CN103615119B - The installation method of sprinkling system and tubing system - Google Patents

The installation method of sprinkling system and tubing system Download PDF

Info

Publication number
CN103615119B
CN103615119B CN201310607112.9A CN201310607112A CN103615119B CN 103615119 B CN103615119 B CN 103615119B CN 201310607112 A CN201310607112 A CN 201310607112A CN 103615119 B CN103615119 B CN 103615119B
Authority
CN
China
Prior art keywords
standpipe
rain
water
arm
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310607112.9A
Other languages
Chinese (zh)
Other versions
CN103615119A (en
Inventor
夏葵
夏艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd filed Critical CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201310607112.9A priority Critical patent/CN103615119B/en
Publication of CN103615119A publication Critical patent/CN103615119A/en
Application granted granted Critical
Publication of CN103615119B publication Critical patent/CN103615119B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to building engineering field, specifically, it relates to the installation method of sprinkling system and tubing system. This sprinkling system, comprising: deluge system, tubing system, the control valve that drenches with rain, controlling alarm assembly, water facilities and the water reservoir for being supplied water by water facilities; Tubing system is located on scaffolding, comprises standpipe and drench with rain arm, standpipe and the described rigid joint drenching with rain and being provided with between arm for the two being connected; The arm that drenches with rain is provided with deluge system, and deluge system is provided with the control valve that drenches with rain; Controlling alarm assembly is located on the scaffolding of different layers according to construction speed; Standpipe is connected with water facilities, and water facilities is by standpipe described in the water suction in described water reservoir. Sprinkling system provided by the invention, it may also be useful to convenient, it is to increase eliminate the efficiency of working-yard burst accident, it is provided that the installation method of tubing system simple and easy to do, it is possible to be applicable to each big working-yard and use.

