CN103617337B - A kind of aircraft maintenance interval aided analysis method - Google Patents

A kind of aircraft maintenance interval aided analysis method Download PDF

Info

Publication number
CN103617337B
CN103617337B CN201310706577.XA CN201310706577A CN103617337B CN 103617337 B CN103617337 B CN 103617337B CN 201310706577 A CN201310706577 A CN 201310706577A CN 103617337 B CN103617337 B CN 103617337B
Authority
CN
China
Prior art keywords
type
parameter
data
maintenance
similarity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310706577.XA
Other languages
Chinese (zh)
Other versions
CN103617337A (en
Inventor
张建民
左养泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ruitian Intelligent Technology Co.,Ltd.
Original Assignee
JIANGSU RUITIAN INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU RUITIAN INFORMATION TECHNOLOGY Co Ltd filed Critical JIANGSU RUITIAN INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310706577.XA priority Critical patent/CN103617337B/en
Publication of CN103617337A publication Critical patent/CN103617337A/en
Application granted granted Critical
Publication of CN103617337B publication Critical patent/CN103617337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Complex Calculations (AREA)

Abstract

The invention discloses a kind of aircraft maintenance interval aided analysis method, it is characterised in that comprise the steps: step one: gather the fault data of aircraft practical flight;Step 2: the data obtained by mathematics model analysis step one;Step 3: collect each maintenance program with reference to type and type parameter;Step 4: input the machine shape parameter;Step 5: comparing calculation reference data and this machine type data, described reference data is each type parameter with reference to type;Step 6: draw the maintenance intervals of reference.The present invention makes " aircraft reliability data analysis technique " and " Case-based reasoning technology " that both advantages are combined, and more rationally, more objective, more efficient provides effective service for maintenance program authorized personnel.

