CN103617100A - Method for migrating remote measuring sample data of scheduling EMS system - Google Patents
Method for migrating remote measuring sample data of scheduling EMS system Download PDFInfo
- Publication number
- CN103617100A CN103617100A CN201310677496.1A CN201310677496A CN103617100A CN 103617100 A CN103617100 A CN 103617100A CN 201310677496 A CN201310677496 A CN 201310677496A CN 103617100 A CN103617100 A CN 103617100A
- Authority
- CN
- China
- Prior art keywords
- remote measurement
- data
- ems system
- remote measuring
- scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a method for migrating remote measuring sample data of a scheduling EMS system. The method includes the following steps that S1, a remote measuring sampling device which changes sampling points of electrical equipment transmits changed equipment information and the remote measuring sample data to the scheduling EMS system; S2, the scheduling EMS system determines remote measuring information needing to be migrated according to the equipment information and the remote measuring sample data sent in the step 1; S3, the remote measuring information determined in the step 2 are migrated. According to the method, historical data can be successively migrated and recovered in the system, damage of data loss to automated operation is prevented, and the method is simple, quite effective and practical.
Description
Technical field
The present invention relates to a kind of application process of EMS system, a kind of method that particularly EMS of scheduling system remote measurement sampled data is moved.
Background technology
Nowadays in electric system, energy management system (EMS) is the general name of modern power network dispatch automated system (containing hardware and software).Its major function is comprised of basic function and two parts of application function.Basic function comprises: computing machine, operating system and EMS support system.Application function comprises: data acquisition and supervision (SCADA), Automatic Generation Control (AGC) are analyzed three parts with plan, network application and formed.
And in automatically working, how efficiently to complete daily numerous and diverse maintenance work, and be better service of scheduling, for this problem, in robotization business, we are had higher requirement.Along with improving constantly of automatization level, in conjunction with the actual conditions of China's dispatch automated system, actively apply scheduling integral system, improve dispatch automated system and there is positive meaning for the technological revolution that promotes scheduling electrical network.
But often because circuit cutover, the transformation of standing or work careless omission cause existing historical data not recycle, often have influence on comprehensive inquiry, form and curve for this reason and the function such as browse in routine work.Once pinpoint the problems, cannot make up, useful historical data cannot be by existing data polishing.Platform based on OPEN3000 system, completes the temporary transient preservation of remote measurement sampled data amount lost, and facilitating user is manually to splice at needs.And data splicings is for valid data and effectual time being completed to the splicing of historical data.When abnormal conditions, can point out the invalid of splicing, avoid the eternal loss of useful data.
Summary of the invention
The object of this invention is to provide a kind of method that the EMS of scheduling system remote measurement sampled data is moved, can be in system achievement realize moving and recovering of historical data, having prevented the loss that loss of data causes automatically working, is a succinct and very effective utility function.
In order to realize above object, the present invention is achieved by the following technical solutions:
Dispatch the method that EMS system remote measurement sampled data is moved, comprise following steps:
Step 1: the remote measurement sampling apparatus that has changed the sampled point of power equipment is given scheduling EMS system by facility information after changing and remote measurement sampling data transmitting;
Step 2: scheduling EMS system determines according to the facility information sending in step 1 and remote measurement sampled data the telemetry intelligence (TELINT) that need to move;
Step 3: move the determined telemetry intelligence (TELINT) of step 2.
Described step 3 comprises following sub-step:
Step 3.1: the title of choosing source remote measurement sampling apparatus title and target remote measurement sampling apparatus;
Step 3.2: the initial time for the treatment of moving data, end time in the source remote measurement sampling apparatus of selecting to need to move;
Step 3.3: initial time, end time that the data of select target remote measurement sampling apparatus are moved into, make it corresponding respectively with initial time and end time in step 3.2;
Step 3.4: scheduling EMS system is carried out data-moving.
The present invention compared with prior art, has the following advantages:
Can be in system achievement realize moving and recovering of historical data, prevented the loss that loss of data causes automatically working, be one and succinctly cut very effective utility function.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of the method moved of the present invention's a kind of EMS of scheduling system remote measurement sampled data.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferably specific embodiment in detail, the present invention is further elaborated.
As shown in Figure 1, a kind of method that the EMS of scheduling system remote measurement sampled data is moved, comprises following steps:
Step 1: the remote measurement sampling apparatus that has changed the sampled point of power equipment is given scheduling EMS system by facility information after changing and remote measurement sampling data transmitting;
Step 2: scheduling EMS system determines according to the facility information sending in step 1 and remote measurement sampled data the telemetry intelligence (TELINT) that need to move;
Step 3: move the determined telemetry intelligence (TELINT) of step 2, specifically move step as follows:
Step 3.1: the title of choosing source remote measurement sampling apparatus title and target remote measurement sampling apparatus;
Step 3.2: the initial time for the treatment of moving data, end time in the source remote measurement sampling apparatus of selecting to need to move;
Step 3.3: initial time, end time that the data of select target remote measurement sampling apparatus are moved into, make it corresponding respectively with initial time and end time in step 3.2;
Step 3.4: scheduling EMS system is carried out data-moving.