Description

The installation method of sprinkling system and tubing system
Technical field
The present invention relates to building engineering field, specifically, it relates to the installation method of sprinkling system and tubing system.
Background technology
In recent years, architecture ensemble is more and more more and more higher, but, in the building main body construction stage, because the protection of outer frame is unfavorable, cause on fire or aerial airborne dust to cause the event of workmen's injures and deaths occasionally to have generation.
Because workmen present position is higher and dangerous, when presence of fire or airborne dust, take flash arrestor or spraying water pipe enforcement rescue inconvenience, timely and effectively fire can not be put out in time or airborne dust is pressed down in time.
Summary of the invention
It is an object of the invention to provide the installation method of a kind of sprinkling system and tubing system, to solve the above problems.
The sprinkling system provided in an embodiment of the present invention comprises:
Deluge system, tubing system, the control valve that drenches with rain, controlling alarm assembly, water facilities and the water reservoir for described water facilities is supplied water;
Described tubing system is located on scaffolding, comprises standpipe and drench with rain arm, described standpipe and the described rigid joint drenching with rain and being provided with between arm for the two being connected; The described arm that drenches with rain is provided with described deluge system, described deluge system be provided with described in drench with rain control valve;
Described controlling alarm assembly is located on the scaffolding of different layers according to construction speed;
Described standpipe is connected with described water facilities, and described water facilities is by standpipe described in the water suction in described water reservoir.
The installation method of tubing system, specifically comprises the following steps:
The scaffolding of respective layer has welded pipe support;
Install spray with construction speed and drench arm and deluge system;
The installation hole of the reserved standpipe of coordinative construction progress;
During installation, check each layer absolute altitude position, every layer to lower unified messenger wire mounting fixing parts;
Prefabricated standpipe numbering layering being arranged, order is installed, to good straightening;
After installation, look for just fixing.
In sprinkling system provided by the invention and installation method, scaffolding arranges tubing system, it is respectively the standpipe being connected with water facilities, and according to the arm that drenches with rain that construction speed is arranged in different construction level, standpipe and drenching with rain is connected by rigid joint between arm, the arm that drenches with rain is provided with beginning shower nozzle, simultaneously according to construction speed, is provided with controlling alarm assembly on the scaffolding of different layers.
Because the water feeding system of urban operating mechanism can not feed sufficient water source, or say the high level of the buildings that can not be delivered in building operation by municipal water supply, so, it is necessary at a peripheral preparation water reservoir of working-yard, the water extracted in water reservoir by water facilities is carried to standpipe.
In construction process, when a certain construction layer presence of fire or the airborne dust that exceedes limiting concentration reach the accident of a certain construction height etc., controlling alarm assembly can give the alarm, workmen at accident generation layer can open on deluge system the control valve that drenches with rain arranged immediately, can spray water downwards and carry out putting out a fire or suppressing airborne dust, after eliminating accident potential, close the control valve that drenches with rain.
So, sprinkling system provided by the invention is easy to use, it is to increase eliminate the efficiency of working-yard burst accident, it is provided that the installation method of tubing system simple and easy to do, it is possible to be applicable to each big working-yard and use.
Accompanying drawing explanation
Fig. 1 is the structural representation of sprinkling system provided by the invention;
1. standpipe, 2. drench with rain arm, 3. deluge system, 4. flexible joint, 5. controlling alarm assembly, 6. water reservoir, 7. water facilities.
Embodiment
Below by specific embodiment son and by reference to the accompanying drawings the present invention is described in further detail.
Embodiment 1: as shown in Figure 1,
Sprinkling system comprises:
Deluge system 3, tubing system, the control valve that drenches with rain, controlling alarm assembly 5, water facilities 7 and the water reservoir 6 for described water facilities 7 is supplied water;
Described tubing system is located on scaffolding, comprises standpipe 1 and is provided with the rigid joint for the two being connected between arm 2 with drench with rain arm 2, described standpipe 1 and described drenching with rain; The described arm 2 that drenches with rain is provided with described deluge system 3, described deluge system 3 be provided with described in drench with rain control valve;
Described controlling alarm assembly 5 is located on the scaffolding of different layers according to construction speed;
Described standpipe 1 is connected with described water facilities 7, and described water facilities 7 is by standpipe 1 described in the water suction in described water reservoir 6.
The installation method of tubing system, specifically comprises the following steps:
101. have welded pipe support on the scaffolding of respective layer;
102. install spray with construction speed drenches arm and deluge system 3;
The installation hole of the reserved standpipe 1 of 103. coordinative construction progresses;
104. install time, check each layer absolute altitude position, every layer to lower unified messenger wire mounting fixing parts;
Prefabricated standpipe 1 numbering layering is arranged by 105., and order is installed, to good straightening;
After 106. installations, look for just fixing.