Description

A kind of aircraft maintenance interval aided analysis method
Technical field
The present invention relates to a kind of aircraft maintenance interval aided analysis method, be specifically related to a kind of based on reliability with the aircraft of CBR Maintenance intervals aided analysis method, the invention belongs to technical field of aerospace.
Background technology
During establishment maintenance program, the discreet value that maintenance intervals draws typically by experiment and experience, have sizable Subjectivity.Existing aircraft reliability data analysis technique and Case-based reasoning technology (i.e. CBR), aircraft reliability number It is to acquire aircraft practical flight data according to analytical technology, and by some analysis skills, analyzes and draw in aircraft practical flight Reliability data.Case-based reasoning technology is the maintenance program information by collecting other type aircrafts, similar by showing As maintenance task, to maintenance program, authorized personnel provides help.Both of which only focuses in some aspect, not to both Unified combination, has considerable degree of one-sidedness.
Summary of the invention
For solving the deficiencies in the prior art, it is an object of the invention to provide a kind of aircraft maintenance interval aided analysis method.
In order to realize above-mentioned target, the present invention adopts the following technical scheme that:
A kind of aircraft maintenance interval aided analysis method, it is characterised in that comprise the steps:
Step one: gather the fault data of aircraft practical flight;
Step 2: the data obtained by mathematics model analysis step one;
Step 3: collect each maintenance program with reference to type and type parameter;
Step 4: input the machine shape parameter;
Step 5: comparing calculation reference data and this machine type data, described reference data is each type parameter with reference to type;
Step 6: draw the maintenance intervals of reference.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that described mathematical model includes: normal distribution mould Type, exponential distribution model, Weibull distribution model, logarithm normal distribution model.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that the mathematical formulae of described normal distribution model:In formula: x is fault data array;μ is the average of fault data array;σ is event The variance yields of barrier array of data.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that the mathematical formulae of described exponential distribution model:X >=0, λ > 0, in formula: x is fault data array;λ is that mean μ divides, it may be assumed that λ=1/μ;μ is the average of fault data array.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that the mathematics of described logarithm normal distribution model is public Formula:In formula: x is fault data array;μ is the average of fault data array;σ is The variance yields of fault data array.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that the described type parameter with reference to type and the machine Shape parameter all includes CBR analytical parameters and fail-safe analysis parameter.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that described CBR analytical parameters includes: type Similarity parameter, similarity of tasks parameter and parameters weighting definition.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that described step 5 includes:
Step 5a: by with reference to the type similarity parameter of type, the type similarity parameter of this type and weight, calculating Type similarity data between two types;
Step 5b: by with reference to the similarity of tasks parameter of type, the similarity of tasks parameter of this type and weight, with type phase Combine like degrees of data and calculate, draw the similarity of tasks data between two tasks;
Step 5c: analyze type similarity data and similarity of tasks data, it is judged that whether the reference task of reference type has reference It is worth;Without value, then terminate reference;Otherwise, then step 5d is carried out;
Step 5d: the reliability distribution models of the present analysis parts drawn in acquisition step two;
Step 5e: maintenance policy, maintenance angle and the analytical parameters selected by maintenance program authorized personnel;
Step 5f: according to distributed model, maintenance policy, maintenance angle, determine calculative mathematical formulae.
Aforesaid a kind of aircraft maintenance interval aided analysis method, it is characterised in that described step 6 includes: pass through mathematical formulae And analytical parameters, calculate the maintenance intervals of reference.
The invention have benefit that: the present invention makes " aircraft reliability data analysis technique " and " Case-based reasoning skill Art " both advantages are combined, more rationally, more objective, more efficient provide effective clothes for maintenance program authorized personnel Business.
Accompanying drawing explanation
Fig. 1 is the flow chart being preferable to carry out of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention made concrete introduction.
With reference to shown in Fig. 1, the operation principle of invention is divided into 6 steps:
1. gather the fault data of aircraft practical flight
Gather the fault data in practical flight, be a most important part in fail-safe analysis.Only grasp each maintenance The truthful data of part, could provide real foundation for analysis work below.
2. by mathematics model analysis data
The invention provides multiple mathematical model, including normal distribution model, exponential distribution model, Weibull distribution model, Logarithm normal distribution model etc..During analysis, calculate various distributed model the most successively, determine the regularity of distribution of fault data Whether meet model.When not meeting, calculate whether next model meets.
The mathematical formulae of normal distribution model:In formula: x is fault data array;μ is The average of fault data array;σ is the variance yields of fault data array.
The mathematical formulae of exponential distribution model:X >=0, in λ > 0 formula: x is fault data Array;λ is that mean μ divides, it may be assumed that λ=1/ μ;μ is the average of fault data array.
The mathematical formulae of Weibull distribution model:In formula: x is fault data array;η is phat (1) Value;M is the value of phat (2).
The mathematical formulae of logarithm normal distribution model:In formula: x is fault data array;μ It it is the average of fault data array;σ is the variance yields of fault data array.
3. collect maintenance program and the design parameter of each type
The maintenance program of various type aircrafts, contains the most probable maintenance intervals that planemaker provides.Each type is peculiar Analytical parameters, how determine that with reference to the key factor of comparison.
4. input the machine shape parameter
For needing to work out the new architecture of maintenance program, each there is specific analytical parameters.Only grasp new architecture Design parameter, then follow-up analysis work is the most meaningful, possesses reference value.
Type parameter and the machine shape parameter of reference type all include CBR analytical parameters and fail-safe analysis parameter.CBR analyzes Parameter:
(1) type similarity parameter: Gross Weight Takeoff, thrust-weight ratio, Mach Number Never To Be Exceeded, cruising speed, visiting number, maximum boat Journey, maximum load, electromotor number, engine arrangement (tail hangs, the wing hangs), day utilization rate, manufacturer/manufacturer etc..
(2) similarity of tasks parameter: Gross Weight Takeoff, visiting number, day utilization rate, manufacturer/manufacturer etc., supplier, Design principle, inside and outside, fault affects classification etc..
(3) parameters weighting definition: define respective weight for all of analytical parameters.
Fail-safe analysis parameter is divided into three kinds of maintenance policies and multiple module, as shown in following table one to three:
Table one: hard time maintenance strategy
Table two: condition maintenarnce strategy
Table three: blind detection strategy
5. comparing calculation reference data and this machine type data
(1) by three step process definition the type similarity parameter of reference type, the type similarity parameter of this type and Weight, can calculate the type similarity data between two types.
(2) by reference type similarity of tasks parameter, this type similarity of tasks parameter and the weight of definition, with type phase Combine like degrees of data and calculate, it can be deduced that the similarity of tasks data between two tasks.
(3) type similarity data and similarity of tasks data are analyzed, it is judged that whether the reference task of reference type has reference price Value.Without value, then terminate reference;Otherwise, then follow-up Analysis of Reliability Data process is carried out.
(4) reliability distribution models of the present analysis parts drawn during second step is obtained.
(5) maintenance policy, maintenance angle and the input analytical parameters selected by maintenance program authorized personnel.
(6) according to distributed model, maintenance policy, maintenance angle, calculative mathematical formulae is determined.
6. draw the maintenance intervals of reference
By mathematical formulae and analytical parameters, calculate the maintenance intervals of reference.
The present invention, by above-mentioned 6 steps, combines " aircraft reliability data analysis technique " and " Case-based reasoning skill Art " feature, make " aircraft reliability data analysis technique " and " Case-based reasoning technology " that both advantage is combined Get up, more rationally, more objective, more efficient provide effective service for maintenance program authorized personnel.
The ultimate principle of the present invention, principal character and advantage have more than been shown and described.Skilled person will appreciate that of the industry, Above-described embodiment limits the present invention the most in any form, the technical scheme that the mode of all employing equivalents or equivalent transformation is obtained, All fall within protection scope of the present invention.