In sum, the method that the present invention's a kind of EMS of scheduling system remote measurement sampled data is moved, can be in system achievement realize moving and recovering of historical data, prevented the loss that loss of data causes automatically working, be one and succinctly cut very effective utility function.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.Those skilled in the art, read after foregoing, for multiple modification of the present invention with to substitute will be all apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (2)
1. dispatch the method that EMS system remote measurement sampled data is moved, it is characterized in that, comprise following steps:
Step 1: the remote measurement sampling apparatus that has changed the sampled point of power equipment is given scheduling EMS system by facility information after changing and remote measurement sampling data transmitting;
Step 2: scheduling EMS system determines according to the facility information sending in step 1 and remote measurement sampled data the telemetry intelligence (TELINT) that need to move;
Step 3: move the determined telemetry intelligence (TELINT) of step 2.
2. the method that scheduling EMS system remote measurement sampled data as claimed in claim 1 is moved, is characterized in that, described step 3 comprises following sub-step:
Step 3.1: the title of choosing source remote measurement sampling apparatus title and target remote measurement sampling apparatus;
Step 3.2: the initial time for the treatment of moving data, end time in the source remote measurement sampling apparatus of selecting to need to move;
Step 3.3: initial time, end time that the data of select target remote measurement sampling apparatus are moved into, make it corresponding respectively with initial time and end time in step 3.2;
Step 3.4: scheduling EMS system is carried out data-moving.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310677496.1A CN103617100A (en) | 2013-12-13 | 2013-12-13 | Method for migrating remote measuring sample data of scheduling EMS system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310677496.1A CN103617100A (en) | 2013-12-13 | 2013-12-13 | Method for migrating remote measuring sample data of scheduling EMS system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103617100A true CN103617100A (en) | 2014-03-05 |
Family
ID=50167803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310677496.1A Pending CN103617100A (en) | 2013-12-13 | 2013-12-13 | Method for migrating remote measuring sample data of scheduling EMS system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103617100A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050086273A1 (en) * | 2002-10-04 | 2005-04-21 | Johannes Loebbert | Electronic device having communication function |
CN102542343A (en) * | 2010-12-27 | 2012-07-04 | 上海市电力公司 | Unified shared data management platform of power system and control method |
CN102833116A (en) * | 2012-09-07 | 2012-12-19 | 山西省电力公司电力科学研究院 | Electrical equipment state information fusing and showing system |
-
2013
- 2013-12-13 CN CN201310677496.1A patent/CN103617100A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050086273A1 (en) * | 2002-10-04 | 2005-04-21 | Johannes Loebbert | Electronic device having communication function |
CN102542343A (en) * | 2010-12-27 | 2012-07-04 | 上海市电力公司 | Unified shared data management platform of power system and control method |
CN102833116A (en) * | 2012-09-07 | 2012-12-19 | 山西省电力公司电力科学研究院 | Electrical equipment state information fusing and showing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103887738A (en) | Automatic cabin wiring harness distribution system and method | |
CN108880667A (en) | A kind of Cable's Fault independent positioning method and device | |
CN103543352B (en) | Determine the method for the dynamic overload curve of transformer based on service data | |
CN111030303A (en) | Low-voltage transformer area topology identification system based on characteristic current | |
CN203287436U (en) | Insulator detection robot based on WIFI network communications | |
US20170075923A1 (en) | Distribution management system | |
CN101609984A (en) | The fast aided modeling method that is used for data acquisition and supervisor control | |
CN103617100A (en) | Method for migrating remote measuring sample data of scheduling EMS system | |
CN105703479B (en) | Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension | |
CN204422696U (en) | A kind of for long distance transmission line OPGW thunderbolt Position monitoring devices | |
CN203870440U (en) | Network centralized control platform of transformer station main transformation oil chromatogram on-line monitoring devices | |
CN110955808A (en) | Method for matching and associating four remote monitoring information of main plant station | |
CN111077807A (en) | Data acquisition unit based on current analysis | |
CN103605759A (en) | Power grid history state data sharing method | |
CN205050193U (en) | Powerline network risk analysis device | |
CN104111389A (en) | Electric power secondary protection equipment pressing plate state management system based on handheld device | |
CN204945754U (en) | Motor intelligent detecting and controlling system | |
CN202454974U (en) | Device for electric power production inspection tour | |
CN104717256A (en) | Measured data cloud storage system and work procedure thereof | |
CN104360120B (en) | Real-time waveform display method with low communication bandwidth requirement | |
CN105006890A (en) | Intelligent substation equipment program management and control system | |
CN104092996A (en) | Remote control video linkage method based on transformer substation | |
CN106300653A (en) | Power distribution automation main station system remote measure and communication introduction method | |
US10216742B2 (en) | Converting data sets in a shared communication environment | |
CN204290488U (en) | A kind of Electric Power Automation Equipment remote monitoring and fault treating apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |