmission lines positive sequence parameters estimation and instrument transformers calibration based on PMU measurement error model | |
CN101741086A (zh) | 基于pmu数据的稳定计算模型及参数精度的综合评估方法 | |
KR20150002914A (ko) | 전력 계통의 데이터 추정 방법 | |
CN103995948A (zh) | 一种基于多项式模型的振荡中心电压预测方法 | |
CN102570452B (zh) | 一种基于模态级数法的facts交互影响程度评估方法 | |
CN106680662B (zh) | 一种双端接地交叉互联电缆的金属护套内的环流估算方法 | |
CN105068035A (zh) | 一种电压互感器误差水平动态检测方法及系统 | |
CN114583767A (zh) | 一种数据驱动的风电场调频响应特性建模方法及系统 | |
Liang et al. | Load calibration and model validation methodologies for power distribution systems | |
CN108233356B (zh) | 一种光伏逆变器控制器一致性评估方法及其评估平台 | |
El-Meligy et al. | Transmission expansion planning considering resistance variations of overhead lines using minimum-volume covering ellipsoid | |
Marushchenko et al. | Approach for acoustic transit time flow measurement in sections of varying shape: Theoretical fundamentals and implementation in practice | |
CN107132500A (zh) | 一种同步相量测量单元在线校准方法与装置 | |
Saha et al. | Sample shifting technique (SST) for estimation of harmonic power in polluted environment | |
Duan et al. | An improved fast decoupled power flow model considering static power–frequency characteristic of power systems with large‐scale wind power | |
CN103576120A (zh) | 三次谐波分量准同步信息传输校验与自愈算法 | |
Liu | Dynamic-data driven real-time identification for electric power systems | |
CN109390946B (zh) | 一种基于多参数规划理论的最优概率潮流快速计算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: ZHONGKEHUA NUCLEAR POWER TECHNOLOGY INSTITUTE CO., Free format text: FORMER OWNER: ZHONGKEHUA NUCLEAR POWER TECHNOLOGY INSTITUTE CO., LTD. Effective date: 20140303 |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140303 Address after: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor Applicant after: China General Nuclear Power Corporation Applicant after: Zhongkehua Nuclear Power Technology Institute Co., Ltd. Applicant after: China Nuclear Power Engineering Co., Ltd. Address before: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor Applicant before: China General Nuclear Power Corporation Applicant before: Zhongkehua Nuclear Power Technology Institute Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor Patentee after: China General Nuclear Power Corporation Patentee after: CHINA NUCLEAR POWER TECHNOLOGY RESEARCH INSTITUTE Patentee after: China Nuclear Power Engineering Co., Ltd. Address before: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor Patentee before: China General Nuclear Power Corporation Patentee before: Zhongkehua Nuclear Power Technology Institute Co., Ltd. Patentee before: China Nuclear Power Engineering Co., Ltd. |