In the installation method of sprinkling system provided by the invention and tubing system, scaffolding arranges tubing system, it is respectively the standpipe 1 being connected with water facilities 7, and according to the arm 2 that drenches with rain that construction speed is arranged in different construction level, standpipe 1 and drenching with rain is connected by rigid joint between arm 2, the arm 2 that drenches with rain is provided with beginning shower nozzle, simultaneously according to construction speed, is provided with controlling alarm assembly 5 on the scaffolding of different layers.
Because the water feeding system of urban operating mechanism can not feed sufficient water source, or say the high level of the buildings that can not be delivered in building operation by municipal water supply, so, it is necessary at a peripheral preparation water reservoir 6 of working-yard, the water extracted in water reservoir 6 by water facilities 7 is carried to standpipe 1.
In construction process, when a certain construction layer presence of fire or the airborne dust that exceedes limiting concentration reach the accident of a certain construction height etc., controlling alarm assembly 5 can give the alarm, workmen at accident generation layer can open on deluge system 3 control valve that drenches with rain arranged immediately, can spray water downwards and carry out putting out a fire or suppressing airborne dust, after eliminating accident potential, close the control valve that drenches with rain.
So, sprinkling system provided by the invention is easy to use, it is to increase eliminate the efficiency of working-yard burst accident, it is provided that the installation method of tubing system simple and easy to do, it is possible to be applicable to each big working-yard and use.
Embodiment 2:
Sprinkling system comprises:
Deluge system 3, tubing system, the control valve that drenches with rain, controlling alarm assembly 5, water facilities 7 and the water reservoir 6 for described water facilities 7 is supplied water;
Described tubing system is located on scaffolding, comprises standpipe 1 and is provided with the rigid joint for the two being connected between arm 2 with drench with rain arm 2, described standpipe 1 and described drenching with rain; The described arm 2 that drenches with rain is provided with described deluge system 3, described deluge system 3 be provided with described in drench with rain control valve;
Described controlling alarm assembly 5 is located on the scaffolding of different layers according to construction speed;
Described standpipe 1 is connected with described water facilities 7, and described water facilities 7 is by standpipe 1 described in the water suction in described water reservoir 6.
In construction process, when a certain construction layer presence of fire or the airborne dust that exceedes limiting concentration reach the accident of a certain construction height etc., controlling alarm assembly 5 can give the alarm, workmen at accident generation layer can open on deluge system 3 control valve that drenches with rain arranged immediately, can spray water downwards and carry out putting out a fire or suppressing airborne dust, after eliminating accident potential, close the control valve that drenches with rain. So, sprinkling system provided by the invention is easy to use, it is to increase eliminate the efficiency of working-yard burst accident.
Owing to city planting ductwork hydraulic pressure can not meet the construction water of Highrise buildings, and flow and the water level in pipe network do not reach working-yard required water amount, therefore contiguous in working-yard increases tank and pressure pump, to reach the order ground of high-building construction water.
According to on-site actual situations, rationally arranging tank position and install pressure pump, pond is about the volume of 10m3, it is possible to meet site operation water and interim fire-fighting water yield 25L/S. Once presence of fire, start water-engine and pressurize, make the flow in pipe network and hydraulic pressure reach fire-fighting requirements.
Water facilities 7 can be specifically pressure pump, and the water outlet at pressure pump increases rubber soft-jointing head, prevents equipment from rotating to tubing system because of vibration.
One, water consumption: 25L/S considers
Two, the determination of water path tube
D=[4Q��(3.14��V��1000)]1/2
Wherein: D caliber (m);
Q water consumption (L/s);
Flow velocity (generally getting 2.0��2.5m/s) in V pipe network
Therefore the choice of diameter 100mm water supply steel tube.
Three, the calculating of pump head:
Pump head calculation formula is as follows:
H=H1+H2+H3
H is pump head (rice)
H1 is that water pump suction pipe arrives and the most unfavorable selects the discrepancy in elevation (rice)
H2 is pipeline head loss (rice), calculates by the 10% of H1
H3 is not for the most to utilize water spot water outlet hydraulic pressure (rice)
Difference according to engineering height, it is possible to arrange described scaffolding be raising legs or for landing, overhanging scaffold.
Scheme one (high level): carry out according to scaffolding scheme, scaffolding scheme adopts outer raising legs to set up, by 6 layers of consideration. The system sub tube installation of drenching with rain is raising legs one layer of bottom, triple bottom portion, five layers of bottom, six layers of top.
Scheme two (low layer): carry out according to scaffolding scheme, employing is landed, overhanging scaffold. Outrigger is set respectively at two layers, seven layers, 13 layers, adopts that outrigger formula is double chooses out-mould scaffold frame. In scaffolding adopt full hall frame. The system sub tube installation of drenching with rain is triple bottom portion, six layers of bottom, eight layers of bottom, 11 layers of bottom, 14 layers of bottom, 17 layers of bottom, 19 layers of top.
In order to improve the work-ing life of tubing system, it is possible to arrange standpipe 1 and be galvanized steel pipe with the arm 2 that drenches with rain. Consider reusing of tubing, the selection of pipe galvanized steel pipe. Mode of connection: groove formula or clamp connection.
Standpipe 1 caliber is: DN100; Branch diameter is: DN50. Sprinkler selection open type DN20.
In order to improve the stable connection of standpipe 1, it is possible at the outer setting groove pipe fitting of rigid joint, described groove pipe fitting by described standpipe 1, described in drench with rain arm 2 and described rigid joint is fastenedly connected.
In order to reduce the loss of tubing system, also comprise flexible joint 4, between every 4-5 rigid joint, it is provided with a described flexible joint 4.