Claims (8)

1. an aircraft maintenance interval aided analysis method, it is characterised in that comprise the steps:
Step one: gather the fault data of aircraft practical flight;
Step 2: the data obtained by mathematics model analysis step one;
Step 3: collect each maintenance program with reference to type and type parameter;
Step 4: input the machine shape parameter;
Step 5: comparing calculation reference data and this machine type data, described reference data is each type ginseng with reference to type Number;
Step 6: draw the maintenance intervals of reference;
Described step 5 includes:
Step 5a: by the reference type similarity parameter of type, the type similarity parameter of this type and weight, Calculate the type similarity data between two types;
Step 5b: by the reference similarity of tasks parameter of type, the similarity of tasks parameter of this type and weight, Be combined calculating with type similarity data, draw the similarity of tasks data between two tasks;
Step 5c: analyze type similarity data and similarity of tasks data, it is judged that the reference task of reference type is No have reference value;Without value, then terminate reference;Otherwise, then step 5d is carried out;
Step 5d: the reliability distribution models of the present analysis parts drawn in acquisition step two;
Step 5e: maintenance policy, maintenance angle and the analytical parameters selected by maintenance program authorized personnel;
Step 5f: according to distributed model, maintenance policy, maintenance angle, determine calculative mathematical formulae.
A kind of aircraft maintenance interval the most according to claim 1 aided analysis method, it is characterised in that described Mathematical model includes: normal distribution model, exponential distribution model, Weibull distribution model, logarithm normal distribution Model.
A kind of aircraft maintenance interval the most according to claim 2 aided analysis method, it is characterised in that described The mathematical formulae of normal distribution model:In formula: x is fault data number Group;μ is the average of fault data array;σ is the variance yields of fault data array.
A kind of aircraft maintenance interval the most according to claim 2 aided analysis method, it is characterised in that described The mathematical formulae of exponential distribution model:In formula: x is Fault data array;λ is that mean μ divides, it may be assumed that λ=1/ μ;μ is the average of fault data array.
A kind of aircraft maintenance interval the most according to claim 2 aided analysis method, it is characterised in that described The mathematical formulae of logarithm normal distribution model:In formula: x is fault data Array;μ is the average of fault data array;σ is the variance yields of fault data array.
A kind of aircraft maintenance interval the most according to claim 2 aided analysis method, it is characterised in that described Type parameter and the machine shape parameter of reference type all include CBR analytical parameters and fail-safe analysis parameter.
A kind of aircraft maintenance interval the most according to claim 6 aided analysis method, it is characterised in that described CBR analytical parameters includes: type similarity parameter, similarity of tasks parameter and parameters weighting definition.
A kind of aircraft maintenance interval the most according to claim 7 aided analysis method, it is characterised in that described Step 6 includes: by described mathematical formulae and analytical parameters, calculate the maintenance intervals of reference.
CN201310706577.XA 2013-12-19 2013-12-19 A kind of aircraft maintenance interval aided analysis method Active CN103617337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310706577.XA CN103617337B (en) 2013-12-19 2013-12-19 A kind of aircraft maintenance interval aided analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310706577.XA CN103617337B (en) 2013-12-19 2013-12-19 A kind of aircraft maintenance interval aided analysis method

Publications (2)

Publication Number Publication Date
CN103617337A CN103617337A (en) 2014-03-05
CN103617337B true CN103617337B (en) 2016-12-07

Family

ID=50168040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310706577.XA Active CN103617337B (en) 2013-12-19 2013-12-19 A kind of aircraft maintenance interval aided analysis method

Country Status (1)