In order to improve in tubing system standpipe 1, drench with rain arm 2 and standpipe 1 stable connection with the arm 2 that drenches with rain, it is also possible to pipe support is set; Described pipe support is set on described standpipe 1, described in drench with rain on arm 2 and the junction of described standpipe 1 and the described arm 2 that drenches with rain.
Fire supply system is all necessary by the rigidity that groove connects and flexible joint mode. Its caliber is big, also big by the area of power, and it needs to consider the change of pressure, the impact of water hammer in pipeline, arranges necessary flexible joint 4.
Pipeline section should arrange 1 flexible joint 4 between every 4-5 continuous print rigid joint,
Should produce the pipeline section of angular deflection should adopt flexible joint 4 at it for having bend pipe, the broken line shape pipeline of temperature compensation function.
Flexible joint 4 is specially adapted to the installation in pump house, and it can greatly reduce noise and vibrations, causes shock attenuation, makes whole system obtain antidetonation protection.
Groove type pipe should be adopted, it should not adopt mechanical three-way when standpipe 1 arranges arm.
When transverse tube arranges arm, branch pipe connection can be adopted to connect, but the caliber of arm must not too greatly and can not arbitrarily use. This is because the intensity of branch pipe connection will lower than pipe fittings such as the groove threeway of standard specifications, four-ways, it is also higher that it bores empty accuracy requirement.
In process control, the processing of groove is very important, and construction should strictly be undertaken by the order of working specification. Note can not slot rolling too fast, otherwise pipeline and zinc coating can be damaged; Can not slot rolling too dark, need to by the spacing control of setting, to prevent affecting the intensity of pipeline;
In the process of slot rolling, pipeline to be kept level, strictly prevents pipeline from longitudinal displacement and angular travel occur. When destructive crack occurs in the position of groove processing, this part should be cut away and again process groove.
If the surface crack occurred, when confirming not affect intensity after metal defect detection, just can install after this position is carried out rotproofing.
The cracking of the plating layer inside and outside pipe found in processing groove, scaling damage, this is relevant with pipe material, galvanizing quality and slot rolling speed etc.
When there is this kind of situation in local, it is possible to occurring that position spraying red lead twice spray zinc process again.
In installation, the chimb of groove type pipe should stick into behind the position of groove holding bolt again, and the bolt on both sides should be simultaneously fastening. The airtight circle of rubber should without damaged and distortion, if fastening time find that rubber is airtight and enclose the rubber circle wrinkling and should more renewing. Strictly prop up/suspension bracket by strictly regulating to arrange fixing/suspension bracket or slide.
Pipe support be in tubing system install major issue it. Adopting the feedwater piping that groove pipeline connects, (frame system not only wants supporting pipeline weight, also to be born hydraulic pressure under pipeline pressure test and working order, the axial force of temperature variation generation and displacement for it.The pressure of system itself is just bigger, and the pressure finally acted on support is very big. The Bracket setting that groove connects should meet the following requirements: standpipe 1 support (pipe clamp), when floor height is not more than 5m, must install 1 support for every layer; When the big sub-5m of floor height, every layer is no less than 2 supports. The spacing hanging (holder) frame 2 suspension brackets on each straight line pipeline section on transverse tube should be less than the requirement of specification.
It is important to note that, system should be provided with enough fixing supports. Its main positions be the bottom into water standpipe 1, standpipe 1 pick out the accessory position of arm, standpipe 1 needs supported weight because free length is longer position, transverse tube pick out arm and be connected with branch pipe connection and accessory position, need the positions such as control pipeline extension. Strictly fixing support or sliding support are set by strictly regulating.
The installation method of tubing system, specifically comprises the following steps:
201. first at the pipe support that raising legs bottom joist steel lower weld is good prefabricated, and pipe support adopts the angle steel of L40 �� 40 �� 4mm to be equipped with U-shaped card;
202. install spray piping arm and deluge system 3;
203. according to construction speed, has welded prefabricated pipe support in the corresponding number of plies of raising legs, installs spray with civil engineering progress and drenches arm and shower nozzle;
204. according to construction speed, the installation hole of reserved standpipe 1;
According to field surveys sketch before 205. constructions, setting-out on the tubing chosen, field fabrication standpipe 1;
206. verification each layer absolute altitude positions, every layer to lower unified messenger wire mounting fixing parts,
Prefabricated standpipe 1 numbering layering is arranged by 207., and order is installed, to good straightening;
208. install, look for after just, fixing.
209. install flexible joint 4 in the position of the corresponding main pipe of bottom of raising legs.
Flexible joint 4 is installed and is convenient to pipelining and dismounting. Standpipe 1 erects to, in installation process, the suspension and support bottom standpipe 1 is wanted firmly to prevent pipeline from dropping
Water pump is installed:
1, the complete situation of water pump and motor is checked before installing.
2, before water pump is installed, building of foundation for water pumps is carried out in advance. Basis adopts C30 concrete H=200mm and carries out burying in advance of foundation for water pumps bolt.
3, check pump foundation, and get out instrument.
4, pump is placed on basis and padded 30 40mm, carries out the back-grouting of wall screw.
5, after 35 days cement is solid, again just look for, and fastening foundation bolt nut.
Control loop:
For cost-saving, construction water has a set of control system of water pump with the water spray system that drenches with rain. Pipeline adopt valve carry out subregion; when a fire; by watchstander, manually signal is delivered to fire alarming and controlling device; controller output signal opens drench valve; make deluge system 3 sprinkling fire in whole protective belt; starting water pump assure feed water, pressure switch, warning water system are reported to the police together, and Controlling System is by the complete offer of producer simultaneously.
System maintenance management:
The water level of fire-water pond should be made regular check on, and the water yield should be guaranteed. In pond, silt, foreign material should be cleared up in time. Every month answered trial trip 1-2 time by water pump. Pressure pump controlling box near watchroom, should have special messenger to carry out maintenance management.
In sprinkling system provided by the invention and installation method, scaffolding arranges tubing system, it is respectively the standpipe 1 being connected with water facilities 7, and according to the arm 2 that drenches with rain that construction speed is arranged in different construction level, standpipe 1 and drenching with rain is connected by rigid joint between arm 2, the arm 2 that drenches with rain is provided with beginning shower nozzle, simultaneously according to construction speed, is provided with controlling alarm assembly 5 on the scaffolding of different layers.
Because the water feeding system of urban operating mechanism can not feed sufficient water source, or say the high level of the buildings that can not be delivered in building operation by municipal water supply, so, it is necessary at a peripheral preparation water reservoir 6 of working-yard, the water extracted in water reservoir 6 by water facilities 7 is carried to standpipe 1.
In construction process, when a certain construction layer presence of fire or the airborne dust that exceedes limiting concentration reach the accident of a certain construction height etc., controlling alarm assembly 5 can give the alarm, workmen at accident generation layer can open on deluge system 3 control valve that drenches with rain arranged immediately, can spray water downwards and carry out putting out a fire or suppressing airborne dust, after eliminating accident potential, close the control valve that drenches with rain.
So, sprinkling system provided by the invention is easy to use, it is to increase eliminate the efficiency of working-yard burst accident, it is provided that the installation method of sprinkling system convenient and easy, it is possible to be applicable to each big working-yard and use. The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations. Within the spirit and principles in the present invention all, any amendment of doing, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. sprinkling system, it is characterised in that, comprising:
Deluge system, tubing system, the control valve that drenches with rain, controlling alarm assembly, water facilities and the water reservoir for described water facilities is supplied water;
Described tubing system is located on scaffolding, comprises standpipe and drench with rain arm, described standpipe and the described rigid joint drenching with rain and being provided with between arm for the two being connected; The described arm that drenches with rain is provided with described deluge system, described deluge system be provided with described in drench with rain control valve;
Described controlling alarm assembly is located on the scaffolding of different layers according to construction speed;
Described standpipe is connected with described water facilities, and described water facilities is by standpipe described in the water suction in described water reservoir;
The outside of described rigid joint is provided with groove pipe fitting, described groove pipe fitting by described standpipe, described in drench with rain arm and described rigid joint is fastenedly connected.
2. sprinkling system according to claim 1, it is characterised in that,
Described scaffolding is raising legs.
3. sprinkling system according to claim 1, it is characterised in that,
Described scaffolding for landing, overhanging scaffold.
4. sprinkling system according to claim 1, it is characterised in that,
Described standpipe and the described arm that drenches with rain are galvanized steel pipe.
5. sprinkling system according to claim 1, it is characterised in that,
Also comprise flexible joint;
A described flexible joint it is provided with between every 4-5 rigid joint.
6. sprinkling system according to claim 1, it is characterised in that,
Also comprise pipe support; Described pipe support is set on described standpipe, described in drench with rain on arm and the junction of described standpipe and the described arm that drenches with rain.
7. the installation method of tubing system, it is characterised in that, specifically comprise the following steps:
The scaffolding of respective layer has welded pipe support;
Install spray with construction speed and drench arm and deluge system;
The installation hole of the reserved standpipe of coordinative construction progress;
During installation, check each layer absolute altitude position, every layer to lower unified messenger wire mounting fixing parts;
Prefabricated standpipe numbering layering being arranged, order is installed, to good straightening;
After installation, look for just fixing;
Water reservoir and water facilities are installed, and water facilities is connected with standpipe and water reservoir.
8. the installation method of tubing system according to claim 7, it is characterised in that,
Also comprise after looking for just fixing step after described installation:
Flexible joint is installed in the position of the corresponding main pipe of the bottom of described scaffolding.
9. the installation method of tubing system according to claim 7, it is characterised in that,
In the described step having welded pipe support on the scaffolding of respective layer, also comprise:
U-shaped angle steel card part it is provided with between adjacent pipe support.
CN201310607112.9A 2013-11-25 2013-11-25 The installation method of sprinkling system and tubing system Expired - Fee Related CN103615119B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310607112.9A CN103615119B (en) 2013-11-25 2013-11-25 The installation method of sprinkling system and tubing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310607112.9A CN103615119B (en) 2013-11-25 2013-11-25 The installation method of sprinkling system and tubing system