Country Link
CN (1) CN103617337B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105160185B (en) * 2015-09-14 2018-03-02 西安航空制动科技有限公司 Influence the assignment method of airplane brake system mean repair time factor
CN107092964B (en) * 2016-10-31 2020-10-09 海航航空技术股份有限公司 First inspection control method for aircraft maintenance project
CN107563084A (en) * 2017-09-11 2018-01-09 中国航空工业集团公司沈阳飞机设计研究所 A kind of outfield fault information analysis method based on LCA and CATIA systems
CN108038278A (en) * 2017-11-29 2018-05-15 安徽四创电子股份有限公司 A kind of maintenance intervals time formulating method of radar system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102030111A (en) * 2010-11-16 2011-04-27 中国民航大学 Aircraft CFDS (Centralized Fault Display System) data analyzer and implementation method thereof
CN103020422A (en) * 2012-11-12 2013-04-03 中航沈飞民用飞机有限责任公司 Method for calculating maintenance time interval of civil aircraft system
CN103136791A (en) * 2011-11-29 2013-06-05 中国商用飞机有限责任公司 Data association method and data association device used for airplane digitalization maintenance and application
CN103384859A (en) * 2011-02-25 2013-11-06 斯奈克玛 Forecasting maintenance operations for an aircraft engine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102030111A (en) * 2010-11-16 2011-04-27 中国民航大学 Aircraft CFDS (Centralized Fault Display System) data analyzer and implementation method thereof
CN103384859A (en) * 2011-02-25 2013-11-06 斯奈克玛 Forecasting maintenance operations for an aircraft engine
CN103136791A (en) * 2011-11-29 2013-06-05 中国商用飞机有限责任公司 Data association method and data association device used for airplane digitalization maintenance and application
CN103020422A (en) * 2012-11-12 2013-04-03 中航沈飞民用飞机有限责任公司 Method for calculating maintenance time interval of civil aircraft system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于RBR与CBR的维修大纲专家系统;刘明、左洪福、耿端阳、蔡景;《北京航空航天大学学报》;20060531;第32卷(第5期);第521-525页 *
最佳维修间隔分析;林旭;《黑龙江科技信息》;20100430;第47-48页 *

Also Published As

Publication number Publication date
CN103617337A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN107941537B (en) A kind of mechanical equipment health state evaluation method
Jiang et al. A visibility graph power averaging aggregation operator: A methodology based on network analysis
Wang et al. Integration of fuzzy AHP and FPP with TOPSIS methodology for aeroengine health assessment
Guo et al. A novel hybrid method for flight departure delay prediction using Random Forest Regression and Maximal Information Coefficient
CN104698837B (en) A kind of time-varying linear structure operational modal parameter recognition methods, device and application
CN106503807B (en) Improved RCM analysis method and mobile equipment integrity evaluation system based on same
CN103617337B (en) A kind of aircraft maintenance interval aided analysis method
CN105070097B (en) Risk recognition method for operating vehicle road traffic accidents
CN104881609A (en) Credibility evaluation method of software unit of complex software system
CN102663264A (en) Semi-supervised synergistic evaluation method for static parameter of health monitoring of bridge structure
CN102521604A (en) Device and method for estimating performance degradation of equipment based on inspection system
Zhang et al. A integrated vehicle health management framework for aircraft—A preliminary report
Liu et al. Bayesian network method for fault diagnosis of civil aircraft environment control system
CN108241900A (en) Engineering project construction period prediction method, device and system
Zhu et al. An integrated approach for structural damage identification using wavelet neuro-fuzzy model
Peng et al. Review of key technologies and progress in industrial equipment health management
Yu Decision making based on generalized geometric operator under interval-valued intuitionistic fuzzy environment
CN104462787B (en) Aeronautical maintenance human factor reliability assessment method based on rough set theory (RST)/interval analytic hierarchy process (IAHP)
Lai et al. A data-driven decision-making approach for complex product design based on deep learning
Paul et al. Application of artificial neural networks in aircraft maintenance, repair and overhaul solutions
Wu et al. Cyber-physical avionics systems and its reliability evaluation
Mu et al. The prediction of human error probability based on Bayesian networks in the process of task
CN116524618A (en) Hierarchical aircraft health quantification method
Han et al. Fault diagnosis of hydraulic variable pitch for wind turbine based on qualitative and quantitative analysis
Zhang A review of the research of quick access recorder data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for accessorily analyzing maintenance interval of aircraft

Effective date of registration: 20190624

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2019320000296

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200326

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2019320000296

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for accessorily analyzing maintenance interval of aircraft

Effective date of registration: 20200330

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2020980001154

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210511

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2020980001154

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An auxiliary analysis method of aircraft maintenance interval

Effective date of registration: 20210512

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2021980003546

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 212016 Building 1, aviation information industrial park, No. 42 Zongze Road, Jingkou District, Zhenjiang City, Jiangsu Province

Patentee after: Jiangsu Ruitian Intelligent Technology Co.,Ltd.

Address before: 212016 Building 1, aviation information industrial park, No. 42 Zongze Road, Jingkou District, Zhenjiang City, Jiangsu Province

Patentee before: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220614

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: JIANGSU RUITIAN INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2021980003546

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An auxiliary analysis method for aircraft maintenance intervals

Effective date of registration: 20220615

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: Jiangsu Ruitian Intelligent Technology Co.,Ltd.

Registration number: Y2022980007904

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231124

Granted publication date: 20161207

Pledgee: Bank of China Limited Dingmaoqiao Branch, Zhenjiang

Pledgor: Jiangsu Ruitian Intelligent Technology Co.,Ltd.

Registration number: Y2022980007904

PC01 Cancellation of the registration of the contract for pledge of patent right