Publications (2)

Publication Number Publication Date
CN103615119A CN103615119A (en) 2014-03-05
CN103615119B true CN103615119B (en) 2016-06-08

Family

ID=50165834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310607112.9A Expired - Fee Related CN103615119B (en) 2013-11-25 2013-11-25 The installation method of sprinkling system and tubing system

Country Status (1)

Country Link
CN (1) CN103615119B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104324471B (en) * 2014-11-18 2017-10-20 广西建工集团联合建设有限公司 A kind of construction exterior rack Multi-functional spray system and its installation method
CN108478970B (en) * 2017-04-11 2020-07-03 贵州宝利科技有限公司 Fire-fighting and fire-preventing device for building
CN114073834A (en) * 2020-08-18 2022-02-22 安徽世纪凯旋消防科技有限公司 Method for improving response time of open fire extinguishing system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2859518B2 (en) * 1993-07-28 1999-02-17 森本 茂生 Concrete wall construction method
US7165650B2 (en) * 2002-07-26 2007-01-23 Korchagin Pavel V High-rise, fire-fighting, rescue and construction equipment
DE10318975B3 (en) * 2003-04-26 2004-12-16 Airbus Deutschland Gmbh Method for fighting a fire occurring in an enclosed space of an aircraft
US7278591B2 (en) * 2004-08-13 2007-10-09 Clearman Joseph H Spray apparatus
CN202559703U (en) * 2012-05-03 2012-11-28 中建五局第三建设有限公司 Protective facility for movable scaffold
CN102839813A (en) * 2012-07-24 2012-12-26 戚文军 Fire-extinguishing scaffold device
CN203613818U (en) * 2013-11-25 2014-05-28 成都市第三建筑工程公司 Spraying system

Also Published As

Publication number Publication date
CN103615119A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN203613818U (en) Spraying system
CN103615119B (en) The installation method of sprinkling system and tubing system
CN104712091B (en) Suspended ceiling structure of long span underground powerhouse and construction method thereof
CN209437933U (en) A kind of fire hydrant pipeline structure
CN203777567U (en) Automatic spray-type fire extinguishing device applied to oblique-roof structure
CN109847252B (en) Temporary fire-fighting construction method in large public building construction
CN201915638U (en) Hyperbolic steel funnel construction equipment
CN214402329U (en) Curtain wall structure
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN104324471A (en) Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system
CN214995659U (en) Automatic spraying vehicle for coating outer wall of high-rise building
CN211215111U (en) Fire fighting access based on building outer wall
CN204352419U (en) A kind of construction exterior rack Multi-functional spray system
CN114348882A (en) Hoisting method of refining tower
CN205373968U (en) Outer wall water pouring test system
CN113339031A (en) Roadway support process system under extremely soft stratum condition and construction method
CN103498543B (en) Without filleting Construction of dry-fasten stone on external wall method
CN204590380U (en) A kind of ceiling structure of long-span underground power house
CN204357130U (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN214282314U (en) Green building structure of housing engineering
CN215564513U (en) Novel integrated pump station that mud was washed
CN216447535U (en) Combined device for reinforcing air pipe and fixing spray pipe
CN212613869U (en) Mass concrete water circulation informationized temperature control system
CN213542087U (en) Valve well of oil filling pipeline of civil transportation airport apron
CN211725142U (en) High slope excavation face blasting dust environmental protection controlling means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20211125